Bill of Quantities for Iloilo Convention Center (Fits-Out to Complete the Operation and Management of the Iloilo Convention Center)

Embed Size (px)

DESCRIPTION

Just two weeks before the scheduled inauguration of the Iloilo Convention Center, the DPWH put out an invitation to bid for "Fits Out to complete the operation and management to Iloilo Convention Center" with an approved budget for the contract of P62.9 million.This is puzzling because the building has been declared ready for occupancy and use for the APEC 2015 meetings later this month of September. The bidding date is September 22, 2015.Among the work items included are the aircon packages, parking lot pavement, floor finishes, ceiling, folding walls and several other items.The funding source is the TIEZA. The details can be found in the Bill of Quantities.

Citation preview

  • 77

    BILL OF QUANTITIES

    Contract Name : Fit-Outs to complete the Operation and Management (Civil

    Works) to Iloilo Convention Center

    Location : Mandurriao District, Iloilo City

    Contract Duration: 60 C.D. ABC: P62,947,025.32

    ITEM

    OF

    WORKS

    DESCRIPTION

    (Unit price in words) UNIT QTY

    UNIT

    COST

    TOTAL

    COST

    A. GENERAL REQUIREMENTS

    a.1 Mobilization and Demobilization

    (Pesos________________________

    _______________________)

    1.00 Ls

    a.2

    Progress Photograph/Submittals

    (Pesos________________________

    _______________________)

    1.00 Ls

    a.3

    Provide Project Sign Board

    (Pesos________________________

    _______________________)

    1.00 Each

    a.4

    Construction Safety and Health

    (Pesos________________________

    _______________________ )

    1.00 Ls

    B. BUILDING FINISHES

    b.1 Floor Finishes

    1019

    Plain Cement Wood Trowelled Finish

    with 25mm x 25mm dia. Grooves (

    For Ramp Finish)

    (Pesos________________________

    _______________________ )

    397.00 Sq.m.

    SPL-1

    6mm thick Stainless Steel Insert to Floor

    Termination

    (Pesos________________________

    _______________________ )

    580.50 lm

  • 78

    1021(3)

    Plain Cement Finish over membrane type waterproofing

    (Pesos________________________

    _______________________ )

    1,033.00 Sq.m.

    b.2 Ceiling Finishes

    1032

    CF2: Exposed RC Beams and Slabs

    (Rubbed Concrete)

    (Pesos________________________

    _______________________ )

    5,230.31 Sq.m.

    SPL-2

    Access Manhole

    (Pesos________________________

    _______________________ )

    27.00 pc.

    b.3 Toilet Finishes

    SPL-3

    Facial-Mirror-6mm thk glass from

    Belgium

    (Pesos________________________

    _______________________

    47.25 Sq.m.

    SPL-4 Grab Bar for Disabled Toilets 13.60 l.m.

    b.4 Water Proofing

    1016(1)

    4.5kg. Torch-on Membrane Type

    Waterproofing

    (Pesos________________________

    _______________________ )

    1,080.21 Sq.m.

    C. SPECIALTY WORKS

    Folding Wall Partitions

  • 79

    1. Ground Floor

    SPL-5

    Wall A1: 17.0 x 11.50 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-6

    Wall A2: 17.0 x 11.50 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-7

    Wall A3: 17.0 x 11.50 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-8

    Wall A4: 17.0 x 11.50 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-9

    Wall B.1: 17.0 x 4.0 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-10

    Wall B.2: 17.0 x 4.0 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    2. Second Floor

    SPL-11

    Wall B.1: 13.421 x 5.0 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-12

    Wall B.2: 13.4 x 5.0 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-13

    Wall B.3: 13.421 x 4.0 opening

    (Pesos________________________

    _______________________ )

    1.00 Set

  • 80

    SPL-14

    Wall C.1: 6.57 x 4.00 m opening (Pesos________________________

    _______________________ )

    1.00 Set

    SPL-15

    Wall C.2:7.196 x 4.50m opening

    (Pesos________________________

    _______________________ )

    1.00 Set

    D. SANITARY/PLUMBING WORKS

    SPL-16

    Hydro Pneumatic Pumps 7.50 Hp.

    230 V/3 dia./60 Hz

    (Pesos________________________

    _______________________ )

    2.00 Units

    SPL-17

    Bladder Tank 349 gals. (396 gals)

    (Pesos________________________

    _______________________ )

    2.00 Units

    SPL-18

    Holding Tank

    (Pesos________________________

    _______________________ )

    2.00 Units

    SPL-19

    Kitchen Sink including accessories

    (Pesos________________________

    _______________________ )

    2.00 Units

    E. ELECTRICAL WORKS

    SPL-20

    Main Feeder (Primary)

    (Pesos________________________

    _______________________ )

    1.00 ls

    SPL-21

    Generator Wire Connection

    (LSVG/ATS to Genset)

    (Pesos________________________

    _______________________ )

    2,280.00 lm

    F. MECHANICAL WORKS

    A/C Equipments

  • 81

    SPL-22

    Packaged Air Cooled Conditioning Unit, 40 TR capacity

    (Pesos________________________

    _______________________

    1.00 Each

    SPL-23

    Packaged Air Cooled Conditioning

    Unit,15 TR capacity

    (Pesos________________________

    _______________________

    1.00 Each

    G. FIRE PROTECTION

    Spl-24

    Pumps, Motors and accessories

    (Pesos________________________

    _______________________ )

    1.00 l.s.

    H. BATTERY PACKS

    Spl-25

    Battery Pack for T5 32W LF

    (Pesos________________________

    _______________________)

    7.00 Set

    Spl-26

    Battery Pack for Pinlight, 26W

    (Pesos________________________

    _______________________)

    46.00 Set

    Spl-27

    Battery Pack for Flourescent Lamp,

    Surfaced MTD 28W

    (Pesos________________________

    _______________________)

    5.00 Set

    I. SITE DEVELOPMENT WORKS

    1. Parking Area and Exterior Floor

    Finishes

    1.1 Parking Area

    311

    Portland Cement Concrete Pavement(

    0.23m thk)

    (Pesos________________________

    _______________________)

    1,587.00 Sq.m.