26
Big enough to deliver – small enough to care

Big enough to deliver – small enough to care

  • Upload
    lanai

  • View
    43

  • Download
    1

Embed Size (px)

DESCRIPTION

Big enough to deliver – small enough to care. Pims Cost Management. Pims Cost Management - Features. Large variety of built-in reports Scope and Change Management Earned Value Management Powerful analysis tools Project Commitments Management - PowerPoint PPT Presentation

Citation preview

Page 1: Big enough to deliver – small enough to care

Big enough to deliver – small enough to careBig enough to deliver – small enough to care

Page 2: Big enough to deliver – small enough to care

Pims Cost Management

Page 3: Big enough to deliver – small enough to care

Pims Cost Management - Features

• Large variety of built-in reports

• Scope and Change Management

• Earned Value Management

• Powerful analysis tools

• Project Commitments Management

• Supports multiple projects and projects with multiple

owners (joint ventures)

Page 4: Big enough to deliver – small enough to care

Cost Management Process in Pims

Page 5: Big enough to deliver – small enough to care

Setting up the WBS

• Identify Facilities, Responsibility and Activities

• Forms the basis for:– Estimating– Reporting– Reference all Project Control Information

• Up to 10 levels deep• Corporate standard/ Project specific• Alternative Structures• Owner Split

Page 6: Big enough to deliver – small enough to care

Cost Management in Pims

Page 7: Big enough to deliver – small enough to care

Enter Estimates

• Document basis of Estimate– Quantities– Norms– Rates

• Track all Changes to Estimate– Contract Register– Change Register– Personnel Register

Page 8: Big enough to deliver – small enough to care

Cost Management in Pims

Page 9: Big enough to deliver – small enough to care

Cost and Progress Planning

• Time phase the projects– Estimate (Reporting basis for

new baseline)– Progress– Total Forecast– Budget

• Per work package• Pre-defined profiles for

early phase• Inflates / deflates

Page 10: Big enough to deliver – small enough to care

Cost Management in Pims

Page 11: Big enough to deliver – small enough to care

Baselines

• Functionality for activating and archiving baselines

ForecastCurrent Baseline

Archived Baseline

Establish new

baseline

Report against the

current baseline

Archive baselines

before establishing

new

Activate Baseline Archive Baseline

Page 12: Big enough to deliver – small enough to care

Cost Management in Pims

Page 13: Big enough to deliver – small enough to care

Contract Management

• Full contract register• Document and Track all

Commitments– Original Contract– Change Requests– Growth

• Milestones• Responsibility• Scope of work• Link with

– Project Control Basis– Invoice Verification

Page 14: Big enough to deliver – small enough to care

Cost Management in Pims

Page 15: Big enough to deliver – small enough to care

Cost Management in Pims

Page 16: Big enough to deliver – small enough to care

Status Reporting

• Merge multiple reports into a

single PDF file

• Supports all Pims reports

• Import Schedules and Pictures

• Add Narrative text

• Distribution matrix

Page 17: Big enough to deliver – small enough to care

Cost Management in Pims

Page 18: Big enough to deliver – small enough to care

Cost Change Management

• Register to keep track of all queries

• Easy to create new forms• Attach external files• All change request forms in

one location• Approval Process• Change Proposal (CP)

Report

Page 19: Big enough to deliver – small enough to care

Cost Management in Pims

Page 20: Big enough to deliver – small enough to care

Forecasting

• Project Forecasting

1. Expert Judgment

2. Based on Contracts/PO information

3. Based on Cost Changes

4. Based on Earned Value Management principles

5. Based on Risks Cost Impact

Page 21: Big enough to deliver – small enough to care

Cost Analyzing

• Pivot grids

• Export to Excel

• Compare baselines

Page 22: Big enough to deliver – small enough to care

Demo Case: Balder

Project scope: Design and build a FPSO

Joint venture between Pacific Oil Company (75%) and Arctic Oil and Gas (25%)

Demonstrates how Pims deals with:

-Owners cost / personnel cost

-Different types of contracts

-Changes

-Earned Value Management

-Forecasting

-Budgets and Funding

-Reporting

Page 23: Big enough to deliver – small enough to care

WBS

Page 24: Big enough to deliver – small enough to care

FPSO - Basic Engineering

• Reimbursable Contract• Focus:

– Earned Value Analysis– Change Management

Page 25: Big enough to deliver – small enough to care

FPSO - Hull and Living Quarters

• Lump Sum, Fixed Price Contract• Focus:

- Change Management

Page 26: Big enough to deliver – small enough to care

FPSO - Topsides

• Reimbursable Contract

for the Engineering

scope, fixed-unit price

on construction and

installation

• Focus: Earned Value

Analysis, Change

Management, Quantity

Management