  • BLOCK : JAISALMER DISTRICT : JAISALMER

    AGRO CLIMATIC ZONE :- 1 C

    TOTAL GEOGRAPHICAL AREA :- 10156 Hac.

    TOTAL EFFECTIVE AREA :- 9000 Hac.

    TOTAL COST :- 1350.00 Lacs.

    UNIT COST :- 15000/Hac.

    ----------------&&&&&&&&----------------

    SUBMITTED BY

    PROJECT MANAGER

    DISTRICT WATERSHED

    DEVELOPMENT UNIT

    JAISALMER (RAJASTHAN)

  • DPR TEMPLATE Index

    S.No Topics Page no.

    1 Chapter

    • Location

    • General Features of watershed (Cost and Area details)

    • Climatic and Hydrological information

    • Other Development Schemes in the project area

    • Details of infrastructure in the project areas

    • Institutional arrangements (,DWDU,PIA,WDT,WC)

    2 Chapter Basic Data ,Analysis and Scope

    2.1 Demography Details

    2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis

    2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status

    2.8 Fodder status

    2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details

    2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details

    2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details

    2.18 Water Budgeting

    2.19 Soil Details 2.20 Soil erosion status

    3 Chapter Proposed Development Plan

    4 Chapter Activity wise Total Abstract of cost

    5 Chapter Annual Action Plan

    5.1 Project fund 5.2 Convergence Plan

    6 Chapter Project outcomes

    7 Technical designs and estimates for proposed activities

  • 8 Enclosures

    8 .1 Maps

    a. Location –District, block, village, watershed location map

    b. Map of Project with Watershed Boundary demarcation in

    cadastral map c. Land Use Land Cover map d. Existing water bodies, DLT e. PRA Map (along with photos & paper drawing)

    f. GIS based intervention map g. Treatment map ie proposed works on revenue map

    8.2 Documents of Agreements:

    • Proceedings of gram sabha for EPA approval

    • Proceedings of gram sabha Resolution for committee constitution

    • Documents related to PRA exercise

    • Proceedings of gram sabha for DPR approval

    • Proceedings of Panchayat Samiti General body for DPR approval

    • Watershed Committee Registration certificate

    • MoU – PIA – DWMA, PIA – WC(in case of NGO as PIA)

  • CHAPTER – I

    Location.

    Jaisalmer- IWMP III Project is located in jaisalmer Block of jaisalmer district. The Project area is

    between the 26.74 latitudes & 70.94 longitudes it is at a distance of 25 km from its Block & District head

    quarters. There are 2412 no. of habitations in the project area and other details are given below.

    General features of watershed

    S.No. Name of Project(as per GOI) Jaisalmer (IWMP) II 2009-10

    (a) Name of Catchment Basanpeer

    (b) Name of watershed area(local name) Basanpeer

    © Project Area 10156 ha.

    (d) Net treatable Area 9000 ha.

    e) Cost of Project 1350 lac

    f) Cost/hectare 15,000

    g) Year of Sanction 2009-10

    h) Watershed Code

    i) No. of Gram Panchayats in project area 6

    j) No. of villages in project area 9

    k) Type of Project Desert

    l) Elevation (metres) 190

    m) Major streams -

    n) Slope range (%) 0--3%

    Macro/micro Name of Gram

    Panchayat

    Name of Villages

    Covered

    Census code of

    villages Area (Hact)

    Cluster Basanpeer Jerat 2044500 1000

    Basanpeer Basanpeer 2030600 1000

    Badoda Gaon Badoda Gaon 2044700 1000

    Hameera Hameera 2037200 1000

    Hameera Jesurana 2037400 1000

    Chandan Chandan 2037600 1000

    Chandan Jhabara 2038700 1000

    Dhaysar Jawandh Juni 2038400 1000

    Chinnu Chinnu 2047500 1000

  • The watershed falls in Agroclimatic Zone-I C .The soil texture is

    sandylomy The average rainfall is 194 mm.The temperatures in the area are in

    the range between 49-32 centigrade during summer and 26-4 centigrade during

    winter.

    The major crops in the area are Bajra, Guar, Mung etc The 9.95% land is

    under cultivation 0 % land fallow,5.32% land is wasteland.

    760 No of households are BPL 152 are landless households and 608

    household are small and marginal farmers. Average land holding in the area is

    5.66 ha. entire area is single cropped area.

    The average annual rainfall (10 years) in the area is 194 mm. There is no

    Major streams in the Watershed area. The major festivals in the villages are

    Holi, Deewali, krishana janamaastmi, Navratra, Gangor, Raksha-bandhan

    & Eid. At present these villages have 7846 population with Communities like

    Rajput, Muslim, Kumhar, Suthar, Megwal and Bhil.

  • Climatic and Hydrological information

    Sl.No. Year Average Annual Rainfall(mm)

    1 2001 361

    2 2002 31

    3 2003 137

    4 2004 42

    5 2005 176

    6 2006 501

    7 2007 142

    8 2008 112

    9 2009 72

    10 2010 361

    2. Average Monthly rainfall (last ten years)

    Sl.

    No Month 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

    Average

    Rainfall(

    mm)

    I June 80.50 6.80 0.00 7.30 23.70 49.80 0.70 13.20 33.00 100.90 31.59

    Ii July 216.50 0.00 60.30 2.20 44.60 3.50 21.00 27.50 21.00 77.70 47.43

    Iii August 64.80 0.40 77.00 28.50 2.20 442.80 105.30 71.80 17.80 90.70 90.13

    iv September 0.00 23.80 0.00 4.10 105.70 5.50 15.10 0.00 0.60 92.00 24.68

    3 Maximum rainfall intensity (mm)

    Duration Rainfall intensity(mm)

    i) 15 minute duration 40

    ii) 30 minute duration 58

    iii) 60 minute duration 69

    4 Temperature (Degree C)

    Season Max Min

    i) Summer Season 49 32

    ii) Winter Season 26 4

    iii) Rainy Season 35 24

    5 Potential Evaporation Transpiration (PET) (mm/dd)

    Season PET

    i) Summer 3200

    ii) Winter 2464

    iii) Rainy 2784

    6 Runoff

    i) Peak Rate (cum/hr) 95.25

    ii) Total run off volume of rainy season (ha.m.) 50.76

    iii) Time of return of maximum flood 5 years 10 years In- Year

    iv)Periodicity of Drought in village area 3 7 -

  • Other Development Schemes in the project area

    S.No Scheme Name of the

    department

    Key

    interventions

    under the

    Scheme

    Targeted

    Beneficiaries

    Provisions

    under the

    Scheme

    1 MG NREGA

    RURAL

    DEVELOPMENT &

    PANCHAYAT RAJ

    DEPARTMENT

    Providing

    Employment

    7846

    165.00 lac

    2 TFC - 25.60 lac

    3 SFC - 18.90 lac

    4 BRGF TSC -

    32.80 lac 5 SGS IAY -

    6 -

    7 -

  • Details of infrastructure in the project areas

    Parameters Status

    (i) No. of villages connected to the main road by an all- weather

    road 9

    (ii) No. of villages provided with electricity 9

    (iii) No. of households without access to drinking water 0

    (iv)

    No. of educational institutions : (P) (S) (HS) (VI)

    Primary(P)/ Secondary(S)/ Higher Secondary(HS)/vocational

    institution(VI) 9 5 3 -

    (v) No. of villages with access to Primary Health Centre 9

    (vi) No. of villages with access to Veterinary Dispensary 0

    (vii) No. of villages with access to Post Office 5

    (viii) No. of villages with access to Banks 3

    (ix) No. of villages with access to Markets/ mandis 0

    (x) No. of villages with access to Agro-industries 0

    (xi) Total quantity of surplus milk 1280 Ltr.

    (xii) No. of milk collection centres (U) (S) (PA) (O)

    (e.g. Union(U)/ Society(S)/ Private agency(PA)/others (O)) - - 42 -

    (xiii) No. of villages with access to Anganwadi Centre 9

    (xiv) Any other facilities with no. of villages (please specify) -

    (xv) Nearest KVK Jaisalmer

    (xvi) cooperative society 3

    (xvii) NGOs -

    (xviii) Credit institutions

    (i) Bank 0

    (ii) Cooperative Society 3

    (xix) Agro Service Centre's -

  • Institutional arrangements (SLNA,DWDU,PIA,WDT,WC, Secretary)

    DWDU Details

    S.No Particulars Details of DWDU

    1 PM ,DWDU Sh. Ramesh Chandra Mathur, Executive

    Engineer

    2 Address with contact no., website PM, DWDU District Jaisalmer, Zila Parishad,

    Jaisalmer

    3 Telephone 02992-250712

    4 Fax 02992-250712

    5 E-mail [email protected]

    PIA particulars

    S.No Particulars Details of PIA

    6 Name of PIA Sh. Jaimal Singh Indaliya

    7 Designation Assist. Engineer

    8 Address with contact no., website AEN. (IWMP) P.S. Jaisalmer

    9 Telephone 9414002113

    10 Fax 02992-252822

    11 E-mail [email protected]

    WDT Particulars:

    S.

    No

    Name of WDT

    member M/F Age Qualification

    Experience

    in watersh

    ed(Yrs)

    Description

    of professi

    onal

    training

    Role/ Function

    1 2 3 4 5 6 7 8

    1 Sh- Gjendra Jain M 48 BE (A.G.) 20 Yes

    Watershed

    Management & Soil

    Conservetion

    2 Sh. Ashok Kumar M 24 B.A.(A.H) - Yes Animal Husbandry

    3 Sh. Sulabh Bhatia M 26 B.Sc. (A.g) - Yes Agriculture

    4 Smt Teena Bhatia F 29 B.A

    Socology Yes Yes SHG

  • Details of Watershed Committees (WC)

    S.

    N.

    Name

    of

    WCs

    Date

    of

    Gram

    Sabha

    for

    WC

    Date of

    Registrati

    on as a

    Society

    (dd/mm/yy

    yy

    Designati

    on Name M/F

    SC/ST/

    OBC/G

    eneral

    Landless/

    MF/SF/

    BF

    Name of

    UG/SHG

    Educational

    qualification

    1 Jerat

    26

    .04-2

    01

    0

    133/1

    5-1

    1-2

    010

    President Sh. Ramjan khan M OBC MF UG Secondary

    Secretary Sh. Bande khan M OBC MF UG Secondary

    Member Sh. Isak khan M OBC MF UG Middle

    Sh. Bakse khan M OBC MF UG Middle

    Sh. Amar M OBC MF UG Primary

    Sh. Prema ram M OBC SF UG Primary

    Sh Jetha ram M OBC SF UG Middle

    Sh Ismail M OBC SF UG Middle

    Smt. Ganga F OBC MF SHG Primary

    Smt. Soyani F OBC MF SHG Middle

    Smt Pathani F OBC MF SHG Primary

  • 2 Basanpeer

    26-0

    4-2

    01

    0

    15

    3/1

    6-1

    2-2

    01

    0

    President Sh. Jamme khan M OBC MF UG Secondary

    Secretary Sh. Sakhi md. M OBC MF UG Sec.

