(C) 2004 by IDS Scheer AG. All rights reserved.
ARISTM IDSTM YTM
© IDS Scheer AG www.ids-scheer.com
ARIS & SAP Solution ManagerARIS & SAP Solution Manager
How to…How to…
Britta HiltBritta Hilt
September 2004September 2004
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com2
Organizational PreconditionsOrganizational Preconditions
AgendaAgenda
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
How do ARIS and SolMan work together?How do ARIS and SolMan work together?
Procedure: ARIS and SolMan IntegrationProcedure: ARIS and SolMan Integration
Database Landscape & Important Tips in HandlingDatabase Landscape & Important Tips in Handling
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com3
Organizational PreconditionsOrganizational Preconditions
AgendaAgenda
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
How do ARIS and SolMan work together?How do ARIS and SolMan work together?
Procedure: ARIS and SolMan IntegrationProcedure: ARIS and SolMan Integration
Database Landscape & Important Tips in HandlingDatabase Landscape & Important Tips in Handling
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com4
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
Process oriented implementation of mySAP Business Suite using SAP NetWeaver
Company processes are based on preconfigured SAP content (SolMan)
i.e. 300 Business Processes for CRM IDS Best Practice models
Company process specifications are a guidance through the entire implementation process: business
blueprint, configuration, testing, training, going live – all cross- component
Reported out of ARIS possible for training requirements, end user documentation
SolMan as platform for the ongoing operation, i.e. monitoring, help desk, …
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com5
Organizational PreconditionsOrganizational Preconditions
AgendaAgenda
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
How do ARIS and SolMan work together?How do ARIS and SolMan work together?
Procedure: ARIS and SolMan IntegrationProcedure: ARIS and SolMan Integration
Database Landscape & Important Tips in HandlingDatabase Landscape & Important Tips in Handling
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com6
Organizational preconditionsOrganizational preconditions
1 responsible role for SolMan Which structure is required to support the implementation
project the best way? Based on that, the modelling will be structured in ARIS.
Which procedure will be followed as soon as all relevant information is transferred from ARIS into SolMan?
User management / access rights / ..? Which documents should be integrated in SolMan, which only
in ARIS? Responsibility that all IMG objects and transactions are
allocated in SolMan reference structure; is allocation to BC sets also required?...
Should non-SAP transactions be available in SolMan? (“entire picture” of implementation in SolMan; holistic approach for testing) If yes, non-SAP components must be listed in system landscape.
…
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com7
Organizational preconditionsOrganizational preconditions
1 responsible role for ARIS Customizing (method filter / semantic checks / …) User management / access rights / … Modeling conventions
Which information is represented in which way?(models / objects / symbols / attributes / relationships)
Which checks must be executed by each modeler before releasing their models?
Model templates & settings ARIS is the leading system for process specification
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com8
Organizational PreconditionsOrganizational Preconditions
AgendaAgenda
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
How do ARIS and SolMan work together?How do ARIS and SolMan work together?
Procedure: ARIS and SolMan IntegrationProcedure: ARIS and SolMan Integration
Database Landscape & Important Tips in HandlingDatabase Landscape & Important Tips in Handling
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com9
How do ARIS & SolMan work together?How do ARIS & SolMan work together?
In ARIS Customer’s processes are described independent of a
software solution (high level) Customer’s processes are
described in detail mapped to “SAP world”
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com10
How do ARIS & SolMan work together?How do ARIS & SolMan work together?
Result Customer’s process models with all relevant process
information, SAP-process steps / manual activities / non-SAP process steps
(if relevant) For each SAP process step, a detailed description can be given
(ARIS report can generate end user documentation & training requirements)
For each process step, the involved role is defined (relevant for training requirements)
For SAP process step, the SAP transaction can allocated
IT landscape (i.e. overview of interfaces), organizational structure, data (if required), …
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com11
How do ARIS & SolMan work together?How do ARIS & SolMan work together?
