Barangay Disaster Risk Reduction Management Plan
Barangay Casili-on Salcedo, Eastern Samar
Brgy. Casili-on BDRRMP 2017-2019 2
© Local Government Unit of Salcedo, Philippines 2016
The document must be attributed as the Participatory Capacity and Vulnerability
Assessment: Barangay Casili-on, Salcedo, Eastern Samar.
Published by Local Government Unit, Salcedo, December 2014.
Disclaimer: The views in this publication are those of the authors.
Brgy. Casili-on BDRRMP 2017-2019 3
Table of Contents
Introduction 4
Barangay Profile: Caridad 5
Barangay History 7
Spot Map 8
Hazard Map 8
Disaster Timeline 10
Social Venn Diagram 10
Hazard Assessment 11
Barangay Resources 12
Seasonal Calendar 12
Vulnerability and Impact Assessment 13
Capacity Assessment 16
Adaptation Assessment 19
BDRRM Organizational Structure 22
Sectoral Plan(Supply/Relief) 23
Sectoral Plan(Evacuation) 24
Sectoral Plan(Damage Control) 25
Sectoral Plan(Medical) 26
Sectoral Plan(Security Rescue) 27
Evacuation Plan 28
BDRRM Plan 29
Pictures 30
Brgy. Casili-on BDRRMP 2017-2019 4
Introduction
The Participatory Capacity and Vulnerability Assessment (PCVA) was designed and implemented by Local Government Unit of Salcedo for the Child Centered-Community Based Climate Change Adaptation (CC-CBA) project in order to assist different project stakeholders in the efficient collection, management and analysis of community-generated data for mainstreaming disaster risk reduction and climate change adaptation in local development plans of schools and local government units. The CC-CBA PCVA is an attempt to stimulate people's understanding and analysis of the factors that affect children, youth and their community's resilience against climate change. The PCVA is both an approach and platform of convergence and empowerment that encourages children and different community stakeholders to collectively assess, plan, implement, advocate and mainstream climate change adaptation for an evidence-based resiliency against climate change impacts.
The design of PCVA identifies five primary areas of assessment by and for the community in subsequent order:
1. Natural Resource Assessment: Changes, trends and current state of the community's natural resources to establish link of climate - weather hazards on the exposure and sensitive units of the community. 2. Hazard Assessment: Levels of vulnerability of the human and non-human elements and the historical impact and types of hazards to a specific location and system of interests in the community. 3. Vulnerability and Impact Assessment: The vulnerabilities of each exposed unit and sensitive systems of community in terms of human and non-human elements, including the likelihood of a unit and its interaction with every exposed and sensitive elements of the community to the effect of a changing climate or extreme weather event; also gauges direct and indirect impacts of hazards to each system of interests. 4. Capacity: The existing capacity, adaptive/required capacity and capacity gaps of human and non-human element.
Brgy. Casili-on BDRRMP 2017-2019 5
Barangay Profile
I. Geographical Classification The barangay is situated along the national road. It is located 10.5 kilometers northwest
of the town proper of Salcedo, 26.5 kilometers of the town proper of Guiuan, and 58.5 kilometers south east of Borongan City (the capital City of E. Samar). Boundaries East : Brgy. Talangdawan West : Brgy. Sta. Margarita,
Quinapondan North : Brgy. Caridad South : Brgy. Tagbacan The National Highway passes through the barangay. Buses from Manila, Tacloban and Borongan, public utility vehicle such as jeepneys, vans, tricycles and trucks are available during daytime, early morning and night.
II. Physical Profile/ Land Area
The Barangay has a total land area of 241.19 hectares (source: MENRO Salcedo-2009). The land use distribution is not yet planned, hence, there is no specific measure of areas for residential, institutional, agricultural, etc. III. Demographic Profile Population
As to the conduct of PCVA, the total Barangay population is , where number of Male is while the female is . There are households in Barangay Palanas. IV. Livelihood and Employment Majority of the people in the barangay are dependent on its income from copra making, tuba gathering and farming. Some are dependent salary of being government employees, remittances from relatives either in local and abroad. Other sources of income are derived from food vending and extracting chromites. V. Economic profile Barangay Caridad is a 5th class Barangay. The Barangay income is dependent on the release of Internal Revenue Allotment (IRA), coming from the National Government. VI. Infrastructure and Utilities
Barangay road Road Distance Road condi-tion
Caridad-Casilion 1.2 kms. Rough
Tagbacan- Casilion ___kms. -do-
San Antonio St. 80meters Half-concrete lane
San Roque St. 100 meters Rough road
Fatima St. 80 meters Rough road
San Jose St. 122meters Concrete
Sto. Nino St. 73 meters Half concrete lane
Unnamed road 6 meters Rough road
Brgy. Casili-on BDRRMP 2017-2019 6
Water system Facilities No. Uses/Condition
Open Dug Well All purpose
Jetmatic Pump 12 Functional
5 Non-functional
3 Brgy. Property (non-functional)
2 Private property
Power
Barangay Casili-on is already energized by Eastern Samar Electric Cooperative (ESAMELCO).
