Bill of Quantity For Rasini Village BILL OF QUANTITY FOR RASINI WATER PROJECT

BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Embed Size (px)

Citation preview

Page 1: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

BILL OF QUANTITY

FOR

RASINI WATER PROJECT

Page 2: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

1

BILL (A) – CONSTRUCTION OF 14.968KM PIPELINE

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.0

1.1

1.2

1.3

1.4

1.5

Clearing of pipeline route

Clear pipeline route of bushes, undergrowth,

trees, debris and rubbish and dispose. Width

of clearance to be 2.0m to accommodate for

access road and trench and excavation of

materials.

Excavation

Excavate for pipe trench to a depth not

exceeding 1000mm for 80mm diameter Pvc

pipes, prepare bed on completion of

excavation.

Excavate for pipe trench to a depth not

exceeding 1000mm for 50mm diameter Pvc

pipes class D, prepare bed on completion of

excavation.

Excavate for pipe trench to a depth not

exceeding 1000mm for 25mm diameter Pvc

pipes class D, prepare bed on completion of

excavation.

Excavate for pipe trench to a depth not

exceeding 1000mm for 20mm diameter Pvc

pipes class D, prepare bed on completion of

excavation.

Excavate for pipe trench to a depth not

exceeding 1000mm for 20mm diameter PPR

pipes; prepare bed on completion of

excavation.

M

M

M

M

M

M

14,968

1,380

1,900

528

7,866

3,294

5

150

100

80

50

50

74,840

207,000

190,000

42,240

393,300

164,700

SUB-TOTAL

1,072,080

Page 3: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

2

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.6

1.7

1.8

1.9

2.0

2.1

Balance Brought Forward

Laying and jointing of pvc pipes.

Distribute, lay and joint 80mm diameter Pvc

pipes class D in trench including making

provisions for appurtenances and pipe fittings

as per specifications.

Distribute, lay and joint 50mm diameter Pvc

pipes class D in trench including making

provisions for appurtenances and pipe fittings

as per specifications.

Distribute, lay and joint 25mm diameter Pvc

pipes class D in trench including making

provisions for appurtenances and pipe fittings

as per specifications.

Distribute, lay and joint 20mm diameter Pvc

pipes class D in trench including making

provisions for appurtenances and pipe fittings

as per specifications.

Distribute, lay and joint 20mm diameter PPR

pipes for meter installation.

Backfilling

Backfill trench using well selected excavated

material after laying and jointing the 100mm,

80mm, 50mm, 25mm and 20mm PVC and

PPR pipes.

M

M

M

M

M

M

1,380

1,900

528

7,866

3,294

14,968

40

30

30

30

30

10

1,072,080

55,200

57,000

15,840

235,980

98,820

149,680

SUB-TOTAL

1,684,600

Page 4: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

3

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

2.2

2.3

2.4

2.5

Balance Brought Forward

Installation of 549 Consumer Water

Meters

Distribute and install 549 No. of 15mm Kent

Water Meters as directed by the Engineer.

Construction of valve chambers

Construct standard reinforced concrete valve

chambers. Include for hardcore fill, boxing

out for manhole and fixing of 1No. MS

manhole cover and frame light duty 600x

450mm for water master meters, air valves

and washout.

Pressure Testing & Disinfection.

Allow for carrying out pressure testing on

pipeline.

Installation of Air Valves, Wash out and

Water Master Meters.

Install rising air valves wash out and water

master meters and connect to pipeline as

instructed on site.

No.

No.

M

No.

549

8

3,808

8

250

4,000

5

1,000

1,684,600

137,250

32,000

19,040

8,000

SUB-TOTAL

1,880,890

Page 5: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

4

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

2.6

2.7

2.8

2.9

3.0

Balance Brought Forward

Installation of air valves, wash out and

water meters.

Provide and install 2” water meters at inter

connection of the 80mm diameter PVC

Pipeline.

Construction of interconnection chambers.

Supply all materials, construct chambers for

interconnection of the gravity main of 80mm

diameter and the extension distribution mains

of 50mm

Install and connect to pipeline sluice valve

and all other fittings.

