UNION CITY BOARD
OF EDUCATION 3912 BERGEN TURNPIKE
UNION CITY, NEW JERSEY 07087
BID DOCUMENTS FOR
ACCESS CONTROL SYSTEM- UNION CITY HIGH
SCHOOL
BOARD OF EDUCATION TRUSTEES
JEANETTE PENA ALICIA MOREJON
President Vice President
PABLO L. CABRERA ALEJANDRO VELAZQUEZ
Trustee Trustee
JOSE M. MEJIA KENNEDY NG
Trustee Trustee
CARLOS VALLEJO
Trustee
SUPERINTENDENT: SILVIA ABBATO
ACTING BOARD SECRETARY: ANTHONY N. DRAGONA
BUSINESS ADMINISTRATOR: ANTHONY N. DRAGONA
PURCHASING AGENT: CHRISTINA HUNT
BOARD COUNSEL: ELISE DiNARDO, ESQ.
1814 KENNEDY BLVD.
UNION CITY, NEW JERSEY 07087
(201) 963-9500
Fax (201) 963-5080
2
ACCESS CONTROL SYSTEM - UNION CITY HIGH SCHOOL
TABLE OF CONTENTS
Page
1.0 BID NOTICE…………………………………………………………...... 3
2.0 DEFINITIONS…………………………………………………………… 6
3.0 INSTRUCTIONS TO BIDDERS………………………………………. 7
4.0 SPECIFICATIONS……………………………………………………... 16
APPENDIX A – DESIGN PLANS
ATTACHMENT #1 – DOOR MATRIX
SCHEDULE 1 – BID PROPOSAL CHECKLIST
SCHEDULE 2 – BID PROPOSAL FORM
SCHEDULE 3 – AFFIDAVIT OF NON-COLLUSION
SCHEDULE 4 – AFFIDAVIT AND QUESTIONNAIRE OF BIDDER’S
EXPERIENCE AND FINANCIAL RESPONSIBILITY
SCHEDULE 5 – STATEMENT OF OWNERSHIP OF CORPORATION
OR PARTNERSHIP
SCHEDULE 6 – AFFIDAVIT OF NO CHANGE IN STATUS
3
1.0 BID NOTICE
ADVERTISEMENT FOR BIDS
Union City Board of Education
3912 Bergen Turnpike
Union City, New Jersey 07087
Notice is hereby given that sealed Bids will be received by the Union City Board of
Education for the furnishing of all labor, material, equipment, and other facilities necessary
for, or incidental to, the installation and programming of an access control hardware and
software at the Union City High School, 2500 John F. Kennedy W, Union City, New Jersey.
The Work of this Project consists of installation of an access control hardware and software
at the Union City High School. The renovation portion of the Project includes, but is not
limited to, installation of card readers, access control hardware, software, door hardware,
wiring and locking devices. The bidder must be authorized by Software House &
American Dynamics to work on the existing system. All Work will be performed in
accordance with requirements of the Contract Documents.
The Project will be awarded as a single overall contract in accordance with NJSA 18A:18A-
18(b) (2).
Contract SOC-1 Single Overall Contract
Beginning Tuesday, April 19, 2016, specifications and bid documents may be inspected at
the Board’s Headquarters, 3912 Bergen Turnpike, Union City, New Jersey 07087,
telephone (201) 271-2289 ext. 1043 during business hours, 8:30 a.m. to 3:00 p.m, or on
the Board's website: http://www.union-city.k12.nj.us/departments/purchasing/bids.
Each bid must be accompanied by a certified check, cashier’s check or bid bond
from a surety company licensed to do business in New Jersey, in the amount of ten
percent (10%) of the Total Cost of the bid submitted, but not in excess of $20,000.00,
made payable to the Union City Board of Education. Bidders are required to comply
with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27
A Pre-Bid Walkthrough for all bidders will be held at the Union City High School, 2500
John F. Kennedy W, Union City, New Jersey, at 9:30 A.M. prevailing time on Wednesday ,
April 27, 2016 for the purpose of entertaining bidder questions. Following the question
session, a tour of the project site will be conducted. It is recommended that bidders attend
the pre-bid conference for the purpose of clarifying questions, familiarizing themselves with
the project site, hearing questions from other bidders and raising concerns that may be
revealed by a site visit. Failure of the bidder to attend the Pre-Bid Conference is at the
bidder’s own risk.
4
Bids may be mailed to Christina Hunt, Purchasing Agent, at the Union City Education
Center located at 3912 Bergen Turnpike, Union City, New Jersey 07087; however, no bid
will be considered, regardless of the postmark, unless it is in the hands of the Purchasing
Agent, prior to the time set for the opening of the bids. Bids may also be delivered in person
to the Purchasing Agent between the hours 8:30 a.m. and 2:30 p.m. on official business
days. All bids must be duly time stamped, in the office of the Purchasing Agent, not later
than the "Bid Opening - Date and Time" as stated below
Bids will be received at the Union City Education Center, 3912 Bergen Turnpike, Union
City, New Jersey, on, Tuesday, May 10, 2016 at 11:00 a.m. (prevailing time) at which time
they will be publicly opened and read aloud.
Additional time sensitive dates for the project are:
Bid Documents Available April 19, 2016
Pre-Bid Walkthrough April 27, 2016
Bid Opening May 10, 2016
Union City Board of Education shall determine the ability of the Bidder (Contractor for
Single Overall Contract SOC-1) to perform the Work required by the Bid Documents in
accordance with procedures outlined in the Project Manual.
Pursuant to N.J.S.A. 18A:18A-26, in order to submit a Bid for the project, Bidders and their
required subcontractors shall be classified by the New Jersey Department of Treasury,
Division of Property Management and Construction in the following disciplines: General
Construction, Structural Steel, Plumbing, HVAC, Electrical Work.
General Administrative Requirements of the bid/contract:
Conformance to Public School Contracts Law
(NJSA 18A:18A-1 et.seq.);
Conformance to New Jersey Prevailing Wage Rate Act
(NJSA 34:11-56.27 et. seq.);
Conformance to Affirmative Action
(PL 1975, C-127(NJAC 17:27) ;
Subcontractor Classification in accordance with State of New Jersey Department of
Treasury (applicable to Contracts in excess of $20,000.00);
NJSA: 18A:18A-27 et seq.
Public Disclosure Law, PL 1977, C-33 (Assembly Bill No. 22);
Bid Security;
Consent of Surety;
Performance and Payment Bond;
Maintenance Bond;
State of New Jersey Department of Treasury, Business Registration Certificate;
Public Works Contractor Registration Act Registration
P.L. 1999 Chapter 238.
5
The Union City Board of Education reserves the unqualified right to reject any and all bids
or any part thereof, to waive any minor irregularities in the bids, and to award the bid to a
responsible and responsive bidder.
No bid may be withdrawn for period of (60) days from the date set for the opening of bids as
set forth above.
By order of the Union City Board of
Education
Christina Hunt
Purchasing Agent
END OF ADVERTISEMENT
6
2.0 DEFINITIONS
2.1 “BID DOCUMENTS” means all documents requesting bid proposals including
the Bid Notice, Definitions, Instructions to Bidders, Specifications, Bid Proposal
Checklist, Bid Proposal Form, Affidavit of Non-Collusion, Affidavit and
Questionnaire of Bidder’s Experience and Financial Responsibility, Statement of
Ownership of Corporation or Partnership, addenda (if any), all documents
submitted by the bidder, and the Contract.
2.2 “BIDDER” means an individual, firm, partnership or corporation, acting directly
or through a duly authored representative, legally submitting a Proposal.
2.3 “BOARD” means the Union City Board of Education.
2.4 “CONSULTANT” means the Board’s representative, MSS Consultants and
Engineers.
2.5 “CONTRACT” means the written agreement executed by and between the
Contractor and the Board, as amended, changed or modified, and shall include all
Bid Documents.
2.6 “CONTRACT ADMINISTRATOR” means Justin Mercado, Director of
Facilities, or his designee.
2.7 “CONTRACTOR” means the bidder to whom the award of the Contract shall be
made pursuant to N.J.S.A. 18A:18A-1, et seq.
2.8 “LEGAL NEWSPAPER”, for purposes of these Bid Documents, means the
JERSEY JOURNAL.
2.9 “LEGAL HOLIDAYS” are the following holidays: New Year’s Day, Martin
Luther King Jr.’s Birthday, Good Friday, Memorial Day, Independence Day,
Labor Day, Thanksgiving Day, and Christmas Day.
2.10 “OWNER” means the Union City Board of Education, acting directly through its
agents or employees and is responsible for payment to the Contractor upon
acceptable completion of the Work in accordance with the terms and conditions
contained in the Contract Documents.
2.11 “REGULAR BUSINESS DAY” means Monday through Friday, 8:30 a.m. to 3:30
p.m. excluding Legal Holidays.
2.12 “WORK” shall include the services required by the Bid Documents and Contract,
whether completed or partially completed, and includes all labor, materials,
equipment, services and products provided or to be provided by the Contractor.
7
3.0 GENERAL REQUIREMENTS
3.1 This Section specifies the card readers, access control hardware and door
hardware, including locking devices to be installed at Union City High School,
2500 John F. Kennedy Boulevard, Union City, New Jersey 07087. These devices
are to be monitored in an existing security office in the main building of Union
City High School on the ground floor. This document has been prepared to
specify technical criteria applicable to the acquisition of the herein described
system. The Contractor shall furnish and install a standard, field proven,
integrated hardware/software system that shall functionally provide the
performance, reliability, and expansion capability specified herein.
