ARC’s Project Evaluation Framework

AMPO ConferenceOctober 19, 2017

David D’Onofrio Principal Planner

Atlanta Regional [email protected]

470.378.1559

Page 2: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Outline

Performance Based Planning

ARC’s Project Evaluation Task Force

Project Evaluation Decision-Making Framework

Outcomes

Lessons Learned

Page 3: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Performance Based Planning

ARC has a rich history of performance-based regional planning

Focused in 2016 on translating federal/state/regional goals to performance measures and metrics for use in TIP project solicitations

Incorporated SHRP2 C02 framework into a 6-month TIP Project Evaluation Taskforce

Page 4: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Major Policy Guidance

2008

2013

20142010

2008

2009

2015

2008

2015

2007 2011

2015

N/A

2008

2008

2014

2011

2007

2009

Comprehensive Transportation Plans (CTPs)

Page 5: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Transportation Environment Economics Community Cost

Mobility Ecosystems/Habitat Economic Impact Land Use Cost

Reliability Water QualityEconomic Development

Cultural & ArcheologicalResources

Cost-Effectiveness

Accessibility Wetlands Social

Safety Air Quality Environmental

Climate Change

Environmental Health

ARC has addressed the blue items in past performance measures

SHRP2 – C02 Performance Measures

Page 6: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

The Atlanta Region’s Plan Policy Goals

Page 7: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Key Decision Points (KDP) Framework

Points along the planning process where the evaluation of funding applications occurs

Three KDPs in the Atlanta process:

KDP 1 – Policy Filters

KDP 2 – Project Evaluation

KDP 3 – Final Factors & Project Selection

Page 8: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP1 – Policy Filters

Page 9: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP2 – Technical Evaluation

ARC evaluates all projects submitted on technical grounds

Projects are broken out into distinct “project types” and scored compared to similar projects

Criteria, measures and metrics were established as part of ARC’s Project Evaluation Taskforce in 2016

Projects are placed into tiers based on a combination of performance and cost-effectiveness measures

Page 10: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Performance Criteria BikeRoad

ExpansionEtc…

Wo

rld

Cla

ss

Infr

astr

uct

ure

Mobility & Congestion

Reliability

Network Connectivity

Multimodalism

Asset Management & Resiliency

He

alth

y Li

vab

le

Co

mm

un

itie

s

Air Quality & Climate Change

Safety

Cultural/Environmental Resources

Social Equity

Land Use Compatibility

Competitive Economy

Goods Movement

Employment Accessibility

Cost Cost Effectiveness or Benefit-Cost

KDP2 Project Evaluation Matrix

Page 11: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP2 – Tools & Data

Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES Emissions Model Real-World Megadata (INRIX/HERE) Walk! Bike! Thrive! GIS data Regional Priority Networks GIS files Regional UGPM GIS files SHRP2 Ecological GIS data FHWA Safety Countermeasures Database / GEARS Safety Data GDOT Traffic Counts and Asset Management Data Project Sponsor Data

Page 12: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP2 – Weights

Criteria Bike/Ped/Trail

Roadway Asset

Management

Roadway

Expansion& TSM&O

TransitExpansion

TransitAsset

Management1

Asset Management & Resiliency

- 14.9 % - -22.0 % / 19.2 %

Mobility&

Congestion13.7 % 13.8 % 13.0 % 13.5 % -

Safety 14.5 % 14.4 % 13.4 % 8.5 %22.0 % / 19.2 %

Network Connectivity 14.4 % 12.9 % 12.4 % 13.5 % -

Reliability - - 12.1 % 12.0 % -

Multimodalism 12.6 % 11.8 % 11.3 % 10.2 % -

Employment Accessibility

10.4 % 10.2 % 10.3 % 11.6 %24.3 % / 21.2 %

Land Use Compatibility

11.5 % - - 10.5 % -

Social Equity 9.7 % 8.3 % 7.0 % 9.5 %20.8 % / 18.2 %

Air Quality & Climate Change

6.3 % - 7.3 % 6.5 %0.0 % / 12.6 %

Goods Movement - 8.1 % 7.8 % - -

Cultural & Environmental Sensitivity

6.8 % 5.5 % 5.3 % 4.1 %11.0 % /

9.6 %

Page 13: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP2 Cookbook –TIP Project Evaluation Documentation

Guide to the TIP Project Solicitation

Documents the decisions made by the TIP Prioritization Taskforce

Outlines how ARC will technically evaluate projects, and includes a list of measures and metrics

