198
APPROVED MUNICIPAL ELECTRICITY TARIFFS 2018/19

APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

APPROVED MUNICIPALELECTRICITY TARIFFS2018/19

Page 2: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the
Page 3: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

1

APPROVED MUNICIPAL ELECTRICITY TARIFFS

Foreword

I am pleased to present the 2018/19 electricity tariffs and prices publication of the National Energy Regulator of South Africa (NERSA).

This is NERSA’s eighth electricity tariffs and prices publication. The aim of this publication is to provide electricity users with information on all tariffs that have been approved by the Energy Regulator.

Our mandate of regulating prices and tariffs is derived from the Electricity Regulation Act, 2006 (Act No. 4 of 2006), which requires the Energy Regulator to regulate prices and tariffs in a way that enables an efficient licensee to recover the full cost of its licensed activities, including a reasonable return or margin. The Electricity Regulation Act further states that a licensee may not charge a customer any other tariff and make use of provisions in agreements other than those determined or approved by the Regulator as part of its licensing conditions.

The prices and tariffs publication is categorised into four distinct areas:I. the tariff objectives;II. basic tariff structures;III. basic customer categories; and IV. Inclining Block Tariffs (IBTs).

The publication contains prices and tariffs categorised into the nine different provinces per distributor, including the average percentage tariff increase as applied for by the respective distributors. The tariffs are for implementation by licensees during the 2018/19 financial year.

We trust that the publication will demonstrate NERSA’s commitment to a fair and transparent process in striking a delicate balance between the interests of all stakeholders.

Enjoy the publication!

____________Chris ForleeChief Executive Officer

Page 4: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

2

APPROVED MUNICIPAL ELECTRICITY TARIFFS

Abbreviations and Acronyms

A ampere

AC alternating current

c cents

c/kWh cents per kilowatt-hour

EPP Electricity Pricing Policy (As approved by the Department of Energy)

FBE Free Basic Electricity

Hz Hertz

IBT Inclining Block Tariff

kVA kilovolt-ampere

kvar/h reactive kilovolt-ampere-hour

kV kilovolt

kW kilowatt

kWh kilowatt-hour

MFMA Municipal Finance Management Act, No. 56 of 2003

N/A not applicable

NERSA National Energy Regulator

R Rand

R/Amp Rand per Ampere

R/month Rand per month

R/kVA Rand per kilovolt-ampere

rms root mean square

TOU Time-of-Use

V volt

VAT value added tax

W watt

< less than

≤ less than or equal to

> greater than

≥ greater than or equal to

Abbreviations and Acronyms

Abbreviations and Acronyms 02Definitions 031. Introduction 04

2. Tariff Objectives 04

3. Basic Tariff Structures 05

4. Basic Customer Categories 06

5. Provision of Free Basic Electricity (FBE) 06

6. Conclusion 06

Provincial Approved TariffsWestern Cape Province 07

Free State Province 50

Northern Cape Province 80

Eastern Cape Province 93

North West Province 110

KwaZulu-Natal Province 122

Gauteng Province 142

Limpopo Province 168

Mpumalanga Province 179

Page 5: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

3

APPROVED MUNICIPAL ELECTRICITY TARIFFS

Definitions

Basic charge covers the costs of the administration of the account. It is a contribution towards fixed costs such as meter reading, billing and administration. It is a fixed charge

payable every month for all metered connections whether electricity is consumed or not.

Cost reflective tariffs are tariffs that distinguish between the unique cost components (or cost drivers) for a specific customer or customer class and where the cost components recover

the full economic cost to supply electricity to that customer.

Distributor a licensee or his/her appointed representative who constructs, operates and maintains the distribution network.

Energy charge is a charge for each unit of energy consumed typically charged as c/kWh. For some tariffs the charge may be time and/or seasonally differentiated.

Free Basic Electricity (FBE) the State’s Free Basic Electricity initiative, which allows for a limited amount of free electricity as deemed necessary to provide basic services as determined and

funded in terms of State policy in order to alleviate poverty.

High voltage nominal voltage levels equal to or greater than 44kV up to and including 132kV.

Inclining Block Tariff (IBT) is a tariff structure where the customers’ consumption is divided into blocks. Each block has a price per unit of energy consumed in that block; the tariff is low at the

first block and increases with each succeeding block i.e. it consists of different prices for different energy consumption levels.

Low Voltage a nominal of 400V (±10%) between any of the three-phase conductors and 230V (±10%) between any phase and the neutral conductor.

Medium voltage nominal voltage levels greater than 11kV and up to and including 44kV.

Network charge is a charge payable per premise every month. The purpose of the network charge is to recover part of the fixed network costs (including capital, operations,

maintenance and refurbishment) associated with the provision of network capacity required and reserved by the customer. For some tariffs the network charge is

unbundled into a Network Demand Charge (NDC) and/or a Network Access Charge (NAC)

- Network demand charge is a charge that recovers network costs on a variable basis and is payable for the chargeable demand registered during the month.

- Network access charge is a charge that recovers network costs on a fixed basis and is based on the annual utilised capacity.

Reactive energy charge is a charge applicable if applied to Time-of-Use tariffs and is based on the reactive power used. It is levied on every kvar/h (reactive energy) which is registered in

access of 30% of the kWh (active energy) supplied during the specified periods of the month. There is no reactive energy charge for a customer operating with a

lagging power factor of 96% or better. The method of calculating this excess differs and is described with the respective tariff.

Single phase supply a 50Hz AC supply at 230V rms phase-to-neutral. The neutral carries the full load current.