3.2 The project is limited to the systems specified (hardware & software) and
connections of same to wiring installed by this bidders electrical contractor.
3.3 The new devices and hardware shall be connected to the existing I Star Panels and
the installation of all required software and hardware to interface to an existing C-
Cure 9000 and a Victor system that shall be programmed by this bidder as
specified.
3.4 All devices shall be connected as required over cable or conductors no less than
18AWG.
3.5 The bidder MUST be authorized by Software House & American Dynamics to
work on the existing system(s). No third party contractors or source of hardware
shall be permitted other than by this bidder.
8
4.0 INSTRUCTIONS TO BIDDERS
4.1 BID OPENING
All bids will be publicly opened and read by the Purchasing Agent, or her
Designee as set forth in the Bid Notice.
4.2 BID SUBMISSIONS
4.2.1 Each document required to be submitted by the bidder (see Bid Proposal
Checklist, Schedule 1) must be properly completed in accordance with these
Bid Documents. No bidder shall submit the requested information on any
form other than those provided in these Bid Documents, unless specifically
permitted by the Board
4.2.2 Bids shall be delivered to the Purchasing Agent as set forth in the Bid Notice.
4.2.3 Each bidder shall sign the documents to be submitted, where applicable, as
follows:
• For a corporation, by an authorized principal executive officer;
• For a partnership or sole proprietorship, by a general partner or the
proprietor respectively; or
• By a duly authorized representative.
4.2.4 Each bidder shall submit one (1) original set of completed Bid Documents and
four (4) copies.
4.3 BID PROPOSAL FORM
4.3.1 On the Bid Proposal Form (see Schedule 2), the bidder must state the prices,
and if applicable, the hourly rates and percentage rates offered, written or typed
in ink, in words and numbers for each item requested.
4.3.2 If the amount shown in words and its equivalent in figures in the Bid Proposal
Form do not agree, the written words shall be binding. In the event there is a
discrepancy between the unit prices and the extended totals, including any
formula, the unit prices shall prevail.
4.3.3 Each bidder shall acknowledge receipt of addenda on the Bid Proposal Form,
if applicable.
4.3.4 Bidders shall provide a bid for each item and alternate, if any, requested on
the Bid Proposal Form.
9
4.3.5 The Contract will be awarded to the bidder whose bid response is most
advantageous, price and other factors considered.
4.4 EXCEPTIONS TO THE BID DOCUMENTS
Any conditions, limitations, provisos, amendments, or other changes attached
or added by the bidder to any of the provisions of these Bid Documents or any
changes made by the bidder on the Bid Proposal Form may result in the
rejection of the bid.
4.5 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
4.5.1 Prior to submitting a bid, the bidder shall, and by submitting a bid, the bidder
represents and warrants that it has:
4.5.1.1 Carefully examined the Bid Documents and addenda, if any;
4.5.1.2 Visited the site of the proposed Work, fully acquainted and
familiarized itself with the conditions as they exist, the
manufacturers and the character of the operations to be carried out
under the proposed Contract, and made such investigation so that
the bidder fully understands the facilities, equipment difficulties,
and restrictions accompanying the Work under the Contract.
4.5.1.3 Requested such information from the Board, fully acquainted and
familiarized itself with the character of the Work to be provided
under the Contract, and made such investigation as the bidder
determined necessary so that the bidder fully understands the
Work required under the Contract; and
4.5.1.4 Brought to the attention of the Board any variations in the Bid
Documents and the actual site conditions that would affect the Bid.
The variations shall be reported in accordance with Sections 4.6
and 4.7 herein.
4.5.1.5 Should the bidder observe that any of the Bid Documents are at
variance with applicable laws, statutes, building codes or
regulations in any respect, or that there are errors, inconsistencies
or ambiguities in the Bid Documents, the bidder shall promptly
notify the Board in writing in accordance with Sections 4.6 and
4.7 herein.
4.6 INTERPRETATION/ADDENDA
4.6.1 No oral interpretation or clarification will be made to any potential bidder as
10
to the meaning of the Bid Documents. A request for an interpretation or
clarification shall be made in writing via electronic mail to Peter Martin, P.E. at
[email protected] with copy to Board Counsel, Elise DiNardo, Esq. via
electronic mail at [email protected]. The request shall be made no later than
five (5) days, Saturdays, Sundays and Holidays excepted, prior to the date for
acceptance of bids. Every interpretation made will be in the form of an
addendum to the Bid Documents, and notice will be provided by facsimile or e-
mail to all potential bidders on record with the Board as having received the Bid
Documents, no later than three (3) days, Saturdays, Sundays and Holidays
excepted, prior to the date for acceptance of bids. All addenda issued become part
of the Bid Documents.
4.6.2 Failure of the bidder to acknowledge receipt of all addenda shall not relieve
the bidder from any obligation.
4.7 OBJECTIONS TO CONTRACT DOCUMENTS
All potential bidders are advised to examine the Bid Documents carefully.
Any potential bidder who wishes to challenge the Bid Documents shall file
such challenge in writing and in the manner as set forth in Section 4.6 no less
than three (3) business days prior to the opening of the bids. Challenges filed after
that time shall be considered void and having no impact on the Board or the
award of a contract. N.J.S.A. 18A:18A-15.
4.8 INTERESTED PARTIES
No official, officer or employee of the Board, nor member of the immediate
family of any such person, may bid on this contract or have a financial interest
in the contract.
4.9 BID GUARANTEE
Each bid must be accompanied by a cashier’s check, certified check or bid
bond from a surety company licensed to do business in the State of New
Jersey, in the amount of ten percent (10%) of the Total Cost per year set forth
in the Bid Proposal Form, but not in excess of $20,000.00, made payable to
the Union City Board of Education. Cash will not be accepted. The bid bond
submitted shall be in a form satisfactory to the Board and shall comply with
the Public School Contracts Law.
4.10 CERTIFICATE OF SURETY
Each bid must include a certificate from a surety company, licensed to do
business in the State of New Jersey, unconditionally agreeing, in the event of
the award of the contract, to furnish a payment and performance bond of a
11
face value of 100% of the Total Cost as set forth in the Bid Proposal Form
submitted. The certificate of surety shall be in a form satisfactory to the Board.
4.11 PERFORMANCE AND PAYMENT BOND
After the award of the contract, the successful bidder shall provide a
performance and payment bond issued by a surety company licensed to do
business in the State of New Jersey, in an amount equal to 100% of the Total
Cost. The performance and payment bond shall be in the form set forth in
N.J.S.A. 2A:44-143.
4.12 CLASSIFICATION
Pursuant to N.J.S.A. 18A:18A-26, if the Total Cost set forth in the Bid
Proposal Form submitted exceeds $20,000, the bidder shall be classified as to
the character and the amount of work. Each bidder shall submit with its bid a
current copy of its State of New Jersey, Department of Treasury, Division of
Property Management and Construction, Notice of Classification Form.
4.13 AFFIDAVIT OF NO CHANGE IN STATUS
Pursuant to N.J.S.A. 18A:18A-32, the bidder shall complete and submit with
its bid an affidavit (in the form attached as Schedule 6) stating that
subsequent to the bidder’s latest statement submitted to the State of New
Jersey, Department of Treasury, Division of Property Management and
Construction for classification, there has been no material adverse change in
the bidder’s qualification information.
4.14 BIDDERS PRE-REQUISITES
4.14.1 The successful bidder(s) must be financially solvent and
experienced in and competent to perform the type of services sought and furnish
all materials, supplies or equipment necessary for the services sought and have
sufficient personnel to supervise, coordinate, and maintain proper execution and
progress of the work required.
4.14.2 The successful bidder(s) shall maintain all records related to this
Contract for a minimum of three (3) years following the termination of the
Contract. The successful bidder(s) agrees to make those records available for
inspection at reasonable times by the Board or any State agency having
jurisdiction over the Board.
4.14.3 The successful bidder(s) or its key personnel must have at least five (5)
years’ experience in providing the type of work required by the Bid
Documents. The bidder must submit with its bid response a completed
12
Affidavit and Questionnaire of Bidder's Experience and Financial
Responsibility (see Schedule 4) providing a summary of its
qualifications and experience, including a list of references.
4.15 TRAVEL TIME, PICKUPS AND DELIVERIES
Contractor shall not be compensated for travel time, delivery time or pickup
time
4.16 CONTRACTOR’S QUALIFICATIONS
The Board will make any investigation it deems necessary to determine the ability
of a bidder to perform the Work required by the Bid Documents. The bidder
agrees to furnish to the Board all such information and data for this purpose as the
Board requests. The Board reserves the right to reject any bid if the evidence
submitted by, or investigation of, the bidder fails to satisfy the Board that the
bidder is properly qualified to carry out the obligations of the Bid Documents. All
bidders must have at least five (5) years of experience operating as an installer in
the same systems as requested in the bid specifications, and with a minimum of
eight (8) prior institutional installations.
4.15 NOTICE OF AWARD, EXECUTION OF CONTRACT & DELIVERY
OF DOCUMENTS
4.15.1 The Board shall have the right to waive any informality or irregularity in any
Bid received, to the maximum extent permitted by law. It is the intent of the
Board to Award a Contract to the lowest responsible Bidder, whose response
is the most advantageous, price and other factors considered, within sixty (60)
calendar days from the return date set forth in the Bid Notice, provided the
response has been submitted in accordance with the requirements of the Bid
Documents, is judged to be reasonable, and does not exceed the funds
available.