    Member Sh. Sher md. M OBC MF UG Middle

    Sh Misri Khan M OBC MF UG Middle

    Sh Bhagwana ram M OBC MF UG Primary

    Sh Chetan ram M SC SF UG Middle

    Smt Fatma F SC SF SHG Primary

    Smt Sharmi F OBC SF SHG Primary

    Smt Rampyari F SC MF SHG Primary

    Smt Mamta F SC MF SHG Primary

    Sh Saleman khan M SC MF UG Middle

    3 Badoda

    Gaon

    28

    .04.2

    01

    0

    17

    9/2

    010-1

    1

    President Sh.Kanwraj singh M GEN MF UG Sec.

    Secretary Sh.Khanu Khan M OBC MF UG Sec.

    Member Sh Gamer singh M GEN MF UG Middle

    Sh Megh singh M GEN MF UG Middle

    Sh Jalam singh M GEN MF UG Middle

    Sh Gayad singh M GEN SF UG Middle

    Sh Vishan singh M GEN SF UG Primary

    Sh Mubarak Khan M OBC SF UG Middle

    Smt Pretam Kanwar F GEN MF SHG Middle

  • Smt Samar Kanwar F GEN MF SHG Middle

    Sh Jorawar M SC MF UG Primary

    4 Hameera

    President

    Secretary

    Member

    5 Jesurana

    30.0

    4.2

    010

    -

    President Sh Bachaye khan M OBC MF UG Secondary

    Secretary Sh Ramtulla M OBC MF UG Secondary

    Member Sh Pirane khan M OBC MF UG Middle

    Sh Kayam khan M OBC MF UG Middle

    Smt Hurmat F OBC MF SHG Middle

    Smt Geeta F SC SF SHG Middle

    Smt Maghi Devi F ST SF SHG Middle

    Sh Chora ram M SC SF UG Middle

    Sh Chela ram M SC MF UG Middle

    Sh Sanwal Khan M OBC MF UG Primary

    Sh Sakhi Khan M OBC MF UG Middle

    6 Chandan

    22.0

    1.2

    010

    123/2

    01

    0-1

    1 President Sh Lakh singh M GEN MF UG Secondary

    Secretary Sh Bheru singh M GEN MF UG Sr.

  • Secondary

    Member Smt Jaikanwar F GEN MF SHG Middle

    Sh Jograj singh M GEN MF UG Middle

    Smt Leela kanwar F GEN MF SHG Middle

    Smt Kishan Kanwar F GEN MF SHG Middle

    Sh Jagmal singh M GEN SF UG Middle

    Smt Pempo M SC SF SHG Middle

    Sh Chetan ram M ST SF UG Middle

    Sh Mehtab singh M GEN SF UG Primary

    Sh Aasu singh M GEN MF UG Middle

    7 Jhabara

    28.0

    4.2

    010

    169/2

    010

    -11

    President Sh Ramje khan M OBC MF UG Middle

    Secretary Sh Sumar khan M OBC MF UG Middle

    Member Sh Amin khan M OBC MF UG Middle

    Sh Ramjan khan M OBC MF UG Middle

    Sh Pathan khan M OBC MF UG Middle

    Sh Sakhi Mohh. M OBC MF UG Middle

    Sh Shah Mohh. M OBC MF UG Middle

    Sh Jakir Hussen M OBC MF UG Middle

    Sh Lakhe khan M OBC SF UG Middle

    Smt Aashraf F OBC SF SHG Middle

    Smt Alsi F OBC SF SHG Middle

    8 Jawandh

    Juni

    President

    Secretary

    Member

  • 9 Chinnu

    04.0

    5.2

    010

    -

    President Sh Laldeen M OBC MF UG Primary

    Secretary Smt Raisa Khatu F OBC MF SHG Sec.

    Member Sh Longe Khan M OBC MF UG Middle

    Sh Habibula M OBC MF UG Middle

    Smt Teeja F OBC MF SHG Middle

    Smt Nasiba F OBC MF SHG Middle

    Sh Elamdeen M OBC SF UG Middle

    Sh Kalu ram M ST SF UG Middle

    Sh Durga Ram M SC SF UG Middle

    Sh Gaddu Khan M OBC SF UG Middle

    Sh Punna Ram M SC SF UG Middle

  • CHAPTER – II

    DEMOGRAPHICAL DETAILS

    Table 2.1 Population & Household Details:

    Total Population

    Male Female Total SC ST

    5768 5325 11093 1430 710

    Household Details

    BPL

    household

    L. Less

    Small

    Farmer

    M.

    Farmer

    Total

    household

    SC

    household

    ST

    household

    760 152 228 380 760 143 71

    0

    100

    200

    300

    400

    500

    600

    700

    800

    BPL

    hous

    ehol

    d

    BPL

    L.Les

    s

    Sm

    all F

    armer

    M. F

    armer

    Tota

    l hou

    seho

    ld

    SC h

    ouse

    hold

    ST

    hous

    ehold

    Series1

    Male, 5768,

    52%

    Female, 5325,

    48%

    Male

    FemaleSeries1,

    1430, 13%

    Series1, 710,

    6%

    Series1,

    8953, 81%

    SC

    ST

    OTHER

  • Table 2.2 Development indicators

    S. No. Development Indicators State Project Area

    1 Per capita income (Rs.) 16,260 12,850

    2 Poverty ratio 0.22 0.19

    3 Literacy (%) 0.604 0.550

    4 Sex Ratio 921 829

    5 infant mortality rate 6.3% 6.2%

    6 maternal mortality ratio 0.38% 0.05%

    The table indicates poor socio economic conditions.

    Comparistion of Various Date of State and Projected Area

    0

    20

    40

    60

    80

    100

    120

    Per

    capi

    ta

    inco

    me

    Pov

    erty

    ratio

    Lite

    racy

    (%)

    Sex

    Rat

    io

    infa

    nt

    mor

    talit

    y

    rate

    mat

    erna

    l

    mor

    talit

    y

    ratio

    1 2 3 4 5 6

    State

    Project Area

  • Table 2.3 Land Use

    Land Use Total area in Ha.

    Private Panchayat Government Community Total

    Agriculture Land 2325 0 0 0 2325

    Temporary fallow 540 0 0 0 540

    Permanent Fallow 0 0 0 0 0

    Cultivated Rainfed 766 0 0 0 766

    Cultivated irrigated 245 0 0 0 245

    Net Sown Area 2193 0 0 0 2193

    Net Area sown more than once 0 0 0 0 0

    Forest Land 0 0 965 0 965

    Waste Land 0 0 2742 0 2742

    Pastures 0.00 0 380 0 380

    Others 0 0 0 0 0

    Total 6069 0 4087 0 10156

    The project area has 2325 ha of cultivable wasteland . 540 ha of fallow land which can be

    brought under cultivation if some irrigation source can be provided through Construction of

    WHS like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed

    varieties of crops. Construction of WHS can also increase in area under irrigation and can be

    brought under vegetative cover, with reasonable effort .Activities like Earthen check dams,

    Vegetative filter strip, V- ditches, staggered trenches ,WHS (Johad) Afforestation of wastelands

    and Pasture development will be taken up on these lands

    Pasture development the land use table shows that there is 380 hectare pasture land

    This emphasizes the need for taking up pastureland development works through sowing of

    promising species of grasses and plantation.

    0

    500

    1000

    1500

    2000

    2500

    3000

    Agriculture

    Land

    Tem

    pora

    ry

    fallo

    w

    Perm

    anent

    Fallo

    w

    Cultiv

    ate

    d

    Rain

    fed

    Cultiv

    ate

    d

    irrigate

    d

    Net

    Sow

    n

    Are

    a

    Net

    Are

    a

    sow

    n m

    ore

    than o

    nce

    Fore

    st

    Land

    Waste

    Land

    Pastu

    res

    Oth

    ers

    Private

    Panchayat

    Government

  • Table 2.4 Agriculture and Horticulture status and fuel availability.

    Cropping Status S.

    No

    Season Crop

    sown

    Rain fed Irrigated Total

    Varieties Area

    (ha)

    Production

    (Ton)

    Productiv

    ity

    (kg/ha)

    Varietie

    s

    Area

    (ha)

    Produc

    tion

    (Ton)

    Produc

    tivity

    (kg/ha)

    Area

    (ha)

    Product

    ion

    (Ton)

    1 Kharif Bajra HHB 67 950 399 420 - - - - 950 399

    Moong K851 70 49 700 - - - - 70 49

    Guar 1210 687 568 1210 687

    2 Rabi - - - - - - - - - -

    2.4 b Abstract of cropped Area(ha)

    Area under Single crop 766

    Area under Double crop 245

    Area under Multiple crop 0

    The farmers are using WCC 75 ,Raj. 171, varieties of Bajra, whereas varieties like HHB 67 ,

    RCB2 can increase the production.

    The crop rotation shows that fallow lands are there. This indicates that there is scope for change

    in crop rotation in fields where there are fallow lands through Soil and Water conservation measures,

    crop demonstration and diversification in agriculture. Soil and Water conservation measures besides

    putting fallow lands under cultivation can change the area under single cropping to double and

    multiple cropping.

  • Table 2.4 c Productivity Gap Analysis.

    Name of the crop

    Productivity kg/ha

    India

    Highest

    Average

    in

    Rajasthan

    Highest

    Average of

    Agro

    climatic

    zone

    District Project Area

    Bajara - 381 562 470 420

    Guar - 535 675 618 568

    Moong 996 763 843 703 700

    Analysis of the above table indicate that besides national gap there is wide gap in

    productivity within state and even within same agro climatic zones.

    The reasons for this variation are

    • The farmers are using local seeds & varieties like WBC-75,Raj.171 of Bajra, and Maru

    Guar for cultivation of Guar Whereas the recommended varieties for Bajara are RHB

    58, RHB-121 HHB 67 for Moong RMG-62 & K-851 for Guar RBC-936 & RBC-986 to

    provide more yield.

    • Lack of Availability of good quality seeds of desired crop and variety in adequate

    quantities and time to the farmers.

    • Availability of water for cultivation

    The productivity gap and reasons of it indicate potential to increase the productivity

    through crop demonstration .Crop demonstrations would be carried out on improved crops/

    varieties, improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder

    seed mini kit. Demonstration of improved methods and economics of fodder crops

    cultivation and also distribution foundation seeds of Forage Crops for further multiplication,

    introduction of fodder crops in the existing crop rotations.

  • Table 2.5 Horticulture plantation, Medicinal & Aromatic Crops,

    floriculture status :

    Activity Area Species Varieties Recommended varieties

    Production

    Horticulture nil - - - nil

    Vegetables nil - - - nil

    Floriculture nil - - - nil

    Medicinal Plants

    nil - - -

    nil

    As discussed earlier . Horticulture/vegetables could be

    more economical to Small and marginal farmers with irrigation source. Also the

    project area has good potential for medicinal & aromatic crops like Sonamukhi,

    Isabgol, Googal etc.

    Agro forestry plantation: To increase the income of farmers and also for shelter belt

    plantation as wind velocity is high in the project area.

    Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals

    and fertilizers on human health the emphasis would be on cultivation of organic

    produce through motivating farmers and providing assistance for production of organic

    input, vermi compost.

    Production and distribution of quality seed – There is need to ensure that good

    quality seed is available for cultivators for which adequate seed production would be

    initiated in watershed areas with the assistance of private sector and agriculture

    department technologies

    Drip irrigation Drip irrigation will be promoted in all horticulture & Medicinal plantations for

    rational use of irrigation higher yields and quality produce.

