Before Beginning As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval” button at near the bottom of the form. This will generate a Transaction ID that will be required to access the partially completed form in the future. This is the Transaction ID string that will be required in the Proposal as shown in Exhibit 2. Part I: Facility Operator Information This information is typically the mailing address for the District Office where the project is located. Status of Owner/Operator should be set to State. Part II: Facility/Site Location Information This is the location of the project. Lat/Long can be pulled from the Layout Sheet on the Plans/Proposal. Lat/Long must be entered in decimal-degree format with negative longitude. The SIC Code will be one of the following: 1611 – Roadway Construction 1622 – Bridge Replacement If a project is only a bridge replacement with approach work, then use 1622. Otherwise, 1611. Part III: Site Activity Information For highway projects, complete only section a) for single projects. The user should enter in the total acreage disturbed for the project. This will be the total of the Disturbed Drainage Areas form the Erosion Control Plans. In lieu of Erosion Control Plans, the total area disturbed should be calculated and entered here. Use the same area for Total in Project as well as Total Disturbed. Optionally, if known, the Start/Completion dates can be entered now or just prior to submittal. There is no need to fill out section b) for highway construction. Part IV: Receiving Water Bodies Every project will have at least one receiving water body. The eForm provides space for two. If a project has more than two receiving waters, supplemental information can be attached in Part VIII. Select the receiving water from the pull-down list. If the discharge does not immediately, within reason, enter a named receiving body, then you may select “Unnamed Tributary…” from the list. Enter the number of discharge points (one per DDA) corresponding with the aforementioned receiving water body. Each point will need Lat/Long coordinates (also in decimal-degree format) entered into the eForm. Click the Add New link to add editable fields for Lat/Long until all points are entered into the eForm. In some instances, the user may

Before Beginning - Kentucky Transportation Cabinet · Before Beginning As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval”

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Before Beginning - Kentucky Transportation Cabinet · Before Beginning As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval”

Before Beginning

As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval” button at near the bottom of the form. This will generate a Transaction ID that will be required to access the partially completed form in the future. This is the Transaction ID string that will be required in the Proposal as shown in Exhibit 2.

Part I: Facility Operator Information

This information is typically the mailing address for the District Office where the project is located. Status of Owner/Operator should be set to State.

Part II: Facility/Site Location Information

This is the location of the project. Lat/Long can be pulled from the Layout Sheet on the Plans/Proposal. Lat/Long must be entered in decimal-degree format with negative longitude. The SIC Code will be one of the following:

1611 – Roadway Construction

1622 – Bridge Replacement

If a project is only a bridge replacement with approach work, then use 1622. Otherwise, 1611.

Part III: Site Activity Information

For highway projects, complete only section a) for single projects. The user should enter in the total acreage disturbed for the project. This will be the total of the Disturbed Drainage Areas form the Erosion Control Plans. In lieu of Erosion Control Plans, the total area disturbed should be calculated and entered here. Use the same area for Total in Project as well as Total Disturbed. Optionally, if known, the Start/Completion dates can be entered now or just prior to submittal. There is no need to fill out section b) for highway construction.

Part IV: Receiving Water Bodies

Every project will have at least one receiving water body. The eForm provides space for two. If a project has more than two receiving waters, supplemental information can be attached in Part VIII. Select the receiving water from the pull-down list. If the discharge does not immediately, within reason, enter a named receiving body, then you may select “Unnamed Tributary…” from the list. Enter the number of discharge points (one per DDA) corresponding with the aforementioned receiving water body. Each point will need Lat/Long coordinates (also in decimal-degree format) entered into the eForm. Click the Add New link to add editable fields for Lat/Long until all points are entered into the eForm. In some instances, the user may

Page 2: Before Beginning - Kentucky Transportation Cabinet · Before Beginning As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval”

encounter a limit on how many discharge points that can be entered into the eForm. In that case, the table in the PDF quad map will suffice for any discharge points that remain. Check all applicable Stream-Use Designations and select the Antidegradation Categorization from the pull-down list. Information for these two sections can be obtained by contacting the Permitting Support Engineer from the Division of Environmental Analysis assigned to your district. You can call (502)564-7250 to reach the Division switchboard.

Part V: MS4 Operator

For KYTC projects within a designated MS4 area, the MS4 Operator will be “DOT” and can be selected from the pull-down menu. If the project falls outside of an MS4 Operator area, then leave this section blank.

Part VI: Construction Activities in a Water Body

Fill in the appropriate information based on the particular construction activity.

Part VII: NOI Preparer Information

This section will be filled out after the project is awarded and prior to the Pre-Construction meeting. District PD&P staff will be responsible for designating who will act as the contact for eh particular project. The response from the Division of Water as to the approval of the NOI will be sent to the e-mail address of the person listed in this Part.

Part VIII: Attachments

The topographic quad map with labeled discharge points will be attached in this Part. The attachment cannot be saved prior to submittal. It must be attached at the time the eForm is completed and submitted for review. Furthermore, the “Supplemental information” attachment can be used if the eForm and quad map do not contain enough information for the reviewer to approve the NOI.

Part IX: Certification

The person completing the eForm will electronically sign for the District Executive Director (CDE) in this section. Once entered, click the “Submit Final Version to DEP” button and recordthe confirmation number that is generated. The eForm can then be accesses as Read-Only using the previously mentioned Transaction ID. It is highly recommended that the user print a hard-copy of the completed form for their records.

Page 3: Before Beginning - Kentucky Transportation Cabinet · Before Beginning As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval”

2-287_Proposed.dgn 8/26/2009 10:51:19 AM

Point Discharge Latitude (N) Longitude (E)

DDA 50 37.771469 -87.076969DDA 60 37.772379 -87.072158DDA 63 37.772441 -87.066535DDA 64 37.773693 -87.066648DDA 141a 37.794112 -87.052612DDA 143a 37.795892 -87.053713DDA 144a 37.795906 -87.053354DDA 157a 37.793686 -87.050382DDA 158a 37.793620 -87.050478DDA 161 37.797487 -87.047492DDA 162 37.797538 -87.047338DDA 163 37.800769 -87.044881DDA 168a 37.800558 -87.041555DDA 169a 37.800472 -87.041555DDA 175b 37.804178 -87.048070DDA 186a 37.809394 -87.041959DDA 189 37.811192 -87.042227DDA 190 37.811300 -87.041132DDA 191a 37.811519 -87.041125DDA 192 37.812011 -87.040747DDA 193a 37.813207 -87.042167DDA 200a 37.811507 -87.044732DDA 201a 37.811122 -87.044249DDA 209 37.815425 -87.042368DDA 210a 37.816337 -87.041894DDA 211 37.816456 -87.041795DDA 212 37.816556 -87.041816DDA 215a 37.818408 -87.041018DDA 219 37.819904 -87.040154DDA 220 37.819845 -87.039861DDA 223a 37.817644 -87.037986

Kevin.Martin
Text Box
EXHIBIT #1
Page 4: Before Beginning - Kentucky Transportation Cabinet · Before Beginning As you progress through the eForm, you may save your progress by clicking the “Save for Future Retrieval”

PCN # CPTL 104 8034Construct Parking Facility of Park Road A

In Dale Hollow State Resort Park

KPDES NOI for Stormwater Discharges Associated with Construction Activity Under the KPDES General Permit

Transaction ID:

9e797bc8-f55d-46d0-940d-9bcb75e88dcd

EXHIBIT #2