4.15.2 Bids submitted shall remain firm for the aforementioned sixty (60) calendar
days and each Bidder so agrees in submitting its response to the Bid
Documents.
4.15.3 Within ten (10) business days of notice of the award of the Contract, the
successful bidder shall deliver to the Board the executed Contract, the
performance and payment bond (if required by the Bid Documents) insurance
documentation reflecting the required insurance coverage and the appropriate
affirmative action documentation.
4.15.4 Failure to deliver the aforementioned documents in a form satisfactory to the
Board, and commence the Contract as required in the Bid Documents shall be
13
cause for the Board to declare the bidder non-responsive and to award the
Contract to the next lowest bidder.
4.16 INSURANCE REQUIREMENTS
The Contractor shall be required to purchase and maintain in full force and
effect during the entire term of the contract, insurance coverage with limits of
not less than the following:
4.16.1 Commercial general liability coverage with a minimum of $1,000,000 per
occurrence, $1,000,000 products/completed operations and $2,000,000 in the
aggregate.
4.16.2 Comprehensive automobile liability insurance coverage with $1,000,000
combined single limit.
4.16.3 Workers’ compensation coverage with limits in accordance with New Jersey
Statutes.
4.16.4 Employers liability insurance limits shall be bodily injury by accident of
$1,000,000 each accident, bodily injury by disease $1,000,000 each employee,
bodily injury by disease $1,000,000 policy limit.
4.16.5 Umbrella liability insurance coverage in excess of the underlying primary
policies described in this section. Each of the underlying policies shall be
specifically listed in the umbrella policy. The umbrella policy shall have a
limit of at least $5,000,000 per each occurrence, $5,000,000 general
aggregate.
4.16.6 The policies shall list the Union City Board of Education as an additional
insured on the commercial general liability, automobile liability, and umbrella
policies.
4.16.7 Each insurance policy shall contain a provision stating that neither the insured,
nor the insurer may cancel, materially change, or refuse renewal without a
minimum thirty (30) days prior written notice to the Board. In the event of
cancellation due to non-payment of premiums, said notice shall be at least ten
(10) days prior to cancellation. All insurance required pursuant to this section
shall remain in full force and effect for the full term of the contract.
4.16.8 Each insurance policy shall provide that neither the contractor, nor its insurer,
shall have any rights to subrogation against the Board. Each insurance policy
shall provide primary coverage for any and all loses and shall be drafted so as
to protect all of the parties.
14
4.16.9 The insurance carrier(s) shall be approved to conduct insurance business in
the State of New Jersey with an A.M. Best rating of A or better, and shall be
subject to approval by the Board.
4.16.10 The contractor shall provide the Board with declaration sheets and
endorsements, and such other documents as requested by the Board
evidencing the insurance coverage provided for herein.
4.16.11 In the event the Contractor is permitted to utilize any subcontractor, the
Contractor shall require the subcontractor’s insurance coverage to be at least
equal to the minimum requirements and terms and conditions set forth above,
including the provisions regarding the Board being listed as an additional
insured and the policies providing primary coverage. In the alternative, the
Contractor may insure the activities of its subcontractors under its own
policies. The Contractor is responsible for and will assume all liabilities for
any insurance deficiency of delinquency of a subcontractor or any claim that
may result because of the deficiency or delinquency.
4.17 INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall release, indemnify,
defend and hold harmless the Board, and its Trustees, Administrators,
Officers, Employees and Agents (collectively, the “Indemnified Parties” and
individually, an “Indemnified Party”) from and against any and all claims,
damages, losses, fines, civil penalties, liabilities, judgments, costs and
expenses of any kind or nature whatsoever, including, but not limited to,
interest, court costs and attorneys’ fees, which in any way arise out of or result
from the Contract, any act(s) or omission(s) by Contractor (or anyone directly
or indirectly employed by Contractor or anyone for whose acts Contractor
may be liable) including, but not limited to, injury or death of any person,
damage to or destruction of any property, real or personal (including, but not
limited to, property owned, leased or under the control of the Board), and
liability or obligations under or with respect to any violation of federal, state
and local laws, regulations, rules codes and ordinances (including but not
limited to, those concerning environmental protection). This Section shall
apply regardless of whether or not the damage, loss or injury complained of
arises out of, or was caused in part by, an Indemnified Party. However,
nothing contained in this Section shall be construed as a release or indemnity
by Contractor of an Indemnified party from or against any loss, liability or
claim to the extent arising from the gross negligence or willful misconduct of
that Indemnified Party. This Section shall not be construed to negate, abridge
or otherwise reduce any other right to indemnity which would otherwise exist
in favor of any Indemnified Party, or any obligation of Contractor, its officers,
directors, employees, agents or contractors to indemnify an Indemnified Party.
Contractor’s obligations under this Section shall not be limited in anyway by
15
any limitation on the amount or type of damages, compensation or benefits
paid or payable by Contractor under workers’ compensation laws, disability
benefit laws or other employee benefit laws or regulations. The
indemnification obligations of this Section shall survive termination or
expiration of this Agreement.
4.18 REPORTING TO STATE
Pursuant to N.J.S.A. 18A-15, for every contract for public work, the entire
cost of which exceeds $20,000.00, the Board shall upon completion of the
Contract, report to the applicable State department as to the Contractor’s
performance, and shall also furnish such report from time to time during
performance if the Contractor is then in default.
4.19 RESTORATION
The Contractor shall restore and clean any Board property which the
bidder damages.
4.20 AFFIRMATIVE ACTION REQUIREMENTS
The successful bidder agrees to comply with the requirements of
N.J.S.A. 10:5-31, et seq. (P.L. 1975, c. 127 as amended) and
N.J.A.C. 17:27-1.1 et seq. The mandatory language and terms set forth and
required by N.J.A.C. 17:27-1.1 et seq. are reprinted as part of the Contract,
and made a part hereof by reference. Prior to the execution of the Contract,
the successful bidder will submit (1) evidence that the bidder is operating
under an existing federally approved affirmative action program; or (2) a
Certificate of Employee Information Report, issued in accordance with
N.J.A.C. 17:27-4; or (3) a completed initial Affirmative Action Employee
Information Report (Form AA-302).
4.21 AMERICANS WITH DISABILITIES ACT OF 1990
Discrimination on the basis of disability in contracting for the purchase of
goods and services is prohibited. The successful bidder agrees to comply
with the requirements of Title II of the Americans with Disabilities Act of
1990 (“Act”). The mandatory language and terms of the Act are reprinted
as part of the form of the Contract, made a part hereof by reference
4.22 PREVAILING WAGE ACT
Pursuant to N.J.S.A. 34:11-56.25 et seq., the successful bidder on projects for
public Work shall adhere to all requirements of the New Jersey Prevailing
Wage Act. Without limitation, the successful bidder shall be required to
submit certified payroll records to the Board within ten (10) days of the
16
payment of the wages. The successful bidder is also responsible for obtaining
and submitting all subcontractors’, if any, certified payroll records within the
aforementioned time period. The prevailing wages for Hudson County will be
attached to the Contract, and, whether attached or not, are incorporated therein
by reference. The prevailing wage rates for Hudson County are available
online at http://www.state.nj.us/labor/lsse/wagerate.htm.
4.23 THE PUBLIC WORKS CONTRACTOR REGISTRATION ACT
Pursuant to N.J.SA. 34:11-56.48 et seq., the bidder is required to be
registered with the New Jersey Department of Labor. Any bidder submitting
a bid shall submit a copy of its Registration Certificate.
4.24 NEW JERSEY BUSINESS REGISTRATION REQUIREMENTS
The bidder and its subcontractors shall comply with the requirements of the
Business Registration Law, N.J.S.A. 52:32-44 (P.L. 2004, c.57). The bidder
shall submit a copy of its business registration certificate with its bid. The
business registration certificate must reflect the name of the taxpayer as well
as a trade name, if applicable. The taxpayer and/or trade name reflected on
the business registration certificate must match the name of the bidder
submitting its response herein. In the event there is a discrepancy between the
name(s) reflected on the business registration certificate and the name of the
bidder submitting its response, the Board reserves the right to reject the bid.
Absent explanation and documentation showing that the bidder and the
taxpayer and/or trade name reflected on the business registration certificate
are the same individual or entity, the Board may reject the bid as noncompliant
with the Bid Documents. The mandatory language and terms of the Business
Registration Law are reprinted as part of the Contract, and made a part hereof by
reference. For information on the Business Registration Law go to:
http://www.state.nj.us.dca/lgs/lpcl/index.shtml.
4.25 STOCKHOLDER DISCLOSURE
All bidders are hereby notified that every corporation and partnership, according
to the provisions of Chapter 33, Laws of 1977 of the State of New Jersey, must
submit a statement prior to the receipt of the bid proposal or accompanying the
bid proposal, setting forth the names and addresses of all stockholders in the
corporation or partnership who own 10% or more of its stock, of any class or of
all partners in the partnership, who own 10%or greater interest therein, as the case
may be. If one or more such stockholder or partner is itself a corporation or
partnership, the stockholders holding 10% or more of that corporation's stock, or
the individual partner's 10% or greater interest in that partnership, as the case may
be, shall also be listed. The disclosure shall be continued until names and
17
addresses of every non-corporate stockholder, and individual partner, exceeding
the 10% ownership criteria established in this act, has been listed.
