30
DESCRIPTION. Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS SECTION - 1 (CONCRETE LINING) 1 Earth work excavation irrigation channels, drains, etc to designed section grade and profile excavated material disposed off undressed with in 50 Ft. in ordinary soil. %o Cft. 78163 2 Earth work excavation irrigation channels,lead upto 50' profile and grade. %o Cft. 2262.86 3 Cement plaster 1-1/2" thick ratio 1:6 in bed. % Sft. 1441446 4 Cement plaster 1-1/2" thick ratio 1:6 on slope. % Sft. 1078801 5 Cement concrete lining using washed screened and graded stone aggregate 1:2:4 in bed % Cft. 392626.6 6 Cement concrete lining using washed screened and graded stone aggregate 1:2:4 in slope. % Cft. 282639.9 7 Bitumen coating to plastered or cement concrete surface 14 Lbs. per 100 Sft. % Sft. 121813 9 Providing and placing cement sand and bituminous joints sealant in ratio 1:2:3 Per Rft. 243629 10 Filling expansion joint with bitumen sand and saw dust in ratio 1:2:2 Per Rft. Per inch 24385.8 11 Dismentalling cement concrete plain 1:2:4. % Cft. 20114.30 SECTION -2 (EARTH WORK) 12 Earth work excavation irrigation channels, drains, etc to designed section grade and profile excavated material disposed off undressed with in 50 Ft. in ordinary soil. %o Cft 3187000 NAME OF WORK:- REHABILITATION OF 7-R/HAKRA WITH SYSTEM BID SCHEDULE ESTIMATED BID RATE QOUTED BY CONTRACTOR SR No. WORK NO. 1

BID SCHEDULE WORK NO. 1 - Punjabeproc.punjab.gov.pk/BiddingDocuments/71498_BOQ OF TENDER NOTI… · Cement concrete lining using washed screened and gra ded stone aggregate 1:2:4

  • Upload
    dinhdat

  • View
    221

  • Download
    1

Embed Size (px)

Citation preview

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

SECTION - 1 (CONCRETE LINING)

1

Earth work excavation irrigation channels, drains, etc to designed

section grade and profile excavated material disposed off undressed

with in 50 Ft. in ordinary soil.

%o Cft. 78163

2Earth work excavation irrigation channels,lead upto 50' profile and

grade.%o Cft. 2262.86

3Cement plaster 1-1/2" thick ratio 1:6 in bed.

% Sft. 1441446

4Cement plaster 1-1/2" thick ratio 1:6 on slope.

% Sft. 1078801

5Cement concrete lining using washed screened and graded stone

aggregate 1:2:4 in bed% Cft. 392626.6

6Cement concrete lining using washed screened and graded stone

aggregate 1:2:4 in slope.% Cft. 282639.9

7Bitumen coating to plastered or cement concrete surface 14 Lbs. per

100 Sft.% Sft. 121813

9Providing and placing cement sand and bituminous joints sealant in ratio

1:2:3Per Rft. 243629

10 Filling expansion joint with bitumen sand and saw dust in ratio 1:2:2Per Rft.

Per inch24385.8

11 Dismentalling cement concrete plain 1:2:4. % Cft. 20114.30

SECTION -2 (EARTH WORK)

12

Earth work excavation irrigation channels, drains, etc to designed

section grade and profile excavated material disposed off undressed

with in 50 Ft. in ordinary soil.

%o Cft 3187000

NAME OF WORK:- REHABILITATION OF 7-R/HAKRA WITH SYSTEM

BID SCHEDULE

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

WORK NO. 1

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

13 Borrowpits excavation undressed in ordinary soil lead upto 100'. %o Cft 6396307

14 Borrowpits excavation undressed in ordinary soil lead upto 2 Mile %o Cft 12707750

15

Compaction of earth work with road roller including ploughing mixing

moistening earth to optimum moisture content in layers etc. complete

90% maximum modified AASHO dry density.

%o Cft 10078130

16

Compaction of earth work with road roller including ploughing mixing

moistening earth to optimum moisture content in layers etc. complete

85% maximum modified AASHO dry density.

%o Cft 7565250

17 Dowel dressing P. Chain 1569.08

18 Uprooting stumps and removing with in 100' thick, No. 307.02

19 Rehandling of earth work lead upto 50 Ft. %o Cft 5295675

20 Jungle Clearance and removing within 100 Ft. %o Sft. 1474000

SECTION - 3 (RAISING OF SHOULDERS)

21 Pacca brick work other than building upto 10' height % Cft. 60226.87

22Cement concrete lining using washed screened and graded stone

aggregate 1:2:4 in bed% Cft. 9100.95

23 Cement plaster 1/2" thick upto 20' height ratio 1:4. % Sft. 92437.1

SECTION - 4 (HEAD REGULATOR)

24

Earthwork excavation in foundation of building, bridge and other

structure i,e; dagbelling, dressing, refilling around structure with

excavated earth, watering, ramming, one chain lift 5.0 ft in ordinary soil

%o Cft 1200

25Earthwork excavation from outside borrowpits un- dressed lead 1.00

Mile%o Cft. 34000

26Earthwork excavation from outside borrowpits un- dressed lead 1.00

Mile%o Cft 30000

27

Compaction of earthwork with power road roller, including ploughing ,

mixing, moistening earth to optimum moisture contents in layers etc.

complete 90%.

%o Cft 30000

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

28Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth 1:4:8% Cft 326.06

29

Providing and laying reinforced cement concrete in roof slab, beams,

columns lintels griders and other structural members laid in situ or

precast laid in position or prestressed members cast in situ, complete in

all respect.

Per Cft. 1838.98

30

RCC in slab of rafts/strip foundation base slab of column and retaining

walls etc. and other than those mentioned above not requiring form work

i.e. horizental shuttering complete in all respect 1:2:4

Per Cft. 7023.77

31

Fabrication of mild steel reinforcement for cement concrete, including cutting,

bending, laying in position, making joints and fastenings, including cost of binding

wire and labour charges for binding of steel reinforcement (also includes removal of

rust bar) deformed bar.

