40
Beneficial Use of Dredged Material at South Padre Island, Texas: an Economic, Environmental, and Partnership Success Story 2014 Conference on Ecological and Ecosystem Restoration July 29, 2013 Ray Newby, P.G. Texas General Land Office Coastal Resources Jerry Patterson Land Commissioner

Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Beneficial Use of Dredged Material at South Padre Island, Texas:

an Economic, Environmental, and Partnership Success Story

2014 Conference on Ecological and

Ecosystem Restoration July 29, 2013

Ray Newby, P.G. Texas General Land Office

Coastal Resources

Jerry Patterson Land Commissioner

Page 2: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

South Padre Island (SPI) Beach Nourishment with the Beneficial Use of Dredged Material (BUDM)

Project Location

Google Earth Image

Page 3: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

SPI Beach Nourishment with BUDM, Project Partners:

• City of SPI;

• Cameron County;

• Texas GLO;

• USACE Galveston District;

• HDR Engineering;

• Dredging Contractors.

Page 4: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Overview of SPI Beach Nourishment with BUDM

Page 5: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

SPI Beach Nourishment with BUDM, Project Details:

• Sand Dredged by USACE from Brazos Santiago Pass - Brownsville Ship Channel;

• Dredged Material Placement Area #1, Isla Blanca County Park Beach;

• Dredged Material Placement Area #5, Northern Portion of the City of SPI Beach;

• USACE Covers Base Plan Dredging Costs;

• GLO and the City of SPI Share Incremental Costs 75% / 25%;

Page 6: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

DMPA #5

DMPA #1

Offshore BU Berm

Ship Channel

Page 7: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,
Page 8: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

DMPA #1 Isla Blanca Park

Page 9: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

DMPA #5 City of SPI

Page 10: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

SPI Beach Nourishment with BUDM Project Details cont.:

• Cameron County Assists with Survey Costs;

• Annual Monitoring Surveys Conducted by HDR Engineering;

• Beach Placement Window Between October 1 to March 15 to Avoid Sea Turtle Nesting Season;

• Also Try to Avoid Snow Bird Season.

Page 11: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

SPI Beach Nourishment with BUDM, Project History:

• 12 Separate BUDM Beach Placement Events Since 1997;

• 6 Offshore Berm Placement Events;

• GLO Coastal Erosion Program Involved Since 2000;

• USACE-GLO BUDM MOA Signed in 2001;

• Mainly Used Cutterhead Suction Dredges;

• Hopper Dredge Pump-out Used First Time in 2012.

Page 12: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Dredge Pipeline Installation

Page 13: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Dredge Pipeline Installation

Page 14: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Dredge Pipeline Installation

Page 15: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Hopper Dredge

USACE photo

Page 16: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Economics of SPI BUDM:

• Funding Sources: GLO CEPRA, City of SPI, Cameron County, and U.S. Fish and Wildlife Service - Coastal Impact Assistance Program;

• Cost of Sand ~ $3 to $5/cubic yard;

• Taylor Engineering Inc. Economic Analysis Benefit / Cost Results: Isla Blanca Park 40 / 1, City of SPI 9 / 1.

Page 17: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

USACE-GLO BUDM Memorandum of Agreement:

• Executed in 2001;

• Covers all USACE Galveston District Maintenance Dredging Projects;

• Streamlined Contracting Process;

• Established 2-Page Support Agreement;

• Avoided Objectionable Language in Standard USACE Agreements.

Page 18: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Related Information:

• 2007 Offshore Investigation Found Approximately 2 Million cy Sand Source;

• City of SPI Obtained USACE Permit for Large-Scale Beach Nourishment;

• Preparing for 2014-2015 BUDM Event;

• Continue to Work with USACE to Improve SPI BUDM Project.

Page 19: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

South Padre Island BUDM

Before

Page 20: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

After South Padre Island BUDM

Page 21: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

For More Information:

• Web: www.glo.texas.gov

[email protected]

• (512) 475 - 3624

USACE photo

Page 22: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

The Mississippi Beneficial Use Program (MSBU)

“Building Momentum for Restoration”

Conference on Ecological and Ecosystem Restoration 2014 New Orleans, Louisiana

George Ramseur, Mississippi Department of Marine Resources Gulf of Mexico Alliance, Habitat Conservation and Restoration Team

Page 23: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

The “MS BUG” • Co-Lead Agencies: USACE; Mobile District; Point of Contact: Mike Malsom MDMR; Point of Contact: George Ramseur • • Steering Committee: Mike Beiser (MDEQ), John Bowie (EPA), Margaret Bretz (SOS), Jenny Jacobsen, Nate Lovelace (USACE), Paul

Necaise (USFWS), Ryan Hendren, Mark Thompson (NOAA/NMFS). • • Agencies & Government:

Alabama Department of Conservation and Natural Resources • Hancock County Port and Harbor Commission • Mississippi Congressman Palazzo’s Office • Mississippi Department of Environmental Quality (MDEQ), Office of Pollution Control • Mississippi Department of Wildlife Fisheries and Parks, Museum of Natural Science • Mississippi Secretary of State’s Office • Mississippi State University/ Grand Bay NERR • USM/ Gulf coast Research Laboratory • National Oceanic and Atmospheric Administration (NOAA) • - Habitat Conservation Division,

- Protected Resources Division • - Office of Coastal Survey • - Coastal Services Center • Port of Pascagoula • Senator Cochran’s Office • Senator Wicker’s Office • U.S. Environmental Protection Agency • U.S. Fish and Wildlife Service •

Private & NGO: • Anchor, QEA • Bean Companies • Chevron Pascagoula • CH2M Hill • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine, Pascagoula

Page 24: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

MSBU GOAL

Regional Sediment Management Thanks to the GOMA/ HCRT- Gulf Regional Sediment Management Master Plan (GRSMMP)

1) Mississippi loses 200 acres per year of marsh and related habitat (10,000 acres since the 1950s).