In SolMan This structure is transferred into project where
further specifications are documented Jump to IMG / transactions / SAP help is realized
Basis for configuration, testing, training, going live and ongoing support
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com12
Organizational PreconditionsOrganizational Preconditions
AgendaAgenda
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
How do ARIS and SolMan work together?How do ARIS and SolMan work together?
Procedure: ARIS and SolMan IntegrationProcedure: ARIS and SolMan Integration
Database Landscape & Important Tips in HandlingDatabase Landscape & Important Tips in Handling
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com13
ProcedureProcedure
ConventionsConventions
OverviewOverview
Step 1 – Configure ARIS Server & ClientsStep 1 – Configure ARIS Server & Clients
Step 2 – Prepare customer databaseStep 2 – Prepare customer database
Step 3 – Set up SolMan project in SolMan & ARISStep 3 – Set up SolMan project in SolMan & ARIS
Step 4 – Document level 1 business modelStep 4 – Document level 1 business model
Step 5 – Structure customer databaseStep 5 – Structure customer database
Step 6 – Document level 2 overview modelStep 6 – Document level 2 overview model
Step 7 – Document level 3 process modelStep 7 – Document level 3 process model
Step 8 – Quality checkStep 8 – Quality check
Step 9 – Generate SAP Process Step List via ARIS ReportStep 9 – Generate SAP Process Step List via ARIS Report
Step 10 – Synchronise ARIS SolManStep 10 – Synchronise ARIS SolMan
Step 11 – Add required information in SolManStep 11 – Add required information in SolMan
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com14
ProcedureProcedure
ConventionsConventions
Overview Overview
Step 1 – Configure ARIS Server & ClientsStep 1 – Configure ARIS Server & Clients
Step 2 – Prepare customer databaseStep 2 – Prepare customer database
Step 3 – Set up SolMan project in SolMan & ARISStep 3 – Set up SolMan project in SolMan & ARIS
Step 4 – Document level 1 business modelStep 4 – Document level 1 business model
Step 5 – Structure customer databaseStep 5 – Structure customer database
Step 6 – Document level 2 overview modelStep 6 – Document level 2 overview model
Step 7 – Document level 3 process modelStep 7 – Document level 3 process model
Step 8 – Quality checkStep 8 – Quality check
Step 9 – Generate SAP Process Step List via ARIS ReportStep 9 – Generate SAP Process Step List via ARIS Report
Step 10 – Synchronise ARIS SolManStep 10 – Synchronise ARIS SolMan
Step 11 – Add required information in SolManStep 11 – Add required information in SolMan
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com15
ReferenceModel Structure
ReferenceModel Structure
BestPractice
BestPractice
Step AStep AStep AStep ACompanymodels
Companymodels
SAP SolManStructure
SAP SolManStructure=
OverviewOverview
Step BStep BStep BStep B
L1L1
L3L3
L2L2
SAP APOCo
mpo
ne
nts
Pro
cess
ste
ps
SAP APOCo
mpo
ne
nts
Pro
cess
ste
ps
SAP APOCo
mpo
ne
nts
Pro
cess
ste
ps
Create Forecasts forecast
SNP:InteractivePlanning
Product View
Create Forecasts forecast
SNP:InteractivePlanning
Product View
Create Forecasts forecast
SNP:InteractivePlanning
Product View
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com16
11
22
33
44
55
66
77
88
99
1010
1111 1111
OverviewOverview
Step 1 – Configure ARIS Server & ClientsStep 2 – Prepare customer databaseStep 3 – Set up SolMan project in SolMan & ARISStep 4 – Document level 1 business modelStep 5 – Structure customer databaseStep 6 – Document level 2 overview model
Step 7 – Document level 3 process model Step 8 – Quality check Step 9 – Generate SAP Process Step List via
ARIS Report Step 10 – Synchronise ARIS -> SolMan Step 11 – Add required information in SolMan
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com17
ProcedureProcedure
Conventions Conventions
OverviewOverview
Step 1 – Configure ARIS Server & ClientsStep 1 – Configure ARIS Server & Clients
Step 2 – Prepare customer databaseStep 2 – Prepare customer database
Step 3 – Set up SolMan project in SolMan & ARISStep 3 – Set up SolMan project in SolMan & ARIS
Step 4 – Document level 1 business modelStep 4 – Document level 1 business model
Step 5 – Structure customer databaseStep 5 – Structure customer database
Step 6 – Document level 2 overview modelStep 6 – Document level 2 overview model
Step 7 – Document level 3 process modelStep 7 – Document level 3 process model
Step 8 – Quality checkStep 8 – Quality check
Step 9 – Generate SAP Process Step List via ARIS ReportStep 9 – Generate SAP Process Step List via ARIS Report
Step 10 – Synchronise ARIS SolManStep 10 – Synchronise ARIS SolMan
Step 11 – Add required information in SolManStep 11 – Add required information in SolMan
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com18
Conventions - GeneralConventions - General
Folder structure It is important for easy orientation that Reference Models
(SAP / IDS) and Company Models are strictly saved in 2 individual folders!
