AREVA NPINAC 2017
October 23rd 2017
André Salgado – Brazil and South America
INAC 2017 - AREVA
AREVA NP
AREVA NP business1
2Nuclear: answering new electricity market challenges
Agenda
INAC 2017 - AREVA
AREVA NP
3
From Areva Group to Areva NP
New Areva
• Mining
• Front End
• Back End
AREVA NP
• Installed Base
• Components
• Instrumentation & Control
• Engineering & Design Authority
• Large Projects
• FUEL
• Installed Base
• Components
• Instrumentation & Control
• Engineering & Design Authority
• Large Projects
• FUEL
INAC 2017 - AREVA
AREVA NP
Target Shareholder structure New NPJan/2018
New NP will be able to secure its long term development with the support of strategic shareholders whilst remaining an autonomous subsidiary
AREVA NP
NEW NP
• Majority shareholder French State• Listed on the French Stock Exchange
AREVA Inc New NP GmbH
NNP GmbH subsidiariesAREVA INC subsidiaries
Other subsidiaries
4
INAC 2017 - AREVA
AREVA NP
AREVA NPReference supplier in the nuclear sector
• Annual revenue* of ~ 3.1 bn€
• Sales Portfolio of 12 bn€
• ~ 14 000 employees worldwide
• > 58 locations
• A diversified portfolio of customers
including worldwide leaders
on the energy market
• Capability to provide services to all
type of nuclear reactor technology
*Sales revenue contributive to AREVA group - Dec 31, 2016
Large Projects Installed Base Fuel Components I&C
Engineering & Design Authority
Activities
ROW
INAC 2017 - AREVA
AREVA NP
AREVA NPWorldwide presence
INAC 2017 - AREVA
AREVA NP
7
AREVA NPChallenges
OEM NSSS DESIGNER AND MANUFACTURER
Consolidate our position as OEM NSSS designer & manufacturer
In-service nuclear fleet• Propose innovative technologies and solutions
(fuel, I&C, services)
New builds• Adapt the offer to serve all potential markets
NSSS OEM
Equipment and technology supplier
#1EPR
VVER Hualong
ATMEA
To satisfy
customers and
partners
ABWR,…#2
OEM: Original Equipment Manufacturer
NSSS: Nuclear Steam Supply System
INAC 2017 - AREVA
AREVA NP
8
Future IntegrityPerformance Passion
Safety
AREVA NPVision and Values
VALUES
High-performing people and technologies
for safe and competitive nuclear plants worldwide
VISION
INAC 2017 - AREVA
AREVA NP
9
Ensure the professional skills of our employees and uphold
their engagement in a demanding and fulfilling work environment
Set the standard in terms of commercial and operational excellence,
both in manufacturing and in project execution, and ensure a high
level of safety
Offer innovative solutions and value-adding technologies that help
our customers achieve their safety, commercial and societal
objectives
AREVA NPMissions
Designer and supplier of Nuclear Steam Supply System and nuclear equipment, services and fuel for high levels of safety and performance
SCOPE
INAC 2017 - AREVA
AREVA NP
Engineering & Design AuthorityDevelopment, design and licensing of NSSS and associated services
Large ProjectsManagement and execution of nuclear reactor New Build projects
Installed BaseMaintenance, engineering services for existing nuclear fleets and fleets under construction
FuelDevelopment, design, licensing and fabrication of fuel assemblies and core components for PWR,
BWR reactors, and research reactors. Development of zirconium products
ComponentsDesign and manufacture of heavy and mobile components for nuclear islands
Instrumentation & Control (I&C)Design and fabrication of safety I&C systems for the nuclear steam supply system
AREVA NP activities
BUSINESS UNITS
INAC 2017 - AREVA
AREVA NP
11
AREVA NP in 2015-2016In-service NPPs
JAPAN
CHINA
- First delivery of M5TM alloy cladding tubes to
CNNC
- Safety Alliance program: contracts for passive
autocatalytic recombiner (PAR) systems and
venting systems
Supply and installation of new
vessel heads for Tihange 3 /
Doel 4 reactors
BELGIUM
Outage services contract for E.ON
reactors
GERMANY
Supply of passive autocatalytic recombiner (PAR) systems and Filtered Containment Venting Systems for the Japanese fleet
SOUTH AFRICA
Supply of steam generatorsfor Koeberg reactors
SWITZERLANDR&D contract for EATF fuel
(Enhanced Accident
Tolerant Fuel) with Gösgen
Contract with EDF for
maintenance activities over
10 years for Sizewell B
UNITED KINGDOM
• Contracts for Cyber Security engineering
services and expertise
• Forward-Alliance program: Multi-year contract
covering scheduled outages and maintenance
activities
• Development of new cavitation peening solution
to extend power plant service life
• New type of fuel for PWRs (GAIA) and BWRs
(ATRIUMTM)
USA
•Large-scale modernization with
replacement of steam generators
and modernization of I&C
•Launch of quality improvement plan
in the equipment manufacturing plants
FRANCE
Safety Alliance program: supply
contracts for venting systems for
Wolsong1 & 2 power plants
SOUTH KOREA
Safety Alliance program:
contracts for containment venting systems (Asco 1 & 2, Vandellos 2)
SPAIN
• Refueling Services
• Maintenance & Outage Services
• Long term spare parts supplies
• Digital I&C Solutions
• Emergency Power Supply (EPS)
• Safety Systems (FCVS, …)
• Fuel engineering and
component supplies
BRAZIL - ARGENTINA
•
INAC 2017 - AREVA
AREVA NP
12
AREVA NP in 2015-2016New builds
CHINA
• Taishan 1: cold-run tests with RPV
closed and then open successfully
carried out
• Taishan 2: introduction of all steam
generators into the reactor building
and completion of primary loop
welding work
Hinkley Point C: signature of the
contracts for the construction of 2 EPR
reactors, led by EDF.
