19
AREVA NP AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and Contribution of AREVA NP GmbH and Siemens for Completion of Belene NPP Axel Wirries Deputy Project Director AREVA NP GmbH Copyright © AREVA NP GmbH 2009. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. Any reproduction, transmission or use of this document or its contents wholly or in part is not permitted without express written authority. Any violation may result in liability for damages.

AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

Embed Size (px)

Citation preview

Page 1: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009

Role and Contribution of AREVA NP GmbH and Siemens

for Completion of Belene NPP

Axel WirriesDeputy Project Director

AREVA NP GmbH

Copyright © AREVA NP GmbH 2009. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. Any reproduction, transmission or use of this document or its contents wholly or in part is not permitted without express written authority. Any violation may result in liability for damages.

Page 2: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 2Bulatom Conference, Varna, May 27-29, 2009

Content

1. Experience of AREVA NP / Siemens - participation in modernization and new building of NPP with VVER-1000

Modernization of NPP Kozloduy Units 5 & 6

Contribution for NPP Tianwan Units 1 & 2

2. AREVA NP / Siemens Contribution for Belene NPP

Electrical systems

Safety I & C

Operational I & C

Heating-Ventilation-Air conditioning (HVAC)

Hydrogen Recombination

3. Joint Commitment for Belene

Page 3: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009

Experience of AREVA NP / Siemens - participation in modernization and

new building of NPP with VVER-1000

Page 4: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 4Bulatom Conference, Varna, May 27-29, 2009

NPP KozloduyModernization Units 5 & 6

Project objective:Adjustment to the international security standard

Scope of service and delivery:75 single projects, basically consisting of:• Security increasing measures• Additional studies and expertise• Measures improving availability• Measures for the improvement of work and maintenance of the facilities

Project duration: 01.06.2001 – 31.05.2006

Consignee:“European Consortium Kozloduy” (ECK)(Framatome ANP SAS/GmbH as leader & Atomenergoexport Russia)

Customer: Kozloduy Nuclear Power Plant PLC

Project status:The project was finalized in due time and at the customer’s high contentment.

Page 5: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 5Bulatom Conference, Varna, May 27-29, 2009

PerformanceKozloduy Unit 5 & 6 Upgrade

> Replacement of 6kV emergency power switchgear, batteries and rectifiers

> Upgrading of 6kV normal power switchgear

> Installation of new diagnostic systems inside the reactor building (loose parts monitoring (KÜS), moisture-sensitive leakage monitoring (FLÜS), fatigue monitoring (FAMOS))

> Hydrogen monitoring and recombination

> Supply of new fire alarm systems

> Seismic upgrading of existing cabinets

Examples for modernization measures

provided by Framatom NP GmbH (later AREVA NP GmbH):

Page 6: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 6Bulatom Conference, Varna, May 27-29, 2009

NPP Tianwan Units 1 & 2

Contribution of AREVA NP and Siemens for NPP Tianwan 1& 2

Duration of our Projects: 1998 – 2007

Customer: JNPC (Jiangsu Nuclear Power Corporation)Location: Lianyungang, Jiangsu Province, China

Highlights:

H2 -Recombiners were included in the VVER-design and supplied by AREVA

For the first time VVER-1000 units were designed and build with qualified digital I&C based on TXS and TXP

~ 5200 HVAC components were designed and supplied

Page 7: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009

Contribution for

NPP Belene Units 1 & 2

Page 8: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 8Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2Contractual Status

November 2005:AREVA NP / Siemens submitted to Atomstroyexport (ASE) their first proposal of participation in Belene project as a Main Foreign Subcontractor

October 2007:The First Period Contract was signed between ASE and AREVA NP / Siemens to perform necessary activities to start the project.

November 2008:A Contract Agreement was signed between ASE and AREVA NP / Siemens

April 2009:The Site Specific Design and Procurement Contract was signed between ASE and AREVA NP GmbH with Siemens as Main Sub-Subcontractor, comprising the scope of supply and services to be performed within the next 12 month.