Communication
The radio broadcast is the primary source of communication in this area. There is satellite broadcast TV using satellite dish (Cignal), to watch TV news locally or internationally. The reliability of local broadcast of AM radio is still the main source of information specially when there is a threat of typhoon.
VII. Education
Barangay Casili-on offers complete elementary education, servicing in-school children and youth with 3 elementary school buildings. There is also one available Day Care Center. VIII. Health and Nutrition
HEALTH PROGRAMS AND SERVICES
Feeding Program
Maternal and Child Care
Immunization Program
Family Planning Program
Free regular check-up
BP and OPT
Deworming
Weight monitoring
Pre and Post Natal services
Garantisadong Pambata
Felariases Program
Other special programs
Brgy. Casili-on BDRRMP 2017-2019 7
BRIEF HISTORY OF THE BARANGAY
Hadton una nga mga panahon, ine nga lugar in usa nga Sitio han Brgy. Caridad,
Salcedo nga gin ngaranan hin “HIGARON”. Gin ngaranan ini nga Sitio Higaron dara kay
abunda ine dinhe nga lugar hin pagka-on, sugad han palawan, kamote, bilanghoy ug an
iba pa nga mga pagkaon nakanhe kukuha-a han mga mulopyo.
Ini nga lugar in may mga salug o sapa nga diin damo an mga kasili o isda ha tab-
ang nga nagin Kasilihon. Dara hini nga kadamo han kasili, an nagmamangulo han Baryo
Caridad hi Juancho Gilber asya an nagtikang hin pagngaran han lugar nga Casili-on.
Ha pagkanhe ha Casilion ni Florentino Duran, nga taga Brgy. Camanga gin-
pauswag ine niya nga lugar ug nagin progresibo ine. Pag abot han panahon nga nagdamo
na an nag uuma ngan mga nagbabalay naglarang ini hi Florentino Duran hin
pagparihistro ha munsipyo nga maging barangay ngan gin ngaran nga Barangay Casilion.
Para han ka patronan han Barangay, an mga tawo ug an simbahan in
nagsisilibrar han patron ha kada Agosto 25 han tuig.
An Barangay Casilion in gin administrar hin mga aktibo nga barangay kapitan. An
una hini amo hi Hon. Florentino Duran, sinundan ni Hon. Sofio Yaranon Sr., Hon. Roberto
Cayosa ngan ha pagkayana in ginpapadayon pagpakaupay ubos han pamunuan ni HON.
MARIETTA J. OBILLO.
Brgy. Casili-on BDRRMP 2017-2019 8
SPOT MAP OF BARANGAY CASILI - ON
HAZARD MAP OF
BARANGAY CASILI-ON
Brgy. Casili-on BDRRMP 2017-2019 9
Hazard Maps
Brgy. Casili-on BDRRMP 2017-2019 10
DISASTER TIMELINE
YEAR - DISASTER EPEKTO SA KOMUNIDAD SINU-SINO AT ILAN ANG APEKTADO
SAAN - SAAN MGA ARAL MULA SA KARANASAN
December 2014 Typhoon Ruby
o Destruction of crops o Destruction of houses
Farmers 90 Families
2 totally damaged HH
o Purok Sampaguita o Purok Orchidds o Purok Camia o Purok Cadena de Amor
o Pagputol ng mga tangkay ng kamoteng kahoy
o Build / construct a strong resilient house
o Cut the branches of trees near the houses
o Always be ready
o Brgy. Infrastructures should be strong /
resilient
o Evacuate as early ass possible
2013 Typhoon Yolanda
o Destruction of farm crops and other livelihood
o Destruction of houses o Destruction of infrastructures
Whole community: o 102 totally
damaged HH o 57 partially
damaged HH o Church o Health Center
Brgy. Casili – on
1966 Typhoon Clarin
o Destruction of farm crops and other livelihood
o Destruction of houses
30 totally damaged HH All the farm crops
Brgy. Casili - on
SOCIAL VENN DIAGRAM
Brgy. Casili-on BDRRMP 2017-2019 11
HAZARD ASSESSMENT
Elements of Characteristic of Hazard Characteristic of Hazard (ano bang meron ang isang bagyo) Analytical Description of
Hazard
Cause / Origin (saan nangaling o ano ang dahilan) Malamig na hangin
Maitim at maulap ang kalangitan
Pagkakaroon ng low pressure sa dagat
Pagkulog at pagkidlat
Malakas na hangin at ulan
Nabubuwal na mga puno
Lumilipad na mga yero
Pagkasira ng mga bahay
Flood
Gustinets of wind
Force (Gaano kalakas) 120-150 kph
Warning Signs & Signals (saan ba narinig, radio, tv o
bgy)
Bandilyo
Pag – asa
Mobile Phone