Tariff is a combination of monthly charges each at particular rates that are usually escalated annually and are applied to recover measured quantities such as consumption

and capacity costs and unmeasured quantities such as service costs.

Tariff structure the combination of different charges and their relationship to each other.

Three-phase supply a 50Hz AC supply at 230V rms phase-to-neutral; 400V rms phase-to-phase (120 degrees vector phase displacement).

Time-of-Use is a tariff that has different energy rates for different time periods and seasons in order to more accurately reflect the shape of the distributors’ long run marginal

energy cost of supply at different times.

Voltage surcharge is a percentage surcharge levied to customers with lower supply voltages as a contribution to the cost to transform electricity from 11kV to lower voltages. It is

calculated as a percentage of the active energy charge, the energy demand charge (where applicable) and the network charge to reflect the higher cost at lower

voltage.

Page 6: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

4

APPROVED MUNICIPAL ELECTRICITY TARIFFS

1. Introduction

The National Energy Regulator (NERSA) is a regulatory authority established as a juristic

person in Terms of Section 3 of the National Energy Regulator Act, 2004 (Act No. 40 of

2004). NERSA’s mandate is to regulate the electricity, piped-gas and petroleum pipelines

industries in terms of the Electricity Regulation Act, 2006 (Act No. 4 of 2006); Gas Act,

2001 (Act No. 48 of 2001); and the Petroleum Pipelines Act, 2003 (Act No. 60 of 2003) and

Petroleum Pipelines Levies Act, 2004 (Act No. 28 of 2004).

In terms of Section 4 (a) (ii) of the Electricity Regulation Act (Act No. 4 of 2006) ‘the

Regulator must regulate prices and tariffs’. When regulating electricity prices and tariffs, the

Energy Regulator aims to enable an efficient licensee to recover the full costs of its licensed

activities, including a reasonable return or margin.

NERSA approves tariffs for its licensees on an annual basis (except for Eskom, who is

considered on a multi-year basis for its revenues and annually for its retail tariffs). The

approved tariffs are communicated to all licensees and are also published on NERSA’s

website, as well as in the tariff publication. This tariff publication was published for the first

time in 2011. The purpose of the publication is to ensure that all stakeholders have access

to the approved tariffs and are able to establish if they are being charged NERSA-approved

tariffs. This tariff publication is made available to all relevant stakeholders, including various

government departments, the Parliamentary Portfolio Committee on Energy, South African

Reserve Bank, South African Local Government Association, Association of Municipal

Electricity Undertakings (AMEU), Labour and Trade Unions, research institutions, tertiary

institutions and the general public.

The approved tariffs listed in this publication are categorised into the nine different provinces

per distributor, including the average percentage tariff increase as applied for by the respective

distributor. The tariff names and categories in the publication are also mentioned according

to the distributor’s application. The different tariff categories are mainly Domestic/Residential

Low and Domestic/Residential High, Commercial Prepaid, Commercial Conventional,

Industrial Low and Industrial High and Industrial Time-of-Use (TOU).

The published tariffs are VAT exclusive and are charged according to the cents per kilowatt-

hour, Rand per month, Rand per kilovolt-ampere and Rand per ampere; whichever unit is

applicable to the various tariff components.

2. Tariff Objectives

During the process of tariff determination, licensees must ensure that tariffs are aligned to

the objectives stated in the Electricity Pricing Policy (2008). A summary of objectives as per

the Electricity Pricing Policy (EPP) are listed below as follows:

• Affordable – Price levels should assume an efficient and prudent utility; in other

words, prices should be based on least cost options and exclude inefficiencies.

• Non-discriminatory – Tariffs should be equitable and fair.

• Predictable and stable – Prevent price shocks and keep customers informed about

future price trends.

• Transparent and unbundled – Full disclosure of cost (no hidden charges). Cost

should be unbundled. Tariffs should be easy to understand and apply.

• Utility Revenue recovery – Revenue from tariffs should reflect the full cost (including

a reasonable risk adjusted margin or return) to supply electricity and ensure that the

industry is economically viable, stable and fundable in the short, medium and long

term.

• Efficient use – Tariffs should promote overall demand and supply side economic

efficiency, and be structured to encourage sustainable, efficient and effective usage

of electricity.

• Cost reflective – A link between the price a user must pay and the cost of serving

that user.

• Low cost of implementation – Implementation and transaction costs should be

minimised.

• State Social support – Tariff levels and structures should accommodate social

programmes.

• Environmentally responsible – The production and transport of electricity should

Page 7: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

5

APPROVED MUNICIPAL ELECTRICITY TARIFFS

be done in a sustainable way and be mindful of the impact on the environment.

• Sufficiency in generation capacity – Expansion through development of least cost

options resources in line with national resource planning.

• State subsidies – Industry needs to achieve and maintain financial sustainability

without ongoing state subsidies. This does not preclude provision for targeted

subsidies such as Free Basic Electricity.

• Returns – Fair and equitable.

3. Basic Tariff Structures

The following represents the basic tariff structures used in this publication and applied by

most licensed distributors:

• Inclining Block Tariff – an Inclining Block Tariff is a tariff structure where the

customers’ consumption is divided into blocks. Each block has a price per unit of

energy consumed in that block; the tariff is low in the first block and increases

with each succeeding block, i.e. it consists of different prices for different energy

consumption levels. This means that the more you consume, the higher your

average price will become.

• Single energy rate tariff – this kind of tariff comprises only an energy charge. All

costs associated with this tariff are expressed in a single c/kWh charge. For some

tariffs the charge may be time and/or seasonally differentiated.

