Booster Bias Supply Booster Bias Supply and Cavity Upgrade and Cavity Upgrade November 16 th , 2011

Booster Bias Supply and Cavity Upgrade November 16 th, 2011

Embed Size (px)

Citation preview

Page 1: Booster Bias Supply and Cavity Upgrade November 16 th, 2011

Booster Bias Supply Booster Bias Supply and Cavity Upgradeand Cavity Upgrade

November 16th, 2011

Page 2: Booster Bias Supply and Cavity Upgrade November 16 th, 2011

Three new Ferrite Bias Supplies Built Two are complete – for NOvA

One is fully tested and operational The other runs but needs further troubleshooting for odd

slewing problem Third one is 40% complete - Booster spare

Finished in the next 3-4 weeks

There are 10 “Ling” MK I supplies that will need upgrading – Booster West Gallery only

Replace main rectifier Transformer – marginal power rating for 15 Hz operation.

Replace PVC SCR heat sinks – prone to LCW water leaks with any pressure surge.

Upgrade can be done one at a time by changing out supply with spare.

Page 3: Booster Bias Supply and Cavity Upgrade November 16 th, 2011

Assembly of last new bias supplyAssembly of last new bias supply

Page 4: Booster Bias Supply and Cavity Upgrade November 16 th, 2011

One of the 10 (Ling) MK I bias supplies that will need upgrading is currently in the test station at MI-60. This supply is being run at 15 Hz to test just how warm the transformer will get. This will determine the priority of the transformer upgrade.

Along with this test we are also taking ferrite bus bar temperature measurements on the cavity that was removed from Booster station 8. This will determine how the new water connection will be made.

For a brief period of time RF has been run on the cavity from station 8 but long term temperature tests have not started. Expect to start in the next day or two.

Cavity still suffering from a significant vacuum leak which may affect long term testing.

Page 5: Booster Bias Supply and Cavity Upgrade November 16 th, 2011

Continue temperature tests on Ling Mk I bias supply

Continue bus bar temperature measurements on cavity from station 8.

Make cavity/tuner temperature measurements with high power RF @ 15 Hz operation.◦ Plan to start tomorrow on high power testing of the cavity

from station 8. ◦ Should know in a few days if vacuum leak is a problem.◦ Plan to run cavity for at least a week or two for high power

testing.