TUGAS Bill of Quantity Irigasi Chek Dam

Embed Size (px)

Citation preview

BILL OF QUANTITYDAFTAR KUANTITAS DAN HARGATUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK ANGKATAN : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : 2009 - 2010 HARGA SATUAN PEKERJAAN (Rp.)

NO

URAIAN PEKERJAAN

SATUAN

VOLUME

JUMLAH (Rp.)

I

PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi 2 Pembersihan Lapangan Unit Ls 1.00 1.00 7,700,000.00 3,200,000.00 7,700,000.00 3,200,000.00

II 1 2 3 4 5 6 7 8

PEKERJAAN CHECK DAM Galian Tanah Berbatu Dengan Alat Timbunan Tanah Dipadatkan (Manual) Kisdam Lantai Kerja (Beton B0) Pasangan Batu 1 : 4 Beton Konstruksi K-175 Kg/cm2 Plesteran 1 : 3 Bronjong M3 M3 M3 M3 M3 M3 M2 M3 415.00 57.50 14.00 39.00 674.00 140.50 282.50 150.00 21,296.00 77,110.00 449,284.00 1,097,140.00 902,896.50 3,592,930.00 55,861.30 772,222.00 8,837,840.00 4,433,825.00 6,289,976.00 42,788,460.00 608,552,241.00 504,806,665.00 15,780,817.25 115,833,300.00

JUMLAH PPN 10 % JUMLAH DIBULATKAN Terbilang : ( Satu Milyar Empat Ratus Lima Puluh Juta Rupiah )

1,318,223,124.25 131,822,312.43 1,450,045,436.68 1,450,000,000.00

7

ANALISA HARGA SATUAN PEKERJAAN GALIAN TANAH BERBATU DENGAN ALAT EXCAVATORUraian Pekerjaan Satuan Mata Pembayaran Hasil per / Jam : GALIAN TANAH DENGAN ALAT : m3 : 32.12 M3

A. DATA PERALATAN1. 2. 3. 4. 5. 6. 7. 8. Jenis Alat / Nama Kapasitas ( backet ) Produksi Alat per Jam Umur Ekonomis Alat Jam Kerja Pertahun Harga Pokok Alat Nilai Sisa Harga Penyusutan : Hydraulic Excavator : 0.54 : : 5 : 2,000.00 : 1,300,000,000.00 : 130,000,000.00 : 1,170,000,000.00 M3 Tahun..( a ) Jam / Tahun ..( b ) .( c ) ( 10 % x c ) ..( d ) ( c - d ) ..( e )

B. BIAYA KERJA ALAT PER JAMBIAYA LANGSUNG a. Biaya Penyusutan b. Biaya Operasi 1 2 3 4 5 6 7 Bahan Bakar Pelumas Engine Hydraulic Oil Grease Gear Oil Bahan Pelengkap Biaya Tenaga Kerja Operator Mekanik Crew = = = = = = = = = 0.248 0.130 0.250 0.500 0.01 x x x x x 160.00 x x x x 1.75 x 5,500.00 20,000.00 40,000.00 41,500.00 30,000.00 = = = = = = 218,240.00 2,600.00 10,000.00 20,750.00 525.00 10,000.00 (e) (a) x (b) 1,170,000,000.00 10,000.00 =

=

117,000.00

1.00 0.15 2.00 Jumlah Jam Kerja per hari

x x x

70,000.00 = 90,000.00 = 45,000.00 = = = Biaya Tenaga Kerja =

70,000.00 13,500.00 90,000.00 173,500.00 8.00 173,500.00 = 8.00 =

Jam 21,687.50 / Jam

JUMLAH BIAYA KERJA ALAT PER JAM c. Biaya perbaikan = 0.00013 x 0.9 x

283,802.50 152,100.00

1,300,000,000.00 =

BIAYA TIDAK LANGSUNG d. Bunga Modal - Faktor Pengembalian = 19 % x ( 1+19% ) ^ 5 ( 1+19% ) ^ ( 5 - 1 ) - Biaya Pengembalian = (c - d ) xD b 0.002 x d b 117,000.00 283,802.50 152,100.00 130,970.15 130.00 684,002.65