  • Table 2.6 Land holding Pattern in project area

    Type of Farmer

    Total House holds

    Land holding (ha) irrigation source wise

    Land holding (ha)Social group wise

    Irrigated (T/W)

    Rain fed

    Total Gen SC ST OBC BPL

    (i)Large farmer

    274 245 4010 4255 759 316 163 2185 832

    (ii) Small farmer

    228 0 196 196 46 34 12 32 72

    (iii) Marginal farmer

    380 0 142 142 52 15 0 14 61

    (iv) Landless person

    152 - - - 0 0 0 0 0

    (V)No. of BPL households

    760 - 1476 1476 325 235 106 214 596

    Total 1794 245 5824 6069 1182 600 281 2445 1561

    5.57% land holdings belong to small and marginal farmers who own 14.54% of total

    cultivated area. Horticulture/vegetables could be more economical to Small and

    marginal farmers with irrigation source. For large farmers with no irrigation facility

    Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka

    construction.

    The following activities will be more beneficial for small land holdings and for

    diversification and income for large farmers

  • Table 2.7 Livestock Status - animals/milk production / average yield.

    S.No .

    Description of animals

    Population in No.

    Yield(milk/mutton/ Wool)

    Equ. cow units

    Dry matter requirement per year (7Kg per animal.)

    Total requirement in M.T.

    1 Cows

    Indigenous 2607 3.5 ltr. per day 2607 6660885 6660

    Hybrid 0 - 0 0 0.00

    2 Buffaloes 40 6 ltr. per day 40 102200 102

    3 Goat 6910 1 ltr. per day 3455 8827525 8827

    4 Sheep 20580 ½ kg per no. 10290 26290950 26290

    5 Camel 369 - 369 942795 942

    6 Poultry 0 - 0 0 0

    7 Piggery 0 - 0 0 0

    Total 30506 0 16761 42824355 42821

    In spite of the large number of livestock, production is less hence increase in

    productivity across all species, is a major challenge. To reduce production of

    unproductive cattle and improve the productivity by improving the breeds by breeding

    management following activities will be taken up

    • Castration

    • Artificial insemination

    • Distribution of superior Breeding bulls for use in Cattle,Buffalo, shee & Goat

    • Breeding distribution crossbred rams

    Besides breed improvement other animal husbandry practices like better health, hygiene

    and feeding practices can increase productivity of livestock. Hence Activities like Animal

    health camps ,Urea-Molasses treatment demonstration ,demonstration of improved

    methods of conservation and utilization of Forage crops are proposed.

  • Table 2.8 Fodder Status

    S.No Item Unit Area/Quantity

    1 Existing Cultivable area under Fodder Ha 2080/15130

    2 Production of Green fodder

    Tonns/year 0/0

    3 Production of Dry fodder Tonns/ Year 2080/15130

    4 Area under Pastures Ha 385/3150

    5 Production of fodder Tonns/year 2080/15130

    6 Existing area under Fuel wood

    Ha -

    7 Supplementary feed Kgs/ day -

    8 Silage Pits No -

    9 Availability of fodder Ton 18280

    i.Requirement of fodder= 42821 tonns ii. Availability of fodder = 18280 tonns.

    Deficiency of fodder = 42821-18280= 24541 tonns. The table above shows there is fodder deficiency (Requirement is 42821 tonns and

    Availability 18280 tonns) is 24541 tonns.

    To minimize the large and expanding gap between feed and fodder resource

    availability and demand there is need for

    • Increase in area under fodder crops

    • Increase in productivity of fodder crops

    • Development of pastures • And reduction in large number of livestock production through replacement by few

    but productive animals

  • Table 2.9 Farm implements

    S. No Implements Nos.

    1 Tractor 37

    2 Sprayers-manual/ power 29

    3 Cultivators/Harrows 37

    4 Seed drill 0

    5 Any Other 27

    Farm mechanization and seed banks: As discussed earlier 46.80% land holdings

    belong to small and marginal farmers who own only 24.67% of total cultivated area so

    owning of big farm implements by individual farmers is not economical so SHG would

    be promoted to buy farm implements and rent to farmer

  • Table 2.10 NREGA Status

    Sr. no.

    Name of village

    Total No .of job cards

    Employment Status

    Activity taken up so far

    1 Jerat 108 500000

    Nadi,Tanka,Greval road,Bunding

    2 Basanpeer 413 1800000

    3 Badoda Gaon 539 2300000

    4 Hameera 528 2300000

    5 Jesurana 156 700000

    6 Chandan 907 3900000

    7 Jhabara 230 1000000

    8 Jawandh Juni 292 1300000

    9 Chinnu 807 3500000

    0

    500000

    1000000

    1500000

    2000000

    2500000

    3000000

    3500000

    4000000

    4500000

    Jera

    t

    Bas

    anpe

    er

    Bad

    oda

    Gao

    n

    Ham

    eera

    Jesu

    rana

    Cha

    ndan

    Jhab

    ara

    Jawan

    dh Jun

    i

    Chi

    nnu

    Total No .of job cards

    Employment Status

  • Table 2.11 Migration Details

    Name of

    village

    No. of

    persons

    migrating

    No. of days

    per year of

    migration

    Major

    reason(s) for

    migrating

    Distance of

    destination of

    migration from

    the village (km)

    Occupation

    during

    migration

    Income from

    such

    occupation (Rs.

    in lakh)

    Jerat 43 315

    Employment

    & Business 150-2000

    Employment

    & Business

    85.00 Lacs

    Basanpeer 20 315 41.00 Lacs

    Badoda

    Gaon

    45 315 51.00 Lacs

    Hameera 35 315 39.00 Lacs

    Jesurana 28 315 37.00 Lacs

    Chandan 35 315 53.00 Lacs

    Jhabara 32 315 45.00 Lacs

    Jawandh

    Juni

    42 315 56.00 Lacs

    Chinnu 10 315 27.00 Lacs

    The migration can be checked by creation of employment opportunities, enhancing farm level economy, increase in the income of the people engaged in animal husbandry by dairy and marketing and value addition. (As discussed earlier) and diversification in livelihoods .

    Chart of migrate person & person days

  • Table 2.12 Livelihood Details

    Major activities (On Farm)

    Name of activity No of House holds

    Average annual income from the

    cultivators 633 956 lac

    Dairying 558 84 lac

    Poultry - -

    Piggery - -

    Landless Agri. Labourers

    467 203 lac

    Major activities (Off Farm)

    Name of activity

    Households/individuals Average annual income from

    the Artisans 51 41.00 Lac

    Carpenter 43 46.00 Lac

    Blacksmith 7 7.00 Lac

    Leather Craft 9 10.00 Lac

    Porter 118 105.00 Lac

    Mason 207 174.00 Lac

    Others specify (Cycle Repair ,STD,Craft etc)

    - -

    The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals

  • Table 2-13 Status of Existing SHG

    S.No Name of SHG

    Members Activity involved

    Monthly income

    Fund avai.

    Assistance available

    Source of assistance

    Training receive

    1 Nayak 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    2 Jerat 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    3 Ganesh 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    4 Sabai 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    5 Ujala 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    6 Agari 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    7 Tara 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    8 Mohini 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance

  • Table 2-14 Ground Water Details

    S.No Source No. Functional depth(meter )

    Dry Area irrigated

    Water availability (days)

    i) Dug wells 0 - - - -

    ii) Shallow tube wells - - - - -

    iii) Pumping sets - - - - -

    iv) Deep Tube Wells 26 150-200 - (Drinking Water)

    365 days

    Total 15 - - - -

  • Table 2.15 Availability of drinking water Sl No. Name of

    the

    Village

    Drinking

    water

    requirement

    ltrs/ day

    Present

    availability

    of drinking

    water

    ltrs/day

    No of

    drinking

    water

    sources

    available

    No

    functional

    No

    requires

    repairs

    No

    defunct

    1 Jerat 3480 2436 2 2 - -

    2 Basanpeer 8760 6132 1 1 - -

    3 Badoda

    Gaon

    25840 18088 1 1 - -

    4 Hameera 16190 11333 1 1 - -

    5 Jesurana 5320 3724 1 1 - -

    6 Chandan 25280 17696 1 1 - -

    7 Jhabara 6820 4774 1 1 - -

    8 Jawandh

    Juni

    7390 5173 2 2 - -

    9 Chinnu 11850 8295 2 2 - -

    Chart of Drinking water requirement and

    present availability of drinkings water

    0

    5000

    10000

    15000

    20000

    25000

    30000

    Jera

    t

    Bas

    anpe

    er

    Bad

    oda

    Gao

    n

    Ham

    eera

    Jesu

    rana

    Cha

    ndan

    Jhab

    ara

    Jawan

    dh Jun

    i

    Chi

    nnu

    No. of persons migrating

    No. of days per year of migration

  • Table 2.16 Water Use efficiency

    Name of major crop

    Area (Hectare)

    through water saving

    devices(Drip/S prinklers)

    through water

    conserving agronomic

    practices#

    Any other (pl. specify)

    Total

    Mustard 60% 20% - -

    Zeera 60% 20% - -

    • The tables above indicate need for judicious use of available Water.

    • Encouraging optimum use of water through installation of sprinklers on every operational

    wells

    Table 2.17 Slope details.

    Slope of Watershed

    S.No. Slope percentage Area in hectares

    1 0 to 3% 10390

    2 3 to 8% -

    3 8 to 25% -

    4 > 25% -

    As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in agriculture fields and protect washing of top soil and manures/fertilizers

  • Table 2.18 Soil details Soil Profile

    S.No. Major Soil Classes Area in hectares

    1 II class 7561

    2 III class 2058

    3 Iv class 770

    Soil Depth :

    B Depth (Cms.) Area in hectares

    1 0.00 to 7.50 -

    2 7.50 to 45.00 7796

    3 > 45.00 2593

    C Soil fertility Status Kg/ha Recommended

    N 50-70 80-90

    P 20-30 40-50

    K 10-15 20-30

    Micronutrients 10-500 ppm 100-500

    The analysis of table shows need to improve and maintain soil fertility. Soil health card to every farmer every crop season will be provided, which will include the recommendation for Application micro nutrient and fertilizers

  • Table 2. 19 Soil Erosion Status :-

    Erosion status in project Area

    Cause

    Type of erosion

    Area affected

    (ha)

    Run off(mm/ year)

    Average soil loss (Tonnes/

    ha/ year)

    Water erosion

    a Sheet 0

    10-12

    b Rill 0

    c Gully 0

    Sub-Total 0

    Wind erosion 10156

    Total for project 10156

    The need is:

    • To check land degradation

    • To reduce excessive biotic pressure by containing the number and increase of livestock

    • To check cultivation on sloping lands without adequate precautions of soil and water conservation measures

    • To discourage cultivation along susceptible nallah beds

    • To check Faulty agriculture techniques

    • To check Uncontrolled grazing and developed cattle tracks

    • To check Deforestation of steep slopes

    • To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up.

  • Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions

    A) Preparatory phase activities Capacity Building Trainings and EPA

    The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and

    wall writings etc. were carried out in all the habitations of Jaisalmer (IWMP) I

    Watershed. A series of meetings were conducted with Gram Panchayat members,

    community and discussed about the implementation of IWMP programme. User groups

    were also formed.

    Grama Sabhas were conducted for approval of EPA (Village), for selecting the

    watershed committee and approval of DPR.