% Kg. 31794.66

32 Bitumen coating to plastered surace or concrete surface @ 14 lbs % Sft % Sft. 242.5

33Extra labour for work of weir, rail or road bridges syphons and concreting

in super structure.% Cft. 7571.97

34 Supplying of plasticizer retarder (Sikmant) @ 0.2 liter per bag of cement. P.Liter 266.53

35 Bailing out water with pump U/S & D/S %o Cft. 80000

36Providing and fixing rubber water stoper for all type of joints 3 bulb 9"

wide 1/8" thickRft. 604

37 Providing and fixing elastic filler sheet 1" thick in expansion joints. Sft. 268

38 Providing and laying G.I.Pipe 1.25" dia 3' long Dowel bar @ 2' centre to centre No. 152

39 Providing and filling grease in 1.25" dia 3' long dowel bar No. 152

40 Providing and laying joint sealer Rft. 268

41 Providing and fixing rain water outlet of AC pipe 3" dia No. 6

42Cement concrete plain including placing compacting finishing and curing

complete 1:2:4 (Wearing coat over bridge)% Cft. 278

Small Ironwork such as gusset plates, knees, bends, stirrups, rings etc.

including cutting, drilling, riveting, handling, assembling and fixing but

excluding erection in position.

% Kg. 591.76

43

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

i) Dismentling of Pacca Brick work % Cft. 791.62

ii) Dismentling RCC % Cft. 178.75

iii) Dismentaling cement concrete 1:2:4 plain. % Cft. 2137.5

44

Providing and installing M.S Blind pipe socketed/welded joint, M.S

reducer (where necessary) in tubewell bore hole including

jointing/welding with strainer etc. complete 2" inner dia 3/16" thick.

Rft. 28

45

Providing surface treatment to roads including supply of bitumen and

bajri/crushed stone aggregate of approved quality, including cleaning of

road surface, heating and spraying bitumen, spreading bajri and rolling

with road roller (including its operation cost, fuel and hire charges etc)

complete including carriage of all materials to site of work, except

bajri/crushed stone aggregate for which supply within 3 miles is included

in the rate (3 coats)

% Sft. 462

46 Pacca brick work other than building upto 10' height. % Cft. 400

47 Cement plaster 1/2" thick upto 20' height ratio 1:4. % Cft. 597.52

48 Cement pointing struck joint on walls upto 20' height 1:3. % Sft. 1540

49 Providing and fixing rawal bolts. No. 40

50 Precast cement concrete solid or face blocks 1:2:4 including cost of templates. Cft. 500

51 Providing and laying coarse sand. % Cft. 315

52 Providing graded bajri 1/8" to 1/2" size on level. % Cft. 157.5

53 Providing graded bajri ½" to 2" size on level % Cft. 157.5

54

Carriage of 100 cft of all material like stone aggregate, spawl kankar,

lime surki etc or 150 cft of timber by truck or by any other means owned

by the contractor lead 280 K.M.

% Cft. 315

55

Providing and laying dry brick pavement soling in street or road etc.

sand grouted laid in proper camber including preparation watering

compaction of bed to proper camber and sand cushion.

% Cft. 800

Credit of old bricks % Cft. 6748

Credit of Steel 5% of R.C.C % Kg. 0

43

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

Credit of brick ballast. % Cft. 333.22

SECTION - 5 (OUTLETS)

56Earth work excavation for outlet refilling ramming and puddling channel

discharge upto 50 Cs.Job 98

57Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth 1:4:8% Cft. 1263.71

58 Pacca brick work other than building upto 10' height 1:4 % Cft. 1927.66

59 Providing and fixing RCC pipe 9" dia at site Rft. 1176

60

Earthwork excavation in foundation of building, bridge and other

structure i,e; dagbelling, dressing, refilling around structure with

excavated earth, watering, ramming, one chain lift 5.0 ft in ordinary soil

%o Cft. 45864

61 Dismentalling of outlets APM or OF "H" upto 2.1' to 3.0'. Each 98

62Cement concrete plain including placing compacting finishing and curing

complete 1:4:8 % Cft. 5762.4

63

Providing and laying reinforced cement concrete in roof slab, beams,

columns lintels griders and other structural members laid in situ or

precast laid in position or prestressed members cast in situ, complete in

all respect.

Cft. 11544.4

64

Fabrication of mild steel reinforcement for cement concrete, including

cutting, bending, laying in position, making joints and fastenings,

including cost of binding wire and labour charges for binding of steel

reinforcement (also includes removal of rust bar) deformed bar.

% Kg. 39113.2

65 Pacca brick work other than building upto 10' height 1:3 % Cft. 7445.06

66

Providing and laying RCC pipe sewer moulded with cement concrete 1:1-

1/2:3 confirming to ASTM specification C-76-79 class-II . Wall-B

including carriage of pipe from factory to site of work lowering in

trenches to correct alignment and grade jointing with rubber ring, cutting

pipe where necessary, testing etc. complete 12" dia.

Rft. 1764

67Extra labour in fixing APM and OF outlets blocks including dressing of

bricks upto 4' depth.Job. 49

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

68Water allowance for construction outlets or culverts, when canal water is

not flowing.Job. 49

69 Providing and laying Iron Machine for outlets. Job 49

Credit of old material Job. 49

Credit of old material Each 49

SECTION - 6 (RD MARKS AND DATA BOARDS)

70 Precast cement concrete solid ratio 1:2:4. Cft 169.93

71 Placing of RD marks. No. 251

72 White washing new surface 2 coats. % Sft. 1317.75

73 Writing letter/figures per letter per inch height No. 15328

74Carriage of consignment odd job/removal of malba by donkey labour

upto 3 Miles.No. 251

75 Cement plaster 1:2 1/2" thick upto 20' height. % Sft. 1317.75

76

Earthwork excavation in foundation of building, bridge and other

structure i,e; dagbelling, dressing, refilling around structure with

excavated earth, watering, ramming, one chain lift 5.0 ft in ordinary soil

%o Cft. 280

77Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth 1:4:8% Cft. 70

78 Pacca Brick work in ground floor 1:3. % Cft. 371.25

79 Cement plaster 1/2" thick 1:2 upto 20' height % Sft. 668.8

80 Preparing surface for painting with emulsion paint two coats. % Sft. 969.00

SECTION - 7 (BUILDINGS)

81

Excavation in foundation of building, bridges & other structures,

including dagbelling, dressing, refilling around structures with excavated

earth, watering & ramming lead up to one chain and lift upto 5' in

ordinary soil.