Miscellaneous

Provide concrete class 15 include for the

required formwork and additional excavation

for anchor blocks and surrounding of pipeline

as directed by the Engineer (Provisional).

Mark post

Provide, lay and fix in place and paint pre-cast

reinforced concrete marker posts along the

pipeline at 200m interval, the posts to be with

letter 100mm, 80mm and 50mm posts be

painted blue. The size to be 75mm x100mm x

150mm long.

No.

No.

No.

No.

No.

15

8

2

4

25

1,000

4,000

1,000

4,000

2,000

1,880,890

15,000

32,000

2,000

16,000

50,000

TOTAL 1,995,890

Page 6: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

5

BILL (B) – MATERIALS FOR PIPELINE Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

PVC 80mm Diameter pipes class D

PVC 50mm Diameter pipes class D

PVC 25mm Diameter pipes class D

PVC 20mm Diameter pipes class D

PPR 20mm Diameter pipes class D

PVC Tee 80mm Diameter Tee

PVC 80mm Diameter Adaptor (male

threaded)

PVC 3” x 2” Reducing socket

G.I. 1 meter pipe Heavy class 3” (one end to

be flanged and the other end threaded).

G.I. 2 meter pipe 2” (one end flanged and the

other end threaded).

PVC Tee 2”

PVC 2” x 1” Reducing socket

PVC 1” Tee

PVC 1” x 3/4” Reducing socket

PVC 3/4” Tee

PVC 3/4” Adaptor

G.I Tee ¾’’

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

NO

230

317

88

1311

1,098

21

10

31

6

12

52

19

72

145

320

549

150

2,500

1,000

550

350

500

800

650

650

1,700

2,000

320

350

150

100

80

60

100

342,500

317,000

48,400

458,850

274,500

16,800

6,500

20,150

10,200

24,000

16,640

6,650

10,800

14,500

25,600

32,940

15,000

SUB-TOTAL 1,641,030

Page 7: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

6

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

38.

Balance Brought Forward

G.I 3” Socket

PVC 1” Adaptor

G.I 3/4” Plain socket

G.I 3/4” Elbow

G.I 3/4” Bend

Water Meter (Kent) 1/2”

G.I 3/4” x

1/2” Reducing Bush

Tap (Pegler) 1/2”

Thread seal

Solfix cement

Sluice valve 3”

Gate valve 2”

Gate valve 1”

Gate valve 3/4”

G.I Nipple 3/4”

No.

No.

No.

No.

No.

No.

No.

No.

No.

LTR.

No.

No.

No.

No.

No.

24

190

1,098

2,196

1,098

549

1,647

549

2,500

100

3

8

6

1,098

357

750

100

60

80

80

2,500

45

700

70

1500

18,000

4,500

1,300

850

80

1,641,030

15,600

19,000

65,880

175,680

87,840

1,372,500

74,115

384,300

175,000

150,000

54,000

36,000

7,800

933,300

28,560

SUB-TOTAL 5,220,605

Page 8: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

7

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.

2.

4.

5.

6.

7.

8.

9.

10.

11.

13.

15.

16.

17.

Balance Brought Forward

MATERIALS FOR VALVE CHAMBERS.

Water meter 3” (Kent) Flanged

Water meter 2” Flanged

Air valve 2” Female screwed

Gate valve 2” U.K

G.I Nipple 2”

G.I Plain socket 2”

G.I Tee 2”

G.I Tee Flanged 3” (both sides)

G.I Plain socket 3”

PVC Adaptor 3”

G.I Flange 3”(Heavy duty)

Bolts, Nuts and Washers of 16mm Diameter

of 3” length

Bolts, Nuts and Washers of 10mm Diameter

of 3” length

Gaskets 6mm thickness

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

Kg

2

1

6

32

12

12

6

3

6

6

6

100

100

10

28,000

19,000

15,000

4,000

250

200

300

6,500

500

650

1,200

75

65

1,200

5,220,605

56,000

19,000

90,000

128,000

3,000

2,400

1,800

19,500

3,000

3,900

7,200

7,500

6,500

12,000

SUB-TOTAL 5,580,405

Page 9: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

8

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

18.

