Upload
zoican-radu
View
218
Download
0
Embed Size (px)
Citation preview
8/10/2019 Battocchi Round Table3
1/10
Smart Metering for Energy EfficiencyKeystone for Smart Grids
Vienna, June 22 2011
Mauro Battocchi
Vice President, International Institutional Affairs
Enel
8/10/2019 Battocchi Round Table3
2/10
2
Presence in:40 countries
Installed capacity:96.500 MW
Annual output:290 TWh
EBITDA:17,5 bln
Customers:61 million
Employees:78,300
CAPEX 2011-2015:31 billion
Stock exchanges:
Enel is listed on the Milan stock exchange (1,5 mln shareholders). 13 companies of
the Group are listed on Madrid and New York stock exchanges and in other Latin
American countries.
Enel: an international energy operator
Core business: power and gas
Installed capacity, production, employees and clients reported preliminarily as of 31.12.2010. Installed capacity net of the MW intended for sale in Bulgaria.
No.1 electricity company inItaly. Second largest utility inEurope by installed capacity
Present throughout the
entire electricity and naturalgas value chain
from 0 a 500 MW 500 to1.000 1.000 to 2.000 2.000 to 10.000 More than 10.000
Representative offices, financial holdings, operative branches, commercial companies
8/10/2019 Battocchi Round Table3
3/10
3
Enel: a world dimension
Focus on major areas of presence
COLUMBIA
First operator ingeneration (20%)
Second operator indistribution (24%)
2,5 mln clients
ARGENTINA
First operator ingeneration (14%)
Second operator indistribution (16%)
2,4 mln clients
CHILE
First operator in
generation (49%)(1)
First operator indistribution (32%)(1)
1,6 mln clients
PERU
First operator ingeneration (31%)
Second operator indistribution (23%)
1,1 mln clients
NORTH AMERICA
Diversified presence in
the main renewabletechnologies (hydro,geothermal, wind)
SPAIN
Second operator in generation (21%) (2)
First operator in distribution (35%)(2)
13 mln clients (electricity and gas)
ITALY
First operator ingeneration (25%)
First operator indistribution (80%)
32,3 mln clients(electricity and gas)
SLOVAKIA
First operator ingeneration (78%)
ROMANIA
Second operator indistribution (30%)
2,6 mln clients
RUSSIA
First vertically integratedforeign operator(upstream gas,generation, supply)
BRAZIL
5,7 mln clients
CENTRAL AMERICA
Hydro and wind powerplants in Costa Rica,Panama, El Salvadorand Guatemala
A fully integrated global energy player with a leading position instrategic markets
FRANCE
12,5% in Flamanville, EPRtechnology (1,600 MW)
Notable presence in windgeneration
Market shares in generation calculated on the basis of energy demand data.Market shares in distribution calculated as ratio of energy distributed including network losses vs. electricity demand.
(1) Market share calculated based on the SIC data (Sistema Interconectado Central), corresponding to the 70% of the Chilean market
(2) Market Iberia including SEIE (Regimen Ordinario + Regimen Especial)
8/10/2019 Battocchi Round Table3
4/10
4
Enels Automatic Meter Management:
Telegestore
32 million customersin Italy
Telegestore is fullyoperational on 32,5 MlnCustomers
Leading Technology
Excellence in
operation
Smart Infrastructure
Meters installed at customer'spremises provide real-timeaccess to the supply data
Meters transmit data regardingconsumptions, receive updatesof the contractual parameters
and remotely manage the supplyconnectivity.
No interventions on-site areneeded.
Tailored Tariffs
Involving customers by enabling participationwhile guarantying high quality of service
Enabling a new hourly-based tariff system,flexible and adaptable tothe various needs
Customers free to
select supply contracttailored on their needsand consenting a costsaving.
