1
www.ariosh.com/projects Ariosh Proprietary Information PROJECT EXPERIENCE JV Platforms Major Structural Repair Project Mobil Producing Nigeria Unlimited (MPNU) Ariosh performed necessary laser surveying and other activities in a step-wise process to establish a scanned model of each of the platform with emphasis on boat landing details and jacket geometry above water where new boat landings are to be installed. Post-processing of the raw data, and information gathered from the laser scan was then used in producing the Jacket leg 3-D model, upon which the model of the designed boat landing structure will then be fit with clamps. Laser Scanning Ariosh performed full Laser Scanning of 22 nos Platforms under the scope of work alongside the boat landing structure above water Fit Assurance Ariosh developed a comprehensive 3-D PDMS Model of the scanned Jacket legs on which the boat landing structures are to be attached Developed 3-D Model of proposed boat landings & Stabbing guides Generated modification drawings for the stabbing guide fabrication for seamless installation of the Boat landing structures to the 24 platforms. Design of Surfer Ladder to be connected on RQ2 Jacket leg Generation of 2D drawings for Boat Landing from PDMS Services Detailed Engineering Design, Facilities Oso RC, RQ1, RQ2, GD, GE, Mfem DA, Unam CA, Idoho BA and BQ, Etim LB, Inim IA, IB, Enang JA, JB, JC, JD, Utue KA, Usari FA, Adua NA, Ekpe OA, Asabo MB, Utue KB). Safety Record Zero LTI, Zero MTI so far Status Ongoing Location Nigeria West Africa

arioscomprojects - Ariosh | Engineering, Procurement

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: arioscomprojects - Ariosh | Engineering, Procurement

www.ariosh.com/projects

Ariosh Proprietary Information

PROJECT EXPERIENCE

JV Platforms Major Structural Repair ProjectMobil Producing Nigeria Unlimited (MPNU)

Ariosh performed necessary laser surveying and other activities in a step-wise process to establish a scanned model of each of the platform with emphasis on boat landing details and jacket geometry above water where new boat landings are to be installed. Post-processing of the raw data, and information gathered from the laser scan was then used in producing the Jacket leg 3-D model, upon which the model of the designed boat landing structure will then be fit with clamps.

Laser Scanning• Ariosh performed full Laser Scanning of 22 nos Platforms under the scope

of work alongside the boat landing structure above water

Fit Assurance• Ariosh developed a comprehensive 3-D PDMS Model of the scanned Jacket

legs on which the boat landing structures are to be attached• Developed 3-D Model of proposed boat landings & Stabbing guides • Generated modification drawings for the stabbing guide fabrication for

seamless installation of the Boat landing structures to the 24 platforms.• Design of Surfer Ladder to be connected on RQ2 Jacket leg• Generation of 2D drawings for Boat Landing from PDMS

Services

Detailed Engineering Design,

Facilities

Oso RC, RQ1, RQ2, GD, GE, Mfem DA, Unam CA, Idoho BA and BQ, Etim LB, Inim IA, IB, Enang JA, JB, JC, JD, Utue KA, Usari FA, Adua NA, Ekpe OA, Asabo MB, Utue KB).

Safety Record

Zero LTI, Zero MTI so far

Status

Ongoing

Location

Nigeria West Africa