• Two-part tariff – this type of tariff consists of a fixed/basic monthly charge plus a

variable charge related to metered kWh consumption.

• The fixed/basic charge covers the costs of the administration of the account.

It is a contribution towards fixed costs such as meter reading, billing and

administration. The fixed charge is payable every month for all metered

connections whether electricity is consumed or not. (The fixed/basic charge

is charged in R/month.)

• The energy on the other hand is charged based on consumption per month.

(Energy rate is charged in c/kWh.)

This type of tariff structure is mainly applicable to conventional metered domestic/

residential and commercial/business customers.

• Three-part tariff – this is a type of tariff that consists of a fixed/basic monthly charge,

a variable charge related to metered kWh consumption plus a network demand

charge measured in R/kVA per month.

• The fixed/basic charge covers the costs of the administration of the account.

It is a contribution towards fixed costs such as meter reading, billing and

administration. The fixed charge is payable every month for all metered

connections whether electricity is consumed or not. (The fixed/basic charge

is charged in R/month.)

• The energy is charged based on consumption per month. (Energy rate is

charged in c/kWh.)

• The demand charge is payable for the chargeable demand registered

during the month. The purpose of the network charge is to recover part of

the fixed network costs (including capital, operations, maintenance and

refurbishment) associated with the provision of network capacity required

and reserved by the customer.

A three-part tariff is applicable to industrial and manufacturing customers.

• Two/three part time-of-use (TOU) tariff – is a tariff that has different time periods

and seasons in order to more accurately reflect the shape of the licensees’ long run

marginal cost of supply at different times. A two-part TOU tariff normally has two tariff

components, namely: a basic/fixed monthly charge (R/month), and energy charge that

is time and/or seasonally differentiated (c/kWh). A three-part TOU tariff would comprise

of the two components mentioned above plus a network demand charge (R/kVA).

Page 8: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

6

APPROVED MUNICIPAL ELECTRICITY TARIFFS

The TOU tariff is applicable to any customer category that is equipped with a time-of-use

metered system, i.e. domestic/residential, businesses and industrial customers.

4. Basic Customer Categories

The tariff structures reflected in this tariff publication relate to the following basic customer

categories:

• Domestic/Residential customer – this category comprises household customers and

can be divided into domestic low and domestic high customers. Domestic low customers

include the indigent and those whose average monthly consumption is less than 400kWh,

while domestic high average monthly consumption is more than 800kWh.

• Commercial/Business customers – this category is for businesses and can be

classified into very small businesses (e.g. small corner shops) and big businesses

(e.g. big retail stores and supermarkets).

• Industrial/Manufacturing – this category is for big industries and can be classified

into industrial low and industrial high customers. This category can also include

mining industries.

• Agricultural/Rural customers – this category is for agricultural farms and customers

in remote rural areas.

• Schools/Hostels/Churches

5. Provision of Free Basic Electricity (FBE)

The provision of free basic electricity (FBE) was raised by National Government in 2002,

and was intended for the indigent customers. The Department of Energy introduced the

Electricity Basic Services Support Tariff (EBSST) policy in 2003 and it was first implemented

in the 2003/04 financial year. This policy prescribes that an allocation of 50kWh per month

be provided to all poor households connected to the national grid. The indigent customers

would be identified by the various municipalities.

The funding for this initiative is provided by National Treasury to local authorities through

equitable share allocation as identified by the Cooperative Governance and Traditional

Affairs (CoGTA) Department. The primary role of the local government equitable share is to

distribute local government’s share of nationally raised revenue, supplementing municipal

own revenues, to assist municipalities in providing basic services to poor households.

In areas where Eskom supplies electricity within municipal boundaries, the applicable

municipality will compensate Eskom based on a rate that is annually approved by NERSA

[i.e. The National Free Basic Electricity (FBE) rate]. The approved rate for the 2018/19 financial

year is 103.57c/kWh.

(Note: all tariff levels shown in this tariff publication are exclusive of the FBE provision.)

6. Conclusion

Customers are encouraged to approach their respective electricity suppliers for assistance

with any queries that they may have. NERSA offices may also be contacted at the following

address:

Kulawula House

526 Madiba Street

Arcadia

0008

Tel: 012 401 4600

Fax: 012 401 4700

Email: [email protected]

Website: www.nersa.org.za

Page 9: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

7

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPEPROVINCE

Page 10: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

8

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Beaufort West 6.84%

Domestic Indigent PrepaidHigh Demand Energy Rate - 131.67Low Demand Energy Rate - 138.51 Domestic Prepaid High Demand Energy Rate - 184.62Low Demand Energy Rate - 203.66

Domestic Credit Meter 1PhaseBasic Charge - 156.84Per 5 Amp Charge - 36.39High Demand Energy Rate - 161.25Low Demand Energy Rate - 111.41 Domestic Credit Meter 3PhaseBasic Charge - 156.84Per 5 Amp Charge - 36.39High Demand Energy Rate - 161.25Low Demand Energy Rate - 111.41

Commercial Prepaid <=60AmpHigh Demand Energy Rate - 218.87Low Demand Energy Rate -198.83

Small Commercial and Industrial UsageBasic Charge - 357.72Per 5 Amp Charge - 83.03High Demand Energy Rate - 140.72Low Demand Energy Rate - 112.37 All Public LightsMaintenance Charge per luminaire<=100Watts - 79.30Maintenance Charge per luminaire>100Watts - 95.44High Demand Energy Charge - 174.37Low Demand Energy Rate - 127.04 Availability feesBasic Charge - 223.07