8/10/2019 Battocchi Round Table3
5/10
5
INVOICES ON REAL
CONSUMPTION
REMOTE CONTRACT
MANAGEMENT
TAILORED TARIFFS
SAVINGS IN BILLING
PRE PAYMENT
EASIER FREE MARKET
DEVELOPMENT AND
MANAGEMENT
FOR CUSTOMERS andother electrical system
operatorsFOR ENEL
FOR THE ELECTRICPOWER SYSTEM
PEAK SHAVING
ENERGY EFFICIENCY
AND CO2 REDUCTION
REDUCTION OF
COMMERCIAL AND
TECHNICAL LOSSES
CUSTOMER
SATISFACTION
EXCELLENCE IN
COMMERCIAL AND
TECHNICAL QUALITY
OPERATING COST
SAVINGS
LEADERSHIP IN
INNOVATION
BenefitsA win-win technology
8/10/2019 Battocchi Round Table3
6/10
6
6
Results achievedEnel Operational Excellence
Opex(/customer)
2001 (128 min ; 80 /Customer)
80
60
30
2010 (45 min ; 49 /Customer)40
80130
2002
20042003
20052006
2007
Quality of service(minutes interruption/year)
European Benchmark
2008
2009
8/10/2019 Battocchi Round Table3
7/10
7
Belgorod
Russia
Enel 32 Mln
Other 4 Mln
Italy
Endesa 13 Mln
EON 0.8 Mln
EDP
IberiaEnel
Romania
Malta
Enemalta 0,25 Mln
International developmentExpansion worldwide
With 50 Mln meters Enel is contributing with the 25%
to the overall European target
Shangai
Honk Kong
China
LATAM
Endesa
Deployment completed/on going
Pilot on going
Potential
Oxxio 0,2 Mln
Netherlands
Hidrocantabrico
8/10/2019 Battocchi Round Table3
8/10
8
Pilot Projects in BrazilEnel model digital meters in the area of Fortaleza
Enel, with Endesa, is developing a pilot remote management
project in Brazil, using the same metering technology that
Endesa is installing in Spain. The pilot project will be
implemented through Coelce, Endesa's electricity
distribution subsidiary operating in the State of Cear,Brazil.
The pilot project was launched in Fortaleza through the
installation of meters of the model developed by Enel
Distribuzione. The project also envisages the installation of
concentrators for the data collected by meters in transformer
stations and training days for the technicians of local Enel Group
distribution companies.
Brazil is the first country in Latin America to begin
developing a regulatory framework for remote management.
8/10/2019 Battocchi Round Table3
9/10
9
Smart Grids: vision and benefits
Central and distributedresources integration
Smart equipments andpower electronics
Central and distributedIntelligence
Electric Vehicle
End user real time
information andparticipation
Multi-directional flowsmanagement
Storage andPlug & Play
technologies
LED Public Lighting
8/10/2019 Battocchi Round Table3
10/10
10
Smart GridsRoadmap Enel
20-20-20
2010 2020
Level ofimplementationSmart Grids
ENEL DEPLOYMENTTelegestoreAutomazione reteWork Force MngmAsset Management
EUROPEAN ELECTRICITYGRID INITIATIVE
2000
EU Frame Program7 ADDRESS Grid4VehiclesENEL PROJECTS
Smart Info, Domanda attiva, Banda larga , E- Mobility
SMART GRIDSFULL ROLL-OUT
Renewable energy, DG, electricvehicles, electricity storage andaggregation
Managementof end-use energy efficiency, aggregation, retail
Customersbecome aware andparticipate actively Customers
DistributionNetwork
Level 2:Smart Distribution networkand processes
Level 3:Smart Integration
Level 4:Smart EnergyManagement
SMARTGRIDS
Functionallevels
Level 1:Smart Pan-European Transmission networkTransmission
Network
Level 0:New generation technologies
Electricity
generation
Level 5:Smart Customers
More automatedmedium voltage distributionnetworkswithself healingcapabilities. Monitoredandcontrolledlow voltage networks.IT supportedmonitoringprocess
Frame-Program 7: Pilots Reti attive Infrastruttura veicoli elettrici
ed ibridi
2009
//
20152012