Meant to be a companion document to the TIP application

http://www.atlantaregional.org/tipsolicitation

Page 14: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP3 – Final Factors

You can’t put a number on EVERYTHING

Preserves local decision-making, in line with SHRP C02

Another lens to account for geographic equity, social equity, jurisdictional preference

Page 15: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Universal TIP Project Call

Key Decision Point (KDP) 1Policy Filters

KDP 2Project Evaluation

Prioritized Lists of Regional Transportation Projects

CMAQ TAP STBGP

Project Evaluation Flowchart

KDP 3Final Factors

Page 16: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Outcomes

Transit

Transit 1

Transit 2

Transit 3

Trail

Trail 1

Trail 2

Trail 3

Roadway

Roadway 1

Roadway 2

Roadway 3

Technical analysis of the performance of all submitted projects

Projects are compared against similar projects to produce lists of the best projects by type

Used to help inform decision-making, not supplant it

Page 17: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Outcomes

Page 18: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP2 Project Tiers

Tier 1High Performance

High Cost-Effectiveness

Tier 3High Performance

Low Cost-Effectiveness

Tier 2Low Performance

High Cost-Effectiveness

Median Performance Score

Tier 4Low Performance

Low Cost-EffectivenessM

ed

ian

Co

st-

Effe

ctiv

en

ess

Sco

re

Page 19: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

KDP2 Project Tiers

Performance ScoreCo

st E

ffec

tive

nes

s Sc

ore

Page 20: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Draft 2017 Project Evaluation Sneak Peak

The following results are very preliminary and reflect scores for 137 projects from ARC’s 2017 project solicitation

Only reflect completion of technical evaluation and a very preliminary staff first pass at recommendations

These will likely change as we move through KDP3 process and meet with jurisdictions

Page 21: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Draft 2017 Project Evaluation Sneak Peak

151%

26%

330%

413%

51% of the funding is allocated towards projects in the top tier of performance

2nd biggest piece of the pie is high performance low cost-effectiveness tier

Small slivers for tiers 2 and 4

Draft Funding Allocated by KDP2 Tier

Page 22: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Draft 2017 Project Evaluation Sneak Peak

Asked sponsors their priority for each project (ranked 1-5)

49% of funding is going towards top priority projects from local governments

Draft Funding Allocated by Local Priority

149%

223%

37%

49%

512%

Page 23: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Draft 2017 Project Evaluation Sneak Peak

The bigger the percent the better the draft projects perform compared to the entire sample for each criteria

KDP3 process should be careful about considering projects that impact: Reliability Safety Culture/Environment Land Use Compatibility

Percent Change in Scores between Solicitation Full Sample and Draft List Sample

% Change

Criteria Mean Score

Mobility 14%Reliability 6%Connectivity 39%Multi Modalism 34%Asset Management 11%Safety 5%Air Quality / Climate 25%Culture/Environment -3%Social Equity 12%Land Use Compat. 12%Good Movement 30%Employment Access 20%Final Score 13%

Page 24: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Draft 2017 Project Evaluation Sneak Peak

Roadway projects = 51% Transit projects = 22% Active mode projects = 27%

Asset Management = 13% System Expansion = 87%

Draft Funding Allocated by Project Type

Bike3%

Ped5%

R.Asset7%

R.Exp32%

R.TSM&O12%T.Asset

6%

T.Exp16%

Trail19%

Page 25: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Make sure you have enough subject matter experts to establish logical, measurable, outcome-driven measures…too many qualitative or boolean measures cloud results

Plan for this process to take a very long time and then even longer to implement the first time through

Make sure you bring your policymakers and stakeholders along for the ride…you want everyone to “own” the process in some way to ensure buy-in

Preserve a channel for local decision-making … even if the project scores come out bad, there are still reasons to build some projects

Make sure all your metrics are backed by reliable/easy-to-access data sources

Setting weights is hard. Prepare for that.

Lessons Learned

Page 26: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Mobility vs. Safety

Maintenance vs. Expansion

Highly congested now vs. congested in the future

Cost effectiveness vs. high performance

Difficult Trade-Offs

Page 27: ARC’s Project Evaluation Framework€¦ · KDP2 Project Evaluation Matrix. KDP2 –Tools & Data Activity Based Travel Model / VISUM Modeling CMAQ Calculator / AREES Model / MOVES

Contacts

Questions/Comments:

David D’Onofrio – [email protected]

Kofi Wakhisi – [email protected]

Kyung-Hwa Kim – [email protected]