Just two weeks before the scheduled inauguration of the Iloilo Convention Center, the DPWH put out an invitation to bid for "Fits Out to complete the operation and management to Iloilo Convention Center" with an approved budget for the contract of P62.9 million.This is puzzling because the building has been declared ready for occupancy and use for the APEC 2015 meetings later this month of September. The bidding date is September 22, 2015.Among the work items included are the aircon packages, parking lot pavement, floor finishes, ceiling, folding walls and several other items.The funding source is the TIEZA. The details can be found in the Bill of Quantities.
Citation preview
77
BILL OF QUANTITIES
Contract Name : Fit-Outs to complete the Operation and Management (Civil
Works) to Iloilo Convention Center
Location : Mandurriao District, Iloilo City
Contract Duration: 60 C.D. ABC: P62,947,025.32
ITEM
OF
WORKS
DESCRIPTION
(Unit price in words) UNIT QTY
UNIT
COST
TOTAL
COST
A. GENERAL REQUIREMENTS
a.1 Mobilization and Demobilization
(Pesos________________________
_______________________)
1.00 Ls
a.2
Progress Photograph/Submittals
(Pesos________________________
_______________________)
1.00 Ls
a.3
Provide Project Sign Board
(Pesos________________________
_______________________)
1.00 Each
a.4
Construction Safety and Health
(Pesos________________________
_______________________ )
1.00 Ls
B. BUILDING FINISHES
b.1 Floor Finishes
1019
Plain Cement Wood Trowelled Finish
with 25mm x 25mm dia. Grooves (
For Ramp Finish)
(Pesos________________________
_______________________ )
397.00 Sq.m.
SPL-1
6mm thick Stainless Steel Insert to Floor
Termination
(Pesos________________________
_______________________ )
580.50 lm
78
1021(3)
Plain Cement Finish over membrane type waterproofing
(Pesos________________________
_______________________ )
1,033.00 Sq.m.
b.2 Ceiling Finishes
1032
CF2: Exposed RC Beams and Slabs
(Rubbed Concrete)
(Pesos________________________
_______________________ )
5,230.31 Sq.m.
SPL-2
Access Manhole
(Pesos________________________
_______________________ )
27.00 pc.
b.3 Toilet Finishes
SPL-3
Facial-Mirror-6mm thk glass from
Belgium
(Pesos________________________
_______________________
47.25 Sq.m.
SPL-4 Grab Bar for Disabled Toilets 13.60 l.m.
b.4 Water Proofing
1016(1)
4.5kg. Torch-on Membrane Type
Waterproofing
(Pesos________________________
_______________________ )
1,080.21 Sq.m.
C. SPECIALTY WORKS
Folding Wall Partitions
79
1. Ground Floor
SPL-5
Wall A1: 17.0 x 11.50 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-6
Wall A2: 17.0 x 11.50 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-7
Wall A3: 17.0 x 11.50 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-8
Wall A4: 17.0 x 11.50 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-9
Wall B.1: 17.0 x 4.0 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-10
Wall B.2: 17.0 x 4.0 opening
(Pesos________________________
_______________________ )
1.00 Set
2. Second Floor
SPL-11
Wall B.1: 13.421 x 5.0 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-12
Wall B.2: 13.4 x 5.0 opening
(Pesos________________________
_______________________ )
1.00 Set
SPL-13
Wall B.3: 13.421 x 4.0 opening
(Pesos________________________
_______________________ )
1.00 Set
80
SPL-14
Wall C.1: 6.57 x 4.00 m opening (Pesos________________________
_______________________ )
1.00 Set
SPL-15
Wall C.2:7.196 x 4.50m opening
(Pesos________________________
_______________________ )
1.00 Set
D. SANITARY/PLUMBING WORKS
SPL-16
Hydro Pneumatic Pumps 7.50 Hp.
230 V/3 dia./60 Hz
(Pesos________________________
_______________________ )
2.00 Units
SPL-17
Bladder Tank 349 gals. (396 gals)
(Pesos________________________
_______________________ )
2.00 Units
SPL-18
Holding Tank
(Pesos________________________
_______________________ )
2.00 Units
SPL-19
Kitchen Sink including accessories
(Pesos________________________
_______________________ )
2.00 Units
E. ELECTRICAL WORKS
SPL-20
Main Feeder (Primary)
(Pesos________________________
_______________________ )
1.00 ls
SPL-21
Generator Wire Connection
(LSVG/ATS to Genset)
(Pesos________________________
_______________________ )
2,280.00 lm
F. MECHANICAL WORKS
A/C Equipments
81
SPL-22
Packaged Air Cooled Conditioning Unit, 40 TR capacity
(Pesos________________________
_______________________
1.00 Each
SPL-23
Packaged Air Cooled Conditioning
Unit,15 TR capacity
(Pesos________________________
_______________________
1.00 Each
G. FIRE PROTECTION
Spl-24
Pumps, Motors and accessories
(Pesos________________________
_______________________ )
1.00 l.s.
H. BATTERY PACKS
Spl-25
Battery Pack for T5 32W LF
(Pesos________________________
_______________________)
7.00 Set
Spl-26
Battery Pack for Pinlight, 26W
(Pesos________________________
_______________________)
46.00 Set
Spl-27
Battery Pack for Flourescent Lamp,
Surfaced MTD 28W
(Pesos________________________
_______________________)
5.00 Set
I. SITE DEVELOPMENT WORKS
1. Parking Area and Exterior Floor
Finishes
1.1 Parking Area
311
Portland Cement Concrete Pavement(
0.23m thk)
(Pesos________________________
_______________________)
1,587.00 Sq.m.