APUC Supplier eEnablement Supporting the Collaborative Procurement Process (V4 26 August 2008)
eProcurement Scotl@nd
Key
Ou
tpu
ts f
rom
Su
pp
lie
r A
do
pti
on
Key
Ac
tiv
itie
s o
f S
up
plie
r A
do
pti
on
By commodity:
• SeEM & PPS will create a Supplier Data Report showing ePS active suppliers, both through institutions & ePS generally
Content availability
Connection types
Catalogues size
Develop a list of specific and general issues / requirements relevant to each commodity
• SeEM & PPS will create a Catalogue Routing Form detailing the recommendation for implementing the commodity onto PECOS including pricing strategy and time required for the lead-in period
•SeEM may be invited to UIG meeting by PPS if specific info/guidance/knowledge is required
• Report of ePS active suppliers, both through institutions & ePS generally
Content availability
Connection types
Catalogues size
• List of specific and general issues / requirements relevant to each commodity
• Supplier Data Report
• Estimate of lead in period for detailing in adverts & ITT
PROJECT START UP & COMMODITY
STRATEGYITT
CAN & TENDER EVALUATION/BID CLARIFICATION
STANDSTILL PERIOD
(where applicable)
AWARD & LEAD-IN PERIOD
CONTRACT MANAGEMENT
•SeEM may be invited to UIG meeting by PPS if specific info/guidance/knowledge is required
•PPS to use the standard text in the ITT: in Schedule 3 of the ITT, the ePS questions in Schedule 7, & issues the ITT with the Supplier Readiness Questionnaire
• General technical advice and guidance for PPS and UIG
CAN Stage:
•PPS may ask SeEM for assistance in answering supplier queries regarding ePS
Tender Evaluation/Bid Clarification:
•PPS to issue SeEM each tenderer’s response to Appendix 1 and their answers to the ePS questions in Schedule 7 of the ITT
• General technical advice and guidance for PPS and suppliers at CAN Stage
• Assess tenderers’ responses to Appendix 1 and ITT Schedule 7ePS questions
At start of Standstill Period PPS to:
•advise SeEM of names of contractors. SeEM to liaise with suppliers and develop content & connection options, obtaining and approving content from suppliers
• agree content maintenance process and suitable timeframes
• address any previously identified challenges / issues regarding P2P process
• set up Contractor(s) onto PECOS Level 1 (if not already available)
• load catalogue against Level 1 profile (as appropriate). PPS to validate prior to loading
• PPS creates Buyers Guide including creation, with SeEM, of ePS Contract Bulletin. PPS & SeEM agree roll out strategy
• Supplier profile set-up on PECOS
• Validated content available on PECOS
• Actions related to specific challenges related to the P2P process
Where Standstill Period not applicable:
•undertake actions detailed in previous Standstill Period section
•PPS & SeEM then to decide on PPS/ePS roll out regarding ePS Contract Bulletin
SeEM to:
•develop & finalise advanced connection options (as appropriate)
• establish a Test Institution for initial set-up (if required)
• establish Roll-out Plan
•carry out Roll-out Plan
• create a Transition Plan for institutions with a requirement to rework existing content / connections with specific suppliers
• issue APUC ePS Contract Bulletin including advice re arrangements for new user training
• Roll-out Plan
• Transition Plan
SeEM to:
•undertake a post implementation internal review (with PPS & UIG)
• undertake a post implementation external review (including suppliers)
• undertake as part of the supplier management process:
– to create and agree supplier ePS Development Plan
– to review General Roll-out Plans
• address unplanned catalogue / content change management
• action any price changes
• Supplier ePS Development Plan
PROJECT START UP & STRATEGY
ITT CAN/TENDEREVALUATION
STANDSTILL PERIOD
AWARD & LEAD-INPERIOD
CONTRACTMANAGEMENT