5.0 SPECIFICATIONS
5.1 TERM OF CONTRACT
5.1.1 The date of the commencement of the Work shall be the date fixed in the written
Notice to Proceed issued by the Board.
5.1.2 The contract time shall be measured from the date of commencement and run for
a period of 120 calendar days for the completion of all Work set forth in the
specifications.
5.2 SITE VISIT
A Pre-Bid Walkthrough for all bidders will be held at the Union City High
School, 2500 John F. Kennedy W, Union City, New Jersey, at 10:00 A.M.
prevailing time on Tuesday, February 16, 2015 for the purpose of entertaining
bidder questions.
5.3 SCOPE OF WORK
5.3.1 Generally. The Union City High School is a multistory facility covering two city
blocks in length and one in width. The facility has an existing access control
system manufactured by Software House, a C-Cure 9000 system. The current
system is fully operational and is holding the latest license and upgrades for the
software. The school has numerous I Star panels throughout the school, mainly on
the street level floors (it should be noted the school is on a graded level that
creates different floors as accessible to street level, for example the 1st floor
maybe on the street level in the front of the building and the rear of same will be
on the 2nd floor).
5.3.2 There are existing card readers 32 proximity based HID single gang devices that
are fully operational. The Board requires the installation of 4 new readers that
shall be multi technology readers, as described in this document. Four of the new
readers, for class rooms and other rooms have existing card reader back boxes and
conduit stub-ups.
5.3.3 Street level doors, as indicated on the attached drawings (Appendix A), will be
equipped with alarm horns to annunciate upon egress from the school. This is to
alert faculty and staff. At the same time the doors that have door position sensors
will also be triggered. These locations do NOT have existing back boxes or stub-
ups.
18
5.3.4 The street level perimeter contacts (existing) are connected to a BA, Radionics
type alarm system, interfaced to several I Star Panels located in or on print MSS-
SC2.1.1 (Room 1221). This interface shall also be used to trigger alarms at the
system monitoring CPU/workstations as required and programmed.
5.4 PAYMENTS
5.4.1 Payments to the successful bidder will be made in accordance with the
rates/prices the bidder sets forth in the Bid Proposal Form.
5.4.2 The successful bidder shall comply with the Board’s standard payment
procedures as well as the payment requirements set forth in the Contract.
5.4.3 Before any payments are made to the successful bidder, the parts, materials,
supplies, equipment, repairs and Work are subject to inspection and approval by
the Board’s personnel and agents.
5.4.4 Payments to the successful bidder will be only made upon the submission and
approval of properly completed certifications for payment, inspection, purchase
orders, vouchers, invoices and bills.
5.4.5 Requests for payment shall be submitted to the Contract Administrator.
5.4.6 Requests for payment shall be accompanied by certified payroll records covering
the period set forth in the request for payment.
5.4.7 The Board reserves the right to demand as much detail, information or
documents as it deems necessary prior to payment.
5.4.8 If the successful bidder fails to perform in accordance with the Bid Documents,
the Board may deduct or retain from monies due, or which may become due to
the successful bidder, such sum sufficient to pay the difference between the
price(s) on which the award is made and the price(s) which the Board may or
shall be obliged to pay to procure such labor, materials, supplies, equipment,
repairs and work from other parties.
5.4.9 The Board is exempt from sales and use taxes. Therefore, no taxes shall be
included on requests for payment or invoices for equipment and materials. The
Board shall provide the successful bidder with a copy of the Board’s sales and use
tax exemption certificate.
5.4.10 All bills submitted by the Contractor will be voted on at the Board’s next
regularly scheduled public meeting following the submission of said bills,
provided said bills are submitted more than ten (10) days preceding the
meeting.
19
5.4.11 Should it be determined by the Board at said meeting that the Contractor has
performed in accordance with the Contract, said bills will be paid within the
subsequent payment cycle.
5.4.12 Should it be determined by the Board at said meeting that the Contractor has
not performed in accordance with the Contract, notice relating to same shall
be issued to the Contractor within the twenty (20) days following said
meeting, pursuant to N.J.S.A. 2A:30A-2.
5.4.13 “Payment Cycle” as used in this section shall mean the period of time
between the date of the meeting at which action is taken with regard to the
Contractor’s bills, when submitted in accordance with this section, and the
date of the next regularly scheduled Board meeting.
5.4.14 To the extent applicable, pursuant to N.J.S.A. 2A:30A-2(f), disputes
regarding whether a party has failed to make payments required, pursuant
to N.J.S.A. 2A:30A-2, may be submitted to a process of alternative dispute
resolution. Alternative dispute resolution permitted by this section shall not
apply to disputes concerning the award process or to the formation of
contracts. In any civil action brought to collect payments pursuant to this
section, the action shall be conducted inside of this State and the prevailing
party shall be awarded reasonable costs and attorney fees.
5.4.15 No interest shall run on any payments due from the Board.
5.4.16 Invoices shall be submitted with a “Release of Lien” by all and any sub-
contractors and suppliers for materials delivered and/or work completed.
5.5 SUBCONTRACTORS
The successful bidder shall not be permitted to subcontract any portion of the
Work, except upon the written consent of the Owner. If the successful bidder is
permitted to subcontract a portion of the Work, the successful bidder is obligated
to ensure the subcontractor(s) comply with and are bound by the terms and
conditions of the Bid Documents. It shall be in the Owner’s sole discretion
whether to consent to any subcontractors.
5.6 TELEPHONE FACILITIES AND EQUIPMENT
5.6.1 The Contractor shall maintain telephone service during Regular Business Days,
and telephone or some reliable alternative communication system (i.e., beeper or
cell phone) during non-Regular Business Days and hours, to enable the Owner to
contact the Contractor immediately.
5.6.2 Contractor’s telephone, fax, cell phone, e-mail address(s) and emergency contact
numbers should be set forth on the Bid Proposal Form.
20
5.7 COMPLIANCE WITH LAWS, REGULATIONS AND INDUSTRY
STANDARDS
5.7.1 The Contractor shall perform all Work in accordance with generally accepted
industry standards and practices, in a reasonably good and workmanlike manner,
and in a diligent and uninterrupted manner. Contractor shall also perform and
complete all Work in accordance with all applicable State and federal statutes,
rules, regulations, codes and ordinances.
5.7.2 Contractor shall be compliant with all requirements of the Americans with
Disabilities Act in terms of placement of hardware, devices and accessibility to
any device installed in this project.
5.8 WORK PERMITS
Contractor shall be responsible for acquiring all permits to complete the Work
required under these Bid Documents. The cost charged by government agencies
for obtaining the permit shall be paid initially by the Contractor, and the Owner
will reimburse the Contractor. Owner may be exempt from certain permit
changes. The Owner will not be liable for reimbursing the Contractor for permit
charges from which the Owner is exempt.
5.9 PARTS, MATERIALS AND SUPPLIES & “OR EQUAL” PROVISION
5.9.1 Pursuant to N.J.S.A. 52:33-1 to 52:33-4, whenever possible, Contractor will use
products manufactured in the United States.
5.9.2 The Contractor will be reimbursed for the cost of parts installed in the Board’s
facilities based on industry recognized trade catalogs. The contractor shall not
charge the Owner any mark-up for parts.
5.9.3 In the event the Bid Documents require the furnishing of any brand name, the
requirement shall be deemed to mean and shall be interpreted to require the
furnishing of the brand name or equivalent. The Board reserves the right to
determine, in its sole discretion, whether a brand is equivalent to that requested.
The bidder shall be required to disclose on its Bid Proposal Form if it will furnish
a product other than those requested. In the event an “equivalent” is substituted by
the Bidder, the Bidder shall provide all information necessary (including
specification sheets) for the Board to determine its suitability for substitution.
5.9.4 All parts, materials and supplies shall be new and are subject to approval by the
Contract Administrator.
5.9.5 The Owner reserves the right to furnish parts, materials and supplies for any job if
deemed to be in the best interest of the Client.
21
5.10 WARRANTY/GUARANTEE
The Contractor shall guarantee all labor and Work performed pursuant to
the Bid Documents and shall deliver to the Owner the Contractor’s written
guarantee made out to the Owner and in form acceptable to Client,
guaranteeing the labor and Work under the Contract to be free from faulty
materials in every particular and free from improper workmanship and
against injury or damage from proper and usual wear and agreeing to
replace or to re-execute without cost to the Owner such labor and Work as
may be found to be improper or imperfect and to make good all damage
caused to other work or materials due to such required replacement or re-
execution. This Guarantee shall be made to cover (and does cover) the
specific warranty periods listed in section 5.20 from the date of final
payment under the Contract or from date of owner’s acceptance of system.
5.11 DEBRIS AND WASTE
Contractor shall be responsible for the clean-up, removal and disposal of
all parts, fixtures, materials, debris, waste, brush, trimmings and
equipment at no charge to the Board.
5.12 SUBMISSIONS
5.12.1 TIME LINES
5.12.1.1 Submit all information necessary for the work (installation of the CCTV
system) to the Owner. The submission shall include installation time lines
work of the EC and all affected trades.
5.12.1.2 Provide such information in accordance with the Schedule to avoid delays
to the normal activity of the schools and administration of same. Provide
contingency planning to allow for any delays or possible delays UCBE
may advise you of.
5.12.2 WIRING DIAGRAMS
5.12.2.1 Provide complete point-to-point wiring diagrams for all systems and
subsystems. Show all components in the communications path from the
antennas through all intervening system components, including repeaters,
duplexers etc. to the individual end-devices. Document network
connections and associated equipment required to complete a transmission
path.