Page 9: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 9Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2 AREVA NP / Siemens Scope

Electrical systems - AREVA Scope

HVAC - AREVA Scope

Safety I&C - AREVA Scope

Operational I&C (including Simulators) - Siemens Scope

H2 Recombination - AREVA Scope

The Scope of AREVA NP / Siemens supply and services for Belene NPP

includes the following “disciplines”:

Page 10: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 10Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2 AREVA NP Scope

Electrical Systems:

Design of the Electrical House Load Systems and

Procurement and supply of electrical equipment

Uninterruptible Power Supply System

Medium Voltage Distribution System

Low Voltage Distribution System

Cables and Cable Penetrations

Instrumentation, Protection and Metering

Testing and commissioning of delivered equipment

Page 11: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 11Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2 AREVA NP Scope

Safety Instrumentation & Control:

Design, Manufacturing, Testing and Supply,

of the digital Safety I&C-Systems:

Reactor Protection System

Reactor Limitation and Control System

Priority and Actuator Control System

Post Accident Monitoring System

Passive Heat Removal Activation

The Software scope includes all TXS-SW embedded in the

equipment and also the TXS-software part for the simulator

Installation of Safety and Operational I&C-Systems

Commissioning of Safety I&C-Systems, including

supervision during plant commissioning and trial operation

Page 12: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 12Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2 Siemens AG Scope

Operational Instrumentation & Control:

Design, Manufacturing, Testing and Supply, of the digital

Operational I&C-Subsystems:

Process Information and Control System

Safety Information and Control System

Process Automation and Safety Automation Systems for: Nuclear Island Power Generation Plant Water Treatment Plant

Process Instrumentation and I&C cables Operational I&C related parts of the Full Scale Simulator as well as Analytical Simulator

Components and Equipment for Control Rooms

Commissioning of these systems, including supervision during plant commissioning and trial operation

Page 13: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 13Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2 AREVA NP Scope

Heating-Ventilation-Air Conditioning:

Procurement and supply of approximately 3500 safety relevant components Quality Class QA 2 and QA 3, such as:

Fans Independent Air Conditioners Air Handling Units Recirculation Units Air Coolers and Air Filters Water Chillers and Chilled Water Pumps Shut-off Check Valves Containment Isolation and Pressure Relief Dampers Isolation and Control Damper Fire Dampers and Air Tight Dampers

including necessary engineering activities

Page 14: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 14Bulatom Conference, Varna, May 27-29, 2009

Completion of Belene NPP Unit 1 & 2 AREVA NP Scope

Hydrogen Recombination:

During design bases accidents and especially during beyond design bases accidents large amounts of hydrogen can be released inside the reactor containment.

For high increase in safety, the engineering, procurement, supply and installation of Passive Autocatalytic Hydrogen Recombiners (PAR) are included in our scope

proven high efficiency of catalytic material total prevention of combustion and combustion loads proven high resistance against poisons, cable fumes, oil

fumes, core melt aerosols several years faultless operation experiences in more than 25 plants compact, robust design optimized for back fitting easy in-service inspection with short inspection times due to easy removable catalytic insert and optimized transportable in-service inspection equipment

Page 15: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009

Joint Commitmentfor NPP Belene

Page 16: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 16Bulatom Conference, Varna, May 27-29, 2009

Joint Commitment

Excerpt from the joint statement of AREVA NP and Siemens AG answering public rumors:

„Siemens AG and AREVA NP have stated clearlyand without doubt that their successful cooperation,especially in the field of Instrumentation & Control, will continue after the withdrawal of Siemens AG as shareholder of AREVA NP based on existing and future agreements.

Please be assured of our full commitment to bring the Belene plants successfully into operation.“

Page 17: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009

Role and Contribution of AREVA NP GmbH and Siemens

for Completion of Belene NPP

Thank you for your attention!

Deputy Project DirectorAREVA NP GmbH

Axel Wirries

Page 18: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009

Any reproduction, alteration, transmission to any third party

or publication in whole or in part of this document and/or its

content is prohibited unless AREVA NP has provided its

prior and written consent. This document and any

information it contains shall not be used for any other

purpose than the one for which they were provided. Legal

action may be taken against any infringer and/or any person

breaching the aforementioned obligations.

Page 19: AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009 Role and

AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009