TV
Radyo
Forewarning (indigenous EWS)
Moon sorounded with ring
Paglabas ng mga paniki sa araw
Paglakas at paglaki ng mga alon sa dagat
Speed of Onset (gaano ba kabilis bago dumating) Depende sa signal warning ng PAGASA
5 hrs. Pinakamadali
2 days pinakamatagal
Frequency (gaano ba ito kadalas) 1 – 2 per year
Period of Occurrence (ilang beses ba itong nangyayari
sa isang taon)
1 – 2 beses sa isang taon
Duration (gaano katagal ang epekto nito 1-3 hrs
2-3 yrs hangang makabawi ng mga pananim para magkaprudokto
Brgy. Casili-on BDRRMP 2017-2019 12
BARANGAY CASILI – ON RESOURCES
UPLAND LOWLAND
o Houses, Provincial Road, Bamboo (bagakay), Goat, Cow, Dog, Cat & Pig o Caladium, Coconut Tree, Cassava, Banana, Sweet potato, Bird, Papaya, Bamboo, Chicken, Mango Tree, Butterfly & Cacao
SEASONAL CALENDAR
SITUATIONS/ ACTIVITIES J F M A M J J A S O N D
Livelihood :
Rootcrop farming √ √ √ √ √ √ √ √ √ √ √ √
Fishing √ √ √ √ √ √ √ √ √ √
Sari –sari store operator √ √ √ √ √ √ √ √ √ √ √ √
Food Vending √ √ √ √ √ √ √ √ √ √ √ √
Carpentry √ √ √ √ √ √ √ √ √ √ √ √
Sawali Making √ √ √ √ √ √ √ √ √ √ √ √
Bread Making √ √ √ √ √ √ √ √ √ √ √ √
Dapon Vending √ √ √ √ √ √ √ √ √ √ √ √
Hog Fattening √ √ √ √ √ √ √ √ √ √ √ √
Occasions :
Christmas and New Year √ √
Fiesta √
Balintawak √
Health :
Fever and Flu √ √ √ √ √ √
Malaking Pagkakautang
Enrolment √ √
Fiesta √
Brgy. Casili-on BDRRMP 2017-2019 13
VULNERABILITY AND IMPACT ASSESSMENT
HAZARD SYSTEM OF INTEREST EXPOSURE SENSITIVITY IMPACT
Typhoon
HUMAN ELEMENTS
1. Children 0-5 years old
Male 51
Female 60
Cough, Cold, Diarrhoea, Fever, Trauma, Diarrhoea, Mosquito bites, Chiconggonia & Dengue
Malnutrition, Hospitalization, Insect bite diseases & Displacement
2. Children 6-12 years old
Male 49
Female 64
Cough, Cold, Diarrhoea, Fever, Trauma, Diarrhoea, Mosquito bites & Chiconggonia
Malnutrition, Hospitalization, Insect bite diseases, Displacement & Poverty
3. Children 13-17 years old
Male 32
Female 36
Cough, Cold, Fever, Diarrhoea & Skin deseases
Hospitalization, Insect bite diseases, Displacement & Poverty
4. 18 to 59 Male 154
Female 167
Diseases
Cough, Cold, Skin disease (kurikong), Fever, Diarrhoea, High Blood, Arthritis & Trauma
Hospitalization, Insect bite diseases, Displacement & Poverty
5. Elderly ( 60 up ) Male 33
Female 39
High blood, Arthritis, Cold, Cough, Fever & Diarrhoea
Hospitalization, Insect bite diseases, Displacement, Death, Poverty
6. CWD Male 1
Female 3
Cough, Cold, Skin disease (kurikong), Fever & Diarrhoea
Hospitalization, Insect bite diseases, Displacement & Poverty
7. PWD Male 8
Female 5
Cough, Cold, Diarrhoea, Fever & Skin disease
Hospitalization, Insect bite diseases, Displacement, Poverty & Malnutrition
NON-HUMAN ELEMENTS
1. Social Services
1.1. Education School buildings
Comfort Room
Staff : 8 Elem. Teachers
Totally Damaged
Totally / Partially damaged
Inability to teach the lesson well
No classes, Pupils may transfer to other schools, Leads to students drop out, Insufficient funds & Unsanitary waste is observed
1.2. Health 1 concrete health center Under construction Can’t be used & Damage of health
Brgy. Casili-on BDRRMP 2017-2019 14
apparatus
1.3. Water 24 units jetmatic & 22 open dug well
Turbidity is high & Contaminated
Cause of human illnesses, Diarrhoea & Stomach ache
2. Livelihood
2.1. Coastal 10 fishermen Destruction of pump boat
Destruction of fish nets and other fishing gear
Poverty
Possibility of theft cases arises
Low yield on catch fish
2.2. Agriculture 95 farmers - Fertilizer - Bolo - Sundang
Destruction of farm
Destruction of crops and other plant
Alkansi / lugi
Poverty
The family will suffer starvation
2.3. Others: - Sari – sari store
12 retailers
Pagkasira ng tindahan
The goods will get wet
Pagkalugi, Poverty & The family will suffer starvation
- Food Vending 7 vendors Loss / damage of materials / tools
Mahina ang kita & poverty