=

D

=

0.45 2.01 130,970.15

=

0.224

=

261,940,298.51 = 2,000.00 260,000.000 = 2,000.00

e. Asuransi Jadi biaya Langsung a. Biaya Penyusutan b. Biaya Operasi c. Biaya Perbaikan d. Bunga Modal e. Asuransi TOTAL B I A Y A Produksi Alat

=

=

130.00

= = = = = = =

60 x 60 x Volume Backet x Efesiensi Waktu Kerja - Efisiensi ( % ) Backet Operator Waktu Alat

- Waktu Kerja ( det ) Swing Isi Buang Jumlah

= = = =

8.00 8.00 7.00 23.00

= = = =

0.70 0.85 0.80 0.80 0.38 0.38 = 32.12 M3 / Jam

Produksi Alat

=

60 x 60 23.00

x

0.54 x

Harga Galian Tanah / M3

=

684,002.65 = 32.12

21,296.38

/ M3

HSP GALIAN TANAH PER M3

=

21,296.0014

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Kisdam / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA 1 Pekerja 2 Mandor BAHAN Tanah timbunan Tali Kawat Karung Plastik Paku biasa Kayu cerucuk PERALATAN

Org/Hari Org/Hari

3.00 0.150

50,000.00 80,000.00

150,000.00 12,000.00

II 1 2 3 4 5 III

M3 Kg Bh Kg Btg

1.10 4.00 30.00 1.50 5.00

65,000.00 12,000.00 1,298.00 12,000.00 14,000.00

71,500.00 48,000.00 38,940.00 18,000.00 70,000.00

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan

408,440.00 40,844.00 449,284.00 449,284.00

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Mobilisasi dan Demobilisasi / Unit SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA

II

BAHAN

III

PERALATAN 1 Tronton

Unit

2.00

3,500,000.00

7,000,000.00

Jumlah ( I + II + III ) Biaya Keuntungan 10 % Harga Satuan Pekerjaan Dibulatkan

7,000,000.00 700,000.00 7,700,000.00 7,700,000.00

8

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Beton Konstruksi Mutu K-175 / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN

I II. III.

Beton Mutu K-175 Pembesian Begisting

M3 Kg M3

1.0000 70.0000 5.0000

1,225,125.00 24,464.00 131,065.00

1,225,125.00 1,712,480.00 655,325.00

Jumlah ( I + II + III ) Harga Satuan Pekerjaan, per m3 Dibulatkan

3,592,930.00 3,592,930.00 3,592,930.00

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Beton Konstruksi K-175 Kg/cm 2 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA Pekerja Mandor Tukang Kepala Tukang

Org/Hari Org/Hari Org/Hari Org/Hari

4.8000 0.2400 0.4000 0.0400

50,000.00 80,000.00 70,000.00 80,000.00

240,000.00 19,200.00 28,000.00 3,200.00

BAHAN 1. Semen 2. Pasir 3. Kerikil PERALATAN 1. Concrete Mixer / Molen 2. Vibrator Concrete

Zak M3 M3

5.9700 0.4800 0.9600

75,000.00 70,000.00 300,000.00

447,750.00 33,600.00 288,000.00

III.

Unit/Hari Unit/Hari

0.200 0.200

190,000.00 80,000.00

38,000.00 16,000.00

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan

1,113,750.00 111,375.00 1,225,125.00 1,225,125.00

9

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Besi Tulang / Kg SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA 1. Pekerja 2. Tukang 3. Kepala Tukang BAHAN 1. Besi Beton 2. Kawat Beton PERALATAN

Org/Hari Org/Hari Org/Hari

0.0675 0.0675 0.0225

50,000.00 70,000.00 80,000.00

3,375.00 4,725.00 1,800.00

II.

Kg Kg

1.1000 0.0200

11,000.00 12,000.00

12,100.00 240.00

III.