UK
FINLAND
Olkiluoto 3: on-site delivery of operational
I&C TXP cabinets, completion of their on-
site testing, and start of commissioning
tests on reactor
TURKEY
ATMEA1: completion of the detailed
generic Basic Design
INDIA
Jaitapur: contract with NPCIL for
basic design studies for an EPR
Flamanville 3: introducing RPV internals
into the reactor building, delivery of the
reactor vessel head to the site and
completion of mechanical assembly
work on the reactor coolant system
FRANCE
BRAZIL
Angra 3: equipment supply, engineering services, I&C.
INAC 2017 - AREVA
AREVA NP
13
AREVA NP in Latin AmericaStrong history and partnerships
Support to the construction and commissioning of the NPPS;
Services expertise for all types of reactors all along;
ANGRA 1 & 2, Atucha 1&2, Embalse, :
• Specialized engineering;
• Maintenance expertise;
• Outage services.
AREVA NP IN LATIN AMERICA
FUEL
INSTALLED BASE AND I&C
A 40 years presence in South America;
Commercial Office in Rio de Janeiro ;
Operational presence on sites: Atucha and Angra.
OEM for ANGRA 2, ANGRA 3, ATUCHA 1 & 2;
Angra 3 : Engineering and Equipment Supply
Components supply
Manufacturing support
Design of Angra 2 fuel in collaboration with INB.Angra plant
Areva´s offices in LATAM
INAC 2017 - AREVA
AREVA NPErection Supervision by
AREVA
Erection Supervision by Siemens
AG
Siemens AG as subcontractor of
AREVA
Brazilian Main Erection
Company
AREVA NP Involvement in Angra 3 Project
Present Industrial scheme and role
ELETRONUCLEAR
Overall Project Management and Supervisory Site Management
Design Supplies Civil Works Erection CommissioningDelegation of personnel
BMEC
Operational I&C
Electrical Part
Civil Part
Conventional
Island
Turboset
Nuclear
Island
Overall Plant
NSSS incl.
Safety I&C
BMEC
BMEC
BMEC
BMEC
BMEC
Civil Works
Contractor
INAC 2017 - AREVA
AREVA NP
AREVA NP business1
2Nuclear: answering new electricity market challenges
Agenda
INAC 2017 - AREVA
AREVA NP
2016: Energy Mix: Installed Capacity
Source: PDE 2026
Hydraulic60%
Nuclear2%
Photovoltaic0%
PCH4%
Oléo3%
Gás Natural8%
EOL7%
Diesel1%
Carvão2%
Biomass9%
Importada5%
INAC 2017 - AREVA
AREVA NP
Brazil: Hydro to Thermal Transition
Brazil Storage Capacity (%) – Since 2008
Source: ONS
Brazil´s Electricity Generation (MWh) Mix: Growth of fossil and expensive Thermal
77%
19%
3% 1%
71%
24%
3% 2%
68%
26%
3%3%
62%30%
3%6%
20
12
20
13
20
14
20
15
20
16
66%
25%
2%7%
INAC 2017 - AREVA
AREVA NP
Electricity Market: a challenge
World’s electricity consumption forecasts by region
2005 2016 2021 2026
Source: PDE 2026 - MME / EPE
430
516
609
741
Brazil´s electricity demandforecasts
Brazil´s electricity consumption will grow 44% until 2026, according PDE.
Additional 65 MW capacity in 10 years !
INAC 2017 - AREVA
AREVA NP
Participations of the Production Sources
in the Energy Mix Evolutions
Source: PDE 2026
INAC 2017 - AREVA
AREVA NP
Nuclear power allows security of the grid by covering baseload needs
Source: RTE 2015
20
INAC 2017 - AREVA
AREVA NP
2017: Energy MixEnergy Generation as of 19/10/2017
Source: ONS
Hydro65%
Thermal23%
Eolica8%
Nuclear3%
Solar1%
INAC 2017 - AREVA
AREVA NP
Nuclear a sustainable and...
...Effective energy ...for low land use
39,5%
22,5%
90%
0,0%
10,0%
20,0%
30,0%
40,0%
50,0%
60,0%
70,0%
80,0%
90,0%
100,0%
Wind Solar Nuclear
Nuclear
Source: NEI Data
The graph summarizes the approximate land required by wind andsolar technologies to match the electricity produced annually by a
1.000-MW nuclear plant
• In oposition to other renewable energy sources, nuclear does not depend on weather and register a muchhigher capacity factor that could compensate hydropower seasonality in Brazil;
• Compared to Solar and Wind, nuclear technologies use very few land and can be installed next to consumptioncenters.
Capacity factor (%)
INAC 2017 - AREVA
AREVA NP
… Environmentally Friendly
COP 21 agreement
Limit increases in global average temperature
to 2°C until 2100
Brazil Engagement
43% reduction in 2030 vs 2005
More than a environmental necessity,
controlling CO2 emissions will also be an
economic one with the implementation of
the CO2 tax regulation
Brazil Emissions in 2015
1,6 Billions tons of CO2e
Brazil´s Target in 2030
1,15 Billions tons of
CO2eq
INAC 2017 - AREVA
AREVA NP
Global and Local challenges for theelectricity sector
Security ofsupply
DiversityAffordable
prices
DistributedGeneration
Low CO2 emissions
FostersIndustrial and
Social development