%o Cft. 7697.46

82 Spraying anti-termite liquid mixed with water in the ratio 1:40. % Sft. 6342.64

83 Dry rammed brick or stone ballast 1½" to 2" gauge. % Cft. 1992.43

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

84Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth ratio 1:4:8.% Cft. 1291.82

85Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth ratio 1:6:12% Cft. 2702.5

86Providing and laying watering and ramming brick ballasdt 1.5" to 2"

gauge mixed with 25% sand for floor foundation complete.% Cft. 82

87 Pacca brick work other than building upto 10' height..1:4 % Cft. 10459.19

88 Pacca brick work in ground floor.1:4 % Cft. 1188.5

89 Pacca brick work in foundation and plinth in cement sand mortor 1:4. % Sft. 12589.3

90 Pacca brick work in foundation and plinth 1:5 % Cft. 5433.25

91Extra cost of labour and material for red oxide in cement pointing to

match with the colour of bricks.% Cft. 11670

92

Providing and laying damp proof course of cement concrete 1-1/2" thick

1:2:4 (using cement, sand and shingle), including one coat bitumen and

one coat polythene sheet.

% Sft. 2650.1

93

Reinforced cement concrete in roof slab, beam columns lintels, girder

and other structural members laid in situ or precast laid in position, or

prestressed members cast in situ, complete in all respect Type C

(nominal mix 1:2:4

Cft. 2654.56

94Plain cement concrete including placing compacting finishing and curing

complete 1:2:4.Cft. 424.24

95

Fabrication of mild steel reinforcement for cement concrete, including

cutting, bending, laying in position, making joints and fastenings,

including cost of binding wire and labour charges for binding of steel

reinforcement (also includes removal of rust bar) deformed bar.

% Kg. 9109.97

96

Providing and laying khaprail tile size 6"x9" laid with 1:3 cement sand

mortor over a bed of 3/4" thick cement plaster 1:3 on slope shades

including finishing complete in all respect.

Cft. 488.25

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

97

Providing and fixing window consisting of M.S box section frame 2"x1-

1/2" leaves frame 1-1/2"x1" box section frame for glazing3/8"x3/8" using

16 SWG sheet MSS flat for fixing3/16" thick glass panes MS box section

complete in all respect.

Sft. 446

98

Single layer of tiles 9"x4½"x1½" laid over 4" earth and 1" mud plaster

without Bhoosa, grouted with cement sand 1:3 on top of RCC roof slab,

provided with 34 lbs. per % Sft or 1.72 Kg/Sq.m bitumen coating sand

blinded.

% Sft. 2581.31

99 Cement plaster 1:4 upto 20' (6.00m) height ½" (13mm) thick. % Sft. 22583.68

100Cement plaster 3/8" thick under soffit of RCC roof slab upto 20' height

1:3.% Sft. 2359.5

101

Cement jointing struck joints on walls upto 20' height 1:2. including extra

cost of labour and material for red oxidre pigment in cement pointing to

match with the colour of bricks.

% Sft. 2725.76

102 Cement pointing struck joints on walls upto 20' height 1:2. % Sft. 3705.00

103 Cement pointing struck joints on walls upto 20' height 1:3. % Sft. 11670.00

104Filling watering ramming earth under floors with surplus earth from

foundation etc.%0 Cft. 2319.14

105 Supply and filling sand under floor or plugging in wells. % Cft. 5668.16

106Fixed pannel with grill and without wire gauze complete as per

specification.Sft. 18.85

107 Supplying and laying polythene sheet over DPC under floor and on roof. Sft. 2597.34

108

1½" thick mosaic flooring, consisting of ½" mosaic topping of one part of

cement and marble powder in the ratio of 3:1 and two parts of marble

chips , laid over 1" thick floor of 1:2:4 cement concrete including rubbing

and polishing complete with finishing using grey cement..

% Sft. 2710.36

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

109

Providing and laying conglomerate flooring two coat work with top layer

of 1/2" thick wearing surface consisting of one part of cement and two

part of stone chips passing 3/16" sieve over bottom layer of cement

concrete 1:3:6 .

% Sft. 1247.04

110Providing and fixing marble strip of any shade for dividing the mosaic

flooring into pannels size 1-1/2".Rft 3680

112

First class deodar wood wrought joinery in door and window etc

panneled or glazed or fully glazed fixed in position including chowkat

holdfast hinges tower bolts complete.

Sft. 66.57

113

Providing and fixing mild steel chowkat of doors, windows C window,

etc. including hold fast, making and threading holes for hinges, etc,

complete. M.s. angle iron 1½"x1½"x1/4" welded with M.S.plate 2"x1/4".

Sft. 651

114

Providing and fixing 1½" thick solid flush foor shutter sterling or equivalent with

commercial ply (5mm) thick on both sides double pressed and deodar wood lipping

1½" x 3/8" around shutter including chromium plated fitting, iron hinges with

aluminium kick plate 22 SWG and both side and finger plate complete.

Sft. 504

115

Mosaic dado or skirting with one part of cement and marble poweder in

ratio 3:1 and two part of marble chips laid over 1/2" thick cement plaster

ratio 1:3 including rubbing and polishing complete with finishing using

grey cement 1/2" thick.

% Sft. 1414.25

116 White wash new surface 3 coats. % Sft 2145.75

117 Distempering 3 coats new surface. % Sft. 9724

118

Small Ironwork such as gusset plates, knees, bends, stirrps, rings etc.

including cutting, drilling, riveting, handling, assembling and fixing but

excluding erection in position.

% Kg. 400

119Rain water down pipe cast iron head fixed in place including cost of

clump hold fast and painting.No. 16

120 Making top khura on roof 2'x2'x6" Size. No. 8

121Bottom khuras of brick masonry in cement mortor 1:6 4'x2'x4-1/2" over

3" cement concrete 1:4:8.No. 8

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

122 Providing and fixing sliding bolts to door iron sliding bolt 12" long. No. 14

123 Providing and fixing sliding bolts to door iron sliding bolt 10" long. No. 10

124

Extra provision for Architectural features including special shuttering

labour material for decorative cornice including special shape brick

under parapet, Texture coloured glazed tiles on outer face of building at

window lintel level, circular masonry .

% No. 19366.62

125

Providing and fixing ward robe 22" deep consisting of RCC shelve 1-1/2"

thick including 1/2" thick vin board boxing and back one side ply vin

board shutter 3/4" thick i/c deodar wood lipping 1/4" on alledges fixed

including deodar wood frame 3"x1" with hang

Sft. 240

126

Providing and fixing class room almirah consisting of 1" thick solid flush

shutter with deodar wood lipping 1/4" thick on all around fixed in deodar

wood frame 3"x1" including full hinges C.P fitting with RCC 1:1.5:3

shelves 1.5" thick including 3 coats of painting.