2) There is no net accretion. 3) Dredged materials are the dominant sediment

resource (5 – 10 MCY annually). Therefore: Ensure any materials dredged from the Mississippi Sound are reused in or adjoining the Sound in a way that directly benefits ecological management or ecosystem functions.

Page 25: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Mississippi Sound, MSBU Program RED = State Boundaries Green = Current BU projects – approx. 200 acres Purple = Priorities – approx. 5,000 + acres

Page 26: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Objectives Holistic , economical approach 1) Prioritize habitats that are in a “trajectory of decline” that can be

readily managed using geologic materials to increase substrate elevations

2) Place dredged materials in a way that best mimics natural Mississippi littoral habitats and shorelines.

a) No containment (thin layer, etc.) where possible b) Native materials (sand, clay) when containment and protection are needed c) Biodegradable materials (coir, straw bales) d) Oyster or reef structures Collaboration See next!

Page 27: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Port of Gulfport to Deer Island

Page 28: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

DIMR1

DIMR2

DEER ISLAND PROJECT SITE As of Fall 2012

Page 29: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Deer Island Plan View

DIMR1

DIMR2

Page 30: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

September 2

September 2013

DIMR1

DIMR2

Page 31: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

DIMR1, Ground Level, April 2014

Page 32: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

• Deer Island BU Summary: • • Layout, 2 “cells” • - DIMR1 built by USACE Mobile in 2003, 40 acres (costs not included in this analysis) • - DIMR2 built by Port of Gulfport in 2012, 40 acres • History • - DIMR1 loses substantial interior volume from Katrina (2005) • - DIMR2 dike constructed summer 2012 • MSBU Program Involvement (2012 through Present) • - Port of Gulfport needs BU capacity for 330,000 cubic yards of new cut material • - MDMR has maintenance permit for DIMR1 and new permit for DIMR2 • - Port of Gulfport begins pumping 200,000 cubic yards to enhance DIMR1 while • concurrently constructing dike for DIMR2 • - Port pumps final 130,000 cubic yards into DIMR2 • - MSBU conducts access channel and dike maintenance (April 2014) • Future • - Jackson County will pump approx. 230,000 cubic yards into DIMR1 2014/ 2015 to complete filling to marsh elevation. • • BU Project Costs* (2012 to present) • - DIMR2 side cast sand containment dike (2012) - $225,000 • - DIMR2 planting 50,000 • - DIMR2 channel and dike maintenance (2014) - 50,000 • • BU Project Costs* (Future) • - Additional dike and tide channel work- $100,000 max. • Total $425,000.00 •

• Total Project acres approx. 80 $5300 per acre •

• Total Project cubic yards approx. 560,000 $ .65 per cubic yard • • • * BU Project Costs reflect cost of the BU specific operation. The costs of dredging, transportation and off loading are considered part of the dredging

operation. Port of Gulfport saved approximately $1.3 million building using DIMR1 and constructing DIMR2 versus their only physically/ economically viable option. If DIMR1 had not already existed, a new site with sufficient capacity could have been built for an additional $200,000, raising casts to about $7800 per acre / and $1.11 per cubic yard. In either scenario, this is economical, natural containment for dredged materials.

Page 33: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Current Project Activity

Page 34: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Current Project Activity

Page 35: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,
Page 36: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

• Round Island BU Summary: • • Layout, 1 cell so far • - 70 acre training “toe” dike built by V.T Halter Marine , Fall 2013. Transport of material paid for by the Port of Pascagoula • History • 100 % MSBU Program Involvement • - V.T.Halter needs BU capacity for potentially 1 million + cubic yards of new cut and previously stockpiled material • - MDMR develops 800 acre concept and initiates permit fprocess or Round Island • - Anticipated volume reduces to about 600,000 cubic yards • - Final permit footprint is reduced to 220 acres incurrent location, north of remaining natural island • - Anticipated dredge volume is reduced to about 350,000 cubic yards • - Current 70 acre footprint is adopted. • - Dike complete October 2013 - • - Material pumping begins November 2013 • - Pumping is delayed until June 2014

- Material quality exceeds expectations with high sand content, is prioritized for dike construction, forming additional capacity for finer grained BU materials in the future.

• Future • - Remainder of currently permitted 220 acre footprint will be built out in new cells as needed. Expansion to larger footprint

of 800 acres will be pursued in future (potentially 10 – 20 years). • • BU Project Costs • - 70 acre side cast sand toe dike (2013) - $425,000 • • Total Project acres approx. 70 $6100 per acre • • Total Project cubic yards approx. 350,000 $1.20 per cubic yard • • • * BU Project Costs reflect cost of the BU specific operation. The costs of dredging, transportation and off loading are considered part

of the dredging operation.

Page 37: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

2000 foot loss in 60 years

West Hancock County, MS

Page 38: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Hancock County, MS Large Shoreline Restoration Concept, 3000 ac., Port of Gulfport?

Page 39: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Pascagoula, Jackson County, MS Large Island Concept, 1500 ac. Port of Pascagoula and Tenants

Page 40: Beneficial Use of Dredged Material at South Padre …...2013/07/29  · • Filtrex Land and Improvement Systems • Ingalls, Pascagoula • ORA Technologies • VT Halter Marine,

Biloxi Marsh, Eastern Louisiana Preliminary Investigations, Large Thin-layer Project w Port of Gulfport. 1000 to 5000 ac.