- Carpenter 50 carpenters Loss / damage of materials / tools
Mahina ang kita & poverty
- Amakan making 3 makers Loss / damage of the raw material
Mahina ang kita & poverty
- Bread making
5 makers Damage of the materials
Pagkabasa ng harena
Mahina ang kita
poverty
- Dapon vending 3 dapon vendors Pagkamatay ng mga puno ng dapon
Pagkasira ngn bahay nito
Mahina ang kita
poverty
- Hog fattening / Raise
2 Hog raisers Death of the hogs, Pagkabasa ng pagkaing baboy & Pagjkasira ng kulungan ng baboy
Mahina ang kita
poverty
3. Ecosystem
Brgy. Casili-on BDRRMP 2017-2019 15
3.1. Water 5 creeks Contamination Lalala ang siltation
Mawawalan ng lugar ng paglalabhan
4. Institution
4.1. Government GOVERNANCE:
Punong Brgy., 7 Brgy. Kagawad, 1 Treasurer, 1 Secretary, 4 tanod, 4 Utility, 10 Lupon, 6 BHW, 1 Day Care Worker, Volunteer Teachers & 1 Bookkeeper
Implementation of ordinance
Resolution
5% DRRMF
Official and employees are affected by the hazard
70 % DRRMF Mitigation and preparation of 30% emergency response are minimal to support damages
4.2. Private 3 credit facility - CARD Inc., SIKAP & ASA
Phil.
Late response Hindi nakakatulong para makabangon ang beneficiary
5. Infrastructure Brgy. Hall, Data Board, Jetmatic Pumps, Tanod Outpost, Reading Center, Children’s park, Church, Water system & Day care center
Destroyed & Lack of Reading Materilas
The council will not be able to conduct its regular session
Brgy. Information is not feasible
Unavailabilitry of water resources
Lack of Reading Materials
Incomplete facilities in the Children’s Park
REMARKS
Brgy. Casili-on BDRRMP 2017-2019 16
CAPACITY ASSESSMENT
SYSTEM OF INTEREST EXISTING CAPACITY (COPING) REQUIRED CAPACITY
(ADAPTIVE CAPACITY) GAPS*
HUMAN ELEMENTS
1. Children 0-5 years old Male – 51 Female - 60
8 BHW’s, 3 CHT, 3 Utility & 4 Barangay Tanod 5 Utility
8 Brgy. Tanod
Available stay in midwife
2 utility
4 Barangay Tanod
2. Children 6-12 years old Male – 49 Female - 64
Same above Same above Same above
3. Children 13-17 years old Male – 32 Female - 36
Same above Same above Same above
4. 18 – 59 years old Male – 154 Female -167
Same above Same above Same above
5. 60 up Male – 33 Female - 39
Same above Same above Same above
6. CWD Male – 1 Female - 3
Same above Same above Same above
7. PWD Male – 8 Female – 5
Same above Same above Same above
NON-HUMAN ELEMENTS
1. Social Services
1.1. Education 0 pupils table, 0 Teachers Chair, 2 Teachers Table, 2 Black Boards, 0 H.E. Room, 0 Library, 0 Electric Fans
40 Pupils Table, 6 Teachers Chair, 7 Teachers Table, 6 Black Boards, 1 H.E. Room, 1 Library
40 Pupils Table, 6 Teachers Chair, 5 Teachers Table, 4 Black Boards, 1 H. E. Room, 1 Library
Brgy. Casili-on BDRRMP 2017-2019 17
& 16 Electric Fans & 16 Electric Fans
1.2. Health 1 concrete Health Center, 2 Weighing Scale, 5 sphygmomanometer, 5 Thermometer, 1 Height board, 1 Baby Bed & 1 Bed
4 weighing Scale, 2 Bed, Medicines & 3 Thermos
2 Weighing Scale, 1 Bed, Medicines & 3 Thermos
1.3. Water 24 units jetmatic pump
22 open dug well 28 units jetmatic pump
4 units jetmatic pump
2. Livelihood
o Farming o Fishing o Carpentry o Amakan Waving o Bread Making o Dapon Producers o Hog Raising o Sari – sari store
operator
95 farmers
10 fishermen
50 carpenters
3 amakan makers
5 bread makers
3 dapon producers
2 hog raisers
Trained on new technology
Avialability of tractors and other facilities
Training on organic farming
Fishing boat and gears
Capital ( puhunan )
Enhancement of Amakan technology
Materials and equipment on organic farming and organic fertilizer production
Hand tractor
Shredding Machine
Production of kawayan and bagakay
Training on sawali / bamboo making
3. Ecosystem
3.1. Forestry None None None
3.2. Water 5 Creeks
4. Institution
4.1. Government BLGU
BHW
Tanod
Lupon
DCW
Teacher
Create ordinances and resolutions on health, peace and order, and barangay sanitation.