Sft. 96

127Painting new surface, preparing surface and painting of door and

window 3 coats. % Sft. 1078

128Providing and laying fair face brick masonary 9"x4.5"3" recessed joint

with cement surkhi 1:3 filling joints complete in all respect. % Sft. 591.51

129Providing and laying 3/4" thick marble slab size 2' wide including rubbing

and polishing.Sft. 52

130

Providing and applying weather shield paint of approved quality of

external surface of building i/c preparing of surface complete in all

respect.

% Sft. 1077.88

131

Providing and laying dry brick pavement soling in street or road etc.

sand grouted laid in proper camber including preparation watering

compaction of bed to proper camber and sand cushion.

% Sft. 4500

132 Grouting 4-1/2" dry brick work with cement mortor 1:5 % Sft. 4500

133

Earth work excavation in open cutting for sewer and manhole as shown

in drawing including shuttering and according to tamplates and level 7'-

15' depth.

%0 Cft. 1120

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

134 Supplying and filling sand under floor or plugging in wells. % Cft. 186.48

135P/L RCC pipe moulded with cement concrete 1:1.5:3 with spigot socket

collar joint including cost of reinforcement complete.

136 i) 4" inner dia Rft. 50

137 ii) 6" inner dia. Rft. 200

138 iii) 9" inner dia. Rft 200

139 Rehandling of earth work lead upto single throw of kassi. %o Cft. 1120

140 Borrow pit excavation lead upto 1 Mile. %o Cft. 95760

141 Dressing slope of banks or ground surface. %o Cft. 31920

142

Compaction of earth work with road roller including ploughing mixing

moistening earth to optimum moisture content in layers etc. complete

85% maximum modified AASHO dry density.

%o Cft. 95760

143Providing and fixing glazed earthen ware water closet including P-Trap

4" glazed.No. 6

144Providing and fixing glazed earthen ware water closet squatter type

combined with foot rest white.No. 4

145 P/fitting plastic soap dish. No. 4

146 P/F chromium plated tee stop cock. No. 4

147 Providing and fixing stainlless sink 24"x48" including bracket set. No. 2

148

Providing and fitting glazed earthen ware wash hand basin 22"x16"

including bracket set, waste pipe and waste coupling etc white with

pedestal.

No. 4

149 P/F chromium plated mix valve for wash hand basin sink or shower. No. 10

150P/F plastic made low down flushing cistern 13.63 litre 3 gallon capacity

including bracket set copper connection etc complete white.No. 4

151 P/F chromium plated shower rose.1/2"x4" No. 4

152 Providing and fixing C.P Towel rail 24" long. No. 4

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

153Providing and fixing looking glass 22"x16" size 5mm thick including

shelf.No. 4

154 Providing and fixing C.P.Bib cock 1/2" dia. No. 10

155 Providing and fixing C.P. Stop cock 1/2" dia. No. 12

156 Providing and fixing floor trap 4" dia . No. 6

157 Providing and fixing gully trap 4" dia complete . No. 6

158 Providing and fixing C.I. soil pipe 4" dia . No. 45

159P/fitting A.C soil pipe with cement chalked joint including all special 6"

dia.No. 55

160 P/Fitting R.C.C pipe 4" dia including laying and jointing in trenches. No. 400

161Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 1/2" dia No. 150

162Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 3/4" dia No. 30

163Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 1.25" dia No. 40

164Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 3" dia No. 300

165 Providing and fixing glass shelf (24"x5") No. 4

166P/F at site of work DURA supper tuff made water tank 200 Gallon capacity laid

on roof. No. 2

167Supply and erection PVC pipe wiring purposes including inspection box pull

box etc. 3/4"" dia.Rft. 400

Supply and erection PVC pipe wiring purposes including inspection box pull

box etc. 1" dia.Rft. 500

i) 3/0.029" Rft. 1500

ii) 7/0.029" Rft. 1000

iii) 7/0.064" Rft. 1000

169 Supplying /errection of copper conductor cable for service 7/029 Rft. 450

168

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

170 Supplying /errection of copper conductor cable for service 7/064 Rft. 400

Supplying and erection of MS sheet box of 16 SWG, 10 cm (4") deep with

4.75mm thick (3/16") bakelite sheet top, for recessed wiring, including making

holes for regulators, switches, plugs, etc.

i) 7" x 4" No. 16

iii) 9" x 4" No. 16

iv) 4" x 4" No. 20

172 Supply and erection of ceiling rose, bakelite. No. 52

173 Supply and erection of wall socket with 3 Pin. No. 12

174Supply and erection of 3 Pin switch and plug combined recessed type 10/15

Amp.No. 12

175 Supply and erection of switches 5 Amp piano type. No. 175

176 Supply and erection of switches 5 Amp recessed type. No. 12

178P/F Pannel board consisting of M.S. combied 12"x18" consisting of 15/20

Amp.No. 2

179Supply and erection of girder clamp hook 5/8" with M.S plate 1"x1/4" with

bolts and nuts for hanging and ceiling fan.No. 12

180 Supply and erection of button holder bakelite large size. No. 12

181 Earthing of main switch complete. No. 2

182 Supply and errection of Exhaust fan plastic body 12" size. No. 6

183 Supply of ceiling fan 56" sweep complete. No. 12

184 Erection of ceiling fan alongwith regulator complete in all respect. No. 12

185 Supplying and erection of call bell with bell fixed on teak wood board 7"x4". No. 2

Supplying electric connection . No. 2

i) double rod with two choke and two starter. No. 30

171

186

DESCRIPTION.

Unit Qty RATE AMOUNT IN FIGURES AMOUNT IN WORDS

ESTIMATED BID RATE QOUTED BY CONTRACTORSR

No.

ii) Single Rod with one choke and one starter. No. 30

187 Wapda connection Demand Notice No. 1

Total

G.Ttoal

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

SECTION - 1 (CONCRETE LINING)

1

Earth work excavation irrigation channels, drains, etc to designed

section grade and profile excavated material disposed off undressed

with in 50 Ft. in ordinary soil.

%o Cft. 58019

2Formation, dressing and preparing sub grade in bed.

% Sft. 49000

3Formation, dressing and prepraring sub grade on slope.

% Sft. 49802

4Cement plaster 1-1/2" thick ratio 1:6 in bed.

