25
Architects’ Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Embed Size (px)

Citation preview

Page 1: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                                                 Architects’ Workshop

April 21, 2005

8:30 am – 1:00 pm

Palm Beach Central High School

Page 2: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                                                 

POST OCCUPANCY EVALUATION

(POE)

Page 3: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Purpose

To seek information and feedback that will help educators and the design team evaluate how well the design serves the educational program.

It is best to conduct the POE when the facility is occupied for one year.

Page 4: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Key Issues

•Is the facility being used in the manner for which it was designed?

•Does the facility address the educational program and students as it was designed to do?

•If you were to build the same school, how would you design it differently to meet the needs of the students? Which features currently address the needs and which ones would be better redesigned or reconfigured?

Page 5: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Methodology•Partnership between the School District and the Architect

Page 6: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Methodology

•Survey/questionnaire

Page 7: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Methodology

•Meeting with school staff, students, parents, etc.

•Tour of School

Page 8: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Methodology

•Architect prepares POE report to include the results of the survey/questionnaire and pictures

Page 9: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Methodology•Architect prepares POE report to include the results of the survey/questionnaire and pictures

Page 10: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Latest POEs

•Palm Beach Central High

•Jeaga Middle School

•Diamond View Elementary

•Equestrian Trails Elementary

Page 11: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Latest POEs

•Elementary Clinic

•Only layout in the Educational Specification

•Precise in detail and location

Page 12: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                                                 

Elementary Prototype Clinic

Floor Plan – May 2002

Page 13: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                                                 

Elementary Prototype Clinic

Floor Plan – April 2004

Page 14: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Results of Survey/Questionnaire

Page 15: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Results of Survey/Questionnaire

Page 16: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Results of Survey/Questionnaire

Page 17: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Results of Survey/Questionnaire

Page 18: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                

Results of Survey/Questionnaire

Page 19: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                                                 

Proposed Elementary Prototype Classroom

Floor Plan

Page 20: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

                                                                 

Proposed Elementary Prototype Classroom

Elevations

Page 21: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Proposed Secondary Prototype ClassroomFloor Plan

Page 22: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Proposed Secondary Prototype ClassroomElevations

Page 23: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Teacher’s Workstation

Page 24: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

Multi-Media Cabinet

Page 25: Architects Workshop April 21, 2005 8:30 am – 1:00 pm Palm Beach Central High School

POE

Next Steps

• On-line

• Theme

• Large Scale