20.

21.

22.

23.

24.

25.

26.

Balance Brought Forward

PVC Adaptors 2”

Coral Blocks 9” x 9” x 16”

Portland Cement

Building Sand

Ballast

Provide for pre-cast reinforced cover for

12No. valve chambers

Reinforcement (Y10)

Binding wire

No.

No.

Bag.

Tonne

Tonne

Lump

Sum

M

Kg

76

1,200

72

12

6

1

288

6

260

75

950

3,500

2,400

60,000

100

200

5,580,405

19,760

90,000

68,400

42,000

14,400

60,000

28,800

1,200

MATERIALS TOTAL 5,904,965

Page 10: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

9

BILL (C) – CONSTRUCTION OF 50M3 SUMP TANK

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

Site Clearance

Clear tank site of all bushes, scrubs,

undergrowth and trees and remove all stumps

and roots and dispose.

Excavate tank site commencing from 200mm

below ground level but not exceeding 1.5m

deep.

Ditto 1.5m to 3.0m deep.

Provide, place and compact 200mm thick

hardcore as shown on the drawings.

Provide, place 50mm thick blinding 1:3:6

concrete mix on top of hardcore and compact.

Provide, mix and place 250mm thick vibrated

reinforced concrete 1:2:4 mix to floor slab.

Allow for curing.

Provide, mix and place 1:3 cement sand

screed 20mm thick on top of floor slab. Allow

for curing.

Provide, place and joint 250mm thick dressed

coral stone tank wall in 1:3 cement sand

mortar as directed by the engineer.

Provide, prepare and apply 1:3 cement sand

plaster of 25mm thick to internal sides of tank

wall. Allow for water proof cement and

curing.

Lump

Sum

M3

M3

M2

M2

M3

M2

M2

M2

1

60

20

40

40

10

38

37

37

2,000

400

600

1,000

500

25,000

500

3,000

500

2,000

24,000

12,000

40,000

20,000

250,000

19,000

111,000

18,500

SUB-TOTAL 496,500

Page 11: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

10

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.9

2.0

2.1

2.2

2.3

2.4

2.5

Balance Brought Forward

Provide, prepare and apply 1:3 cement sand

plaster of 20mm thick to external sides of tank

wall. Allow for curing.

Reinforcement

Provide and fix R8 reinforcement bars in

horizontal mortar joint of tank wall as shown

on drawing.

Provide and fix Y10 reinforcement bars in

concrete foundation of tank bottom as shown

on drawings directed by engineer.

Provide and fix Y10 reinforcement bars in

concrete roof slab of the tank as shown on the

drawing.

Provide a ventilation of 100mm diameter

using G.I bends on the roof slab of the tank

and fix gauge wire as diameter on site.

Provide and fix all the piping system of inlet,

outlet, washout and all other necessary fittings

of the tank as directed on site.

Provide materials for construction of valve

chamber at inlet and outlet of tank.

M2

M

M

M

No

Lump

sum

No

37

400

856

887

4

1

2

500

100

120

120

4,000

15,000

40,000

496,500

18,500

40,000

102,720

106,440

16,000

15,000

80,000

SUB-TOTAL 875,160

Page 12: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

11

Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

2.6

2.7

2.8

Balance Brought Forward

Sundries

Provide, mix and place reinforced concrete

1:2:4 to column as shown on the drawings.

Allow for plastering. The column size to be

200 x 200mm.

Provide a manhole opening of size 600mm x

600mm on top of roof with a lockable cover.

Provide, erect and fix Y10 bar on the floor

slab for the columns as shown on the

drawings.

No.

No.

M

2

1

24

15,000

4,000

120

875,160

30,000

4,000

2,880

TOTAL 912,040

Page 13: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

12

BILL (D) - FABRICATION & INSTALLATION OF 24M ELEVATED TANK Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.0

1.2

1.3

1.4

1.5

Excavation and earthworks.