Maximum Demand User LVBasic Charge - 932.32High Demand Energy Rate - 88.60Maximum Demand Charge - 118.09High Demand Charge - 125.74Low Demand Charge - 78.52

Bulk Industrial SupplyBasic Charge - 2 407.25High Demand Energy Rate - 82.81Maximum Demand Energy Charge ( Minimum 25kVA) - 110.43High Demand Energy Charge - 117.60Low Demand Charge - 73.43 Large MV Time of UseBasic Charge - 3 610.88Notified Demand Charge - 77.51Notified Maximum Demand - 103.36Reactive Energy Charge - 3.06Low Season Energy ChargePeak - 113.50Standard - 83.21Off-peak - 58.75High Season Energy ChargePeak - 314.19Standard - 106.57Off-peak - 72.20 Large LV Time of UseBasic Charge - 1 805.45Notified Demand Charge - 82.93Notified Maximum Demand - 110.53Reactive Energy Charge - 3.06

Domestic Time of UseBasic Charge - 156.84Per 5 Amp Charge - 36.36Low Season Energy ChargePeak - 115.86Standard - 83.94Off-peak - 58.17High Season Energy ChargePeak - 327.38Standard - 108.56Off-peak - 65.12 Commercial Time of UseBasic Charge - 397.89Per 5 Amp Charge - 80.79Low Season Energy ChargePeak - 115.86Standard - 83.94Off-peak - 58.17High Season Energy ChargePeak - 327.38Standard - 108.56Off-peak - 65.12 Telkom TowersBasic Charge - 1 596.60

Page 11: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

9

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Beaufort West (Continued)

Low Season Energy Charge Green Energy (Solar and Wind) Peak - 118.90 Domestic Basic Charge - 87.47

Standard - 87.18 Low Season Energy Charge Off-peak - 61.55 Peak - 84.15

High Season Energy Charge Standard - 57.92

Peak - 329.16 Off-peak - 36.74

Standard - 111.64 High Season Energy Charge Off-peak - 75.64 Peak - 257.99

Standard - 78.14

Off-peak - 42.45

Bergrivier 6.84%

Convetional Lifeline and Prepaid LifelineConsumers<=20AmpBlock 1 (0-50kWh) - 91.43Block 2 (51-350kWh) - 108.85Block 3 (351-600kWh) - 116.47Block 4 (>600 kWh) - 136.06

Prepaid Single Phase Consumers>20AmpBlock 1 (0-50kWh) - 91.43Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 162.18Block 4 (>600 kWh) - 190.49 Conventional Single Phase ConsumersBlock 1 (0-50kWh) - 91.66Block 2 (51-350kWh) - 116.49Block 3 (351-600kWh) - 134.63Block 4 (>600 kWh) - 148.95Basic charge - 193.38

Commercial Three Phase PrepaidConsumersEnergy charge - 163.27

Commercial Conventional Three Phase Prepaid ConsumersBasic charge - 690.18Energy charge - 147.44

KVA Supply IndustrialBasic charge - 1 804.52Energy charge - 102.57Demand charge - 189.18

N/A N/A   

Page 12: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

10

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Bitou 6.84% Lifeline Prepaid 0-30ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76

Single Phase Prepaid 33-45ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 257.00 Single Phase Prepaid 46-63ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 342.00 Three Phase Prepaid 0-45ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 693.00 Three Phase Prepaid 46-63ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 890.00

Prepaid Single Phase 60ABasic Charge (R/day) - 25.27Energy Charge - 146.05 Prepaid Three Phase 60ABasic Charge (R/day) - 69.54Energy Charge - 146.05 Prepaid Three Phase 100ABasic Charge (R/day) - 113.76Energy Charge - 146.05 Streetlight UsageEnergy Charge - 179.60

Conventional Single Phase 15A Basic Charge - 449.00Energy Charge - 146.05 Conventional Single Phase 30/32ABasic Charge - 481.00Energy Charge - 146.05 Conventional Single Phase 40/45ABasic Charge - 721.00Energy Charge - 146.05 Conventional Single Phase 60/63ABasic Charge - 884.83Energy Charge - 143.67 Conventional Single Phase 80ABasic Charge - 1 782.00Energy Charge - 146.05 Conventional Three Phase 15ABasic Charge - 1 205.00Energy Charge - 146.05 Conventional Three Phase 30/32ABasic Charge - 1 220.21Energy Charge - 143.67

Low Voltage (<500V)Basic Charge - 878.00Energy Charge - 69.68Network Demand Charge - 182.59Network Access Charge - 45.94

High Voltage (=> 500V & < 66kV)Basic Charge - 878.00Energy Charge - 66.20Network Demand Charge - 173.46Network Access Charge - 43.64

Low Voltage (<500V)Basic Charge - 878.00Network Demand Charge - 57.48Network Access Charge - 45.94Reactive Energy Charge - 14.80Low Season : Peak - 119.89Standard - 85.19Off-peak - 57.20High Season :Peak - 349.70Standard - 111.95Off-peak - 64.73 Time of Use High Voltage (≥500V and <66KV)Basic Charge - 878.00Network Demand Charge - 54.61Network Access Charge - 43.64Reactive Energy Charge - 14.80Low Season : Peak - 113.90Standard - 80.93Off-peak - 54.34High Season :Peak - 322.22Standard - 106.35Off-peak - 61.49

Page 13: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

11

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Bitou (Continued)