    S.no Name of the Gram Panchayat

    Date on which Grama Sabha approved EPA

    1 Jerat 07.02.2011

    2 Basanpeer 05.03.2011

    3 Badoda Gaon 26.04.2011

    4 Hameera 02.10.2010

    5 Jesurana 10.02.2011

    6 Chandan 10.05.2010

    7 Jhabara 23.11.2010

    8 Jawandh Juni 29.12.2010

    9 Chinnu 25.12.2010

    S. No.

    Names of village

    Amount earmarked for EPA

    Entry Point Activities planned

    Estimated cost

    Expenditure incurred

    Balance

    Expected outcome

    Actual outcome

    1 Jerat 6.00 6.00 6.00 2.18 3.82 6.00 6.00

    2 Basanpeer 6.00 6.00 6.00 1.45 4.55 6.00 6.00

    3 Badoda Gaon

    6.00 6.00 6.00 1.45 4.55

    6.00 6.00

    4 Hameera 6.00 6.00 6.00 2.91 3.09 6.00 6.00

    5 Jesurana 6.00 6.00 6.00 2.18 3.82 6.00 6.00

    6 Chandan 6.00 6.00 6.00 1.45 4.55 6.00 6.00

    7 Jhabara 6.00 6.00 6.00 2.15 3.85 6.00 6.00

    8 Jawandh Juni

    6.00 6.00 6.00 1.45 4.55

    6.00 6.00

    9 Chinnu 6.00 6.00 6.00 2.91 3.09 6.00 6.00

  • The PRA exercise was carried out in all the villages on the dates shown below:

    S.no Name of the village/Habitation

    Date on which PRA conducted

    1 Jerat 29.07.2010

    2 Basanpeer 26.09.2010

    3 Badoda Gaon 24.08.2010

    4 Hameera 25.07.2010

    5 Jesurana 10.09.2010

    6 Chandan 10.10.2010

    7 Jhabara 29.07.2010

    8 Jawandh Juni 24.08.2010

    9 Chinnu 25.12.2010

  • Transact walk were carried out involving the community for Social mapping,

    Resource mapping. detailed discussions and deliberations with all the primary stakeholders were

    carried out.

    Socio-economic survey was carried out during 28-3-2011 (dates) period covering all the

    households and primary data on demography, Land holdings, Employment status, Community

    activities etc. was collected as mentioned in chapter 2.

    State remote sensing department was assigned the work of preparing various

    thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and

    management of geo-spatial database depicting present conditions of land (terrain), water and

    vegetation with respect to watershed under different ownerships at village level

    Various thematic layers provided by SRSAC are :

    • Digitised Khasara maps of the villages falling in project area.

    • Network of Drainage lines, existing water bodies, falling in the project area.

    • Base maps (transport network, village/boundaries, and settlements).

    • Land Use / Land cover map.

    • Contours at 1 meter interval, slope map

    Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as

    discussed in chapter 2) final Treatment plan on revenue map for implementation has been

    framed. Thus each intervention identified has been marked on revenue map (map enclosed in

    DPR as annexure------).The GIS based intervention map, PRA based intervention map are

    annexed as ------.

    .

  • s

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 135.00 135.00 0.00 0.00

    Monitoring 1% - 0 13.50 13.50 0.00 0.00

    Evaluation 1% - 0 13.50 13.50 0.00 0.00

    EPA 4% - 0 54.00 54.00 0.00 0.00

    I & CB 5% - 0 67.50 67.50 0.00 0.00

    DPR 1% - 0 13.50 13.50 0.00 0.00

    Total (A) 297.00 297.00 0 0

    (B)

    Earthen Bund Mtr 139 33950 47.19 47.19 0.00 3.54

    Tanka Num. 50000 118 59.00 59.00 0.00 4.43

    dhora (Small) Num. 200000 109 218.00 218.00 0.00 16.35

    khadeen Num. 300000 105 315.00 315.00 0.00 23.63

    Khet talai Num. 350000 18 63.00 63.00 0.00 4.73

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 66 33.00 33.00 0.00 2.48

    V- ditch Mtr 27.69 25850 7.16 7.16 0.00 0.54

    Water Harvesting Structure Num. 85000 16 13.60 13.60 0.00 1.02

    Afforestation hact. 50000 82 41.00 41.00 0.00 3.08

    0.00 0.00 0.00 0.00

    MMS Num. 0 0 0.00 0.00 0.00 0.00

    LSCD Num. 15000 87 13.05 13.05 0.00 0.98

    WHS Num. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0 0.00 0.00 0.00 0.00

    Total (B) 810.00 810.00 0.00 60.75

    (C)

    Horticulture Plantation Num. 250 18361 45.90 27.54 18.36 8.26

    Sprinklers and Drip

    irrigationhact. 20000 82 16.40 16.40 0.00 4.92

    Floriculture Num. 0 0 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 37 14.66 8.80 5.86 2.64

    Vermi compost Num. 5000 98 4.90 4.90 0.00 1.47

    Crop Demonstration Num. 2000 1683 33.66 33.66 0.00 10.10

    0.00 0.00 0.00 0.00

    Dairy Num. 1000 1210 12.10 12.10 0.00 3.63

    Annual Camp Num. 50000 82 41.00 41.00 0.00 12.30

    Poultry Num. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 42 4.20 4.20 0.00 1.26

    Animal Minral/ Mixar Num. 1000 2740 27.40 27.40 0.00 8.22

    SHG Land less/ BPL Num. 50000 53 26.50 26.50 0.00 7.95

    Food Processing Num. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 226.72 202.50 24.23 60.75

    (D) Consolidation 40.50 40.50 0.00 0.00

    Total (D) 40.50 40.50 0.00 0.00

    Grand Total 1374.22 1350.00 24.23 121.50

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Total

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 30.00 30.00 0.00 0.00

    Monitoring 1% - 0 3.00 3.00 0.00 0.00

    Evaluation 1% - 0 3.00 3.00 0.00 0.00

    EPA 4% - 0 12.00 12.00 0.00 0.00

    I & CB 5% - 0 15.00 15.00 0.00 0.00

    DPR 1% - 0 3.00 3.00 0.00 0.00

    Total (A) 66.00 66.00 0 0

    (B)

    Earthen Bund Mtr 139 7500 10.43 10.43 0.00 0.78

    Tanka Num. 50000 36 18.00 18.00 0.00 1.35

    dhora (Small) Num. 200000 24 48.00 48.00 0.00 3.60

    khadeen Num. 300000 20 60.00 60.00 0.00 4.50

    Khet talai Num. 350000 4 14.00 14.00 0.00 1.05

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 20 10.00 10.00 0.00 0.75

    V- ditch Mtr 27.69 8200 2.27 2.27 0.00 0.17

    Water Harvesting Structure Num. 85000 4 3.40 3.40 0.00 0.26

    Afforestation hact. 50000 20 10.00 10.00 0.00 0.75

    MMS Num. 0 0 0.00 0.00 0.00 0.00

    LSCD Num. 15000 26 3.90 3.90 0.00 0.29

    WHS Num. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0 0.00 0.00 0.00 0.00

    Total (B) 180.00 180.00 0.00 13.50

    (C)

    Horticulture Plantation Num. 250 4332 10.83 6.50 4.33 1.95

    Sprinklers and Drip

    irrigationhact. 20000 20 4.00 4.00 0.00 1.20

    Floriculture Num. 0 0 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 3.35 1.34 0.80 0.54 0.24

    Vermi compost Num. 5000 24 1.20 1.20 0.00 0.36

    Crop Demonstration Num. 2000 380 7.60 7.60 0.00 2.28

    Dairy Num. 1000 290 2.90 2.90 0.00 0.87

    Annual Camp Num. 50000 20 10.00 10.00 0.00 3.00

    Poultry Num. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 10 1.00 1.00 0.00 0.30

    Animal Minral/ Mixar Num. 1000 600 6.00 6.00 0.00 1.80

    SHG Land less/ BPL Num. 50000 10 5.00 5.00 0.00 1.50

    Food Processing Num. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 49.87 45.00 4.87 13.50

    (D) Consolidation 9.00 9.00 0 0

    Total (D) 9.00 9.00 0.00 0.00

    Grand Total 304.87 300.00 4.87 27.00

    Gram Panchayat Basanpeer

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0.00 15.00 15.00 0.00 0.00

    Monitoring 1% - 0.00 1.50 1.50 0.00 0.00

    Evaluation 1% - 0.00 1.50 1.50 0.00 0.00

    EPA 4% - 0.00 6.00 6.00 0.00 0.00

    I & CB 5% - 0.00 7.50 7.50 0.00 0.00

    DPR 1% - 0.00 1.50 1.50 0.00 0.00

    Total (A) 33.00 33.00 0 0

    (B)

    Earthen Bund Mtr 139 3500.00 4.87 4.87 0.00 0.36

    Tanka Num. 50000 7.00 3.50 3.50 0.00 0.26

    dhora (Small) Num. 200000 13.00 26.00 26.00 0.00 1.95

    khadeen Num. 300000 12.00 36.00 36.00 0.00 2.70

    Khet talai Num. 350000 3.00 10.50 10.50 0.00 0.79

    Bank Stabilisation/

    Peripheral BundsMtr 0 0.00 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 5.00 2.50 2.50 0.00 0.19

    V- ditch Mtr 27.69 1200.00 0.33 0.33 0.00 0.02

    Water Harvesting Structure Num. 85000 2.00 1.70 1.70 0.00 0.13

    Afforestation hact. 50000 8.00 4.00 4.00 0.00 0.30

    MMS Num. 0 0.00 0.00 0.00 0.00 0.00

    LSCD Num. 15000 4.00 0.60 0.60 0.00 0.05

    WHS Num. 0 0.00 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0.00 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0.00 0.00 0.00 0.00 0.00

    Total (B) 90.00 90.00 0.00 6.75

    (C)

    Horticulture Plantation Num. 250 1835.00 4.59 2.75 1.84 0.83

    Sprinklers and Drip

    irrigationhact. 20000 9.00 1.80 1.80 0.00 0.54

    Floriculture Num. 0 0.00 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0.00 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 5.00 2.00 1.20 0.80 0.36

    Vermi compost Num. 5000 10.00 0.50 0.50 0.00 0.15

    Crop Demonstration Num. 2000 190.00 3.80 3.80 0.00 1.14

    Dairy Num. 1000 105.00 1.05 1.05 0.00 0.32

    Annual Camp Num. 50000 9.00 4.50 4.50 0.00 1.35

    Poultry Num. 0 0.00 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 4.00 0.40 0.40 0.00 0.12

    Animal Minral/ Mixar Num. 1000 300.00 3.00 3.00 0.00 0.90

    SHG Land less/ BPL Num. 50000 7.00 3.50 3.50 0.00 1.05

    Food Processing Num. 0 0.00 0.00 0.00 0.00 0.00

    Total ( C) 25.14 22.50 2.64 6.75

    (D) Consolidation 4.50 4.50 0.00 0.00

    Total (D) 4.50 4.50 0.00 0.00

    Grand Total 152.63 150.00 2.64 13.50

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Gram Panchayat Badoda Gonv

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 30.00 30.00 0.00 0.00

    Monitoring 1% - 0 3.00 3.00 0.00 0.00

    Evaluation 1% - 0 3.00 3.00 0.00 0.00

    EPA 4% - 0 12.00 12.00 0.00 0.00

    I & CB 5% - 0 15.00 15.00 0.00 0.00

    DPR 1% - 0 3.00 3.00 0.00 0.00

    Total (A) 66.00 66.00 0 0

    (B)