% Sft. 1005588

5Cement plaster 1-1/2" thick ratio 1:6 on slope.

% Sft. 1315435

6Cement concrete lining using washed screened and graded stone

aggregate 1:2:4 in bed% Cft. 264007

7Cement concrete lining using washed screened and graded stone

aggregate 1:2:4 in slope.% Cft. 345007

8Bitumen coating to plastered or cement concrete surface 14 Lbs. per

100 Sft.% Sft. 141307

9Bitumen coating to plastered or cement concrete surface 10 Lbs. per

100 Sft.% Sft. 13089

10Providing and placing cement sand and bituminous joints sealant in

ratio 1:2:3Per Rft. 229747

11 Filling expansion joint with bitumen sand and saw dust in ratio 1:2:2Per Rft.

Per inch23014

12 Dismentalling cement concrete plain 1:2:4. % Cft. 7361

SECTION -2 (EARTH WORK)

13

Earth work excavation irrigation channels, drains, etc to designed

section grade and profile excavated material disposed off undressed

with in 50 Ft. in ordinary soil.

%o Cft 7426500

14 Borrowpit excavation undressed in ordinary soil lead upto 100'. %o Cft 5762750

BID RATE QUOTED BY CONTRACTOR

WORK NO.2

NAME OF WORK:- REHABILITATION OF 6-R/HAKRA WITH SYSTEM

BID SCHEDULE

S.No. DESCRIPTION

ESTIMATED

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

15 Borrowpit excavation undressed in ordinary soil lead upto 2 Mile %o Cft 10802500

16

Compaction of earth work with road roller including ploughing mixing

moistening earth to optimum moisture content in layers etc. complete

90% maximum modified AASHO dry density.

%o Cft 9844750

17

Compaction of earth work with road roller including ploughing mixing

moistening earth to optimum moisture content in layers etc. complete

85% maximum modified AASHO dry density.

%o Cft 9383000

18 Dowel dressingP.

Chain1919.18

19 Rehandling of earth work lead upto 50 Ft. %o Cft 1264200

20 Jungle Clearance and removing within 100 Ft. %o Sft. 1620000

21 Uprooting stump and removing within 100 Ft. from 2'-6' girth Each 804

Total 0

SECTION - 3 (RAISING OF SHOULDERS)

22 Pacca brick work other than building upto 10' height % Cft. 89741

23Cement concrete lining using washed screened and graded stone

aggregate 1:2:4 in bed% Cft. 35846

24 Cement plaster 1/2" thick upto 20' height ratio 1:4. % Sft. 555609

25 Dismentalling pacca brick work with cement sand mortor. % Cft. 13359.66

Total

Credit of old bricks.%o

Nos.72141

Credit Brick ballast. % cft. 8016

SECTION - 4 (FALL STRUCTURES)

26

Earthwork excavation in foundation of building, bridge and other

structure i,e; dagbelling, dressing, refilling arround structure with

excavated earth, watering, ramming, one chain lift 5.0 ft in ordinary

soil.

%o Cft 1200

27Earthwork excavation from outside borrowpits un- dressed lead 1.00

Mile%o Cft 30000

28

Compaction of earthwork with power road roller, including ploughing ,

mixing, moistening earth to optimum moisture contents in layers etc.

complete 90%.

%o Cft 30000

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

29Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth 1:4:8% Cft 221

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

30

Providing and laying reinforced cement concrete in roof slab, beams,

columns lintels girders and other structural members laid in situ or

precast laid in position or prestressed members cost in situ, complete

in all respect.

Per Cft. 728

31

RCC in slab of rafts/strip foundation base slab of column and retaining

walls etc. and other than those mentioned above not requiring form

work i.e. horizontal shuttering complete in all respect 1:2:4

Per Cft. 8959.75

32

Fabrication of mild steel reinforcement for cement concrete, including

cutting, bending, laying in position, making joints and fastenings,

including cost of binding wire and labour charges for binding of steel

reinforcement (also includes removal of rust from bar) deformed bar.

% Kg. 30826.53

33Bitumen coating to plastered surace or concrete surface @ 14 lbs %

Sft% Sft. 242.5

34Extra labour for work of weir, rail or road bridges syphons and

concreting in super structure.% Cft. 9366

35Supplying of plasticizer retarder (Sikmant) @ 0.2 liter per bag of

cement.P.Liter 329.69

36 Bailing out water with pump U/S & D/S %o Cft. 80000

37Providing and fixing rubber water stoper for all type of joints 3 bulb 9"

wide 1/8" thickRft. 604

38 Providing and fixing elastic filler sheet 1" thick in expansion joints. Sft. 268

39Providing and laying G.I.Pipe 1.25" dia 3' long Dowel bar @ 2' centre to

centre.No. 152

40 Providing and filling grease in 1.25" dia 3' long dowel bar. No. 152

41 Providing and laying joint sealer . Rft. 268

42 Providing and fixing rain water outlet of AC pipe 3" dia. No. 6

43Cement concrete plain including placing compacting finishing and

curing complete 1:2:4 (Wearing coat over bridge)% Cft. 116

44

Small Iron work such as gusset plates, knees, bends, stirrps, rings etc.

including cutting, drilling, reveting, handling, assembling and fixing but

excluding erection in position.

% Kg. 592

45 Dismentling of Pacca Brick work % Cft. 1217

46 Dismentling RCC % Cft. 45

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

47

Providing and installing M.S Blind pipe socketed/welded joint, M.S

reducer (where necessary) in tubewell bore hole including

jointing/welding with strainer etc. complete 2" inner dia 3/16" thick.

Rft. 28

48

Providing surface treatment to roads including supply of bitumen and

bajri/crushed stone aggregate of approved quality, including cleaning

of road surface, heating and spraying bitumen, spreading bajri and

rolling with road roller (including its operation cost, fuel and hire

charges etc) complete including carriage of all material to site of work

except bajri / crushed stone aggregate 3 coats.

% Sft. 462

49 Cement pointing struck joint on walls upto 20' height 1:3. % Sft. 1540

50 Providing and fixing rawal bolts. No. 40

51Precast cement concrete solid or face blocks 1:2:4 including cost of

templates.Cft. 500

52 Providing and laying coarse sand. % Cft. 315

53 Providing graded bajri 1/8" to 1/2" size on level. % Cft. 157.5

54 Providing graded bajri ½" to 2" size on level % Cft. 157.5

55

Carriage of 100 cft of all material like stone aggregate, spawl kankar,

lime surkhi etc or 150 cft of timber by truck or by any other means

owned by the contractor lead 280 K.M.