Conventional Single Phase 15 -32ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 214.00 Conventional Single Phase 33-45ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 321.00 Conventional Single Phase 46-63ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 427.00 Conventional Single Phase 80ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 724.00

Conventional Three Phase 40/45ABasic Charge - 1 801.44Energy Charge - 143.67 Conventional Three Phase 60/63ABasic Charge - 2 439.37Energy Charge - 143.67 Conventional Three Phase 80ABasic Charge - 3 243.39Energy Charge - 143.67 Conventional Three Phase 100ABasic Charge - 4 053.71Energy Charge - 143.67

Page 14: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

12

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Bitou (Continued)

Conventional Single Phase 100ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 906.00 Conventional Three Phase 15-32ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 577.00 Conventional Three Phase 33-45ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 866.00 Conventional Three Phase 46-63ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 1 112.00

Page 15: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

13

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Bitou (Continued)

Conventional Three Phase 80ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 1 780.00 Conventional Three Phase 100ABlock 1 (0-50kWh) - 84.81Block 2 (51-350kWh) - 110.16Block 3 (351-600kWh) - 159.13Block 4 (>600 kWh) - 190.76Basic charge - 2 110.00

Breede Valley 6.84%

Residential Credit Meter/Prepayment MetereringBlock 1 (0-50kWh) - 91.43Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.45Block 4 (>600 kWh) - 194.84

Small Power User 1Single Phasev (≤100A)Energy Charge - 195.93 Small Power User 2Three Phase (≤100A)Energy Charge - 195.93 Small Scale Embedded Generation (Residential)Basic Charge - 79.25 Small Scale Embedded Generation (Commercial Fed In)Basic Charge - 79.25

Small Power User 1Conventional Single Phase ≤100ABasic Charge - 410.36Energy Charge - 154.98 Small Power User 2Conventional Three Phase ≤100ABasic Charge - 410.36Energy Charge - 154.98 Municipal Conventional/Pre-paymentEnergy Charge - 162.01 Public LightingEnergy Charge - 139.75

Small Power User3 -Three PhaseNMD<100kVA at 400VEnergy Charge - 143.27Demand Charge - 21.91 Small Power User 4 Three PhaseNMD>70kVA at 400V/11000VBasic Charge - 349.40Energy Charge - 132.72Demand Charge - 34.83 Small Power User 5 Three PhaseNMD<1MVA at 400V/11000VEnergy Charge - 136.24

N/A

Industrial TOU (>1MVA at 11000V)Basic Charge (R/day) - 10 330.94Low Energy charge:Peak - 138.89Standard - 97.20Off-peak - 63.56High Energy charges :Peak - 433.05Standard - 129.35Off-peak - 72.61Network Demand Charge - 40.23Capacity Charge - 32.11Reactive Energy Charge - 18.41

Page 16: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

14

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Breede Valley (Continued)

Public Lighting (No Measurment of Electricity)Basic Charge - 76.20 Illuminated Road And Advertisement SignsBasic Charge - 76.20 Illuminated Phone BoothsBasic Charge - 76.20 Availability Charge Residential (Vacant Stand)Basic Charge - 215.55 Availability Charge Commercial (Vacant Stand)Basic Charge - 536.07

Large Power Users 1 Three PhaseNMD<70kVA at 400VBasic Charge - 609.57Energy Charge - 117.85Demand Charge - 146.95 Large Power Users 1 Three PhaseNMD<70kVA at 11000VBasic Charge - 609.57Energy Charge - 117.85Demand Charge - 138.88

Cape Agulhas 8.42%

Domestic Prepaid Indigent up to 20AmpBlock 1 (0-50kWh) (c/kWh) - 95.25Block 2 (51-350kW) (c/kWh) - 121.43Block 3 (351-600kWh) (c/kWh) - 174.43Block 4 (>600kWh) (c/kWh - 202.43

Domestic High Single Phase Conventional=>20Amp/Prepaid>30AmpBlock 1 (0-50kWh) (c/kWh) - 91.44Block 2 (51-350kW) (c/kWh) - 117.55Block 3 (351-600kWh) (c/kWh) - 165.46Block 4 (>600kWh) (c/kWh - 194.85Availability Fee (R/Amp)- 6.40

Small Consumer/Prepaid Meters Single Phase >20AmpEnergy Charge - 181.318 Public Schools/Hotels/Prepaid Meters 20Amp Three PhaseEnergy Charge - 176.24 Sport Clubs Conventional/PrepaidEnergy Charge - 153.85

Small Consumer/Prepaid Over 20Amp Single PhaseAvailability fee (R/Amp) - 9.57Energy Charge - 148.50 Small Consumer/Prepaid Meters/> Over 20Amp Three PhaseAvailability fee (R/Amp) - 26.44Energy Charge - 148.50

N/A

Industrial 11 000VAvailability fee /kVA - 6.11Energy Charge - 95.52Demand Charge - 100.79 Industrial 380/220VAvailability fee/kVA - 6.11Energy Charge - 95.52Demand Charge - 130.47

N/A

Page 17: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

15

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Cape Agulhas (Continued)

Domestic Prepaid 30AmpBlock 1 (0-50kWh) (c/kWh) - 101.92Block 2 (51-350kW) (c/kWh) - 129.94Block 3 (351-600kWh) (c/kWh) - 182.93Block 4 (>600kWh) (c/kWh - 209.40

Domestic High Three PhaseConventionalBlock 1 (0-50kWh) (c/kWh) - 91.44Block 2 (51-350kW) (c/kWh) - 117.55Block 3 (351-600kWh) (c/kWh) - 165.46Block 4 (>600kWh) (c/kWh - 194.85Availability Fee (R/Amp)- 17.66