5.12.2.2 The intent of this requirement is to provide a document that will permit
end-to-end tracing of the system wire and cabling. Where conductors are
22
grouped into a cable for long site runs, a single line, properly identified,
should be shown. Where these cables fan out for termination, individual
wire terminations and markings shall be shown.
5.12.3 PRODUCT DATA
Provide Product Data for each element of the System includes manuals,
service documents and manufacturer installation/operation guides.
5.12.4 SAMPLES
5.12.4.1 Submit one sample of the hardware to the Owner for approval of quality,
design and finish (the hardware devices interior and exterior along with
one applicable mounting bracket(s)).
5.12.4.2 Samples shall be retained at Owner office or a site field office for 30 days.
5.12.5 OPERATING SEQUENCES
Provide a complete written description of the sequence of operation of the
system, including programming guides and operation manuals from the
manufacturer.
5.12.6 EQUIPMENT LOCATIONS DRAWINGS
Provide drawings that show the elevations for every building that indicate
exact locations of all equipment in the system, new (not existing).
5.12.7 SHOP DETAIL DRAWINGS.
5.12.7.1 These drawings shall indicate the accurate locations of all equipment &
raceways associated with the system in respect to architectural and
structural conditions. Drawings of components, equipment layouts, and
other small size areas shall be dimensioned to the common scale of 1/8" or
1" per foot (floor layouts may be 1/16” per one foot). Cad format only.
5.12.7.2 Drawings shall include explicit notes on the termination of all conductors
and shields for each location. Architectural backgrounds shall be in
accordance with the latest architectural drawings and shall be complete
with elevations, sections, and details as required to depict the installation.
If, upon preliminary submittal of drawings, there are corrections to be
made, they shall be made to the drawings and resubmitted for approval
without extra cost to the owner’s representative. These drawings shall be
approved prior to starting work. These drawings and changes, at
completion of the job, shall become a part of the contract documents.
23
5.12.8 MARKINGS
Submit for approval wire marking, panel label, zone label, terminal strip
numbering, terminal strip identification styles, and typical text as outlined
in IDENTIFICATION AND TAGGING of this specification.
5.12.9 TEST PROCEDURE
A written document detailing the test procedure of the system shall be
supplied. This procedure shall include all tests required by the equipment
manufacturer and by this specification. Copies of the test format shall be
submitted which shall comply with the requirements of the Owner.
5.12.10 TRAINING PLAN
5.12.10.1 Submit the plan to be followed in training key employees in the operation
and maintenance of the installed system, as previously described. (All
training by factory or manufacturer trainers, dealer or integrator training is
acceptable if approved by the Owner).
5.12.10.2 Training should be divided into 2 parts:
a. Administration Training: Provide three sessions (3 hours each) for all
school administrators and security staff or as required by the Owner.
b. Technical Staff & System Operators: Provide three sessions (7 hours
each) during school hours and one session after hours should the
Administration require same.
5.12.11 PROJECT RECORD DOCUMENTS
5.12.11.1 Provide three copies of all electronic CAD drawings on high quality
clearly labeled CD discs.
5.12.11.2 The Contractor shall obtain, pay for, and keep up-to-date and available to
the Owner or its representative, complete photocopies of the project
drawings clearly annotated with "as-built" data as the work is performed.
This data shall include routing of signal wire and cables, including the
designations assigned to each wire/cable.
5.12.11.3 Upon completion of this project, the information shown on these drawings
shall be transferred to the electronic drawings and submitted to the
Architect. These record documents showing “as-built” conditions shall be
submitted to Owner in electronic and printed form in accordance with the
provisions of this specification.
24
5.12.11.4 All related manuals, service manuals, operator’s manuals, programming
manuals and serial numbers.
5.12.12 TRAINING DOCUMENTS
Copies of all printed training materials shall be provided in bound and
electronic format to be maintained by the Owner.
5.13 PACKAGING, DELIVERY AND STORAGE
5.13.1 Pack Hardware in heavy-duty containers, complete with all accessories,
bolts, screws, washers, cables, connectors etc., as required for application
and secure attachment.
5.13.2 Deliver components and other materials in manufacturers’ original,
unopened, protective packaging.
5.13.3 Each container shall bear a suitable label which shall state the quantity and
kind of contents and all information relating to proper placement in
building.
5.13.4 Hardware shall be individually wrapped and protected in such a manner
that no marring or damage to finish will be possible. Where possible,
maintain protective covering until installation is complete, and remove and
dispose of such coverings as part of final clean-up. Touch up damage to
finishes to match adjacent surfaces, including recoating of galvanized or
plated surfaces where damaged, cut or drilled.
Note: any hardware installed with damage shall be replaced at no cost
to Owner.
5.13.5 Handle in a manner that prevents degradation of the performance of the
component(s).
5.13.6 All connectors and devices shall be stored to preclude water damage or
corrosion.
5.13.7 Hardware shall be delivered to Project or the factories of the various
fabricators of work to which Hardware is to be applied. Deliver hardware
in the order required and in ample time to permit installation at the
scheduled time. Bidders shall deliver only the equipment that can be
installed within 45 days, Owner will not accept invoices for the delivery of
hardware that cannot be installed within that 45 day period with the
exception of cable, connectors and raceway material.
25
5.13.8 Store Hardware in a clean, dry and safe place as directed by Owner if
stored on the site or property.
5.13.9 Equipment stored on site must be for installation within the following 45
days.
5.13.10 ANY onsite storage of hardware shall be the responsibility of the
contractor NOT the Client. The contractor must provide proof of insurance
of same on site stored devices with Owner listed as additional insured in
the event the equipment has been accepted by Owner.
5.13.11 Verify security and access requirements for each location and adhere to
them prior to any work or component deliveries.
5.13.12 Off-site storage of hardware and devices shall be the responsibility of this
contractor.
5.14 CONTRACTOR, MANUFACTURER AND SYSTEM
REQUIREMENTS
5.14.1 CONTRACTOR QUALIFICATIONS
5.14.2 Contractor must be certified by Software House & American Dynamics as
an Installer and Seller/ Dealer Enterprise Level in order to bid the project.
Under no circumstances shall any bids from anyone other than a certified
dealer or integrator be acceptable. See Page 6 of the bid documents:
“3.5 The bidder MUST be authorized by Software House & American
Dynamics to work on the existing system(s). No third party
contractors or source of hardware shall be permitted other than by
this bidder.”
5.14.3 At the time of bid, the bidder shall have installed other systems of similar
size, complexity, and general operation as the system described in this
specification. Similar experiences shall include at least five (5) years of
experience installing fully integrated digital systems, with at least 6 or
more manufacturer certified technicians, as specified.
5.14.4 Hold all legally required state contractor's licenses necessary to
accomplish the installation and activation of the described system at the
facilities indicated. Contractor shall submit copies of licenses with their
bid submission.
5.14.5 Have a local office, within 50 miles of the school, staffed with factory
trained technicians, fully capable of engineering, supervising installation,
system start-up, providing the Owner training and service of both
26
hardware and software for systems of similar complexity and function as
the system described in this specification.
5.14.6 Indicate compliance with the provisions of this specification by letter,
signed by an officer of the corporation, or a principal if other Ownership
currently exists. This letter shall also clearly identify any exceptions to
specification requirements.
5.14.7 RESEARCH AND DEVELOPMENT - The Contractor shall provide, at
the Post-award meeting, a detailed list of software/hardware developments
and new releases for the specified system proposed for the current and
prior three years by release number and date. Contractor shall indicate the
number of up-grades planned for the current year and include in their
proposal any costs for same and the installation by their technician.
Contractor shall demonstrate compliance with these qualifications by
providing a letter of compliance to the “Contractor Qualifications” with
their bid submission.
5.14.8 CONTRACTOR RESOURCES
The Contractor shall provide their support and training structure including
the number of personnel that have been trained and certified by the
Manufacturer of the specified systems. The training includes both
installation and operator training. Contractor personnel that have not been
certified by the Manufacturer of the specified system will not be
acceptable for installation and training. Contractors must submit
documentation of training and manufacturer certification with their bid.
5.14.9 MANUFACTURER QUALIFICATIONS
5.14.9.1 Approved manufacturers: Software House & American Dynamics,
exceptions to these manufacturers are not acceptable based upon the
existing hardware/software in the school and the requirement that this
system operate within same existing equipment.
5.14.9.2 The manufacturer's supplied system shall be a fully integrated system,
with the latest technology hardware and software. Major system
development efforts to meet the requirements of this specification are
unacceptable.
5.14.9.3 The submitted manufacturer must be a seamless integration of the existing
C-Cures and alarm point monitoring, digitally based and fully
interoperable system in to a single data base operating system, with the
capability to operate on a single platform with seamless technology.
27
5.14.9.4 LATEST HARDWARE/SOFTWARE TECHNOLOGY - The
Manufacturer shall supply sufficient information to indicate that the
specified equipment is state of the art and not subject to revision or change
to any hardware or software that shall be without cost to the Board within
one year after the date of acceptance of the system. The manufacturer shall
submit, through a letter presented by the Contractor with their bid
submission, a written statement indicating compliance with this
requirement.
5.14.9.5 HARDWARE AND SOFTWARE PRODUCTS - The Manufacturer shall
indicate, through a letter presented by the Contractor with their bid
submission, which products in the specified system the manufacturer has
developed and are currently being manufactured at their facility. The list
should include, but not be limited to: Management Software, Hardware
Technology, access control hardware.