% Cft. 315

Total

Credit of old bricks % Cft. 925.62

Credit of Steel 5% of R.C.C % Kg. 46

SECTION - 5 (OUTLETS)

56Earth work excavation for outlet refilling ramming and puddling channel

discharge upto 50 Cs.Job 140

57Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth 1:4:8% Cft. 1805.3

58Pacca brick work other than building upto 10' height in 1:4 cement

sand mortar.% Cft. 2753.8

59 Providing and fixing RCC pipe 9" dia at site Rft. 1680

60

Earthwork excavation in foundation of building, bridge and other

structure i,e; dagbelling, dressing, refilling arround structure with

excavated earth, watering, ramming, one chain lift 5.0 ft in ordinary soil

%o Cft. 131040

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

61 Dismentalling of outlets APM or OF "H" upto 2.1' to 3.0'. Each 140

62Cement concrete plain including placing compacting finishing and

curing complete 1:4:8 % Cft. 8232

63

Providing and laying reinforced cement concrete in roof slab, beams,

columns lintels girders and other structural members laid in situ or

precast laid in position or prestressed members cost in situ, complete

in all respect.

Cft. 16292

64

Fabrication of mild steel reinforcement for cement concrete, including

cutting, bending, laying in position, making joints and fastenings,

including cost of binding wire and labour charges for binding of steel

reinforcement (also includes removal of rust from bar) deformed bar.

% Kg. 52839.43

65 Pacca brick work other than building upto 10' height 1:3 % Cft. 10635.8

66

Providing and laying RCC pipe sewer moulded with cement concrete

1:1.5:3 confirming to ASTM specification C-76-79 class-II . Wall-B

including carriage of pipe from factory to site of work lowering in

trenches to correct alignment and grade jointing with rubber ring cutting

pipe where necessary testing etc. complete 12" dia.

Rft. 2520

67Extra labour in fixing APM and OF outlets blocks including dressing of

bricks upto 4' depth.Job. 70

68Water allowance for construction outlets or culverts, when canal water

is not flowing.Job. 70

69 Providing and laying Iron Machine for outlets. No. 70

Total 0

Credit of old material Job. 70

Credit of old material Each 70

SECTION - 6 (RD MARKS AND DATA BOARDS)

70 Precast cement concrete solid ratio 1:2:4. Cft 284.34

71 Placing of RD marks. No. 420

72 White washing new surface 2 coats. % Sft. 2206

73 Writing letter/figures per letter per inch height No. 21990

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

74Carriage of consignment odd job/removal of malba by donkey labour

upto 3 Miles.No. 420

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

75 Cement plaster 1:2 1/2" thick upto 20' height. % Sft. 2206

76

Earthwork excavation in foundation of building, bridge and other

structure i,e; dagbelling, dressing, refilling arround structure with

excavated earth, watering, ramming, one chain lift 5.0 ft in ordinary soil

%o Cft. 168

77Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth 1:4:8% Cft. 42

78 Pacca Brick work in gound floor 1:3. % Cft. 222.75

79 Cement plaster 1/2" thick 1:2 upto 20' height % Sft. 401.58

80 Preparing surface for painting with emulsion paint two coats. % Sft. 401.70

SECTION - 7 (BUILDINGS)

81

Excavation in foundation of building, bridges & other structures,

including dagbelling, dressing, refilling around structures with

excavated earth, watering & ramming lead up to one chain and lift upto

5' in ordinary soil.

%o Cft. 15368

82 Spraying anti-termite liquid mixed with water in the ratio 1:40. % Sft. 12998.86

83 Dry rammed brick or stone ballast 1½" to 2" gauge. % Cft. 4213.68

84Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth ratio 1:3:6.% Cft. 3175.26

85Cement concrete brick or stone ballast 1½" to 2" gauge in foundation

and plinth ratio 1:4:8.% Cft. 2434.27

86Providing and laying watering and ramming brick ballast 1.5" to 2"

gauge mixed with 25% sand for floor foundation complete.% Cft. 82

87 Pacca brick work in foundation and plinth in cement sand mortor 1:4. % Sft. 18897.75

88 Pacca brick work in foundation and plinth in 1:6 % Cft. 3723.58

89

Providing and laying damp proof course of cement concrete 1"-

1/2" thick 1:2:4 (using cement, sand and shingle), including one coat

bitumen and one coat polythene sheet.

% Sft. 2138.73

90

Providing and laying damp proof course of cement concrete 2" thick

1:2:4 (using cement, sand and shingle), including one coat bitumen

and one coat polythene sheet.2" thick

% Sft. 555.37

91 Pacca brick work in ground floor.1:5 % Cft. 4916.78

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

92

Reinforced cement concrete in roof slab, beam columns lintels, girder

and other structural members laid in situ or precast laid in position, or

prestressed members cast in situ, complete in all respect Type C

(nominal mix 1:2:4

Cft. 4873.67

93Plain cement concrete including placing compacting finishing and

curing complete 1:2:4.Cft. 524.87

94

Fabrication of mild steel reinforcement for cement concrete, including

cutting, bending, laying in position, making joints and fastenings,

including cost of binding wire and labour charges for binding of steel

reinforcement (also includes removal of rust from bar) deformed bar.

% Kg. 20534.71

95 Pacca brick work in ground floor.1:4 % Cft. 5651.13

96

Providing and laying khaprail tile size 6"x9" laid with 1:3 cement sand

mortor over a bed of 3/4" thick cement plaster 1:3 on slope shades

including finishing complete in all respect.

Cft. 878.69

97

Providing and fixing window consisting of M.S box section frame 2"x1-

1/2" leaves frame 1.5"x1" box section frame for glazing3/8"x3/8" using

16 SWG sheet MSS flat for fixing3/16" thick glass panes MS box

section complete in all respect.

Sft. 813.56

98

Single layer of tiles 9"x4½"x1½" laid over 4" earth and 1" mud plaster

without Bhoosa, grouted with cement sand 1:3 on top of RCC roof slab,

provided with 34 lbs. per % Sft or 1.72 Kg/Sq.m bitumen coating sand

blinded.