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan, per Kg Dibulatkan

22,240.00 2,224.00 24,464.00 24,464.00

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Begisting/Cetakan Beton / M2 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA Pekerja Tukang Mandor Kepala Tukang

Org/Hari Org/Hari Org/Hari Org/Hari

0.6000 0.5000 0.0100 0.0500

50,000.00 70,000.00 80,000.00 80,000.00

30,000.00 35,000.00 800.00 4,000.00

BAHAN 1. Paku 2. Multiplek 3. Kayu Begisting PERALATAN

Kg Lbr M3

0.4000 0.3500 0.0320

12,000.00 45,000.00 900,000.00

4,800.00 15,750.00 28,800.00

III.

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan, per m2 Dibulatkan

119,150.00 11,915.00 131,065.00 131,065.00

10

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. 1. 2. 3. III. 1. 2. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Lantai Kerja ( Beton B0) / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA Pekerja Mandor Tukang Kepala Tukang BAHAN Semen Pasir Kerikil PERALATAN Concrete Mixer / Molen Vibrator Concrete

Org/Hari Org/Hari Org/Hari Org/Hari Zak M3 M3 Unit/Hari Unit/Hari

4.80000 0.24000 0.40000 0.04000 4.24 0.50 1.00 0.20 0.20

50,000.00 80,000.00 70,000.00 80,000.00 75,000.00 70,000.00 300,000.00 190,000.00 80,000.00

240,000.00 19,200.00 28,000.00 3,200.00 318,000.00 35,000.00 300,000.00 38,000.00 16,000.00

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan

997,400.00 99,740.00 1,097,140.00 1,097,140.00

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Timbunan Tanah Dipadatkan / M3 (Manual ) SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN

I.

TENAGA KERJA 1 Pekerja 2 Mandor BAHAN

Org/Hari Org/Hari

1.3300 0.0450

50,000.00 80,000.00

66,500.00 3,600.00

II.

III.

PERALATAN

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan

70,100.00 7,010.00 77,110.00 77,110.00

11

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Pasangan Batu Kali Ad. 1 : 4 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA Pekerja Mandor Tukang Batu Kepala Tukang

Orang / Hari Orang / Hari Orang / Hari Orang / Hari

3.6000 0.1800 1.2000 0.1200

50,000.00 80,000.00 70,000.00 80,000.00

180,000.00 14,400.00 84,000.00 9,600.00

BAHAN 1. Semen Pc 2. Batu Belah/Kali 3. Pasir PERALATAN

Zak M3 M3

3.2570 1.2000 0.5220

75,000.00 210,000.00 70,000.00

244,275.00 252,000.00 36,540.00

III.

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan

820,815.00 82,081.50 902,896.50 902,896.50

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Plesteran Ad. 1 : 3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA Pekerja Mandor Tukang Kepala Tukang

Orang / Hari Orang / Hari Orang / Hari Orang / Hari

0.4000 0.0200 0.2000 0.0200

50,000.00 80,000.00 70,000.00 80,000.00

20,000.00 1,600.00 14,000.00 1,600.00

BAHAN 1. Semen Pc 2. Pasir PERALATAN

Zak M3

0.1630 0.0194

75,000.00 70,000.00

12,225.00 1,358.00

III.

Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan, per M2 Dibulatkan

50,783.00 5,078.30 55,861.30 55,861.30 12

ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Bronjong / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)

URAIAN TENAGA KERJA 1. Pekerja 2. Mandor

Orang / Hari Orang / Hari

1.382 0.024

50,000.00 80,000.00

69,100.00 1,920.00 71,020.00

II.

BAHAN 1. Kawat Bronjong Pabrikan 2. Batu Belah / Kali

Unit M3

1.000 1.100

400,000.00 210,000.00

400,000.00 231,000.00 631,000.00

III.

PERALATAN

Jumlah (I + II) / 3 + III Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan

702,020.00 70,202.00 772,222.00 772,222.00

13

DAFTAR UPAHTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK ANGKATAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : 2009 - 2010 SATUAN KUANTITAS HARGA SATUAN (Rp.) 70,000.00 45,000.00 90,000.00 45,000.00 45,000.00 50,000.00 80,000.00 70,000.00 80,000.00

URAIAN

1. 2. 3. 4. 4. 6. 7. 8. 9.

Operator Pembantu Operator Mekanik Pembantu Mekanik Oil Man / Crew Pekerja Mandor Tukang Kepala Tukang

Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

#REF! #REF!

#REF! #REF!