    Earthen Bund Mtr 139 7650 10.63 10.63 0.00 0.80

    Tanka Num. 50000 32 16.00 16.00 0.00 1.20

    dhora (Small) Num. 200000 26 52.00 52.00 0.00 3.90

    khadeen Num. 300000 22 66.00 66.00 0.00 4.95

    Khet talai Num. 350000 2 7.00 7.00 0.00 0.53

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 20 10.00 10.00 0.00 0.75

    V- ditch Mtr 27.69 8550 2.37 2.37 0.00 0.18

    Water Harvesting Structure Num. 85000 4 3.40 3.40 0.00 0.26

    Afforestation hact. 50000 18 9.00 9.00 0.00 0.68

    MMS Num. 0 0 0.00 0.00 0.00 0.00

    LSCD Num. 15000 24 3.60 3.60 0.00 0.27

    WHS Num. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0 0.00 0.00 0.00 0.00

    Total (B) 180.00 180.00 0.00 13.50

    (C)

    Horticulture Plantation Num. 250 4200 10.50 6.30 4.20 1.89

    Sprinklers and Drip

    irrigationhact. 20000 22 4.40 4.40 0.00 1.32

    Floriculture Num. 0 0 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 6.65 2.66 1.60 1.06 0.48

    Vermi compost Num. 5000 22 1.10 1.10 0.00 0.33

    Crop Demonstration Num. 2000 360 7.20 7.20 0.00 2.16

    Dairy Num. 1000 280 2.80 2.80 0.00 0.84

    Annual Camp Num. 50000 18 9.00 9.00 0.00 2.70

    Poultry Num. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 10 1.00 1.00 0.00 0.30

    Animal Minral/ Mixar Num. 1000 660 6.60 6.60 0.00 1.98

    SHG Land less/ BPL Num. 50000 10 5.00 5.00 0.00 1.50

    Food Processing Num. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 50.26 45.00 5.26 13.50

    (D) Consolidation 9.00 9.00 0.00 0.00

    Total (D) 9.00 9.00 0.00 0.00

    Grand Total 305.26 300.00 5.26 27.00

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Gram Panchayat Hameera

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 30.00 30.00 0.00 0.00

    Monitoring 1% - 0 3.00 3.00 0.00 0.00

    Evaluation 1% - 0 3.00 3.00 0.00 0.00

    EPA 4% - 0 12.00 12.00 0.00 0.00

    I & CB 5% - 0 15.00 15.00 0.00 0.00

    DPR 1% - 0 3.00 3.00 0.00 0.00

    Total (A) 66.00 66.00 0 0

    (B)

    Earthen Bund Mtr 139 7400 10.29 10.29 0.00 0.77

    Tanka Num. 50000 20 10.00 10.00 0.00 0.75

    dhora (Small) Num. 200000 24 48.00 48.00 0.00 3.60

    khadeen Num. 300000 26 78.00 78.00 0.00 5.85

    Khet talai Num. 350000 4 14.00 14.00 0.00 1.05

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 10 5.00 5.00 0.00 0.38

    V- ditch Mtr 27.69 3300 0.91 0.91 0.00 0.07

    Water Harvesting Structure Num. 85000 2 1.70 1.70 0.00 0.13

    Afforestation hact. 50000 20 10.00 10.00 0.00 0.75

    MMS Num. 0 0 0.00 0.00 0.00 0.00

    LSCD Num. 15000 14 2.10 2.10 0.00 0.16

    WHS Num. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0 0.00 0.00 0.00 0.00

    Total (B) 180.00 180.00 0.00 13.50

    (C)

    Horticulture Plantation Num. 250 3667 9.17 5.50 3.67 1.65

    Sprinklers and Drip

    irrigationhact. 20000 18 3.60 3.60 0.00 1.08

    Floriculture Num. 0 0 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 10 4.00 2.40 1.60 0.72

    Vermi compost Num. 5000 20 1.00 1.00 0.00 0.30

    Crop Demonstration Num. 2000 380 7.60 7.60 0.00 2.28

    Dairy Num. 1000 210 2.10 2.10 0.00 0.63

    Annual Camp Num. 50000 18 9.00 9.00 0.00 2.70

    Poultry Num. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 8 0.80 0.80 0.00 0.24

    Animal Minral/ Mixar Num. 1000 600 6.00 6.00 0.00 1.80

    SHG Land less/ BPL Num. 50000 14 7.00 7.00 0.00 2.10

    Food Processing Num. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 50.27 45.00 5.27 13.50

    (D) Consolidation 9.00 9.00 0.00 0.00

    Total (D) 9.00 9.00 0.00 0.00

    Grand Total 305.27 300.00 5.27 27.00

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Gram Panchayat Chandhan

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 15.00 15.00 0.00 0.00

    Monitoring 1% - 0 1.50 1.50 0.00 0.00

    Evaluation 1% - 0 1.50 1.50 0.00 0.00

    EPA 4% - 0 6.00 6.00 0.00 0.00

    I & CB 5% - 0 7.50 7.50 0.00 0.00

    DPR 1% - 0 1.50 1.50 0.00 0.00

    Total (A) 33.00 33.00 0 0

    (B)

    Earthen Bund Mtr 139 3700 5.14 5.14 0.00 0.39

    Tanka Num. 50000 10 5.00 5.00 0.00 0.38

    dhora (Small) Num. 200000 12 24.00 24.00 0.00 1.80

    khadeen Num. 300000 13 39.00 39.00 0.00 2.93

    Khet talai Num. 350000 2 7.00 7.00 0.00 0.53

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 5 2.50 2.50 0.00 0.19

    V- ditch Mtr 27.69 1650 0.46 0.46 0.00 0.03

    Water Harvesting Structure Num. 85000 1 0.85 0.85 0.00 0.06

    Afforestation hact. 50000 10 5.00 5.00 0.00 0.38

    MMS Num. 0 0 0.00 0.00 0.00 0.00

    LSCD Num. 15000 7 1.05 1.05 0.00 0.08

    WHS Num. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0 0.00 0.00 0.00 0.00

    Total (B) 90.00 90.00 0.00 6.75

    (C)

    Horticulture Plantation Num. 250 1835 4.59 2.75 1.84 0.83

    Sprinklers and Drip

    irrigationhact. 20000 9 1.80 1.80 0.00 0.54

    Floriculture Num. 0 0 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 5 2.00 1.20 0.80 0.36

    Vermi compost Num. 5000 10 0.50 0.50 0.00 0.15

    Crop Demonstration Num. 2000 190 3.80 3.80 0.00 1.14

    Dairy Num. 1000 105 1.05 1.05 0.00 0.32

    Annual Camp Num. 50000 9 4.50 4.50 0.00 1.35

    Poultry Num. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 4 0.40 0.40 0.00 0.12

    Animal Minral/ Mixar Num. 1000 300 3.00 3.00 0.00 0.90

    SHG Land less/ BPL Num. 50000 7 3.50 3.50 0.00 1.05

    Food Processing Num. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 25.14 22.50 2.64 6.75

    (D) Consolidation 4.50 4.50 0.00 0.00

    Total (D) 4.50 4.50 0.00 0.00

    Grand Total 152.64 150.00 2.64 13.50

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Gram Panchayat Dhayasar

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 15.00 15.00 0.00 0.00

    Monitoring 1% - 0 1.50 1.50 0.00 0.00

    Evaluation 1% - 0 1.50 1.50 0.00 0.00

    EPA 4% - 0 6.00 6.00 0.00 0.00

    I & CB 5% - 0 7.50 7.50 0.00 0.00

    DPR 1% - 0 1.50 1.50 0.00 0.00

    Total (A) 33.00 33.00 0 0

    (B)

    Earthen Bund Mtr 139 4200 5.84 5.84 0.00 0.44

    Tanka Num. 50000 13 6.50 6.50 0.00 0.49

    dhora (Small) Num. 200000 10 20.00 20.00 0.00 1.50

    khadeen Num. 300000 12 36.00 36.00 0.00 2.70

    Khet talai Num. 350000 3 10.50 10.50 0.00 0.79

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 6 3.00 3.00 0.00 0.23

    V- ditch Mtr 27.69 2950 0.82 0.82 0.00 0.06

    Water Harvesting Structure Num. 85000 3 2.55 2.55 0.00 0.19

    Afforestation hact. 50000 6 3.00 3.00 0.00 0.23

    MMS Num. 0 0 0.00 0.00 0.00 0.00

    LSCD Num. 15000 12 1.80 1.80 0.00 0.14

    WHS Num. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) Num. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNum. 0 0 0.00 0.00 0.00 0.00

    Total (B) 90.00 90.00 0.00 6.75

    (C)

    Horticulture Plantation Num. 250 2492 6.23 3.74 2.49 1.12

    Sprinklers and Drip

    irrigationhact. 20000 4 0.80 0.80 0.00 0.24

    Floriculture Num. 0 0 0.00 0.00 0.00 0.00

    Vegetables Num. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants hact. 40000 6.65 2.66 1.60 1.06 0.48

    Vermi compost Num. 5000 12 0.60 0.60 0.00 0.18

    Crop Demonstration Num. 2000 183 3.66 3.66 0.00 1.10

    Dairy Num. 1000 220 2.20 2.20 0.00 0.66

    Annual Camp Num. 50000 8 4.00 4.00 0.00 1.20

    Poultry Num. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts Num. 10000 6 0.60 0.60 0.00 0.18

    Animal Minral/ Mixar Num. 1000 280 2.80 2.80 0.00 0.84

    SHG Land less/ BPL Num. 50000 5 2.50 2.50 0.00 0.75

    Food Processing Num. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 26.05 22.49 3.56 6.75

    (D) Consolidation 4.50 4.50 0.00 0.00

    Total (D) 4.50 4.50 0.00 0.00

    Grand Total 153.55 150.00 3.56 13.50

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Gram Panchayat Chinnu

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

  • s

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 135.00 135.00 0 13.50 0 13.50 0 40.50 0 32.40 0 21.60 0 13.50 0 135.00

    Monitoring 1% 0% 13.50 13.50 0 1.35 0 1.35 0 2.70 0 2.70 0 2.70 0 2.70 0 13.50

    Evaluation 1% 0% 13.50 13.50 0 2.03 0 2.03 0 2.43 0 2.30 0 2.43 0 2.30 0 13.50

    EPA 4% 0% 54.00 54.00 0 54.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 54.00

    I & CB 5% 0% 67.50 67.50 0 20.25 0 20.25 0 10.13 0 10.13 0 3.38 0 3.38 0 67.50

    DPR 1% 0% 13.50 13.50 0 13.50 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 13.50

    Total (A) 297.00 104.63 37.13 55.76 47.52 30.11 21.87 297.00

    Earthen Bund Mtr 33950 0.0083 47.1905 1669 2.3199 2298 3.1942 9523 13.237 11083 15.4054 5008 6.96112 4369 6.07291 33950 47.1905

    Tanka Num. 118 3 59 7 3.5 12 6 32 16 34 17 18 9 15 7.5 118 59

    Dhora Num. 109 12 218 6 12 10 20 26 52 30 60 19 38 18 36 109 218

    Khadin Num. 105 18 315 5.1667 15.5 8.3333 25 24.333 73 27.45 82.35 19.3333 58 20.3833 61.15 105 315

