2
Tower Mooring & Loading System Penglai FPSO located in Bohai Bay

Blue Water SYMS

Embed Size (px)

Citation preview

Page 1: Blue Water SYMS

Tower Mooring & Loading System Penglai FPSO located in Bohai Bay

Tower Mooring Bohai Bay leaflet.qxd 02-08-2006 12:33 Pagina 1

Page 2: Blue Water SYMS

The Soft Yoke Mooring System (SYMS) is part of the Bohai Phase I I development project, located in the Bohai Sea offthe north-east coast of the People’s Republic of China (PRC) approximately 140 miles from Tanggu and 85 miles fromDalian. The FPSO is permanently moored to a fixed tower. The transfer of all production fluids, power and control signals from the FPSO to/from the overall field development will be through this system.

The SYMS is fixed to the seabed by means of a jacket, supporting risers and J-tubes. The fixed deck facilitates the piglaunchers/receivers, drain tanks and control equipment.

The rotating deck transfers the mooring loads exerted by the yoke arms into the main bearing and allows 360o

rotational freedom up to the 100-year return storm. The rotating deck houses an offshore crane and the multiple product swivel stack including E & I and utility swivel. There are two hose connection decks: one on the rotating deckof the SYMS and one on the FPSO. The purpose of the decks is to support the jumper hoses and jumper cables whichcross-over from the rotating deck to the FPSO.

The pendulums and ballast blocks, located at the bottom end of the pendulums, are supported by the PendulumSupport Structure which is located on the forecastle deck of the FPSO. Two retractable bridges will give access fromthe FPSO to the rotating deck via the gangway on the yoke arms.

The NetherlandsBluewater Energy Services B.V.

Marsstraat 332132 HR HoofddorpThe NetherlandsTel. (+31) 23 568 2828Fax.(+31) 23 554 2160

United KingdomBluewater Services (U.K) Ltd.

Bluewater House, Badenton CrescentPortlethen, Aberdeen, AB12 4YDUnited KingdomTel. (+44) 1224 403 300Fax. (+44) 1224 403 340

U.S.A.Bluewater OffschoreProduction System (U.S.A.), Inc.

8554 Katy Freeway, Suite 327Houston, Texas, U.S.A. Tel. (+1) 713 722 8131Fax. (+1) 713 722 8145

NigeriaBluewater Offshore ProductionSystems Nigeria Limited

Plot 99A Jide Oki Street,Victoria Island, Lagos, NigeriaTel./Fax. (+234) 1 775 0640/775 3719

SingaporeBluewater International B.V.Singapore Representative Office

78 Shenton Way, 12-03/04Singapore 079120, SingaporeTel. (+65) 6227 3178Fax. (+65) 6227 3179

Tower Mooring & Loading System

Water depth 28 meter

FPSO length 323 meterFPSO displacement 390.000 TOver-all height 78 meterFootprint jacket 36 X 36 meterPendulum lenght 28.5 meter

Thickness of flat level ice 25.5 cm

1/100 year wave height 11 meter

Number of swivel modules 7Number of paths in utility swifel 7Number of risers 7Number of J-tubes 8

Tower Mooring & Loading System Particulars

Designed and built by Bluewater Energy Services BVClient ConocoPhillips China Inc. and CNOOCProject Bohai Development ProjectCompleted substucture 2007Completed upperstructure 2008Location Offshore Bohai Sea, 140 miles from

Tanggu and 85 miles from Dalian