Agriculture Small Holdings/ Over 20Amp Single PhaseAvailability fee (R/Amp) - 6.41Energy Charge - 136.552 Agriculture Small Holdings/Prepaid Meters Over 20AmpAvailability fee (R/Amp) - 19.26Energy Charge - 136.55 Agriculture Small Holdings/ Prepaid Over20Amp Three PhaseAvailability fee (R/Amp) - 6.41Energy Charge - 137.215 Agriculture Small Holdings/Prepaid Meters Over 20Amp Three MetersAvailability fee (R/Amp) - 19.26Energy Charge - 137.215

Small Consumer/Over 20Amp Single PhaseAvailability fee (R/Amp) - 9.57Energy Charge - 148.50 Public Schools,/Hotels/Charity/ and Welfare Organisations Prepaid Three PhaseAvailability fee (R/Amp) - 23.78Energy Charge -136.55 Public Schools, Hotels, Charity and Welfare Organisations Single Phase Prepaid/Over20AmpAvailability fee (R/Amp) - 9.57Energy Charge - 136.55 Telephone CubicleAvailability fee (R/Cubicle) - 69.57 Advertising SignsAvailability fee (R/Sign) - 173.48 SSEG Feed in TariffEnergy Charge - 71.00 SSEG Netwok Charge: All InstallationFixed Charge - 365.00 Municipal UsageEnergy Charge - 133.486

Page 18: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

16

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Cederberg 6.84%

Domestic IndigentEnergy Charge - 112.66

Domestic Conventional 1PhaseBasic Charge - 289.85Energy Charge - 151.92 Domestic Conventional 3PhaseBasic Charge - 433.99Energy Charge - 151.92 Domestic Prepaid 20 Amps 1 PhaseEnergy Charge - 180.44 Domestic Prepaid >20 Amps 1 PhaseBasic Charge - 46.00Amp Charge - 3.50Energy Charge - 157.30

Business Consumer Prepaid (20Amp)Energy Charge - 202.34 Business Consumer Prepaid 1/3 Phase (>20Amp)Basic Charge - 46.86Amp Charge - 3.52Energy Charge - 173.00 Agriculture Tariff Low Voltage FarmersBasic Charge - 580.58Energy Charge - 176.29 Temporary UsersEnergy Charge - 252.45 Street LightsEnergy Charge - 104.17 Availablity ChargeEnergy Charge - 193.41

Business Consumer Conventional 1 PhaseBasic Charge - 519.70Energy Charge - 167.34 Business Consumer Conventional 3 PhaseBasic Charge - 552.10Energy Charge - 167.34 School, Holidays, Old Age Homes, Day Cares and ChurchesBasic Charge - 849.56Energy Charge - 135.52 Sport Clubs, Golf Clubs and Sport GroundsBasic Charge - 249.56Energy Charge - 135.52

Time Of Use MV Self GeneratorsBasic Charge - 3 612.06Low Season Energy Charge:Peak - 135.41Standard - 102.10Off - Peak - 73.12Demand Charge - 65.36Access Charge - 56.08 High Season Energy Charge:Peak - 335.72Standard - 127.79Off - Peak - 80.53Demand Charge - 65.36Access Charge - 56.08Reactive Energy - 0.0849 Buy Back RatesLow Season Energy Charge:Peak - 94.58Standard - 65.06Off - Peak - 41.33High Season Energy Charge:Peak - 289.85Standard - 87.80Off - Peak - 54.89

Page 19: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

17

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Cederberg (Continued)

Time Of Use LV Self GeneratorsBasic Charge - 1 806.03Low Season Energy Charge:Peak - 139.47Standard - 105.16Off - Peak - 75.32Demand Charge - 71.89Access Charge - 61.68High Season Energy Charge:Peak - 365.73Standard - 131.62Off - Peak - 82.94Demand Charge - 71.89Access Charge - 61.88Reactive Energy - 0.087 Buy Back Rates Energy Charge Low Season: Peak - 94.58Standard - 65.06Off - Peak - 41.33High Season Energy Charge:Peak - 289.85Standard - 87.80Off - Peak - 54.89

Page 20: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

18

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Cape Town 5.66%

LifelineTariffBlock 1 (0- 350kWh) - 104.58Block 2 (>350kWh) - 190.88

Domestic UserBlock 1 (0- 600kWh) - 158.35Block 2 (>600kWh) - 197.85 Home UserBlock 1 (0- 600kWh) - 136.61Block 2 (>600kWh) - 197.85Basic Charge - 130.44 Domestic Embedded GenerationBlock 1 (0- 600kWh) - 95.69Block 2 (>600kWh) - 197.85Basic Charge - 12.36/day Domestic and Non Domestic Feed In Tariff - 73.87

Small Power 1<=1000Basic Charge - 49.33/dayEnergy Charge - 116.11 Lighting TariffStreet Lighting and Tariff Signals: 175.70c/kWh Investment Incentive Small Power UserBasic Charge - 45.00/dayEnergy Charge - 116.11

Small Power 2>1000Basic Charge - 3.89/dayEnergy Charge - 222.85

Industrial Large Power LVBasic Charge - 63.33/dayEnergy Charge - 66.62Demand Charge - 265.05

Large Power MVBasic Charge - 63.33/dayEnergy Charge - 58.82Demand Charge - 235.69