Trainings and seminars
Fund for conducting trainings and seminars
4.2. Private Senior Citizen
Farmers Association
Fisher folk association
Women’s Organization
Livelihood program Trainings and seminars
Fund for conducting trainings and seminars
Brgy. Casili-on BDRRMP 2017-2019 18
5. Infrastructure Health Center Day Care Center Jetmatic pump Church Data Board Tanod Outpost Reading Center Children’s Park Water System
Under Construction 5 jetmatic Pump Not Resilient Incomplete Data Lack of reading facilities Incomplete recreational facilities Not potable water
Complete facilities and apparatus for the health center No CR for Male 10 jetmatic pump Resilient to any disaster Complete data Complete reading facilities Complete recreational facilities Potable water and tap stand
Construction Construction of the male CR Construction of 5 jetmatic pump Rehabilitation of the Barangay Church Complete data Rehabilitation of the Tanod Outpost Procurement of reading materials and construction of comfort Room Rehabilitation of the Children’s Park Rehabilitation of the water system
Remarks
Brgy. Casili-on BDRRMP 2017-2019 19
ADAPTATION ASSESSMENT
SYSTEM OF INTEREST ADAPTATION MEASURES PRIORITY RANK TIME FRAME
HEALTH
1. Request stay in midwife for the lying in
2. Detail more utility for the Brgy.
3. Deatil another Brgy. Tanod for safety of our Brgy.
4. Purchase weighing scale for the BHW
5. Purchase 3 sphygmomanometer
6. Purchase 3 thermometer
7. Purchase 1 height board
8. Purchase more medicine
9. Purchase 1 more bed
10. Purchase 5 thermos for the lying in
11. Purchase tables and chairs for the lying in
1
8
5
10
9
11
4
2
3
6
7
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
EDUCATION 1. Rehabilitation school buildings used as an evacuation
center 1
Throughout the year
WATER / SANITATION 1. Rehabilitation of 24 units Jetmatic pump
2. Cleaning and chlorination of water source
1
2
2016
2016
LIVELIHOOD
1. Purchase of hand tractor
2. Purchase of shredder
3. Training for cassava cake and cassava chips making
4. Training for cassava flour making
5. Training for hat waving
6. Purchase of other farm materials ( bolo, sundang )
7. Production of organic fertilizer
8. Training for bubu, panggal and timing making
2
4
5
6
7
3
1
8
2015
2015
2015
2015
2015
2015
2015
2015
Brgy. Casili-on BDRRMP 2017-2019 20
FORESTRY AND WATER
1. Tree planting
2. Crafting of ordinance for tree park and production area
of bamboo and bagakay
3. Crafting of ordinance for mandating segregation of
household waste
4. Crafting of ordinance designating of dumping site and
composting area
5. Tree planting along the river bank
6. Clearing of water ways
7. Crafting of ordinance banning the throwing / dumping of
trash in the water ways
7
3
2
4
5
6
1
May 2015
2015
April 2015
May 2015
June 2015
June 2015
April 2015
GOVERNMENT
1. 70 % DRRMF for preparation and mitigation of 30%
emergency response
2. Organized BDRRMC
3. Trained BDRRMC
4. Pre-positioning of materials and equipment’s for
disaster preparedness
5. Construction / rehabilitation of safe evacuation
center
6. Inclusion of identified recovery & rehab project in
20 % DF
7. Hazard map posting
8. Drill and simulation
9. Evacuation plan posting
10. IEC for family preparedness
11. Adaptation of environmental ordinances
12. Evacuation route plan posting
4
1
3
5
12
11
9
6
8
7
10
2
8
March 2015
Feb. 2015
Feb. 2015
March 2015
Jan. 2016
Jan. 2016
Sep. 2015
July 2015
Sep. 2015
July. 2015
Sep. 2015
March 2015
Sep. 2015
Brgy. Casili-on BDRRMP 2017-2019 21
INFRASTRUCTURE
1. Construction of Health Center
2. Construction of Male CR in the day care center
3. Rehabilitation of Brgy. Chapel
4. Completion of the data board information
5. Rehabilitation of level 2 water system
6. Procurement of reading materials and
construction of comfort room in the reading
center
7. Rehabilitation of the tanod outpost
8. Rehabilitation of children’s park
