CATEGORY:INDUSTRY- MULTIDISCIPLINARYCOLLABORATION
TEAMS NAME: INNO-BIM 2(WH)
TEAMS MEMBERS: ANG KOOI FUNG, TAM SOOK MENG, ROMMEL BERNAL,
JIM DUPITAS, SOFIA ELARMO, SU MON SOE, JEEVARATHINAM,
FRANCO LOBRIGO, TRAN DINH BAC & MADHANAGOPAL
THE MAXWELL
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
2/16
INNO-BIM 2BIM WORKFLOW OVERVIEW
BIM Model
Architect
Structure Engineer
MEP EngineerContractor
Fabricator
Quantity Surveyor
Owner
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
3/16
INNO-BIM 2
DESIGNCONCEPT
DESIGNANALYSIS
BUILDABILITY&
GREENMARK
DESIGNDOCUMENTDRAWINGS
ARCHITECTURALRENDERING/ANIMATIONS
ARCHITECTURALTAKE-OFF
STRUCTURALDESIGN MODEL
MEP DESIGNMODEL
DESIGNDEVELOPMENT ARCHITECTURAL DESIGN
SOLAR RADIATION SUN PATH ANALYSIS DAYLIGHTING ANALYSIS WIND ANALYSIS SITE ORIENTATION THERMAL ANALYSIS ARTIFICIAL LIGHTINGANALYSIS
ARCHITECTURALDESIGN MODEL
BIM WORKFLOW
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
4/16
INNO-BIM 2
DESIGNDEVELOPMENT STRUCTURAL DESIGN
BIM WORKFLOW
DESIGNANALYSIS
STRUCTURE PERFORMANCEFOUNDATION DESIGNCOLUMN DESIGNBEAM DESIGNSLAB DESIGN
DESIGNDOCUMENTDRAWINGS
STRUCTURALRENDERING/ANIMATIONS
STRUCTURALTAKE-OFF
ARCHITECTURALDESIGN MODEL
MEP DESIGNMODEL
STRUCTURALDESIGN MODEL
ARCHITECTURALDESIGN MODEL
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
5/16
INNO-BIM 2BIM WORKFLOW
DESIGNDEVELOPMENT MEP DESIGN
DESIGNANALYSIS
Energy DataCooling Load Analysis
DESIGNDOCUMENTDRAWINGS
MEP RENDERING/ANIMATIONS
MEP TAKE-OFF
ARCHITECTURALDESIGN MODEL
STRUCTURALDESIGN MODEL
MEPDESIGN MODEL
STRUCTURALDESIGN MODEL
ARCHITECTURALDESIGN MODEL
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
6/16
INNO-BIM 2
CONSTRUCTIONPHASE
BIM WORKFLOW
PLANNING/LOGISTIC
QUANTITY &COST
PRE-FABRICATION
SAFETY
TECHNICALCOORDINATION
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
7/16
INNO-BIM 2COLLABORATION OVERVIEW
DESIGN
FACILITYMANAGEMENT
ARCHITECTS
STRUCTURALENGINEERS
MEPENGINEERS
CONSTRUCTION
PLANNING/LOGISTICS
QSPRE-
FABRICATIONSAFETY
Buzzsaw sysncautomaticallyuploads/downloadsmultiple models fromdifferent firms to/froma central Buzzsawlocation in the cloud
Server
View 2D and 3D projectdesigns from the field withBuzzsaw mobile foriPhone, iPad, and Android
Iphone/ Ipad &
Android
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
8/16
INNO-BIM 2FINAL ARCHITECTURAL DESIGN
SOLAR PANEL/ LOUVERS
UPN WITH RETAIL LINK TO TANJONGPAGAR MRT
BUILDING SKIN
OPEN CONCEPT FOOD COURT ATPODIUM ROOF TOP
PODIUM ROOFTOP LANDSCAPE
NATURAL LIGHTING FOR OFFICE SPACE
1
2
3
4
5
6
1
1
1
2
3
54
6
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
9/16
INNO-BIM 2FINAL STRUCTURAL DESIGN
Podium
1st to 4th storey designed as 300mm thick
flat slab typical with 600x600mm columnsand 1500x1500x500mm drop panel 800mm diameter CBP wall is provided atbasement The basement designed as 400mm thickslab supporting by 800mm diameter piles
Office Tower
Designed as structural column with
beam-slab framing Beams have been standardized to2000x500mm, 250x500, 750x500 and750x700mm The slab is designed as 250mm thicktypically with 125mm precast prestressedplank and 125mm topping
Multi Storey Car Park
Full precast system
250x800mm precast column 250x500mm precast beam 100mm thick precast slab with 100mmthick topping The columns will be supported by250x250mm precast piles.