Investment Incentive LVBasic Charge - 94.26/dayLow Season Energy Charge:Peak - 111.63Standard - 77.35Off Peak - 49.66Demand Charge - 155.07High Season Energy Charge:Peak - 338.85Standard - 103.78Off Peak - 57.12Demand Charge - 155.07 Investment Incentive MVBasic Charge - 92.41/dayLow Season Energy Charge:Peak - 111.63Standard - 77.35Off Peak - 49.66Demand Charge - 94.36High Season Energy Charge:Peak - 338.85Standard - 103.78Off Peak - 57.12Demand Charge - 94.36

Medium Voltage Time Of UseBasic Charge - 7 714.38 /dayLow Season Energy Charge:Peak - 95.44Standard - 59.82Off Peak - 32.12Demand Charge - 122.12High Season Energy Charge:Peak - 361.32Standard - 87.20Off Peak - 39.59Demand Charge - 122.12 Large User High Voltage Time Of UseBasic Charge - 92.41/dayLow Season Energy Charge:Peak - 106.39Standard - 73.43Off Peak - 46.81Demand Charge - 89.86High Season Energy Charge:Peak - 324.87Standard - 98.85Off Peak - 53.98Demand Charge - 89.86

Page 21: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

19

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Cape Town (Continued)

Wheeling Supplier MV InternalBasic Charge - 92.41/dayLow Season Energy Charge:Peak - 7.79Standard - 3.47Off Peak - 0.00Demand Charge - 94.36High Season Energy Charge:Peak - 36.53Standard - 6.78Off Peak - 0.90Demand Charge - 94.36 Wheeling Supplier MV ExternalBasic Charge - 92.41/dayLow Season Energy Charge:Peak - 24.68Standard - 17.50Off Peak - 11.69Demand Charge - 94.36High Season Energy Charge:Peak - 72.27Standard - 23.03Off Peak - 13.27Demand Charge - 94.36

Large User LV ( TOU) Basic Charge - 94.26/dayLow Season Energy Charge:Peak - 111.63 Standard - 77.35Off Peak - 49.66Demand Charge - 155.07High Season Energy Charge:Peak - 338.85Standard - 103.78Off Peak - 57.12Demand Charge - 155.07 Large User MV ( TOU) Basic Charge - 92.41/dayLow Season Energy Charge:Peak - 111.63Standard - 77.35Off Peak - 49.66Demand Charge - 94.36High Season Energy Charge:Peak - 338.85Standard - 103.78Off Peak - 57.12Demand Charge - 94.36

Page 22: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

20

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Cape Town (Continued)

Wheeling Wheeling MVBasic Charge - 92.41/dayLow Season Energy Charge:Peak - 111.63Standard - 77.35 Off Peak - 49.66Demand Charge - 94.36High Season Energy Charge:Peak - 338.85Standard - 103.78Off Peak - 57.12Demand Charge - 94.36

Drakenstein 6.84%

Single Phase Lifeline 20ABlock 1 (0-400kWh) - 107.80Block 2 (>400kWh) - 154.92 All Other Domestic Single PhaseBasic Charge - 6.60/AmpEnergy Charge - 152.40 Single Phase Convention/Prepaid 30ABasic Charge - R155.05/monthEnergy Charge - 152.40

All Other Domestic Three PhaseBasic Charge - 17.019/AmpEnergy Charge - 154.92

Commercial Single Phase Prepaid 20AEnergy Charge - 200.76 All Other Commercial Single PhaseBasic Charge - 6.592/AmpEnergy Charge - 164.85 Rural TariffsRural 12.5kVA and LessBasic Charge - 1 008.02Energy Charge - 122.33 Rural 12.5kVA Up To 25kVABasic Charge - 1 153.41Energy Charge - 124.25

All Other Commercial Three PhaseBasic Charge - 15.345/AmpEnergy Charge - 162.31

Co-generation TariffsDomestic Small Scale Embedded Generation Single PhaseBasic Charge- R9.797/Amp/monthEnergy export charge-132.16Block 1 (0- 500kWh) - 132.16Block 2 (>500kWh) - 165.07 Domestic Small Scale Embedded Generation Three PhaseBasic Charge- R16.401/Amp/monthEnergy export charge-132.16Block 1 (0- 500kWh) - 132.16Block 2 (>500kWh) - 165.07

Large Power Users Small Scale Embedded Generation (MV=>1000V)Basic Charge - 1 985.39Access Charge - 58.44Demand Charge - 69.06Reactive Energy - 0.0267/kVArhEnergy Charges -High SeasonPeak - 211.22Standard - 88.68Off - Peak - 50.86Energy Charges -Low SeasonPeak - 129.60Standard - 72.44Off - Peak - 44.98

Time of Use Urban Medium VoltageFull Season ConsumerBasic Charge - 1 724.49Access Charge - 49.08Demand Charge - 58.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 103.21Off - Peak - 59.19Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 52.35

Page 23: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

21

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Drakenstein (Continued)

Rural >25kVA Up To 50kVABasic Charge - 1 628.34Energy Charge - 124.25 Rural >50kVA Up To 100kVABasic Charge - 2 144.47Energy Charge - 124.25

Commercial Small Scale Embedded Generation Single PhaseBasic Charge- R9.56/Amp/monthEnergy export charge-132.16Block 1 (0- 500kWh) - 132.16Block 2 (>500kWh) - 165.07

Commercial Small Scale Embedded Generation Three PhaseBasic Charge- R21.85/Amp/monthEnergy export charge-132.16Block 1 (0- 500kWh) - 132.16Block 2 (>500kWh) - 165.07

