14
Camp Management Background of CM Project Started in Sierra Leone in late 2002 (as a working group first) Response to inadequate quality of protection and assistance particularly in IDP camps Many camps were poorly managed by organisations with little funding and low expertise Documented cases of humanitarian aid workers sexually abusing and coercing people in the camps

Background of CM Project

  • Upload
    traci

  • View
    28

  • Download
    2

Embed Size (px)

DESCRIPTION

Background of CM Project. Started in Sierra Leone in late 2002 (as a working group first) Response to inadequate quality of protection and assistance particularly in IDP camps Many camps were poorly managed by organisations with little funding and low expertise - PowerPoint PPT Presentation

Citation preview

Page 1: Background of CM Project

Camp Management

Background of CM Project• Started in Sierra Leone in late 2002 (as a working

group first)

• Response to inadequate quality of protection and assistance particularly in IDP camps

• Many camps were poorly managed by organisations with little funding and low expertise

• Documented cases of humanitarian aid workers sexually abusing and coercing people in the camps

Page 2: Background of CM Project

Camp Management

Background of CM Project• In 2003, an Inter-agency Toolkit Editorial

Group was established

• Producing the second edition of the Camp Management Toolkit in 2004

• Since then, the CM Toolkit has been ordered/downloaded by over hundred organisations and used in more than a dozen of conflict or natural disaster situations

Page 3: Background of CM Project

Camp Management

Background of CM ProjectToday’s members

• NRC (Coordinator)• UNHCR• OCHA• DRC• IRC• IOM (joined recently)

Page 4: Background of CM Project

Camp Management

The Camp Management Toolkit

• Introduction to CM using a holistic approach

• Provides basic information on most aspects of camp operations and cross-cutting issues

• Complements existing sector guidelines and standards

• Defines roles and responsibilities of camp management agency

• Provides essential readings and references as well as tools, such as forms and matrices

Page 5: Background of CM Project

Camp Management

The Aim of the CM Toolkit

To enhance standards in camp management through mapping the roles and responsibilities of camp management agencies, reviewing lessons learned, and identifying good practice

Page 6: Background of CM Project

Camp Management

The new logo 2008

Page 7: Background of CM Project

Camp Management

The new layout 2008

Page 8: Background of CM Project

Camp Management

Page 9: Background of CM Project

Camp Management

Page 10: Background of CM Project

Camp Management

Structure of the new CM Toolkit18 Chapters, divided into 4 sections

• Introduction

• Core camp management

tasks

• A safe environment

• Camp services

Page 11: Background of CM Project

Camp Management

Structure of the new chapters

• Introduction

• Key messages

• Key issues

• Tools

• Reading and References

Page 12: Background of CM Project

Camp Management

The new CM Toolkit is still a ‘living’ document

Please provide feedback to this address:

[email protected]

Page 13: Background of CM Project

Camp Management

Practical information• Electronic version available on www.nrc.no/camp/

• Will be translated into French and Arabic (to follow in 2008)

• Printed hardcopy will also be provided through the CCCM Cluster

Page 14: Background of CM Project

Camp Management

Frequently asked questions

• Is the CM Project/Toolkit a CCCM cluster product/project?

• Is it made for IDP situations only?

• And?