2
8
7
6
3
5
4
1
Aug. 2015
Dec. 2015
Dec. 2015-2016
Nov. 2015-2016
Dec. 2015
Feb. 2015- 2016
Jan. 2015 – 2016
Dec. 2015
Brgy. Casili-on BDRRMP 2017-2019 22
BDRRM ORGANIZATIONAL STRUCTURE OF BRGY. CASILI–ON
ALBERTO G. LOYOLA
BDRRMO
VICE CHAIRMAN
PREPAREDNESS PREVENTION / MITIGATION EMERGENCY RESPONSE RECOVERY / REHAB
SUPPLY & RELIEF
DELIA TAMBOLOGAN
MYRNA NADERA
LUZ YAKIT
RODULFO SEBALON
ESTRELLA YAKIT
GILDEGARDO APILADO
EVACUATION
ALBERTO LOYOLA
VILMA LOYOLA
DAINA MACABOCSIT
ROSALIA APILADO
DAMAGE CONTROL
RENATO MACAWILE
CLAUDIA YAKIT
MARIETTA OBILLO
FLORA YAKIT
MARGARITA TAMBOLOGAN
SECURITY / RESCUE
JUDE ODIVELAS
JAIME COLANDOG
FAUSTINO NADERA
JESSIE AYON
FRANCISCO LACTAWAN
MEDICAL
FRANCISCA JALBAY
NIEVES ABDON
EDITA BALDICANAS
JANICE QUILBIO
CRISTEE GALANGUE
JUVELYN OGARIO
AMALIA CABUGAWAN
Brgy. Casili-on BDRRMP 2017-2019 23
SECTORAL PLAN (SUPPLY/ RELIEF)
SYSTEM OF INTEREST EXISTING RESOURCES
PROJECTED NEED
GAPS ACTIVITY TO MEET THE NEEDS
SUPPORT AGENCY INGO /
NGO
SOURCE OF FUND ESTIMATED COST
Children 0 – 5y.o. - Male 51 - Female 60
Children 6 – 12y.o. - Male 49 - Female64
Children 13 – 17y.o. - Male 32 - Female 36
18 above - Male 154 - Female 167
Elderly - Male 33 - Female 39
CWD - Male 1 - Female 3
PWD - Male 8 - Female 5
30 % of 5 %
BDRRM Fund
Rice
Coffee
Sugar
Sardines
Noodles
Powdered milk
Biscuits
Medicine
Distilled water
Bath soap
Laundry soap
11 sacks rice
181 (25g) packs coffee
1 sack sugar
543 cans sardines
543 Packs Noodles
111 packs powdered milk
181 packs biscuits
Medicines
111 distilled water
181 boxes bath soap
181 bar laundry soap
Resolution for procurement
BLGU MLGU DSWD PLAN
UNICEF
30 % OF 5 % BDRRM Fund
NGO’ s
24,200 3,982
1,900 8,145
4,887
2,775
9,955
2,000 3,330
5,086
3,620
Total: 735 70,862
Brgy. Casili-on BDRRMP 2017-2019 24
SECTORAL PLAN (EVACUATION)
SYSTEM OF INTEREST EXISTING RESOURCES
PROJECTED NEED
GAPS ACTIVITY TO MEET THE NEEDS
SUPPORT AGENCY INGO /
NGO
SOURCE OF FUND ESTIMATED COST
Children 0 – 5y.o. - Male 51 - Female 60
Children 6 – 12y.o. - Male 49 - Female64
Children 13 – 17y.o. - Male 32 - Female 36
18 above - Male 154 - Female 167
Elderly - Male 33 - Female 39
CWD - Male 1 - Female 3
PWD - Male 8 - Female 5
Megaphone
Flashlight
Day Care Center
Brgy. Hall
Medicine
Health Center
Elem. School Bldg.
Generator
Evacuation Center
Megaphone
Flashlight
Batteries
Mosquito net
Thermos
Coffee
Sugar
Noodles
Match
Solar radio
Solar lamp
Medicine
1 evacuation center
3 megaphones
50 mosquito nets
28 thermos
50 doz. Coffee
50 pcs. Matches
7 solar radio
7 solar lamp
20 L. diesel
3 boxes basic Med.
BLGU Resolution
Coordinate risk assistance in
different NGO’s
BLGU LGU
PLAN PRC
UNICEF AMURT OXFAM UNDP
LGU BLGU PLAN PRC
MLGU UNICEF
P 3M P 10, 500 P 2, 100
P 840 P 6, 300 P 6, 000 P 3, 640 P 1, 250 P 1, 900 P 3, 000
P 150 P 4, 200 P 4, 200
P 800 P 2, 000
Total: 735 P 3, 046 , 880.00
Brgy. Casili-on BDRRMP 2017-2019 25
SECTORAL PLAN (DAMAGE CONTROL)
SYSTEM OF INTEREST EXISTING RESOURCES
PROJECTED NEED
GAPS ACTIVITY TO MEET THE NEEDS
SUPPORT AGENCY INGO /
NGO
SOURCE OF FUND ESTIMATED COST
Children 0 – 5y.o. - Male 51 - Female 60
Children 6 – 12y.o. - Male 49 - Female64
Children 13 – 17y.o. - Male 32 - Female 36
18 above - Male 154 - Female 167
Elderly - Male 33 - Female 39
CWD - Male 1 - Female 3
PWD - Male 8 - Female 5
Jetmatic Pump
Day Care Center
Tanod Outpost
Reading Center
Children’s Park
Water System
Construction of jetmatic pumps
Chlorination of existing water sources
Construction of Male and Female CR
Rehab. Of Tanod Outpost and construction of CR
Complete reading materials and other facilities
Complete recreational facilities
Potable water with tap stand
5 jetmatic Pump
Separate comfort room for male and female
Comfort room for male and female
Complete reading materials and other facilities
Complete recreational facilities
Rehab of water system
Through resolution to
concerned agencies.
