RIGGING DEPARTMENT
ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK
RIGGING DEPARTMENT LOGO
LIFTSWINGMOVEDOWN
In safety corridor
THINK SAFEDO SAFELY
SAFETY FIRST
START
DATA MATERIAL1. DIMENSION2. WEIGHT
REFERENCE1. RIGGING BOOK 2. EQUIP. MANUAL3. Standard Rigging
NEED DUO CRANE
TAILING DESIGN
MONO CRANE
No
Yes
JSA
Risk
RIGGING PLAN
STOP
CONTROL
REPORT
ACTION
Rigging Engineer Responsibility
Prepare Rigging Procedures:
(1) Method Of Work, sequence of activities
(2) Job Safety Assessment Procedures,Sequence and criterion for safely condition
(3) Safe Work Method Statements,Metode kerja yang aman
(4) Risk Management Safe Work Method Statement (SWMS),
(5) Rigging Plans,
(6) Rigging Tools,
(7) Critical Lift Worksheet,
(8) Lift Study,
(9) Crane Lift Study,
(10) General Scaffolding Safety Checklists).
Definition of RiggingRigging is part of the lifting
operation which forms the link between the crane and the load
Lifting Plan
Displacement
Safety Factor
RIGGING PLAN LIFTING FOR
POWER CONTROL CENTERS
LiftingProcedure
STEP 1
LIFTING TOOLS IN SPECIAL CONDITION
STEP 2
LIFTING TOOLS IN SPECIAL CONDITION
STEP 3
LIFTING TOOLS IN SPECIAL CONDITION
STEP 4
LIFTING TOOLS IN SPECIAL CONDITION
Displacement Frame Analysis
Displacement Stress Analysis