April 2001 HEPix/HEPNT 1
RAL Site Report
John Gordon
CLRC, UK
April 2001 HEPix/HEPNT 2
Summary
• Old
• New
• Grid
April 2001 HEPix/HEPNT 3
Old
• HP farm closed down – to most users October 2000– To all February 2001
• NT Farm– LHCb production finished end of Feb 2001– Most machines moved to Linux then (10x450MHz
duals)– Core Farm remains so could be brought back into
use
April 2001 HEPix/HEPNT 4
Security
• Site Policy
• Firewall
• Only specified ports allowed in to certain machines
• No incoming access to the rest
– has reduced scanning
• Auditing critical services
April 2001 HEPix/HEPNT 5
New
• BaBar
• CDF
• Linux
• Data Storage
April 2001 HEPix/HEPNT 6
BaBar
• 4 Sun 420R = 16 cpus• Accessing existing 6TB disk served by
E4500
April 2001 HEPix/HEPNT 7
April 2001 HEPix/HEPNT 8
CDF
• Funded by JIF (government programme)
• Still out to tender
• Large disk and SMP server(s)
– at RAL + 4 UK universities
– 5TB plus 2x8-way servers
• 16 node farm at RAL
• Use of Datastore (10-20TB)
• Similar to original BaBar bid
April 2001 HEPix/HEPNT 9
Linux Farm
• Was 120 cpus 40x450Mhz + 80x600MHz
• Added 20x450 from NT Farm in March
• Added 48x1GHz duals in APril
• 236 cpus >100GFLOPS peak
• 1GHz cpus show wide variation in benchmarks
April 2001 HEPix/HEPNT 10
April 2001 HEPix/HEPNT 11
April 2001 HEPix/HEPNT 12
DataStore
• Move existing IBM Magstar tapes into refurbished STK robot (30TB)
• 2 STK 9940 drives (60GB/tape, 10MB/s)
• 6TB of tapes today
• 175TB if robot full
• 330TB if IBM tapes replaced
• >1PB with bigger tapes next year
April 2001 HEPix/HEPNT 13
April 2001 HEPix/HEPNT 14
April 2001 HEPix/HEPNT 15
April 2001 HEPix/HEPNT 16
Network
• RAL now connected to ThamesValleyNet MAN @ 622Mbit– connected last week – Oxford, RAL, Reading– hence SuperJanet4 2.5Gbit UK national backbone
• RAL site backbone – a number of Nortel Gigabit switches– replacing FDDI (still in parallel)
April 2001 HEPix/HEPNT 17
Network
• HEP services network – 2 Extreme Networks Summit 7i copper
Gigabit switches– testing Intel EEpro1000 copper NIC -
looks good• Experimenting with wireless ethernet
– outside firewall, PPTP to come inside
April 2001 HEPix/HEPNT 18
Grid Testbed
• 15 dual 1GHz planned
• 10-15 borrowed from Linux Farm for now
• 2x1.4TB IDE disk servers
• Gigabit switch
• Globus 1.1.3 and PBS
– unless WP6 decides otherwise.
April 2001 HEPix/HEPNT 19
GASS and Datastore
Datastore
Userglobus-rcp
globus-url-copy
Gass server gsiwuftpd
gsiftp/http
vtp
April 2001 HEPix/HEPNT 20
Grid Access to Datastore
• We have implemented a Globus GASS server which will serve data from Datastore over Grid using GSI and globus i/o tools
– globus-rcp, globus-url-copy, Globus i/o library
• Plan to implement GridFTP server in same way