All models created by ARIS user must be saved in the correct folder.
Reuse of reference models Company models use Reference Structure (SAP / IDS) objects
(occurrence copy) and have new objects. SAP SolMan object is copied and pasted from SAP SolMan
folder structure in company model Company models
Added with relevant information, i.e. per process step: role, textual description, transaction code (if relevant)
Are transferred into SolMan
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com19
Level 0 SolMan root model:
no attributes required Project object
attributes SAP function type: project Assigned to level 1
scenario model Level 1
Model attribute SAP model type: project Released on / by / Release
Objects Relevant for SAP
Object attributes SAP function type: scenario Colour: white
Not relevant for SAP No object attribute required Colour: green
Assigned to level 2 scenario models No occurrence copiesNo occurrence copies within models
Responsible: ARIS AdminResponsible: ARIS AdminResponsible: ARIS AdminResponsible: ARIS Admin
Conventions - Level 0 + 1Conventions - Level 0 + 1
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com20
Responsible: ARIS AdminResponsible: ARIS AdminResponsible: ARIS AdminResponsible: ARIS Admin
Conventions - Level 2Conventions - Level 2
Level 2 Model attribute
SAP model type: scenario Released on / by / Release
Objects Relevant for SAP
Object attributesSAP function type: process
Colour: white Link to Business Blue Prints
(external files) Not relevant for SAP
No object attribute required Colour: green
Assigned to level 3process models
NO OCCURRENCE COPIESNO OCCURRENCE COPIES within models(except process interface symbols on level 3)
Assigned to level 3 process models
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com21
Conventions - Level 3Conventions - Level 3
Level 3 Procedure to get model
Copy eEPC template (in libraries)and paste it into correct folder.Legend & model nameplacement available
Assign level 2 object toexisting level 3 eEPC.
Copy level 2 object name(highlight object, F2, copy)
Paste level 2 object name into level 3 model name attribute(open level 3 eEPC, F8, double-click in model name attribute, paste, ensure that no line break in the model attribute name.)
Delete model If model needs to be deleted, rename it in
DEL_DEL_Admin will delete it.
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com22
Conventions - Level 3Conventions - Level 3
Level 3 Procedure to get model content
Copy & paste from Best Practiceor SAP SolMan reference models(symbol: green or white)
Create new functions if SAP relevant: white symbol if not supported by SAP: green
1 function equals moreor less a TA
Function attribute SAP Component must be maintained accordingto text in library model
Relevant objects are
Layout Display print pages in model
(view – options – model options (global)) Print scaling >= 65 % (recommended) Not larger than 2 DIN A 4 (portrait)
horizontal: 1 page definitely ( intranet publishing) vertical: 2 pages max recommended
event function SAPfunction
persontype
processinterface
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com23
Pink
Green
White
Yellow
White
Blue
White
White
White
EPC Process Symbol Conventions - Level 3EPC Process Symbol Conventions - Level 3Symbol Name / Description Colour
Event
Process step(non-SAP)
Process stepSAP function
Organizational responsibility
Preceding process /Following process
Application system(SAP or non-SAP)
Data input / output(within SAP system)
Data input / output(outside of SAP)
Exclusiv Or
And / Or
And
Start of process / End of processPrior to decision merge ANDANDafter a decision split
Must be linked to all functions: role who isexecuting it. Copy from library model
Exactly 1 of the paths is followed
At least 1 of the paths is followed
All paths are followed
Must be linked to all non-manual functionsCopy from library model!
