S. Platte Windermere St. S. Platte River Bridge Belleview Park Progress Park Phase 1 Progress Park to Lehow Phase 2B Lehow Ave. to Broadway Phase 2A Broadway to Greenwood Point Phase 3 Greenwood Point to Washington St. Big Dry Creek Trail An Urban Greenway Corridor Funding South Suburban Park & Recreation District South Suburban Park Foundation City of Englewood City of Littleton City of Greenwood Village City of Cherry Hills Village Arapahoe County Urban Drainage & Flood Control Challenges Urbanized Area Multiple Jurisdiction City of Englewood City of Littleton City of Greenwood Village Constricted/encroached corridor Private land acquisitions Numerous roadway & railway crossings

Big Dry Creek Greenway 2008

Embed Size (px)

DESCRIPTION

I presented the award-winning Big Dry Creek Greenway project at the 2008 American Trails Symposium.

Citation preview

Page 1: Big Dry Creek Greenway 2008

S. Platte

Windermere St. S. Platte River

Bridge

Belleview Park

Progress Park

Phase 1 Progress

Park to Lehow

Phase 2B Lehow

Ave. to Broadway

Phase 2A Broadway to Greenwood Point

Phase 3

Greenwood Point

to Washington St.

Big Dry Creek Trail An Urban Greenway Corridor

Funding South Suburban Park & Recreation District

•South Suburban Park Foundation City of Englewood

City of Littleton

City of Greenwood Village

City of Cherry Hills Village Arapahoe County

Urban Drainage & Flood Control

Challenges •Urbanized Area

•Multiple Jurisdiction

City of Englewood

City of Littleton

City of Greenwood Village

•Constricted/encroached corridor

•Private land acquisitions

•Numerous roadway & railway crossings

Page 2: Big Dry Creek Greenway 2008

Bridge Span Across South Platte

River Connection to Mary Carter

Greenway

Challenges Cross Channelized River with little

freeboard available.

Solutions Design free span bridge (200ft) with

minimal deck thickness.

Total Cost $385,000

Completed 2002

Completed 2002

Page 3: Big Dry Creek Greenway 2008

Bridge Span Across South Platte

River Connection to Mary Carter

Greenway - Construction

Page 4: Big Dry Creek Greenway 2008

Bridge Span Across South Platte River

Connection to Mary Carter Greenway - Completion

Page 5: Big Dry Creek Greenway 2008

S. Platte River to S. Windermere

Street

Challenges Underpass designs for 5 crossings

BNRR

RTD

BNRR SPUR

Santa Fe Drive

S. Windermere

Total Cost $592,530

Trail Length 2,500 LF

Completed 2001

Page 6: Big Dry Creek Greenway 2008

S. Platte River to S. Windermere

Street – Pre Construction & Construction

Page 7: Big Dry Creek Greenway 2008

S. Platte River to S. Windermere

Street – Post Construction

Page 8: Big Dry Creek Greenway 2008

Belleview Park City of Englewood

Page 9: Big Dry Creek Greenway 2008

Progress Park City of Littleton

Page 10: Big Dry Creek Greenway 2008

Phase 1 Progress Park to Lehow Avenue City of

Englewood

Challenges Eroding channel

Creek crossing solution

100-yr floodplain

Total Cost $417,600

Total Length 1,100 LF

Completed 2004

Page 11: Big Dry Creek Greenway 2008

Phase 1 Progress Park to Lehow Avenue City of Englewood

– Pre Construction and Construction

Page 12: Big Dry Creek Greenway 2008

Phase 1 Progress Park to Lehow Avenue City of Englewood

– Completed

Page 13: Big Dry Creek Greenway 2008

Phase 2A Broadway to Greenwood Point

Challenges Narrow/encroached channel

Steep channel banks

Limited access

Broadway underpass

Total Cost $518,388

Total Length 1,000 LF

Completed 2007

Page 14: Big Dry Creek Greenway 2008

Phase 2A Broadway to Greenwood Point– Pre Construction

Page 15: Big Dry Creek Greenway 2008

Phase 2A Broadway to Greenwood Point– Construction

Page 16: Big Dry Creek Greenway 2008

Phase 2A Broadway to Greenwood Point– Path with Wall

Construction

Page 17: Big Dry Creek Greenway 2008

Phase 2A Broadway to Greenwood Point– Tributary

Drainage Rundown

Page 18: Big Dry Creek Greenway 2008

Phase 2A Broadway to Greenwood Point– Completed

Page 19: Big Dry Creek Greenway 2008

Phase 3 Greenwood Point to Washington Street

City of Littleton

Challenges Narrow encroached channel

Steep channel banks

Limited access

Eroding channel

Total Cost $680,000

Total Length 2,500 LF

Completed 2006

Page 20: Big Dry Creek Greenway 2008

Phase 3 Greenwood Point to Washington Street

City of Littleton – Pre Construction

Page 21: Big Dry Creek Greenway 2008

Phase 3 Greenwood Point to Washington Street

City of Littleton – Construction

Page 22: Big Dry Creek Greenway 2008

Phase 3 Greenwood Point to Washington Street

City of Littleton – Completed

Page 23: Big Dry Creek Greenway 2008

Phase 2B Lehow Ave. to Broadway

Challenges Eroding channel

Two Crossings

Ramp to Broadway

Unsuitable soils

Total Cost $631,577 (bid)

Total Length 1,200 LF

Est. Completion 2009

Page 24: Big Dry Creek Greenway 2008

Phase 2B Lehow Ave. to Broadway– Pre Construction and

Construction

Page 25: Big Dry Creek Greenway 2008

Big Dry Creek Trail An Urban Greenway Corridor

Total Cost: $3.2 million

Federal Enhancement Funds : $600,000