“ “ “ “ “ “ “ “ “
KALAHI
MLGU
AMURT
MLGU
BLGU
PLAN
KAL;AHI
KALAHI
MLGU
BRGY. GEN. FUND
PLAN
KAL;AHI
P 50,000
P 100,000
P 100,000
P 20, 000
P 60,000
P 1.5 M
Brgy. Casili-on BDRRMP 2017-2019 26
SECTORAL PLAN (MEDICAL)
SYSTEM OF INTEREST EXISTING RESOURCES
PROJECTED NEED
GAPS ACTIVITY TO MEET THE NEEDS
SUPPORT AGENCY INGO / NGO
SOURCE OF FUND ESTIMATED COST
Children 0 – 5y.o. - Male 51 - Female 60
Children 6 – 12y.o. - Male 49 - Female64
Children 13 – 17y.o. - Male 32 - Female 36
18 above - Male 154 - Female 167
Elderly - Male 33 - Female 39
CWD - Male 1 - Female 3
PWD - Male 8 - Female 5
8 BHW
Paracetamol
Vitamins
Amoxicillin
Carbocistine
Thermometer
Band Aid
Betadine
Cotton
Bandage
Alcohol
Gauze Bandage
Toothbrush
Sanitary napkin
Pills
Mefenamic
Metoprolol
Agua oxinada
Losartan
Neobloc
Clothes
Rosary
Mana pack
Solar
Wheel chair
2 boxes
5 boxes
5 boxes
10 boxes
2 pc.
1 box
2 pcs.
3 pcs.
2 pcs.
3 bottles.
2 packs
1 doz.
3 packs
50 boxes
10 boxes
10 boxes
2 bottles
2 boxes
2 boxes
1 doz.
12 pcs.
2 boxes
2 pcs.
1 pc.
Brgy. Appropriation
PLAN OXFAM RED CROSS CARITAS
LGU PLAN CHRISTIAN AID BLGU 5 %
P 400 P 300 P 120 P 600 P 200 P 50 P 100 P 24 P 150 P 124 P 60 P 90 P 90 P 120 P 2500 P 120 P 160 P 160 P 180 P 240 P 600
Total: 735 P
Brgy. Casili-on BDRRMP 2017-2019 27
SECTORAL PLAN (SECURITY RESCUE)
SYSTEM OF INTEREST EXISTING RESOURCES
PROJECTED NEED
GAPS ACTIVITY TO MEET THE NEEDS
SUPPORT AGENCY INGO /
NGO
SOURCE OF FUND ESTIMATED COST
Children 0 – 5y.o. - Male 51 - Female 60
Children 6 – 12y.o. - Male 49 - Female64
Children 13 – 17y.o. - Male 32 - Female 36
18 above - Male 154 - Female 167
Elderly - Male 33 - Female 39
CWD - Male 1 - Female 3
PWD - Male 8 - Female 5
6 Tanod’s with Honorarium of P 400/ mos.
Training
ID
Uniform
Batuta
Solar flashlight
Whistlle
Raincoat
Boots
Wall clock
Radio gram
Motorcycle
Safety helmet
Chainsaw
Nylon rope
Hand cup
Stretchers
Nescafe
Sugar
Thermos
Jacket
Training
6 pcs. ID
6 pairs uniform
6 pcs. Batuta
6 pcs. Flashlight
6 pcs. Whistle
6 pcs. Raincoat
6 pairs boots
1 pc. Wall clock
2 pairs radio gram
1 motorcycle
6 pcs. Helmet
1 pc. Chainsaw
50m. rope
1 hand cup
1 stretcher
2 doz. Nescafe
1 kl. Sugar
1 thermos
6 pcs. jacket
Resolution to the concerned agency Coordinate to different NGO’s
LGU UNDP MLGU PLAN CRS OXFAM AMURT RED CROSS HABITAT UN OCHA UNICEF DILG BLGU PNP WFP ZUILEG UNHCR MSF
LGU UNDP MLGU PLAN CRS OXFAM AMURT RED CROSS HABITAT UN OCHA UNICEF DILG BLGU PNP WFP ZUILEG UNHCR MSF
- P 360 P 1,500 P 600 P 900 P 210 P 2,400 P 1,200 P 150 P 4,000 P 36,000 P 3,00 P 20, 000 P 400 P 600 P 1,500 P 60 P 40 P 120 P 1,200
Total: 735 P 74,240
Brgy. Casili-on BDRRMP 2017-2019 28
EVACUATION PLAN
MGA LUGAR NA LILIKASAN AT KAKAHAYAN NITO EVACUATION CENTER CAPACITY SINU - SINO
Casili – on Elem. School : Grade VI Bldg.