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com24
Level 3 - Additional Info for each Process Step Who is executing the process step? (Role) Which application system is supporting the process step?
Which data is required as input or output?
Conventions - Level 3Conventions - Level 3
Confirmdocument
receiptSA54 Accountant
Checkcompletenessof remittance
SAP R/3Enterprise
Accountant
Printmaterialdocument
MaterialDocument
MaterialDocument
Data withinData withinSAP systemSAP system
Data outside ofData outside ofSAP systemSAP system
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com25
Conventions - Level 3Conventions - Level 3
Level 3 Process models
Model attribute SAP model type: process
(for Process Step List eEPC)DO NOT MAINTAIN IF REPORTDO NOT MAINTAIN IF REPORTFOR LIST EEPC IS USED!!FOR LIST EEPC IS USED!!
Released on / by / Release All SAP functions, attribute
SAP function type = process stepSAP function type = process step(or attribute Ready for synchronisationReady for synchronisation, if report forProcess Step List eEPC is used later on)
No occurences copies in customer models for SAP functions Libraries
Move all roles into organisation folder and paste them into“org chart”
Move all data input / output into data folder and paste them into “data model”
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com26
Conventions - Level 3Conventions - Level 3
Level 3 Delete / move models
Find all models with DEL_and delete them
Move models into folderon request
Allocate reused objects intocorrect folder
Find all SAP SolMan objects &Best practice model objects used in the company models
Move object definition (& assigned FAD) into corresponding company folder(use report Object_AssignedModel_Path.rso, ObjectOccInModel_Path.rsm (with eval filter for SAP functions))
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com27
ProcedureProcedure
ConventionsConventions
OverviewOverview
Step 1 – Configure ARIS Server & Clients Step 1 – Configure ARIS Server & Clients
Step 2 – Prepare customer database Step 2 – Prepare customer database
Step 3 – Set up SolMan project in SolMan & ARIS Step 3 – Set up SolMan project in SolMan & ARIS
Step 4 – Document level 1 business model Step 4 – Document level 1 business model
Step 5 – Structure customer database Step 5 – Structure customer database
Step 6 – Document level 2 overview model Step 6 – Document level 2 overview model
Step 7 – Document level 3 process model Step 7 – Document level 3 process model
Step 8 – Quality check Step 8 – Quality check
Step 9 – Generate SAP Process Step List via ARIS Report Step 9 – Generate SAP Process Step List via ARIS Report
Step 10 – Synchronise ARIS SolMan Step 10 – Synchronise ARIS SolMan
Step 11 – Add required information in SolMan Step 11 – Add required information in SolMan
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com28
Step 1 – Configure ARIS Server & ClientsStep 1 – Configure ARIS Server & Clients
Create method filter / template(Method filter must have value-chain symbols in eEPC)
Define client settings and ensure that they are applied to all client PCs.