5.14.10 SYSTEM REQUIREMENTS.
5.14.10.1 Hardware information:
Quantities are indicated on the attached Door Matrix (4 new doors with
readers and 10 readers to shunt the alarms
5.15 INSTALLATION, ELECTRICAL CONTRACTOR & WIRING
REQUIREMENTS (APPLICABLE TO ALL SECTIONS OF THE BID
SPECIFICATIONS)
5.15.1 Contractor shall be compliant with all requirements of the Americans with
Disabilities Act in terms of placement of hardware, devices and
accessibility to any device installed in this project.
5.15.2 The contractor shall hire a licensed (State of New Jersey, Master
Electrician) electrical contractor (EC) or a State certified Communications
Systems Installer (CSI) to install all the wiring, raceway, conduit, back
boxes and devices. The EC/CSI contractor shall have at least ten (10)
years of experience and sufficient manpower to comply with the
construction schedule for the work. The EC/CSI shall be supervised by the
prime contractor and shall attend all job meetings as required.
5.15.3 The EC/CSI is subject to approval by the Board; all bidders must submit
the EC’s name, references and statement of qualifications, as well as the
EC’s Business Registration Certificate, Employee Information Report, and
Proof of Insurance with their bid submission
5.15.4 EC/CSI must be present with bidder at the walk thru.
28
5.15.5 WIRING
5.15.5.1 The minimum gauge wire permitted in any place for this work is 18awg
conductors.
5.15.5.2 All wiring and terminations shall be as required tested using a Fluke tester
or other device to assure continuity and integrity. All cables must be
tagged and the tag is permanent printed format such as Brother label make
or approved device, hand written tags are not permitted.
5.15.5.3 Any hardware requiring power above 10 amps, including induction loads
shall be protected by fuses and the wiring shall be no less than 14AWG,
electronic panic bars shall be powered with no less than 12AWG wiring’
All high amperage devices are subject to Board approval prior to
installation or purchase.
5.15.5.4 Under no circumstances shall plugs of any sort be permitted on field
hardware, such as power supplies, etc. All devices in the field must be
hard wired. Plug in transformers shall not be permitted.
5.15.6 WORK STANDARDS
5.15.6.1 All debris, excess wire conduit or other materials must be removed from
the site on a daily basis by this contractor. Under no circumstances shall
refuse, material or raceway material be left in occupied areas of the
school. Work areas will be clearly marked and temporary barriers shall be
put in place to prevent students and others from wandering into work
spaces.
5.15.6.2 All wiring through interior plenums, floor slabs shall be sealed with
approved fire-stop materials.
5.15.6.3 All cable in plenum space shall be compliant with Federal, State and local
codes with regards to flammability and smoke attenuation.
5.15.6.4 All cables in any space shall be secured to black-iron or structure with
approved support straps every 24”, no cables or raceway shall be allowed
to be installed without proper support.
5.15.6.5 Exterior penetrations of the walls, soffits or other surfaces shall be
approved by the Board, prior to the work proceeding.
5.15.6.6 All grounding shall be by cold water ground and shall be provided at
every location for repeaters, chargers or power supplies. In locations
requiring multiple grounds provide ground bars with 40% spare capacity.
29
5.15.6.7 Exterior metallic devices and any supporting brackets shall be grounded
with braided or twisted conductors of at least #12AWG. Devices that are
above the highest roof line shall be provided/ installed with lightning
protection straps properly grounded to either the structure steel or as
required by Federal, State and local codes.
5.15.6.8 All conductors, related to this project, shall be enclosed in EMT with
compression fitting for any connection exposed or accessible to tampering.
Conduit shall extend at least 24” above any ceiling or plenum space.
Exterior devices shall be connected using either Seal Tight type flexible
connections; no more than 12” in length, and exterior grade EMT,
attachment clips shall be cast metal fittings not interior grade metal strap
type clips. Note: All cut EMT shall have any and all burrs sanded or
otherwise removed to preclude damage to cable.
5.15.6.9 Wire Mold type raceway is not permitted unless approved in writing by
the Board.
5.15.6.10 ALL CAT cable runs are to be made without ANY splice, connectors or
other devices outside the IDF closet..
5.15.6.11 All raceways, plenum cables shall be run and installed parallel to level
surfaces, all bends, turns shall be at 90 degrees and at all times neatly
installed.
5.16 SPECIAL CONDITIONS
5.16.1 EC/CSI is advised that the wiring required to connect to the existing
security office is through a school which is currently occupied with
students and staff (unless during recess-holiday periods). Access to some
areas may be restricted or may require re-mobilization to another area due
to classes being in session, sporting events and other school related
activities. Allowances for same must be included in the bid.
5.16.2 The contractor shall ensure that all dangerous or hazardous materials are
properly secured and attended to, at all times during the project, to ensure
the safety of students, staff and the public. The Board is not responsible
for damages to materials and/or equipment not properly secured or left
unattended during the project.
5.16.3 The distance limitation of cable connections from the reader to the
assigned IDF closet shall not exceed 1,200 feet. IDF closets are indicated
on the drawings/plans attached herewith (Appendix A).
30
5.17 SUPERVISION OF WORK
5.17.1 The Contractor shall personally, or through an authorized and competent
representative, constantly supervise the work from beginning to
completion and shall, within reason, keep the same work force and
supervisor on the project throughout the duration of the project. The
Contractor shall remain in contact with the Contract Administrator at all
times during the project to ensure deliveries and installation proceeds
without delay or hindrances to other trades.
5.17.2 A detailed Construction Schedule shall be provided and coordinated with
the Board’s Consultant on the project.
5.18 SITE PROJECT MANAGER
5.18.1 The Contractor shall provide a site project manager to interface with all
appropriate site contractors and the Board during the installation of the
system. The site project manager shall be responsible to attend all project
team meetings and provide progress reports regarding the project as
requested by the Contract Administrator.
5.19 PLAN OF OPERATIONS AND PROJECT SCHEDULE
5.19.1 Before beginning work, the Contractor shall submit for approval to the
Contract Administrator a complete plan and schedule of proposed
operations, including a detailed plan indicating EC mobilization times,
commencement of work dates and anticipated completion dates. The
schedules of all subcontractors, transportation, storage, and all other
matters affecting the work shall be accounted for in the project schedule.
The project schedule shall be revised on a weekly basis and all updates
shall be provided to the Contract Administrator.
5.19.2 The Contractor’s work may require re-scheduling due to other trade
activity and/or limited access to certain areas of the school.
5.19.3 EC shall operate with sufficient staffing to ensure installation of
equipment, hardware, wiring and materials in accordance with the project
schedule.
A. Each project shall be considered complete upon satisfactory
completion of wiring, cameras, connections and
demonstration of functionality to Client or agent’s
satisfaction.
31
B. The project is not expected to exceed 120 days from
commencement of work to date of acceptance. Sufficient
staffing is required to achieve this time line.
5.20 WARRANTY & EXTENDED SERVICE REQUIREMENTS
5.20.1 The entire system, including the wiring & any new door hardware, shall be
warranted for 2 years after the Owner’s acceptance of same. No device
installed, supplied or otherwise delivered shall have a warranty of less
than one year from the date of acceptance.
5.20.2 Wiring and connectors that are mounted or installed in plenums, walls,
raceways shall be warranted for two years after Owner’s acceptance of
same.
5.20.3 The Contractor shall warrant the following devices as indicated (all
devices will have a minimum warranty of one year following Owner’s
acceptance):
-- Readers – 2 years
-- Lock & Alarm Horn Power Supplies/Batteries – 1 year
-- Interior cables and connectors – 2 years
-- Exterior Mounting Hardware – 2 years
-- Door hardware – 2 years
-- Alarm horns -- 2 years
-- Door contacts (new) – 2 years
-- Electric hinges (new) – 2 years
NOTE: Warranty commences from date of system acceptance by the Owner
(or from date of final acceptance see section 5.10).
5.20.4 Owner’s acceptance will be deemed to have occurred upon system
acceptance. Mere delivery of any part of the system(s) shall not be deemed
as acceptance. Beneficial use of any part of the system(s) shall not be
deemed as acceptance.
5.20.5 The contractor shall provide to the Owner detailed Bill of Materials &
Warranty dates of maturity.
5.20.6 All products shall be provided with the manufacturer’s warranty and
original license agreements including certificates and registration
numbers.
32
5.20.7 The access control and alarm system manufacturer shall provide software
support and any upgrades for a period of one year at no additional cost to
the Board. Installation of these up-grades or support shall be installed, or
otherwise provided, at no cost for labor or any staffing required to install
same by the Contractor
5.21 ATTIC STOCK
Provide and deliver to the Owner one of each of the following devices for
its attic stock:
1. Spare card readers (provide 4 spares)
2. Alarm horns (provide 4 spares)
3. Magnetic or strike locks (provide 2 spare of each)
4. Electronic panic bar assemblies (solenoids and latch hardware) 4
spares
5.21 LABELS & TAGGING
All wiring and devices shall be clearly tagged and machine printed as
follows: UCBOE
5.21.1 Labels for all items other than wiring terminations (see section 5.21.3),
will be provided by the contractor.
5.21.2 Install all labels on hardware so as not to obstruct any manufacturer
markings and place same using alcohol wipe to clean the surface.
