15
April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Embed Size (px)

Citation preview

Page 1: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

April 2014by Aron Butler, Sam Firke, and others

Electric Brewing in the AABG

Page 2: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

“Electric brewing” typically refers to the heat source– elements designed for electric water heaters (basically a big resistor inside a SS sheath).

An electric element requires some level of electronic control, and this can easily escalate to automating other processes (flow, fill, etc.).

Motivated by the “geek factor” versus adding a practical tool to save time and effort on particular steps?

Electric Heating vs. Automation

Page 3: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Manual control. Has a basic switch (or timer) that applies full power to heater. Folks use bucket heaters like this.

Thermostat control. User sets temperature, controller turns heater fully on when temp is below setpoint, then off when above. A Ranco controller would work this way.

?

Power control. User sets the percent power output of the element (pulse-width modulation or phase control). A PID controller combines thermostat and power control functions.

Implementation

Page 4: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Required Infrastructure & Investment

With 120V and ~$100... bucket heater with heavy-duty timer can provide hot strike and sparge water if turned on several hrs before dough-in.

With 120V and ~$500… RIMS system with element, temp controller, pump, and fittings can provide mash temp control (as well as hot strike water).

With 240V and $1000+... full electric mash and boil.

Best value for your brewing style?

Page 5: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Example: Brian Lagoe’s e-RIMS10 gal BIAB with bucket heater for strike, 120V RIMS heater with Auber PID for mash, and propane burner for boil

Page 6: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Example: Aron Butler’s e-BIABOne-vessel BIAB keggle system, single 240V element for boil and mash (RIMS-like), custom microprocessor controller

Page 7: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Example: Mark Z’s e-HERMS15 gal 3-vessel system with 240V electric boil and HLT, mash heating via HERMS, commercial PID & timer controls (similar to Kal Wallner’s setup)

Page 8: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Example: Sam Firke’s e-HERMS20 gal 3-vessel system with 240V electric boil and HLT, mash heating via HERMS, commercial PID & timer controls (similar to Kal Wallner’s setup)

Page 9: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Example: Matt Becker’s 50kW RIMSPilot-scale system with 120 gal MLT@22kW, 55 gal [email protected] and 55 gal BK@11kW. Controls include industrial PLCs and SCRs.

Page 10: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Depends on power (or watt) density of heater, meaning how much power must be transferred to the wort per area (square inch).

Typical element power density ranges from 50 W/in2 (ultra-low) to 150+ (high). Ultra-low density elements present similar (or lower) temperatures to the wort as flame-fired kettles, and will not scorch as long as they remain immersed.

Will I Scorch My Wort?

Page 11: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Is Electric Heat More Expensive?

No… for two big reasons:➢ All the electrical heat goes into the water, versus only about

⅓ for a typical propane burner.➢ Retail propane is very expensive energy (about 5x more per

BTU than natural gas).

Rough numbers: A typical 5-gal brew session uses ~4 lbs propane, or about $5 worth. Electric equivalent uses about 8 kWh, or about $1 worth.

(But per-batch savings are offset by higher equipment costs.)

Page 12: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

That GFCI Seems Expensive…

It’s a clever device that can save your life!

From Siemens website (GFCI vendor)

Page 13: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Summary (vs. Propane Burners)

Pros:➢ Precise mash control with

RIMS/HERMS for greater repeatability

➢ Brew indoors with full electric

➢ Many options for automation

➢ Won’t run out of gas➢ Lower energy cost➢ Educational process➢ Quieter

Cons:➢ Equipment expense➢ Complexity➢ Time to build➢ Nonzero risk of

electrocution (use GFCI!)➢ System is less portable➢ May require mods to your

home’s wiring (grounds, 240V/30A outlet) or infrastructure (exhaust, sink)

Page 14: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

Lessons Learned➢ Always use grounded cords and a GFCI upstream of brewery➢ Don’t fire elements dry (or with bubbles in RIMS tubes)➢ Use proper wire gauge, make tight connections➢ Decide what you really want/need (brewday experience,

features) before starting the build

Page 15: April 2014 by Aron Butler, Sam Firke, and others Electric Brewing in the AABG

ResourcesInspiration: www.electricbrewery.com (Kal Wallner)

Aron’s build: limbrewing.wordpress.com

Parts: www.homebrewing.orgwww.oscsys.comwww.brewershardware.comwww.brewhardware.comwww.auberins.comwww.stainlessbrewing.com

Advice: Aron Butler, Sam Firke, Mark Zadvinskis, Brian Lagoe, Matt Becker, Mike O’Brien, others