% Sft. 6485.67

99 Cement plaster 1:4 upto 20' (6.00m) height ½" (13mm) thick. % Sft. 30184.68

100Cement plaster 3/8" thick under soffit of RCC roof slab upto 20' height

1:3.% Sft. 4575.25

101

Cement jointing struck joints on walls upto 20' height 1:2. including

extra cost of labour and material for red oxide pigment in cement

pointing to match with the colour of bricks.

% Sft. 5755.5

102 Cement jointing struck joints on walls upto 20' height 1:2. % Sft. 11322.25

103Filling watering ramming earth under floors with new earth excavated

from outside lead upto 5 mile.%0 Cft. 28767.88

104Filling watering ramming earth under floors with surplus earth from

foundation etc.%0 Cft. 9094.06

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

105 Supply and filling sand under floor or plugging in wells. % Cft. 7919.15

106Fixed pannel with grill and without wire gauze complete as per

specification.Sft. 18.85

107Supplying and laying polythene sheet over DPC under floor and on

roof.Sft. 4821.67

108

1½" thick mosaic flooring, consisting of ½" mosaic topping of one part

of cement and marble powder in the ratio of 3:1 and two parts of

marble chips , laid over 1" thick floor of 1:2:4 cement concrete

including rubbing and polishing complete with finishin using grey

cement.

% Sft. 6219.36

109

Providing and laying conglomerate flooring two coat work with top layer

of 1/2" thick wearing surface consisting of one part of cement and two

part of stone chips passing 3/16" sieve over bottom layer of cement

concrete 1:3:6 .

% Sft. 2342.88

110Providing and fixing marble strip of any shade for dividing the mosaic

flooring into pannels size 1-1/2".Rft 7287

111 Providing and fixing windows complete. Sft. 327

112

First class deodar wood wrought joinery in door and window etc

panneled or glazed or fully glazed fixed in position including chowkat

holdfast hinges tower bolts complete.

Sft. 137.14

113

Providing and fixing mild steel chowkat of doors, windows C window,

etc. including hold fast, making and threading holes for hinges, etc,

complete. M.s. angle iron 1½"x1½"x1/4" welded with M.S.plate 2"x1/4".

Sft. 1368

114Fixed pannel with grill and without wire gauze complete as per

specification.Sft. 74.85

115

Providing and fixing 1½" thick solid flush door shutter sterling or

equivalent with commercial ply (5mm) thick on both sides double

pressed and deodar wood lipping 1½" x 3/8" around shutter including

chromium plated fitting, iron hinges with aluminium kick plate 22 SWG

on both sides and finger plate complete.

Sft. 1218.52

116

Mosaic dado or skirting with one part of cement and marble powder in

ratio 3:1 and two part of marble chips laid over 1/2": thich cement

plaster ratio 1:3 including rubbing and polishing complete with finishing

using grey cement 1/2" thick.

% Sft. 2182.75

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

117 Painting door and window any type 3 coats new surface. % Sft. 1187.04

118 Providing and fixing approved quality mortice lock. No. 13

119 White wash new surface 3 coats. % Sft 7494.5

120 Distempering 3 coats new surface. % Sft. 18164

121 Providing and laying approved white glazed tiles 1/4" thick. % Sft. 385

122 White glazed tiles dado jointed 1/4" thick in white cement. % Sft. 145.25

123Providing and laying topping of cement concrete 1:2:4 including

surface finishing dividing into pannels 1½" thick.% Sft 957.25

124 Cement plaster 3/8" thick under soffit of RCC roof slab 1:3. % Cft. 1477

125

Small Ironwork such as gusset plates, knees, bends, stirrups, rings etc.

including cutting, drilling, rivetting, handling, assembling and fixing but

excluding erection in position.

% Kg. 84

126Rain water down pipe cast iron head fixed in place including cost of

clump hold fast and painting.No. 26

127 Making top khura on roof 2'x2'x6" Size. No. 18

128Bottom khuras of brick masonry in cement mortor 1:6 4'x2'x4-1/2" over

3" cement concrete 1:4:8.No. 8

129 Providing and fixing sliding bolts to door iron sliding bolt 12" long. No. 28

130 Providing and fixing sliding bolts to door iron sliding bolt 10" long. No. 18

131

Extra provision for Architectural features including special shuttering

labour material for decorative cornice including special shape brick

under parapet, Texture coloured glazed tiles on outer face of building

at window lintel level, circular masonry and special shape of bricks on

verandah. opening etc complete.

% No. 59719.05

132

Providing and fixing ward robe 22" deep consisting of RCC shelve 1-

1/2" thick including 1/2" thick vin board boxing and back one side ply

vin board shutter 3/4" thick i/c deodar wood lipping 1/4" on alledges

fixed including deodar wood frame 3"x1" with hang rod in centre

position drawers i/c full hings CP fitting and painting.

Sft. 507.75

133

Providing and fixing class room almirah consisting of 1" thick solid

flush shutter with deodar wood lipping 1/4" thick on all around fixed in

deodar wood frame 3"x1" including full hinges full hings C.P fitting

with RCC 1:1.5:3 shelve 1.5" thick including 3 coats of painting.

Sft. 96

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

134Painting new surface, preparing surface and painting of door and

window 3 coats. % Sft. 1582

135Providing and laying fair face brick masonary 9"x4.5"x3" recessed joint

with cement surkhi 1:3 filling joints complete in all respect. % Sft. 1314.76

136Providing and laying 3/4" thick marble slab size 2' wide including

rubbing and polishing.Sft. 108

137

Providing and applying weather shield paint of approved quality of

external surface of building i/c preparing of surface complete in all

respect.

% Sft. 1445.92

138

Providing and laying dry brick pavement soling in street or road etc.

sand grouted laid in proper camber including preparation watering

compaction of bed to proper camber and sand cusion.

% Sft. 8100

139 Grouting 4.5" dry brick work with cement mortor 1:5 % Sft. 8100

140

Earth work excavation in open cutting for sewer and manhole as shown

in drawing including shuttering and according to tamplates and level 7'-

15' depth.

%0 Cft. 2240

141 Supplying and filling sand under floor or plugging in wells. % Cft. 372.96

P/L RCC pipe moulded with cement concrete 1:1.5:3 with spigot

socket collar joint including cost of reinforcement complete.

i) 4" inner dia Rft. 150

ii) 6" inner dia. Rft. 400

iii) 9" inner dia. Rft 500

143 Rehandling of earth work lead upto single throw of kassi. %o Cft. 2240

144 Borrow pit excavation lead upto 1 Mile. %o Cft. 95760

145 Dressing slope of banks or gound surface. %o Cft. 31920

146

Compaction of earth work with road roller including ploughing mixing

moistening earth to optimum moisture content in layers etc. complete

85% maximum modified AASHO dry density.