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com29
Step 2 – Prepare customer databaseStep 2 – Prepare customer database
Reference models SAP SolMan models
Run import from SolMan Repository to get all SolMan objects & models WITHOUT Project SolMan reference
Merge all relevant IDS Best Practice models into database Folder structure: Processes / Libraries / IDS Best Practice
models / SAP SolMan models
Library models eEPC template with legend for level 2 & 3 and with correct model
attributes SAP components (text according to scenario report run over SAP
SolMan scenario DB) organisational chart for roles data model for data objects
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com30
Create customer project in SolMan Create a new project in SolMan / Administration
Name & Title Language = ARIS DB language
Select all components & versions according to scope Initial transfer from SolMan project into ARIS
In ARIS, synchronise in Processes folder Select SolMan project & synchronize Create model and copy project object in the new access model
(otherwise, reorg would delete project object) Rename empty eEPC assigned to project object in
Level 1 Business Model
Step 3 – Set up SolMan project in SolMan & ARISStep 3 – Set up SolMan project in SolMan & ARIS
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com31
Step 4 – Document level 1 business modelStep 4 – Document level 1 business model
Empty Level 1 Business Model = eEPC with Value chain symbols
Create level 1 business model together with customer
Set in scope / out of scope of SAP implementation project according to colour code
Maintain legend
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com32
Step 5 – Structure customer databaseStep 5 – Structure customer database
Create folder structure according to level 1 business model
Assign level 2 model for each level 1 element in relevant folder; models have no content, only legend
DO NOT have the same value chain element occur more than once in company models!(No occurrence copies)(No occurrence copies)
Integrate all required access objects in access model, i.e. organisation, data, … & assign to library models
User / user groups Read / Write access, no delete access Method filter / functional privileges
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com33
Step 6 – Document level 2 overview modelStep 6 – Document level 2 overview model
Maintain content for level 2 overview model together with customer in assigned level 2 model
Set in scope / out of scope of SAP implementation project according to colour code
DO NOT have the same value chain element occur more than once in company models!(No occurrence copies)(No occurrence copies)
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com34
Step 7 – Document level 3 process modelStep 7 – Document level 3 process model
Use eEPC template and assign, as described in conventions above
Reuse SAP / IDS Best Practice reference models and / or create new SAP / non-SAP functions
Copy / paste relevant part of reference objects in level 3 eEPC Allocate person type for functions which require user interaction Define data input / output, if required If required: For new SAP function, assign function with FAD and
model screen(s) Maintain FAD model attribute: SAP model type: process stepSAP model type: process step In screen, maintain transactiontransaction attribute & SAP componentSAP component
Use level 2 overview objects as interfaces in level 3 process models; ensure that end event = start event
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com35
Step 8 – Check qualityStep 8 – Check quality
Level 1 & 2: colour coding; Model / object attributes Level 3
Assignment level 2 object name = level 3 model name Semantic / logical flow / all required information allocated
(i.e. roles, ..) Process interfaces from level 2 / start & end event / … Libraries updated (objects moved & pasted into library models) Model / object attributes maintained (SAP component according
to template text, ready for synchronisation, …) Used objects in company folder
Run report on used models which outputs all objects and the path where they are saved in
Move object from SolMan / IDS Best Practice folder into correct company folder
Move assigned FAD with screen into correct company folder SAP ID only existing once in relevant models
(run report to check)
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com36
Step 9 – Transfer models into SAP Production databaseStep 9 – Transfer models into SAP Production database
Define settings in Merge, that assignment level is 4 level 1 level 2 level 3 FADs)
Select project model (access model) & merge intoSAP Production Database
ReasonIn the next step, for each relevant level 3 eEPC, an additional list eEPC is generated. This should not be done in the “real” database which is also the basis for web publishing.
Please noteAll required attributesAll required attributes (SAP, release) must be maintainedmust be maintained before this merge is done. No maintenance of attributes in SAP Production DB! (= Inconsistency among databases!)
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com37
Report is started on project (or scenario / process) object Report drills down: function eEPC (n times) until it finds an eEPC
which does not have SAP model type maintained Column eEPCs are not taken into consideration In lowest eEPCs, all functions are selected which are ticked with:
Ready for synchronisation = yes Report assigns new eEPC per process object
Name: Z_[name of process object]Z_[name of process object] All process steps which are ready for synchronization and do not yet
have an SAP ID are copied in new eEPC If process step already occurs somewhere in a process step list, it is not
copied anymore decision is taken in which Process Step List the process step should occur SAP process steps only occur onceonce in reference structure
In new eEPC, model attribute SAP model typeSAP model type is maintained with ProcessProcess All objects copied in Process Step list eEPC are maintained with
SAP function type: Process stepSAP function type: Process step andSAP Component: R3 EnterpriseSAP Component: R3 Enterprise(only possible if only 1 SAP Component in scope!)(only possible if only 1 SAP Component in scope!)