    Khet Talai Num. 18 21 63 0.1167 0.4083 1.1333 3.9667 5.5333 19.3667 5.545 19.4075 4.33333 15.1667 1.33833 4.68417 18 63

    Bank Stabilization /Peripheral Bunds Mtr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Conservation measures for non arable land

    Pasture Development hact. 66 3 33 2.75 1.375 6.75 3.375 18 9 18 9 11.5 5.75 9 4.5 66 33

    V - ditch Mtr 25850 0.0017 7.157865 1496.8 0.4145 1907 0.528 6887 1.90701 7521.88 2.08281 4092 1.13307 3945.38 1.09247 25850 7.15787

    Water Harvesting Structure Num. 16 5.1 13.6 0 0 1 0.85 5 4.25 5 4.25 3 2.55 2 1.7 16 13.6

    Afforestation hact. 82 3 41 3.75 1.875 6.75 3.375 23.75 11.875 24 12 13.25 6.625 10.5 5.25 82 41

    Drainage line treatment MMS Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    LSCD Num. 87 0.9 13.05 5 0.75 8 1.2 23 3.45 26 3.9 14 2.1 11 1.65 87 13.05

    WHS Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Gully Plugs(ECD) Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Ground water recharge Structure Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Total (B) 810.00 38.14 67.49 204.09 225.40 145.29 129.60 810.00

    Horticulture plantation (vegetable,Medicine) Num. 18361 0.009 27.5415 625 0.9375 1510 2.265 4780 7.17 7545 11.3175 1950 2.925 1951 2.9265 18361 27.5415

    Sprinklers and Drip irrigation hact. 82 1.2 16.4 4 0.8 7.5 1.5 25.75 5.15 29.25 5.85 9.25 1.85 6.25 1.25 82 16.4

    foriculture Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Vegetables Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Medicinal Plants hact. 36.65 1.44 8.796 1.25 0.3 3.5 0.84 11.5 2.76 14.5 3.48 4.5 1.08 1.4 0.336 36.65 8.796

    Vermi compost Num. 98 0.3 4.9 8 0.4 12 0.6 28 1.4 31 1.55 10 0.5 9 0.45 98 4.9

    Crop Demonstration Num. 1683 0.12 33.66 89 1.78 129 2.58 527 10.54 577 11.54 189 3.78 172 3.44 1683 33.66

    Micro Enterprise

    Dairy Num. 1210 0.06 12.1 82 0.82 113 1.13 341 3.41 412 4.12 134 1.34 128 1.28 1210 12.1

    Animal camp/Breed improovement Num. 82 3 41 4 2 7 3.5 27 13.5 27 13.5 9 4.5 8 4 82 41

    Poultry Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Local Artisans/craft Num. 42 0.6 4.2 3 0.3 5 0.5 12 1.2 14 1.4 3 0.3 5 0.5 42 4.2

    Animal Minral/ Mixar Num. 2740 0.06 27.4 139 1.39 184 1.84 890 8.9 1020 10.2 271 2.71 236 2.36 2740 27.4

    SHG Land less/ BPL Num. 53 3 26.5 2 1 5 2.5 16 8 20 10 6 3 4 2 53 26.5

    Food Processing Num. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Total (C) 202.50 9.73 17.26 62.03 72.96 21.99 18.54 202.50

    (D) Consolidation 3% 40.50 0.00 0.00 0.00 0.00 4.50 36.00 40.50Grand Total 1350.00 152.50 121.87 321.87 345.87 201.88 206.01 1350.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 30.00 30.00 0 3.00 0 3.00 0 9.00 0 7.20 0 4.80 0 3.00 0 30.00Monitoring 1% 0% 3.00 3.00 0 0.30 0 0.30 0 0.60 0 0.60 0 0.60 0 0.60 0 3.00Evaluation 1% 0% 3.00 3.00 0 0.45 0 0.45 0 0.54 0 0.51 0 0.54 0 0.51 0 3.00EPA 4% 0% 12.00 12.00 0 12.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 12.00I & CB 5% 0% 15.00 15.00 0 4.50 0 4.50 0 2.25 0 2.25 0 0.75 0 0.75 0 15.00DPR 1% 0% 3.00 3.00 0 3.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 3.00

    Total (A) 66.00 23.25 8.25 12.39 10.56 6.69 4.86 66.00

    Earthen Bund Mtr 7500 0.00139 10.43 438 0.61 500 0.70 2000 2.78 2044 2.84 1250 1.74 1268 1.76 7500 10Tanka Num. 36 0.5 18.00 2 1.00 2 1.00 10 5.00 10 5.00 6 3.00 6 3.00 36 18Dhora Num. 24 2 48.00 1 2.00 2 4.00 6 12.00 7 14.00 4 8.00 4 8.00 24 48Khadin Num. 20 3 60.00 1 3.50 1 4.00 5 16.00 5 16.35 3 10.00 3 10.15 20 60Khet Talai Num. 4 3.5 14.00 0 0.00 0 0.00 1 3.50 1 3.50 1 3.50 1 3.50 4 14Bank Stabilization /Peripheral Bunds Mtr 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0

    Conservation measures for non arable landPasture Development hact. 20 0.5 10.00 1 0.50 1 0.50 5 2.50 5 2.50 4 2.00 4 2.00 20 10V - ditch Mtr 8200 0.00028 2.27 478 0.13 547 0.15 2187 0.61 2235 0.62 1367 0.38 1386 0.38 8200 2Water Harvesting Structure Num. 4 0.85 3.40 0 0.00 0 0.00 1 0.85 1 0.85 1 0.85 1 0.85 4 3Afforestation hact. 20 0.5 10.00 1 0.50 1 0.50 5 2.50 5 2.50 4 2.00 4 2.00 20 10

    Drainage line treatment MMS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0LSCD Num. 26 0.15 3.90 2 0.30 2 0.30 7 1.05 7 1.05 4 0.60 4 0.60 26 4WHS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0Gully Plugs(ECD) Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0Ground water recharge Structure Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0

    Total (B) 180.00 8.54 11.15 46.79 49 0 32.07 0 32.25 180

    Horticulture plantation (vegetable,Medicine) Num. 4332 0.0015 6.50 150 0.23 445 0.67 900 1.35 1885 2.83 300 0.45 652 0.98 4332 6.50

    Sprinklers and Drip irrigation hact. 20 0.20 4.00 1.00 0.20 1 0.20 7 1.40 7 1.40 2 0.40 2 0.40 20 4.00

    foriculture Num. 0 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Vegetables Num. 0 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Medicinal Plants hact. 3.35 0.24 0.80 0.00 0.00 0.5 0.12 1 0.24 1.50 0.36 0.35 0.08 0 0.00 3.35 0.80

    Vermi compost Num. 24 0.05 1.20 2.00 0.10 2 0.10 8 0.40 8 0.40 2 0.10 2 0.10 24 1.20

    Crop Demonstration Num. 380 0.02 7.60 25.00 0.50 25 0.50 127 2.54 127 2.54 38 0.76 38 0.76 380 7.60

    Micro EnterpriseDairy Num. 290 0.01 2.90 19.00 0.19 19 0.19 97 0.97 97 0.97 29 0.29 29 0.29 290 2.90Animal camp/Breed improovement Num. 20 0.50 10.00 1.00 0.50 1 0.50 7 3.50 7 3.50 2 1.00 2 1.00 20 10.00Poultry Num. 0 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft Num. 10 0.10 1.00 1.00 0.10 1 0.10 3 0.30 3 0.30 1 0.10 1 0.10 10 1.00Animal Minral/ Mixar Num. 600 0.01 6.00 40.00 0.40 40 0.40 200 2.00 200 2.00 60 0.60 60 0.60 600 6.00SHG Land less/ BPL Num. 10 0.50 5.00 1.00 0.50 1 0.50 3 1.50 3 1.50 1 0.50 1 0.50 10 5.00

    Food Processing Num. 0 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Total (C) 45.00 2.72 3.28 14.20 0 15.80 4.28 0 4.73 45.00

    (D) Consolidation 3% 9.00 0.00 0.00 0.00 0.00 4.50 4.50 9.00Grand Total 300.00 34.51 22.67 73.38 75.57 47.54 46.33 300.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)Gram Panchayat Basanpeer

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 15.00 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    Monitoring 1% 0% 1.50 1.50 0 0.15 0 0.15 0 0.30 0 0.30 0 0.30 0 0.30 0 1.50

    Evaluation 1% 0% 1.50 1.50 0 0.23 0 0.23 0 0.27 0 0.26 0 0.27 0 0.26 0 1.50

    EPA 4% 0% 6.00 6.00 0 6.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 6.00

    I & CB 5% 0% 7.50 7.50 0 2.25 0 2.25 0 1.13 0 1.13 0 0.38 0 0.38 0 7.50

    DPR 1% 0% 1.50 1.50 0 1.50 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 1.50

    Total (A) 33.00 11.63 4.13 6.20 5.28 3.35 2.43 33.00

    Earthen Bund Mtr 3500 0.00 4.87 205 0.28 233 0.32 933 1.30 954 1.33 583 0.81 592 0.82 3500 4.87

    Tanka Num. 7 0.50 3.50 0 0.00 1 0.50 2 1.00 2 1.00 1 0.50 1 0.50 7 3.50

    Dhora Num. 13 2.00 26.00 1 2.00 1 2.00 3 6.00 4 8.00 2 4.00 2 4.00 13 26.00

    Khadin Num. 12 3.00 36.00 1 3.00 1 3.00 3 9.00 3 9.00 2 6.00 2 6.00 12 36.00

    Khet Talai Num. 3 3.50 10.50 0 0.00 1 3.50 1 3.50 0 0.00 1 3.50 0 0.00 3 10.50

    Bank Stabilization /Peripheral Bunds Mtr 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Conservation measures for non arable land 0 0 0 0 0 0 0

    Pasture Development hact. 5 0.50 2.50 0 0.00 1 0.50 1 0.50 1 0.50 1 0.50 1 0.50 5 2.50

    V - ditch Mtr 1200 0.00 0.33 70 0.02 80 0.02 320 0.09 327 0.09 200 0.06 203 0.06 1200 0.33

    Water Harvesting Structure Num. 2 0.85 1.70 0 0.00 1 0.85 1 0.85 0 0.00 0 0.00 0 0.00 2 1.70

    Afforestation hact. 8 0.50 4.00 0 0.00 1 0.50 3 1.50 2 1.00 1 0.50 1 0.50 8 4.00

    Drainage line treatment 0 0 0 0 0 0 0

    MMS Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD Num. 4 0.15 0.60 0 0.00 0 0.00 1 0.15 1 0.15 1 0.15 1 0.15 4 0.60

    WHS Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 90.00 5.30 11.20 23.89 21.07 16.02 12.53 90.00

    Horticulture plantation (vegetable,Medicine) Num. 1835 0.0015 2.75 0 0.00 60 0.09 300 0.45 590 0.89 450 0.68 435 0.65 1835 2.75

    Sprinklers and Drip irrigation hact. 9 0.20 1.80 0 0.00 1 0.20 3 0.60 4 0.80 1 0.20 0 0.00 9 1.80

    foriculture Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants hact. 5 0.24 1.20 0 0.00 0.25 0.06 2.00 0.48 2.00 0.48 0.75 0.18 0 0.00 5 1.20