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
10/16
INNO-BIM 2FINAL MEP DESIGN
Group of wash basins connected in seriesGroup of urinals connected in seriesLoop ventilating pipe provided
AHU and 177 kw Cooling tower placed on the roofWSHP (Water Source Heat Pumps) are used to coolthe building which is very effective.
Cooling system designed based on the heating &cooling load calculated using Revit MEP
Piping System HVAC System
Electrical System
Use of lifts with AC variable voltage andvariable frequency (VVVF) motor driveand energy efficient features such as sleepmode features are used.
Fire Protection System
Both Dry & Wet fire protectionsystems are used
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
11/16
GBS(Energy Analysis
Software)
INNO-BIM 2BIM FOR SUSTAINABILITY & BUILDABILITY
BUILDABILITY SCORE COMPUTATION
BS Score Structural
System = 40
BS Score of differencestructural systemgenerated directly fromStructural Model
Total GFA = 123,000 m2
Required Buildable Score = 77
SUSTAINABILITY ANALYSIS
Ecotect(Sustainable
Building DesignSoftware)
Site Analysis
OrientationAnalysis
Wind Analysis
Sun Path &Shadow Analysis
Thermal Analysis
BS Score of differencewall system generateddirectly fromArchitectural Model
Carpark NV= 2593/4112=63% > 20%
BS Score Wall System =To be further verifiedby Revit Archi model
CARPARK NATURAL VENTILATION
Car park & NV area generated
directly from Revit Structure.
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
12/16
INNO-BIM 2BIM FOR 2D SHOP DRAWINGS
The precast connection details can be better understandby including 3D view generated automatically from RevitStructure
M&E combined services drawings generated directlyfrom Revit MEP
Structure shop drawings generated directly from RevitStructure
Architecture shop drawings generated directly fromRevit Architectural
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
13/16
INNO-BIM 2BIM FOR QUALITY COORDINATION
Set conflict rule forclash checking
Run clash check and
the clash points will behighlightedautomatically
Export Architectural, Structureand MEP Revit Model to IFCformat
Import Architectural,Structure and MEP RevitModel in IFC format toTekla BIMSight
The Architectural,Structure and MEP modelsare highlighted in differentcolor for easyidentification
Zoom in to the clasharea to study the clash indetail
The clash point can bemarked up and capturedas picture and send outtogether in a file to therelevant party.
The pictures captured canbe used to generate
walkthrough inside the file.
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
14/16
INNO-BIM 2BIM FOR CONSTRUCTION PLANNING
3D visualization for carpark construction sequence.Useful for training to the site staff/ subcon.
4D schedule simulation useful for Productionteam players to foresee and anticipate thework flow on site
Study the Underground Pedestrain Walkway(UPN) with better visualization
To Tanjong PagarMRT Exit G
Proposed UPN
Study the interface/ PC connectiondetails with better visualization
3D visualization make the decisioneasier for temporary facilities
and tower crane location
planning, etc.
7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2
15/16
INNO-BIM 2BIM FOR QUANTITY SURVEY
Precast Quantity generated directly from Structuralmodel is useful for mould and logistic planning.
Precast Quantity
Car Park Lot QuantityM&E Quantity
Mechanical equipment quantity, plumbingfixture quantities and space schedulegenerated directly from Revit MEP
Total Concrete Quantity
Total car park quantity generated directly
from Revit Architecture.
Required CP Lot = 400
Total Normal CP Lot =417
Total HandicappedCP Lot = 26
Total = 443, OK!
Total concrete Volume= 65880 m3
Total concrete quantitygenerated directly from RevitArchitecture.