15

DAFTAR BAHANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK ANGKATAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : 2009 - 2010 SATUAN KUANTITAS HARGA SATUAN (Rp.) 41,500.00 20,000.00 5,500.00 5,500.00 40,000.00 30,000.00 11,000.00 25,000.00 1,298.00 14,000.00 900,000.00 12,000.00 9,500.00 400,000.00 25,000.00 900,000.00 300,000.00 210,000.00 12,000.00 70,000.00 75,000.00 65,000.00 45,000.00 5,000.00 KETERANGAN

URAIAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 28 29

Gress Retinak A Pelumas Engine Minyak Solar Minyak Premium Hidraulic Oil Gear Oil Besi beton Baja U Karung Plastik Kayu Cerucuk dia.15 Cm Kayu begisting Kawat Beton Kawat Bronjong Kawat Bronjong Pabrikan Kawat Las Kayu Papan Kelas.IV Kerikil / Batu Koral beton Batu Bela / Kali Paku Biasa Pasir Semen @ 50 Kg Tanah urugan / Timbunan Multiplk Ember

Kg Liter Liter Liter Liter Liter Kg Kg Bh Btg M3 Kg Kg Unit Kg M3 M3 M3 Kg M3 Zak M3 Lbr Bh

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan

#REF! #REF!

#REF! #REF!

16

DAFTAR HARGA PERALATANTUGAS : EKONOMI TEKNIK FAKULTAS / JURUSAN : TEKNIK / SIPIL PEKERJAAN : PEMBANGUNAN CHECK DAM KELOMPOK : I (SATU) ANGKATAN : 2009 - 2010 NO. URAIAN SATUAN KUANTITAS HARGA SATUAN (Rp.) 283,802.50 27,142.86 11,428.57 13,571.43 17,500.00 5,000.00 6,428.57 KETERANGAN

1. 2. 3. 4. 5. 6. 7.

Excavator Concrete Mixer Vibrator Concrete Mesin Las Gunting Pemotong Baja Kunci Pembengkok Baja Mesin Pompa Air

Jam Jam Jam Jam Buah Buah Jam

1.00 1.00 1.00 1.00 1.00 1.00 1.00

Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru

#REF! #REF!

#REF! #REF!

17

JADWAL WAKTU PELAKSANAANTUGAS : EKONOMI TEKNIK FAKULTAS / JURUSAN: TEKNIK / SIPIL PEKERJAAN : PEMBANGUNAN CHECK DAM KELOMPOK : I (SATU) ANGKATAN : 2009 - 2010

NO

URAIAN

SATUAN VOLUME BOBOT 1 2

BULAN I Minggu 3 4 5

BULAN II Minggu 6 7

8

21

BULAN III Minggu 22 23

KETERANGAN 24 100

I

PEKERJAAN PERSIAPAN 90 1 Mobilisasi dan Demobilisasi 2 Pembersihan Lapangan Unit Ls 1.00 1.00 0.584 0.243 0.29 0.12 0.29 0.12 80 70

II 1 2 3 4 5 6 7 8

PEKERJAAN CHECK DAM 60 Galian Tanah Berbatu Dengan Alat Timbunan Tanah Dipadatkan (Manual) Kisdam Lantai Kerja (Beton B0) Pasangan Batu 1 : 4 Beton Konstruksi K-175 Kg/cm2 Plesteran 1 : 3 Bronjong M3 M3 M3 M3 M3 M3 M2 M3 415.00 57.50 14.00 39.00 674.00 140.50 282.50 150.00 0.670 0.336 0.477 3.246 46.165 38.294 1.197 8.787 0.67 0.34 0.06 3.25 0.06 9.23 0.06 9.23 0.06 9.23 19.15 0.06 9.23 19.15 0.06 9.23 30 0.60 0.60 4.39 4.39 20 10 0 Total Kemajuan Rencana Komulatif Rencana 100.00 0.29 0.29 0.79 1.08 3.31 4.39 9.29 13.68 9.29 22.97 28.44 51.41 28.44 79.85 9.29 89.15 0.66 89.80 5.05 94.86 4.73 99.59 0.41 100.00 0.06 0.06 40 50

#