    Vermi compost Num. 10 0.05 0.50 1 0.05 1 0.05 3 0.15 3 0.15 1 0.05 1 0.05 10 0.50

    Crop Demonstration Num. 190 0.02 3.80 10 0.20 10 0.20 50 1.00 80 1.60 20 0.40 20 0.40 190 3.80

    Micro Enterprise

    Dairy Num. 105 0.01 1.05 5 0.05 5 0.05 25 0.25 45 0.45 15 0.15 10 0.10 105 1.05

    Animal camp/Breed improovement Num. 9 0.50 4.50 1 0.50 1 0.50 3 1.50 2 1.00 1 0.50 1 0.50 9 4.50

    Poultry Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft Num. 4 0.10 0.40 1 0.10 1 0.10 1 0.10 1 0.10 0 0.00 0 0.00 4 0.40

    Animal Minral/ Mixar Num. 300 0.01 3.00 15 0.15 20 0.20 100 1.00 150 1.50 15 0.15 0 0.00 300 3.00

    SHG Land less/ BPL Num. 7 0.50 3.50 0 0.00 1 0.50 2 1.00 3 1.50 1 0.50 0 0.00 7 3.50

    Food Processing Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 22.50 1.05 1.95 6.53 8.47 2.81 1.70 22.50

    (D) Consolidation 3% 4.50 0.00 0.00 0.00 0.00 0.00 4.50 4.50Grand Total 150.00 17.98 17.27 36.61 34.81 22.17 21.16 150.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Badoda Gaun

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 30.00 30.00 0 3.00 0 3.00 0 9.00 0 7.20 0 4.80 0 3.00 0 30.00

    Monitoring 1% 0% 3.00 3.00 0 0.30 0 0.30 0 0.60 0 0.60 0 0.60 0 0.60 0 3.00

    Evaluation 1% 0% 3.00 3.00 0 0.45 0 0.45 0 0.54 0 0.51 0 0.54 0 0.51 0 3.00

    EPA 4% 0% 12.00 12.00 0 12.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 12.00

    I & CB 5% 0% 15.00 15.00 0 4.50 0 4.50 0 2.25 0 2.25 0 0.75 0 0.75 0 15.00

    DPR 1% 0% 3.00 3.00 0 3.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 3.00

    Total (A) 66.00 23.25 8.25 12.39 10.56 6.69 4.86 66.00

    Earthen Bund Mtr 7650 0.00139 10.63 446 0.62 510 0.71 2040 2.84 2085 2.90 1275 1.77 1294 1.80 7650 10.63

    Tanka Num. 32 0.5 16.00 2 1.00 2 1.00 9 4.50 9 4.50 5 2.50 5 2.50 32 16.00

    Dhora Num. 26 2 52.00 2 4.00 2 4.00 7 14.00 7 14.00 4 8.00 4 8.00 26 52.00

    Khadin Num. 22 3 66.00 1 3.00 2 6.00 5 15.00 6 18.00 4 12.00 4 12.00 22 66.00

    Khet Talai Num. 2 3.5 7.00 0.1167 0.41 0.1333 0.47 1 1.87 1 1.91 0 1.17 0 1.18 2 7.00

    Bank Stabilization /Peripheral Bunds Mtr 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Conservation measures for non arable land 0 0 0 0 0 0 0

    Pasture Development hact. 20 0.5 10.00 1 0.50 2 1.00 5 2.50 5 2.50 4 2.00 3 1.50 20 10.00

    V - ditch Mtr 8550 0.000277 2.37 498.75 0.14 570 0.16 2280 0.63 2330 0.65 1425 0.39 1446 0.40 8550 2.37

    Water Harvesting Structure Num. 4 0.85 3.40 0 0.00 0 0.00 1 0.85 1 0.85 1 0.85 1 0.85 4 3.40

    Afforestation hact. 18 0.5 9.00 1 0.50 1 0.50 5 2.50 5 2.50 3 1.50 3 1.50 18 9.00

    Drainage line treatment 0 0 0 0 0 0 0

    MMS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD Num. 24 0.15 3.60 1 0.15 2 0.30 6 0.90 7 1.05 4 0.60 4 0.60 24 3.60

    WHS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 180.00 10.32 14.13 45.58 48.85 30.78 30.33 180.00

    Horticulture plantation (vegetable,Medicine) Num. 4200 0.0015 6.30 150 0.23 325 0.49 1200 1.80 1865 2.80 400 0.60 260 0.39 4200 6.30

    Sprinklers and Drip irrigation hact. 22 0.20 4.40 1 0.20 2 0.40 7 1.40 7 1.40 3 0.60 2 0.40 22.00 4.40

    foriculture Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00

    Vegetables Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00

    Medicinal Plants hact. 6.65 0.24 1.60 0 0.00 0.5 0.12 2.50 0.60 2.50 0.60 1.15 0.28 0 0.00 6.65 1.60

    Vermi compost Num. 22 0.05 1.10 1 0.05 2 0.10 7 0.35 7 0.35 3 0.15 2 0.10 22 1.10

    Crop Demonstration Num. 360 0.02 7.20 24 0.48 24 0.48 120 2.40 120 2.40 36 0.72 36 0.72 360 7.20

    Micro Enterprise

    Dairy Num. 280 0.01 2.80 18 0.18 19 0.19 80 0.80 110 1.10 30 0.30 23 0.23 280 2.80

    Animal camp/Breed improovement Num. 18 0.50 9.00 1 0.50 1 0.50 6 3.00 6 3.00 2 1.00 2 1.00 18 9.00

    Poultry Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00

    Local Artisans/craft Num. 10 0.10 1.00 1 0.10 1 0.10 3 0.30 3 0.30 1 0.10 1 0.10 10 1.00

    Animal Minral/ Mixar Num. 660 0.01 6.60 44 0.44 44 0.44 220 2.20 220 2.20 66 0.66 66 0.66 660 6.60

    SHG Land less/ BPL Num. 10 0.50 5.00 1 0.50 1 0.50 3 1.50 3 1.50 1 0.50 1 0.50 10 5.00

    Food Processing Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 45.00 2.68 3.32 14.35 15.65 4.91 4.10 45.00

    (D) Consolidation 3% 9.00 0.00 0.00 0.00 0.00 0.00 9.00 9.00Grand Total 300.00 36.24 25.70 72.32 75.06 42.38 48.29 300.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Hameera

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 30.00 30.00 0 3.00 0 3.00 0 9.00 0 7.20 0 4.80 0 3.00 0 30.00Monitoring 1% 0% 3.00 3.00 0 0.30 0 0.30 0 0.60 0 0.60 0 0.60 0 0.60 0 3.00Evaluation 1% 0% 3.00 3.00 0 0.45 0 0.45 0 0.54 0 0.51 0 0.54 0 0.51 0 3.00EPA 4% 0% 12.00 12.00 0 12.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 12.00I & CB 5% 0% 15.00 15.00 0 4.50 0 4.50 0 2.25 0 2.25 0 0.75 0 0.75 0 15.00DPR 1% 0% 3.00 3.00 0 3.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 3.00

    Total (A) 66.00 23.25 8.25 12.39 10.56 6.69 4.86 66.00

    Earthen Bund Mtr 7400 0.00139 10.29 400 0.56 650 0.90 2000 2.78 2400 3.34 1200 1.67 750 1.04 7400 10.29Tanka Num. 20 0.5 10.00 2 1.00 4 2.00 4 2.00 5 2.50 3 1.50 2 1.00 20 10.00Dhora Num. 24 2 48.00 1 2.00 2 4.00 6 12.00 6 12.00 5 10.00 4 8.00 24 48.00Khadin Num. 26 3 78.00 1 3.00 2 6.00 6 18.00 7 21.00 5 15.00 5 15.00 26 78.00Khet Talai Num. 4 3.5 14.00 0 0.00 0 0.00 1 3.50 2 7.00 1 3.50 0 0.00 4 14.00Bank Stabilization /Peripheral Bunds Mtr 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Conservation measures for non arable land 0Pasture Development hact. 10 0.5 5.00 0.50 0.25 1.50 0.75 3.00 1.50 3.00 1.50 1 0.50 1 0.50 10 5.00V - ditch Mtr 3300 0.00028 0.91 100 0.03 210 0.06 800 0.22 1130 0.31 600 0.17 460 0.13 3300 0.91Water Harvesting Structure Num. 2 0.85 1.70 0 0.00 0 0.00 1 0.85 1 0.85 0 0.00 0 0.00 2 1.70Afforestation hact. 20 0.5 10.00 1.00 0.50 2.00 1.00 6.00 3.00 7.00 3.50 3.00 1.50 1.00 0.50 20 10.00Drainage line treatment MMS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00LSCD Num. 14 0.15 2.10 1 0.15 2 0.30 4 0.60 4 0.60 2 0.30 1 0.15 14 2.10WHS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Gully Plugs(ECD) Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Ground water recharge Structure Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 180.00 7.48 15.01 44.45 52.60 34.13 26.32 180.00

    Horticulture plantation (vegetable,Medicine) Num. 3667 0.0015 5.50 200 0.30 425 0.64 980 1.47 1500 2.25 300 0.45 262 0.39 3667 5.50Sprinklers and Drip irrigation hact. 18 0.20 3.60 1.25 0.25 1.75 0.35 5.00 1.00 7.00 1.40 2.00 0.40 1.00 0.20 18.00 3.60foriculture Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Vegetables Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Medicinal Plants hact. 10 0.24 2.40 0.50 0.12 1.00 0.24 3.00 0.72 4.00 0.96 1.00 0.24 0.50 0.12 10.00 2.40Vermi compost Num. 20 0.05 1.00 2 0.10 4 0.20 4 0.20 6 0.30 2 0.10 2 0.10 20 1.00Crop Demonstration Num. 380 0.02 7.60 10 0.20 30 0.60 120 2.40 130 2.60 60 1.20 30 0.60 380 7.60Micro EnterpriseDairy Num. 210 0.01 2.10 10 0.10 30 0.30 60 0.60 70 0.70 20 0.20 20 0.20 210 2.10Animal camp/Breed improovement Num. 18 0.50 9.00 1 0.50 2 1.00 5 2.50 6 3.00 2 1.00 2 1.00 18 9.00Poultry Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Local Artisans/craft Num. 8 0.10 0.80 0 0.00 1 0.10 2 0.20 3 0.30 1 0.10 1 0.10 8 0.80Animal Minral/ Mixar Num. 600 0.01 6.00 20 0.20 30 0.30 190 1.90 250 2.50 60 0.60 50 0.50 600 6.00SHG Land less/ BPL Num. 14 0.50 7.00 0 0.00 1 0.50 4 2.00 6 3.00 2 1.00 1 0.50 14 7.00Food Processing Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 45.00 1.77 4.23 12.99 17.01 5.29 3.71 45.00(D) Consolidation 3% 9.00 0.00 0.00 0.00 0.00 0.00 9.00 9.00