5.21.3 All wiring terminations shall be clearly tagged using a Brother PT 7600 or
equal and labels that are at least 5/8” in size (width) and a length sufficient
to clearly indicate the conductor’s type, termination point etc.
5.21.4 Tags that are hand written and or paper based attached by string are not
permitted.
5.22 RECORD BOOK
5.22.1 The contractor shall provide a digital and hardcopy book that lists each
device by location along with serial numbers and a description of same.
The format of this document shall be in a standard Microsoft Excel
document and in a fixed PDF format.
33
5.23 CARD READERS
5.23.1 Card readers and any device installed by or under this contract (contractor)
shall be installed in the following manner(s):
A. Interior masonry surfaces, cinder block, cement or brick: ¾” EMT
conduit with compression fittings and in locations that have a
suspended ceiling all conduit shall extend at least 10’ above the
finished floor. All conductors shall be protected by conduit so as to
prevent damage by people to the conductors therein (horn back box
has ½” conduit openings, use reduce or hole expander).
B. Exterior masonry surfaces, cinder block, cement or brick the
penetration shall be at 90 degrees into the facility where possible (with
drip stop). In locations where this is not possible the conduit shall be
run in a manner to limit exposure of same to observation. Conduit
shall be rigid ¾” weather proof, painted with etching primer and a
finish coat to match the location.
C. Back-boxes shall be of the type specifically designed for surface
mount with threaded entry points. Boxes with more than 2 “KOs” are
not acceptable nor are any 1900 series type boxes. Boxes shall be
weatherproof rated.
D. Anchoring to masonry surfaces (as above type) shall be by Hilti epoxy
anchoring type systems, plastic or lead anchors are not permitted.
E. All anchoring hardware shall be stainless steel and all conduit straps
shall galvanized steel or aluminum straps.
F. Alarm horns are to be mounted at the maximum height possible in each
location.
5.23.2 As manufactured by Software House model SWH-4100 Multi-Technology
Card Reader, black in color surface mount device. Mount over new or
existing back boxes. In locations with masonry surfaces use weather proof
back box in ALL locations with conduit.
Note: In no instances is Wiremold type raceway permitted in any
place.
5.24 ELECTRONIC HARDWARE
5.24.1 REQUEST TO EXIT HARDWARE (REX) – PIR
34
The drawings/plans (Appendix A) indicate certain “new” access control
doors, doors that do not have any existing hardware or locks. These doors
are to be equipped with REX devices to shunt the alarm for egress. T Rex
type sensors or approved equal. Any power supplies required for same
devices shall be supplied by this contractor.
Special Note: The drawings/plans (Appendix A) indicate that egress
sensors are built-in to certain hardware and devices. Bidders are advised to
make allowance for any hardware that may not have functional egress
sensors or are non-functional.
The electric mortise locks were manufactured by Yale and installed in
2007-8 during the construction of the facility.
5.24.2 ALARM HORN
5.24.2.1 The alarm horns shall be as manufactured by Cooper Notification Inc. or
approved equal. Model/Series HS 24VDC white in color (no writing or
signage shall state “FIRE”, nor shall any horn be approved that is
modified by paint or other means that stated “Fire” prior to the
modification). The horn shall be mounted on a Cooper Notification 10B
back box, weather proof, or approved equal.
5.24.2.2 The horns above specified required 24 VDC, provide one power supply
for each IDF closet that is related to the door. Attention must be paid to
wiring to the horn to preclude voltage drops of any sort caused by distance
issues.
5.24.2.3 Union City High School has the latest Victor Software System. The
Contractor shall program that system, with the C-Cure Software to provide
both alarm and real-time recording by any local cameras (as indicated by
Owner).
5.24.2.4 Each horn, by the egress doors are equipped with a card reader to turn-off
the alarm. This interface shall be via the I Star panel and shall be
programmed by the Contractor.
5.24.2.5 All interfaces are the responsibility of the Contractor and each new device
will be clearly indicated by location, type and status for the functional use
by Owner. Non-programmed hardware and devices that have
identification in either the C-Cure or Victor Software shall be considered
uninstalled and the acceptance of the system declined.
35
5.24.3 CRASH BAR EGRESS HARDWARE
5.24.3.1 Crash bar hardware shall be as manufactured by Allegion/Von Duprin or
approved equal. Model RX-EL-SD-9947-EO or RX-EL-SD-9947-NL-OP-
110MD . Provide power supply Model PS-914-900-2RS or approved
equal, install same in nearest IDF Closet. All wiring to the panic hardware
from the power supply shall be 12AWG stranded cable, or above to
10AWG stranded. Contractor must ascertain the distance and calculate
the voltage drop to ascertain the correct wiring.
5.24.3.3 POWER SUPPLIES
5.24.3.3.1 No plug-in type transformers are permitted. All power supplies shall be
hardwired on the primary side (input) by a licensed electrical contractor.
All power supplies are to be wall-mounted in the IDF Closets and clearly
marked as to purpose and hardware powered by same. Prove 4 fuses of
each type used by the power supply (primary and secondary sides).
5.24.3.3.2 Power supplies shall be as specified or as manufactured by Altronix or
approved equals. All power supplies must UL listed for the specific
application.
5.24.3.4 DOOR CONTACTS
5.24.3.4.1 The existing door contacts are large metal in frame sensors that are
operational. Bidders are advised that there are no spare conductors to any
doors, this will require any interfacing for alarm purposes to be at the IMC
or RM modules as noted on the print MSS-SC2.1.1 (Room 1221).
5.24.3.4.2 New card reader controlled doors are to be equipped, were possible, with
built-in door position sensor or latch status capable locks.
5.25 HARDWARE PROGRAMMING
5.25.1 All devices installed by this contract/specification shall be fully integrated
into the existing C-Cures & Victor Software. The Radionics/burglar alarm
system inputs and outputs shall also be integrated and each point of alarm
clearly indicated in the software. All devices shall be assigned a name and/
or number as required by the Contract Administrator. The Contract
Administrator is the final authority regarding the type of names, points and
inter-relationship with the CCTV cameras that are located nearby any
alarm point. The Contractor shall provide a detailed matrix of hardware
installed with a point to point schematic of same along with CAD
drawings indicating new device locations and the cameras that are related
to any given alarm point.
36
5.25.2 The I Star panels, existing and otherwise are to be fully documented as to
what is connected and how (meaning is there any other sub-panel or
device). The BA /Radionics connections must also be documented and
included in any schematics.
5.25.3 The documentation work shall be done in an orderly and timely manner.
5.26 SITE ACCESS
5.26.1 The Contractor’s vehicles, vehicles belonging to employees of the
Contractor, and all other vehicles entering upon the Board’s property in
performance of the work shall use only designated site access.
Contractor shall not permit vehicles to park on any area of the Board’s
property unless authorized by the Board.
5.26.2 The Contractor shall restrict access of all persons entering the Board’s
property in connection with the work to the access route and to the actual
site of work.
5.26.3 In order to ensure the safety of the children, deliveries and access to the
site must be coordinated with the principal, or other person in charge of
each building.
5.26.4 In addition to regular work hours, the Contractor shall work overtime and
on Saturdays, Sundays and Holidays, if necessary, to complete the Work
on time and to avoid or to minimize any interruption to the operations of
the school district, or any part or department thereof, at no additional cost
to the Board.
5.26.5 Any overtime costs for Board personnel shall be paid by the Contractor.
5.26.6 The Board reserves the right to determine when the work will be
provided.
5.27 BUILDING OPERATION AND PROTECTION
5.27.1 The Contractor shall perform the Work in a manner that will cause
the least interference to the operation of the High School or any part or
department thereof.
5.27.2 The Contractor shall give reasonable notice to the Board sufficiently in
advance to permit the Board to take whatever action may be necessary to
permit the Work to be done at the site.
37
5.27.3 Existing entrances and exits shall be maintained in a safe, unobstructed
and operable condition at all times.
5.27.4 The Contractor shall take all necessary precautions to protect people and
property from injury and damage.
5.28 HOURS OF OPERATION AND SCHEDULES
During the Contract term, on regular business days, the Contractor is
permitted to work inside the High School from 7:00 a.m. until 4:00 p.m. If
the Contractor needs to work before or after these times, he shall notify the
Board sufficiently in advance so the Board may have a custodian present.
Lack of availability of a custodian is not the responsibility of the Board.
38
SCHEDULE 1
BID PROPOSAL CHECKLIST – 1 PAGE
Bidder should initial each item indicating that the document has been submitted.
1. _______ Bid Proposal Checklist
2. _______ Original and Four (4) Copies of Bid Proposal Form and all
required documents
3. _______ Bid Proposal Form
4. _______ Bid Guarantee
5. _______ Certificate of Surety
6. _______ Statement of Ownership of Corporation or Partnership
7. _______ Affidavit of Non-Collusion
8. _______ Affidavit and Questionnaire of Bidder’s Experience and
Financial Responsibility
9. _______ Certificate of Registration issued by the New Jersey Department of
Labor, Division of Wage and Hour Compliance, as required by the
Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48 et seq.