4 families (15 persons )
F. Caandoy Family; A. Nuevo Family; E. Macasusi Family; Y. Sebalon Family
Grade IV Bldg. 10 families (36 persons ) R. Ogario Family, Sr.; R. Ogario Family, Jr.; G. Nuevo family; E. Nuevo Family; J. Ayon Family; T. Pagaspas Family; C. Jalbay Family; Carlito Jalbay Family; D. Jalbay Family
Grade V Bldg. 2 families (9 persons ) M. Abdon Family; Cabugawan Family
Pre – Elem. Bldg. 9 families ( 48 persons )
A.Colandog Family; A. Elogario Family; B. Clemente Family; R. Colandog Family; Abeo Family; Centillas Family; Robert Family; Rowel Family; Lumactod Family
Principal’s Office 5 families ( 22 persons ) Marlon Edano Family; Mamerto Edano Family; R. Candido Family; Marcelino Edano Family; Elacion Abutan Family
Day Care Center 6 Families (21 persons ) Dionisio Abdon Family; Jumar Abdon Family; Leonilo Cayosa Family; Allan Ogana Family; Zaida Family; Michael Abdon Family
Barangay Hall 2 Families ( 8 persons ) Loyola Family; Macawile Family
SALAS’s Residence 5 families (16 persons ) Macawile family; Gandia Family; Colandog Family; Ogario Family; Salas Family
JAPSON Bldg. 6 families ( 25 persona ) Lumen Family; Ida Family; Abejo Family; Yodico Family; Yodico Family; Bade Family
APILADO’s Residence 2 Families ( 9 persons ) Apilado Family; Engr. Apilado Family
LACANDAZO’s Residence 2 families ( 14 persons ) Bautista Family; Lacandazo Family
OBILLO’s Residence 5 families ( 18 persons ) Gilber Family 1; Gilber Family 2; Macale Family; Obillo Family; Oliverio Family; Caberio Family
OGKING’s Residdence 2 families ( 10 persons )
MYRNA NADERA’s Residence 4 families (19 persons ) Quilbio Family; Campo Family; Olivar Family; Nadera Family
ROBERT TAMBOLOGAN’s Residence 4 families ( 19 persons ) Poncion; Cebricus; Baldicanas ; tambologan
MILAGROSA NADERA’s Residence 8 families ( 25 persons ) Odivelas Family 1; Odivelas Family 2; Delfin; Randy; Pablo
YAKIT Sr. Residence 8 families ( 38 persons ) F. Nadera; F Yakit; J. Yakit’ E. Yakit; M. Colandog; M. Gagarino; M. Arcilla
BALDICANAS Residence 7 families ( 28 persons ) A.Ogsila Sr.; Ogsila Jr,; Yaranon Family; R. Yaranon; Dacutan; J. Baldicanas; E. Baldicanas Family
QUILBIO Residence 4 families (21 persons ) V. Odivelas; Raagas; Yarzo; Quilbio
C. YAKIT Residence 4 families (19 persons ) Suico Family; Arca Family; Yakit; Partolan Family; C. Yakit Family
Brgy. Casili-on BDRRMP 2017-2019 29
BDRRM Plan
4 THEMATIC AREAS PROJECTS AND ACTIVITIES UNDER EACH AREA
PREVENTION AND MITIGATION
o Creation of ordinance on tree planting o Creation of ordinance on the cleanliness of the Barangay o Posting of the DRRM Plan o Construction of evacuation center o Produce billboards or signage’s of the safe route to safe places o Creation of ordinance on waste segregation o Adoption of the memorandum circular of the DPWH on the exact distance of the national road to the
houses
DISASTER PREPAREDNESS
o Orientation of the family on the safe evacuation center o Creation of ordinance for producing the early warning system o Drill simulation o Produce billboards or signage’s of the safe route to safe places o Prepare / bring banig, kumot, clothing, and medicines o Family savings for emergency o Bring your own food to the evacuation center
EMERGENCY RESPONSE
o Cleaning of the community o Repair of houses and other destroyed facilities o Relief operation o Free medical consultation o Post traumatic activities o Livelihood training o Cleaning and chlorination of the waterways o DRRM Planning
RECOVERY AND REHABILITATION
o Creation of ordinance on the design construction of resilient houses o Sustainable livelihood program o Rehabilitation of public infrastructures o Livelihood support training’s o Construction of standard drainage
Brgy. Casili-on BDRRMP 2017-2019 30