    Grand Total 300.00 32.50 27.49 69.83 80.17 46.11 43.89 300.00% Targets

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Chandhan

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 15.00 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00Monitoring 1% 0% 1.50 1.50 0 0.15 0 0.15 0 0.30 0 0.30 0 0.30 0 0.30 0 1.50Evaluation 1% 0% 1.50 1.50 0 0.23 0 0.23 0 0.27 0 0.26 0 0.27 0 0.26 0 1.50EPA 4% 0% 6.00 6.00 0 6.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 6.00I & CB 5% 0% 7.50 7.50 0 2.25 0 2.25 0 1.13 0 1.13 0 0.38 0 0.38 0 7.50DPR 1% 0% 1.50 1.50 0 1.50 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 1.50

    Total (A) 33.00 11.63 4.13 6.20 5.28 3.35 2.43 33.00

    Earthen Bund Mtr 3700 0.00139 5.14 100 0.14 260 0.36 1050 1.46 1600 2.22 400 0.56 290 0.40 3700 5.14Tanka Num. 10 0.5 5.00 0 0.00 1 0.50 3 1.50 3 1.50 2 1.00 1 0.50 10 5.00Dhora Num. 12 2 24.00 1 2.00 2 4.00 2 4.00 3 6.00 2 4.00 2 4.00 12 24.00Khadin Num. 13 3 39.00 0 0.00 1 3.00 3 9.00 3 9.00 3 9.00 3 9.00 13 39.00Khet Talai Num. 2 3.5 7.00 0 0.00 0 0.00 1 3.50 1 3.50 0 0.00 0 0.00 2 7.00Bank Stabilization /Peripheral Bunds Mtr 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Conservation measures for non arable landPasture Development hact. 5 0.5 2.50 0.00 0.00 0.50 0.25 2.00 1.00 2.00 1.00 0.50 0.25 0.00 0.00 5.00 2.50V - ditch Mtr 1650 0.00028 0.46 150 0.04 200 0.06 400 0.11 500 0.14 200 0.06 200 0.06 1650 0.46Water Harvesting Structure Num. 1 0.85 0.85 0 0.00 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 1 0.85Afforestation hact. 10 0.5 5.00 0.50 0.25 1.00 0.50 3.00 1.50 3.00 1.50 1.50 0.75 1.00 0.50 10.00 5.00Drainage line treatment MMS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00LSCD Num. 7 0.15 1.05 0 0.00 1 0.15 2 0.30 3 0.45 1 0.15 0 0.00 7 1.05WHS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Gully Plugs(ECD) Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Ground water recharge Structure Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 90.00 2.43 8.82 22.37 26.16 15.76 14.46 90.00

    Horticulture plantation (vegetable,Medicine) Num. 1835 0.0015 2.75 25 0.04 90 0.14 600 0.90 705 1.06 300 0.45 115 0.17 1835 2.75Sprinklers and Drip irrigation hact. 9 0.20 1.80 0.50 0.10 1.25 0.25 2.50 0.50 3.00 0.60 0.75 0.15 1 0.20 9.00 1.80foriculture Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Vegetables Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Medicinal Plants hact. 5 0.24 1.20 0.25 0.06 0.50 0.12 1.50 0.36 2.00 0.48 0.25 0.06 0.50 0.12 5.00 1.20Vermi compost Num. 10 0.05 0.50 1 0.05 1 0.05 3 0.15 3 0.15 1 0.05 1 0.05 10 0.50Crop Demonstration Num. 190 0.02 3.80 10 0.20 20 0.40 50 1.00 60 1.20 20 0.40 30 0.60 190 3.80Micro Enterprise 0Dairy Num. 105 0.01 1.05 10 0.10 10 0.10 30 0.30 30 0.30 10 0.10 15 0.15 105 1.05Animal camp/Breed improovement Num. 9 0.50 4.50 0 0.00 1 0.50 3 1.50 3 1.50 1 0.50 1 0.50 9 4.50Poultry Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00Local Artisans/craft Num. 4 0.10 0.40 0 0.00 0 0.00 1 0.10 2 0.20 0 0.00 1 0.10 4 0.40Animal Minral/ Mixar Num. 300 0.01 3.00 10 0.10 30 0.30 100 1.00 120 1.20 20 0.20 20 0.20 300 3.00SHG Land less/ BPL Num. 7 0.50 3.50 0 0.00 1 0.50 2 1.00 3 1.50 0 0.00 1 0.50 7 3.50Food Processing Num. 0 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 22.50 0.65 2.36 6.81 8.19 1.91 2.59 22.50(D) Consolidation 3% 4.50 0.00 0.00 0.00 0.00 0.00 4.50 4.50

    Grand Total 150.00 14.70 15.30 35.38 39.63 21.02 23.98 150.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Roopasi

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 15.00 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    Monitoring 1% 0% 1.50 1.50 0 0.15 0 0.15 0 0.30 0 0.30 0 0.30 0 0.30 0 1.50

    Evaluation 1% 0% 1.50 1.50 0 0.23 0 0.23 0 0.27 0 0.26 0 0.27 0 0.26 0 1.50

    EPA 4% 0% 6.00 6.00 0 6.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 6.00

    I & CB 5% 0% 7.50 7.50 0 2.25 0 2.25 0 1.13 0 1.13 0 0.38 0 0.38 0 7.50

    DPR 1% 0% 1.50 1.50 0 1.50 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 1.50

    Total (A) 33.00 11.63 4.13 6.20 5.28 3.35 2.43 33.00

    Earthen Bund Mtr 4200 0.00139 5.84 80 0.11 145 0.20 1500 2.09 2000 2.78 300 0.42 175 0.24 4200 5.84

    Tanka Num. 13 0.5 6.50 1 0.50 2 1.00 4 2.00 5 2.50 1 0.50 0 0.00 13 6.50

    Dhora Num. 10 2 20.00 0 0.00 1 2.00 2 4.00 3 6.00 2 4.00 2 4.00 10 20.00

    Khadin Num. 12 3 36.00 1 3.00 1 3.00 2 6.00 3 9.00 2 6.00 3 9.00 12 36.00

    Khet Talai Num. 3 3.5 10.50 0 0.00 0 0.00 1 3.50 1 3.50 1 3.50 0 0.00 3 10.50

    Bank Stabilization /Peripheral Bunds Mtr 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Conservation measures for non arable land 0

    Pasture Development hact. 6 0.5 3.00 0.25 0.13 0.75 0.38 2.00 1.00 2.00 1.00 1.00 0.50 0.00 0.00 6.00 3.00

    V - ditch Mtr 2950 0.00028 0.82 200 0.06 300 0.08 900 0.25 1000 0.28 300 0.08 250 0.07 2950 0.82

    Water Harvesting Structure Num. 3 0.85 2.55 0 0.00 0 0.00 1 0.85 1 0.85 1 0.85 0 0.00 3 2.55

    Afforestation hact. 6 0.5 3.00 0.25 0.13 0.75 0.38 1.75 0.88 2.00 1.00 0.75 0.38 0.50 0.25 6.00 3.00

    Drainage line treatment MMS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD Num. 12 0.15 1.80 1 0.15 1 0.15 3 0.45 4 0.60 2 0.30 1 0.15 12 1.80

    WHS Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure Num. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 90.00 4.07 7.18 21.01 27.51 16.53 13.71 90.00

    Horticulture plantation (vegetable,Medicine) Num. 2492 0.0015 3.74 100 0.15 165 0.25 800 1.20 1000 1.50 200 0.30 227 0.34 2492 3.74

    Sprinklers and Drip irrigation hact. 4 0.20 0.80 0.25 0.05 0.50 0.10 1.25 0.25 1.25 0.25 0.50 0.10 0 0.05 4.00 0.80

    foriculture Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants hact. 6.65 0.24 1.60 0.50 0.12 0.75 0.18 1.50 0.36 2.50 0.60 1.00 0.24 0.40 0.10 6.65 1.60

    Vermi compost Num. 12 0.05 0.60 1 0.05 2 0.10 3 0.15 4 0.20 1 0.05 1 0.05 12 0.60

    Crop Demonstration Num. 183 0.02 3.66 10 0.20 20 0.40 60 1.20 60 1.20 15 0.30 18 0.36 183 3.66

    Micro Enterprise 0

    Dairy Num. 220 0.01 2.20 20 0.20 30 0.30 49 0.49 60 0.60 30 0.30 31 0.31 220 2.20

    Animal camp/Breed improovement Num. 8 0.50 4.00 0 0.00 1 0.50 3 1.50 3 1.50 1 0.50 0 0.00 8 4.00

    Poultry Num. 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft Num. 6 0.10 0.60 0 0.00 1 0.10 2 0.20 2 0.20 0 0.00 1 0.10 6 0.60

    Animal Minral/ Mixar Num. 280 0.01 2.80 10 0.10 20 0.20 80 0.80 80 0.80 50 0.50 40 0.40 280 2.80

    SHG Land less/ BPL Num. 5 0.50 2.50 0 0.00 0 0.00 2 1.00 2 1.00 1 0.50 0 0.00 5 2.50

    Food Processing Num. 0 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 22.49 0.87 2.13 7.15 7.85 2.79 1.71 22.49

    (D) Consolidation 3% 4.50 0.00 0.00 0.00 0.00 0.00 4.50 4.50Grand Total 150.00 16.56 13.44 34.35 40.64 22.66 22.35 150.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Chinnu

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • s

  • Unit of Pre-project Expected Post-

    measurement Status project Status Remarks

    1 Meters 150-200 120-150

    2 No. - -

    3 Description salty Clean water

    4 Description 6 month 12 month

    5 Ha - -

    6 Description - -

    7 Ha -

    I Area under single crop Ha 1980 2500

    Ii Area under double crop Ha 0 50

    Iii Area under multiple crop Ha 0 0

    8 Ha 2850 4000

    9 yield of q/ha 3.72 5

    major crops of

    areaq/ha - -

    q/ha 5.05 6

    q/ha 6.23 7

    10 production ton 314 400

    of major crops of

    areaton - -

    ton 542 600

    ton 38 50

    11 Ha 68 90

    12 Ha - 10

    13 Ha 8 50

    14 Ha 24 80

    15 Q 162500 350000

    16 Litres/day 3500 5000

    17 No. 7 16

    18 No. 14500 25000

    19 Rs.in la 0.16 0.25

    20 No. 137 0

    21 No. - 1

    CHAPTER- VI EXPECTED OUT COMES

    S. No. Item

    Status of water table (Depth to

    Ground water structures

    Quality of drinking water

    Availability of drinking water

    Change in irrigated Area

    Change in cropping/ land use

    Area under agricultural crop

    Change in cultivated Area

    Yield of Bajra

    Yield of Wheat

    Yield of GUAR

    Yield of MOONG

    Production of Bajra

    Production of Wheat

    Production of GUAR

    Production of MOONG

    Area under vegetation

    Area under horticulture

    Area under fuel

    Area under Fodder

    Fodder production

    Milk production

    SHGs Active

    No. of livelihoods

    Income

    Migration

    SHG Federations formed

  • Critical Assumption

    • No severe droughts/ unexpected floods/ natural disasters

    • Adequate funds are allocated for the same and released on time.

    • There is no significant pest/ disease attack, and if so, then it will have been contained before

    irreversible damage is done.

    • Adverse market conditions do not persist long.

    • Sound macro-economic and growth conditions continue and the benefits are widely distributed

    particularly in the rural areas.

    • Facilitating agencies and resource providers have the required competent staff so that timely and

    appropriate technical advice and services are provided to farmers whenever required.

    • The Capacity Building Plan is implemented, monitored and modified to address evolving needs and

    feedback from participants.

    • The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District and

    State level Implementing