(P.L. 1999, c. 238)
10. _______ Business Registration Certificate issued by the New Jersey Department
of Treasury, pursuant to N.J.S.A. 52:32-44(1)(b)(P.L. 2004, c. 57)
11. _______ Contractor’s Notice of Classification issued by the State of New Jersey,
Department of Treasury, Division of Property Management and
Construction
12. _______ Affidavit of No Change in Status, pursuant to N.J.S.A 18a:18-32
13. _______ Mandatory Affirmative Action Language
______________________________________(seal)
(Contractor)
BY: _____________________________________
(Authorized Signature)
______________________________________
(Printed Name and Title)
39
SCHEDULE 2
BID PROPOSAL FORM
Proposal for Access Control System - Union City High School
TO: Union City Board of Education
FROM:________________________ ____________________________
Contractor Phone Number
________________________ ____________________________
Mailing Address Facsimile Number
________________________ ____________________________
Mailing Address Cellular Phone Number
________________________ ____________________________
Mailing Address Email Address
The undersigned herby agrees to provide complete performance in accordance with the
Bid Documents for the prices listed in this Bid Proposal Form. The bidder represents that it has
read and understands the Bid Documents and that it has duly considered all information contained
therein in the course of submitting its bid. Moreover, submission of this bid serves as the bidder's
representation that, if awarded the contract, it will not make any claims for or have any right to
any concessions or damages because of lack of understanding of the Bid Document or lack of
information concerning same.
Single Overall Contract Bid:
$ __________________ __________________________________________ Price in figures Price in words
The bidder states that it has received the following Addenda, Notices, or Revisions to the Bid
Documents and has given them due consideration in the preparation of its bid.
Addendum No., Title of Notice or Title of Revision Date Received
_________________________________________ ____________
______________________________________ ____________
____________(seal) Contractor
Witness:
______________________________ By_____________________ Signature Authorized Signature
______________________________ ________________________ Printed Name Printed Name
_________________________________ ____________________________
Title Title
_________________________________ ____________________________
Date Date
40
SCHEDULE 3
AFFIDAVIT OF NON-COLLUSION – 1 PAGE
STATE OF NEW JERSEY )
) ss.: Access Control System
) Union City High School
COUNTY OF )
I, ________________________________ residing at
_________________________________________________ in the
City/Town/Township/Borough of _______________________________, and State of
_________________, of full age, being duly sworn according to law upon my oath
depose and say:
1. I am the ______________________________of the firm
________________________________________________, the bidder making the
bid for the project, goods, services and/or material bid set forth in the Bid
Documents, , and I executed the Bid Proposal Form with full authority to do so; and
I state that the bidder has not, directly or indirectly, entered into any agreement,
participated in any collusion, or otherwise taken any action in restraint of free,
competitive bidding in connection with the bid, and that all statements contained in
the bid and in this Affidavit are true and correct, and made with full knowledge that
the Union City Board of Education (“The Board”) relies upon the truth of the
statements contained in the Bid Documents completed and submitted by the bidder,
and in the statements contained in this Affidavit, in awarding the contract for the
said project, services and/or material bid.
2. I further warrant that no person or selling agency has been employed or
retained to solicit or secure such contract upon an agreement or
understanding for a commission, percentage, brokerage or contingent fee,
except bona fide employees or bona fide established commercial or selling
agencies maintained by _________________________________________.
____________________________________
(Signature of Affiant)
Subscribed and sworn to before me ____________________________________
this ____day of_____________, 20__. (Printed Name)
_______________________________ ____________________________________
NOTARY PUBLIC (Title)
41
SCHEDULE 4
AFFIDAVIT AND QUESTIONAIRE OF BIDDER’S EXPERIENCE AND
FINANCIAL RESPONSIBILITY:
AFFIDAVIT
STATE OF NEW JERSEY )
) ss.: Access Control System
) Union City High School
COUNTY OF )
I, ________________________________ , am
(Identify Relationship to Bidder)
of , of full age, being duly sworn, I depose and say:
(Name of Bidder)
1. All of the answers set forth in the attached Questionnaire are true and each question is
answered on the basis of my personal knowledge, or based on my diligent inquiry.
2. All of the answers given in the Questionnaire are given by me for the express purpose of
inducing the Union City Board of Education, to award the Contract to
(Name of Bidder)
3. I understand and agree that the Union City Board of Education will rely upon the
information provided in the Questionnaire in determining the lowest responsible bidder
to be awarded the contract.
4. I also understand and agree that the Union City Board of Education may reject the bid in
the event that the answer to any of the foregoing questions is false.
5. I do hereby authorize the Union City Board of Education to inquire about or to
investigate the answer to any question provided in the Questionnaire, and I further
authorize any person or organization that has knowledge of the facts supplied, or which
should have been supplied, in the Questionnaire to furnish the Union City Board of
Education with any information necessary to verify the answers given.
____________________________________
(Signature of Affiant)
Subscribed and sworn to before me ____________________________________
this ____day of_____________, 20__. (Printed Name)
_______________________________ ____________________________________
NOTARY PUBLIC (Title)
42
QUESTIONNAIRE
This Questionnaire must be completed and submitted as part of the Bid. Failure to
complete this form or to provide any of the information required herein may result in
rejection of the Bid.
1. How many years has the bidder been engaged in the business of providing the
Work requested by the Bid Documents under the present firm name?
2. List any other names under which the bidder, its partners or officers have
conducted business in the past three (3) years, and the number of years business
was conducted under that name.
3. When was the bidder organized, formed or incorporated?
4. List three bank references with contact information:
5. Credit available for this Contract?
6. List the names and home addresses of all the officers of the bidder, noting their
position in the Company:
7. List the name of the executive who will give personal attention to the project:
43
8. Has the bidder ever been adjudged bankrupt or been subject to a receivership or
an order of reorganization? If so, give details and particulars.
9. Is the bidder at this time subject to any court order relating to bankruptcy,
liquidation or reorganization? If so, give details and particulars.
10. Has the bidder, its partners or officers failed to perform any contract in the past
three (3) years? If the answer is “Yes”, state when, where and why. A complete
explanation is required.
11. Are there any judgments, claims, arbitration proceedings or suits pending or
outstanding against the bidder, or any of its principals?
12. Has the bidder filed any lawsuits or requested arbitration with regard to any
contracts within the last five years? (If the answer is yes, please attach details).
13. Within the last five (5) years, has any officer or principal of the bidder ever been
an officer or principal of another organization that failed to complete a contract?
(If the answer is yes, please attach details).
14. On a separate sheet, list the private and public contracts the bidder is currently
performing, giving the name of project, owner, contract amount, percentage of
contract completed and scheduled completion date, and owner contact number.
15. On a separate sheet, list the contracts the bidder has completed in the past five (5)
years, giving the name of project, owner, owner contact number, the contract
amount, date of completion and percentage of the cost of the work performed with
bidder’s own forces.
44
16. State the average annual amount of work requested by the Bid Documents
performed by the bidder during the past five (5) years:
17. On a separate sheet, list the experience of the key individuals of your
organization.
18. Trade References with contract information:
19. Name of Bonding Company:
20. Name and address (no P.O. Box) of agent authorized to accept service in the State
of New Jersey.
45
SCHEDULE 5
STATEMENT OF OWNERSHIP OF CORPORATION OR PARTNERSHIP
New Jersey law, N.J.S.A. 52:25-24.2, provides that no corporation or partnership
shall be awarded by any state, county, municipal or school district contract for the
performance of any work or the furnishing of any materials or supplies, unless prior to
the receipt of the bid or accompanying bid of said corporation or partnership there is
submitted a statement. The statement shall set forth the names and addresses of all
stockholders in the corporation or partnership who own ten percent (10%) or more of its
stock of any class, or of all individual partners in the partnership who own a ten percent
(10%) or greater interest therein.
If one or more of such stockholders or partners is itself a corporation or
partnership, the stockholders holding ten percent (10 %) or more of that corporation’s
stock, or the individual partners owning ten percent (10%) or greater interest in that
partnership, as the case may be, shall also be listed. The disclosure shall be continued
until names and addresses of every non-corporate stockholder, and individual partner,
exceeding the ten percent (10%) ownership criteria established in this act has been listed.
Accordingly, this statement must be completed and submitted simultaneously
with the bid.
In the case of corporate or partnership stockholders, continue the disclosure on
extra sheets until all required individual stockholders or partners are disclosed.
(1) Names and addresses of all stockholders in ,
a corporation, who own ten percent (10%) or more of its stock of any class are:
Names: Addresses:
46
(2) Names and addresses of all partners of ,
a partnership, owning an interest therein of ten percent (10%) or greater are:
Names: Addresses:
(3) Continued information on stockholders or partnerships that are themselves
corporations or partnerships (Use extra sheets if necessary and attach).
WITNESS: (seal)
Contractor
By:
(Signature) (Authorized Signature)
(Printed Name) (Printed Name)
(Title) (Title)
(Date) (Date)
47
SCHEDULE 6
AFFIDAVIT OF NO CHANGE IN STATUS
STATE OF NEW JERSEY )
) ss.:
)
COUNTY OF )
I, ________________________________ residing at
_________________________________________________ in the
City/Town/Township/Borough of _______________________________, and State of
_________________, of full age, being duly sworn according to law upon my oath
depose and say:
1. I am the ______________________________of the firm of
________________________________________________,
the bidder submitting a bid for the project, services, good and/or material bid
set forth in the Bid Documents.
2. Since the above-referenced bidder’s last submission to the State of New
Jersey, Department of Treasury, Division of Property Management and
Construction for classification, there has been no material adverse change in
the above said bidder’s classification information.
____________________________________
(Signature of Affiant)
Subscribed and sworn to before me ____________________________________
this ____day of_____________, 20__. (Printed Name)
_______________________________ ____________________________________
NOTARY PUBLIC (Title)