Step 10 – Generate SAP Process Step List via ARIS ReportStep 10 – Generate SAP Process Step List via ARIS Report
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com38
Step 10 – Generate SAP Process Step List via ARIS ReportStep 10 – Generate SAP Process Step List via ARIS Report
Result in ARIS Each level 2 SAP process is assigned to 2 models: level 3 process and
SAP Process Step List eEPC Process Step List eEPC maintained with model attribute: Process Each relevant process step occurs onceonce (!) in the entire reference
structureThus, there are Process Step List eEPCs which do not have all relevant process step for their business process they relate to.
For each relevant process step, attributes Process stepProcess step andSAP componentSAP component maintained (if only R/3if only R/3!!)
Please note Instead of using additional SAP Process Step List eEPCs, it could also be
possible to check if SAP relevant functions are used more than once in the entire synchronization structure
If they are not, then, the generation of List eEPCs is not required In order to check, run analysis “model comparism”
on ALL relevant models
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com39
L2-A1 L2-A2 L2-A3
oo
mr
= Ready for synchronization
M = manual process step
O = occurrence copy of the same process step
Z = new SAP process step (customer-specific)
.
p .
z .
z5
.
.
o
pr
z
L2-B1 L2-B2
Model name: z_...Model attribute for SAP model type: process
Result in ARIS
L1-A L1-B L1-C
Step 10 – Generate SAP Process Step List via ARIS ReportStep 10 – Generate SAP Process Step List via ARIS Report
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com40
o
m
p .
.
o
p
Model name: z_...Model attribute for SAP model type: process
Result in SolMan after Synchronisation
Step 11 – Synchronise ARIS -> SolManStep 11 – Synchronise ARIS -> SolMan
Open DB with Entire Method On project object, synchronise ARIS models
Assigned level 1 business model eEPC And their assigned level 2 overview model eEPCs And their assigned level 3 SAP process step list eEPCs
= Ready for synchronization
M = manual process step
O = occurrence copy of the same process step
Z = new SAP process step (customer-specific)
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com41
Step 12 – Add required information in SolManStep 12 – Add required information in SolMan
Blue print details, test cases, …
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com42
Organizational PreconditionsOrganizational Preconditions
AgendaAgenda
Benefits of ARIS and SolMan IntegrationBenefits of ARIS and SolMan Integration
How do ARIS and SolMan work together?How do ARIS and SolMan work together?
Procedure: ARIS and SolMan IntegrationProcedure: ARIS and SolMan Integration
Database Landscape & Important Tips in HandlingDatabase Landscape & Important Tips in Handling
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com43
Development DB
Production DB Models are signed off
All attributes are maintained (SAP & Release)
Generate list eEPC
Merge
Delete Z_eEPCs Export with
evaluation filter
Synchronise
Database landscapeDatabase landscape
© IDS Scheer AG ARIS Process Platform www.ids-scheer.com44
Important tips in handlingImportant tips in handling
NEVERNEVER EVER use a so-called Definition copyDefinition copy in ARIS!Reason:If SAP relevant objects are duplicated via definition copy, the attribute SAP IDSAP ID is also copied in the new ARIS object.Then, synchronization is not possible anymore because SAP ID must be uniqueunique.
Ongoing synchronizationsBefore 2nd – nth update, run checks
SAP-ID-Report: is SAP ID unique
Delta-Report: is there a process step occurring in a Process Step List eEPC which is not used in any company process eEPC?If yes, only deactivate in Process Step List eEPC; do not delete it!