%o Cft. 95760

147Providing and fixing glazed earthen ware water closet including P-Trap

4" glazed.No. 13

148Providing and fixing glazed earthen ware water closet squatter type

combined with foot rest white.No. 8

142

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

149 P/fitting plastic soap dish. No. 8

150 P/fitting plastic toilet paper holder. No. 8

151 P/fitting Plastic towel rail No. 8

152 P/fitting plastic shelf railing. No. 4

153 P/F chromium plated towel rail 24" long. No. 4

154 P/F chromium plated tee stop cock. No. 8

155Providing and fixing glazed earthen ware W.H.B 22"x16" complete

coloured without pedestal.No. 4

156 Providing and fixing stainless sink 24"x48" including bracket set. No. 5

157 Providing and fiixing low down flushing cistern 3 gallon capacity etc. No. 3

158

Providing and fitting glazed earthen ware wash hand basin 22"x16"

including bracket set, waste pipe and waste coupling etc white with

pedestal.

No. 8

159 P/F chromium plated mix valve for wash hand basin sink or shower. No. 20

160P/F plastic made low down flushing cistern 13.63 litre 3 gallon capacity

including bracket set copper connection etc complete white.No. 8

161 P/F chromium plated shower rose.1/2"x4" No. 8

162Providing and fixing plastic soap dish toilet paper including railing and

shelf etc.No. 4

163 Providing and fixing C.P Towel rail 24" long. No. 8

164Providing and fixing looking glass 22"x16" size 5mm thick including

shelf.No. 12

165 Providing and fixing C.P. Swan neck two way 1/2" dia. No. 4

166 Providing and fixing C.P.Bib cock 1/2" dia. No. 32

167 Providing and fixing C.P. Stop cock 1/2" dia. No. 36

168 Providing and fixing floor trap 4" dia . No. 22

169 Providing and fixing gully trap 4" dia complete . No. 22

170 Providing and fixing C.I. soil pipe 4" dia . Rft. 190

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

171P/fitting A.C soil pipe with cement chalked joint including all special 6"

dia.Meter 110

172 P/Fitting R.C.C pipe 4" dia including laying and jointing in trenches. Rft. 800

173 Providing and fixing C.I. soil pipe 2" dia . Rft. 95

174 Providing and fixing C.I. special such as tee bends plug type. Kg. 35

175 Providing and fixing C.I. special such as tee bends plain type. Kg. 86

176Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 1/2" dia Rft 650

177Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 3/4" dia Rft 510

178Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 1.25" dia. Rft. 80

179Providing and fixing jointing testing G.I pipe for water supply including

cutting bending laying in position complete 3" dia Rft 600

180 Providing and fixing glass shelf (24"x5") No. 11

181 Providing and fitting electric motor and pump complete. Job 1

182 Providing and fitting Electric Geezer. No. 1

183 Providing and fitting Hand pump. No. 1

184Providing and fitting Electric Fiber glass water tank 200 Gallon

capacity.No. 1

185P/F at site of work DURA supper tuff made water tank 200 Gallon

capacity laid on roof. No. 4

186Providing and fixing earthen ware water closet (European Type)

including P-Trap 4" glazed.No. 3

187Supply and erection PVC wiring purposes including inspection box pull

box etc. 1/2" dia.Rft. 3070

188Supply and erection PVC wiring purposes including inspection box pull

box etc. 3/4" dia.Rft. 800

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

189Supply and erection PVC wiring purposes including inspection box pull

box etc. 1" dia.Rft. 1000

Supply and erection of single core insulated copper conductor in

prelaid PVC pipe 250/440 volts.

i) 3/0.029" Rft. 7500

ii) 7/0.029" Rft. 3650

iii) 7/0.044" Rft. 750

iii) 7/0.064" Rft. 1600

191 Supplying /erection of copper conductor cable for service 7/029 Rft. 900

192 Supplying /erection of copper conductor cable for service 7/064 Rft. 800

Supplying and erection of MS sheet box of 16 SWG, 10 cm (4") deep

with 4.75mm thick (3/16") bakelite sheet top, for recessed wiring,

including making holes for regulators, switches, plugs, etc.

0

i) 7" x 4" No. 52

ii) 8" x 10" No. 6

iii) 9" x 4" No. 32

iv) 4" x 4" No. 40

194 Supply and erection of ceiling rose, bakelite. No. 129

195 Supply and erection of wall socket with 3 Pin. No. 24

196Supply and erection of 3 Pin switch and plug combined recessed type

10/15 Amp.No. 24

197 Supply and erection of switches 5 Amp piano type. No. 420

198 Supply and erection of switches 5 Amp recessed type. No. 44

199P/F Pannel board consisting of M.S. combied 12"x18" consisting of

15/20 Amp.No. 4

200Supply and erection of girder clamp hook 5/8" with M.S plate 1"x1/4"

with bolts and nuts for hanging and ceiling fan.No. 24

201 Supply and erection of button holder bakelite large size. No. 64

202 Earthing of main switch complete. No. 5

190

193

Unit Qty RATEAMOUNT IN

FIGURESAMOUNT IN WORDS

BID RATE QUOTED BY CONTRACTOR

S.No. DESCRIPTION

ESTIMATED

203 Supply and erection of Exhaust fan plastic body 12" size. No. 15

204 Supply and erection of ceiling fan 56" No. 8

205 Supply of ceiling fan 56" sweep complete. No. 24

206 Erection of ceiling fan alongwith regulator complete in all respect. No. 24

207Supplying and erection of call bell with bell fixed on teak wood board

7"x4".No. 4

208 Supplying electric connection . No. 4

Supply and errection of tube light including rod choke, starter with

frame complete

i) double rod with two choke and two starter. No. 60

ii) Single Rod with one choke and one starter. No. 60

210

Supply and erection of pannel board of size 1"x1-1/2" and 6" to 7"

fixing made being made of Fuji Terasaki board 30/360 Amp etc.

complete in alll respect.

No. 1

211 Supply and erection of bulb head light with glass on floor. No. 4

212Providing and installation of Transformer 25 KWA with all accessories

complete.No. 1

213 Wapda connection Demand Notice. Job. 1