Excavate for foundation to a depth not

exceeding 1500mm.

Tank construction.

Construct a 50m3

METRIC COLD Pressed

Steel Sectional Water Storage Tank of size

5000mm x 5000mm x 2000mm to BS 1564

Part II complete with 1.5mm thick pitched

roof cover, Internal & External ladders, Water

Level Indicator, Vent Cleats, Stays, Manhole

with lockable cover, Glasticord joining

compound, galvanized nuts, bolts & washers.

Tank painted with 2 coats Bituprime

internally & Aluminium paint externally –

Plate thickness 4.5mm.

Provide 15m high Tank tower to BS 449

complete with walk way, hand rail, ladder

painted with 2 coat of Aluminium paint.

Fabricate and erection of structural steel work

for 15m steel tower.

Allow for piping costs and transportation to

site.

Item

No.

No.

Item

Item

1

1

1

1

1

350,000

796,210

1,789,480

259,500

1,216,000

350,000

796,210

1,789,480

259,500

1,216,000

TOTAL 4,411,190

Page 14: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

13

BILL (E) – INSTALLATION OF SOLAR PUMPING SYSTEM Item

No. Description Unit Qty. Rate

Amount

(Kshs.)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

Supply and install a solar pump for pumping

water from a 10m deep well to a 15m high

50m3

water tower. Consider a 45m total head

and 50,000 litres daily water requirement.

Lorentz PU4000 C-SJ8-15pump c/w motor

PS4000 4kVA DC pump controller

PV Disconnect switch 440v/40A

Well-probe sensor

Solarworld 85w 12v Solar modules

Solarworld cable dual core

Surge Protector PS4000

4mm2

4core submersible cable

Cable joint (1.5mm-4mm)

Pressure KIT Switch

Dayliff 11/2” 3m pipe

Dayliff 11/2” adaptor set

Solar support structure

Installation materials

Installation Labour & Transport

Fencing chain link and securing the solar

system and the well.

No.

No.

No.

No.

No.

M

No.

M

No.

No.

No.

No.

LS.

LS.

LS.

SM.

1

1

1

1

42

100

1

100

2

1

7

1

1

1

1

5

290,000

192,000

35,000

9,800

7,650

90

31,000

510

2,600

7,800

1,900

3,900

226,330

75,000

45,000

10,000

290,000

192,000

35,000

9,800

321,300

9,000

31,000

51,000

5,200

7,800

13,300

3,900

226,330

75,000

45,000

50,000

TOTAL 1,365,630

Page 15: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

14

GENERAL SUMMARY OF BILL OF QUANTITY FOR RASINI VILLAGE

BOQ

ITEM.

DESCRIPTION AMOUNT (KSHS)

BILL (A) CONSTRUCTION OF 14.968KM PIPELINE 1,995,890

BILL (B) MATERIAL FOR 14.968KM PIPELINE 5,904,965

BILL (C) CONSTRUCTION OF 50M3 SUMP TANK 912,040

BILL (D) CONSTRUCTION OF 24M ELEVATED TANK 4,411,190

BILL (E) INSTALLATION OF SOLAR PUMPING SYSTEM 1,365,630

SUB-TOTAL 14,589,715

CONTINGENCY (5%) 729,485.75

GRAND TOTAL 15,319,201

Page 16: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

15

PROFILE DRAWINGS

FOR

RASINI WATER PROJECT

Page 17: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

16

Page 18: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

17

Page 19: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

18

SUMP TANK DRAWINGS

FOR

FAZA WATER & SANITATION PROJECT

Page 20: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

19

Page 21: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

20

Page 22: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

21

Page 23: BILL OF QUANTITY FOR RASINI WATER PROJECT - lamu.go.kelamu.go.ke/wp-content/uploads/2019/05/Bill-of-Quantity-Reticulation-Faza.pdfBill of Quantity For Rasini Village 1 BILL (A) –

Bill of Quantity For Rasini Village

22