Large Power Users Small Scale Embedded Generation (LV=>1000V)Basic Charge - 1 985.39Access Charge - 63.74Demand Charge - 73.04Reactive Energy - 0.0267/kVArhEnergy Charges -High SeasonPeak - 239.00Standard - 94.45Off - Peak - 53.74Energy Charges -Low SeasonPeak - 129.60Standard - 72.44Off - Peak - 51.71 Special Customer- Stellenbosch Municipality Tou MVBasic Charge - R199.99/dayCapacity Charge - R16.05/kVADemand Charge - R30.44/kVAAdministration Charge- R90.15/once offSubsidy Charge- 77.91Reactive Energy - 0.0267/kVArhEnergy Charges -High SeasonPeak - 310.22Standard - 93.99Off - Peak - 51.94Energy Charges -Low SeasonPeak - 101.19Standard - 69.65 Off - Peak - 44.19

6 Months Season ConsumerBasic Charge - 1 724.49Access Charge - 23.88Demand Charge - 58.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 103.21Off - Peak - 59.19Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 52.35 4 Months Season ConsumerBasic Charge - 1 724.49Access Charge - 15.92Demand Charge - 58.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 103.21Off - Peak - 59.19Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 52.35

Page 24: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

22

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Drakenstein (Continued)

2 Months Season ConsumerBasic Charge - 1 724.49Access Charge - 7.96Demand Charge - 51.95Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 103.21Off - Peak - 59.19Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 52.35 Time Of Use Urban Low VoltageFull Season ConsumerBasic Charge - 1 724.49Access Charge - 54.38Demand Charge - 62.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 109.94Off - Peak - 62.61Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 60.15

Page 25: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

23

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Drakenstein (Continued)

6 Month Season ConsumerBasic Charge - 1 724.49Access Charge - 26.53Demand Charge - 62.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 109.94Off - Peak - 62.61Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 60.15 4 Month Season ConsumerBasic Charge - 1 724.49Access Charge - 18.57Demand Charge - 62.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 109.94Off - Peak - 62.61Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 60.15

Page 26: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

24

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Drakenstein (Continued)

2 Month Season ConsumerBasic Charge - 1 724.49Access Charge - 9.28Demand Charge - 62.55Reactive Energy - 0.0267Energy Charges -High SeasonPeak - 298.08Standard - 109.94Off - Peak - 62.61Energy Charges -Low SeasonPeak - 150.86Standard - 84.30Off - Peak - 60.15

George6.84%

Domestic Single Phase 1Part PrepaidMeter (Indigent)Block 1 (0-550kWh) - 121.96Block 2 (>550kWh) - 176.50 Domestic Single Phase 1Part PrepaidMeter (30 and 60Amps)Energy Charge - 171.95

Domestic 1 Part Prepaid MeterSingle Phase Energy Charge - 176.65 Domestic 1 Part Credit MeterThree Phase Energy Charge - 181.47 Domestic Single Phase 2 PartCredit MeterBasic Charge - 204.34Energy Charge - 150.36 Domestic Single Phase 2 PartPrepaid MeterBasic Charge - 206.33Energy Charge - 147.05

Small General ConsumersEnergy Charge - 195.35 Agriculture 10KVA to 16KVABasic Charge - 209.92Energy Charge - 153.10 Agriculture 16KVA to 25KVABasic Charge - 355.16Energy Charge - 153.10 Agriculture 25KVA to 50KVABasic Charge - 710.34Energy Charge - 153.10 Agriculture 50KVA to 100KVABasic Charge - 791.24Energy Charge - 153.10

Normal General Consumers Single PhaseBasic Charge - 110.81Energy Charge - 43.54Demand Charge- 89.83/Amp Normal General Consumers Three PhaseBasic Charge - 198.27Energy Charge - 88.66Demand Charge - 89.83/Amp

Low Voltage CustomersBasic Charge - 1 293.07Energy Charge - 81.00Demand Charge - 243.51 Telephone BoothBasic Charge - 190.58 Non- Municipal Street Lighting Energy Charge - 164.36 Municipal Street Lighting Basic Charge - 101.74Energy Charge - 107.51

Medium Voltage Customers (Existing Customers)Basic Charge - 1 847.22Energy Charge - 73.00Demand Charge- 240.23 Medium Voltage Customers (New Customers)Basic Charge - 1 847.22Energy Charge - 73.00Demand Charge- 177.50Access Charge - 67.15

Industrial Time of UseBasic Charge - 2 023.55Low Season Energy Charge:Peak - 113.10Standard - 87.00Off-peak - 75.00Access Charge - 57.00Demand Charge - 65.00High Season Energy Charge:Peak - 294.80Standard - 114.00Off-peak - 80.00Access Charge - 57.00Demand Charge - 65.00Reactive Energy - 17.75

Page 27: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

25

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

George (Continued)

Domestic Three Phase 2PartCredit MeterBasic Charge - 275.33Energy Charge - 161.06 Domestic Three Phase 2PartPrepaid MeterBasic Charge - 279.88Energy Charge - 151.06 Domestic Three Phase 1 PartPrepaid MeterEnergy Charge -176.50

Domestic Time of UseBasic Charge - 257.84Low Season Energy Charge:Peak - 134.75Standard - 96.07Off-peak - 82.02High Season Energy Charge:Peak - 324.55Standard - 207.38Off-peak - 111.31 Embedded GenerationBasic Charge - 379.61Low Season Energy Charge:Peak - 134.75Standard - 96.07Off-peak - 82.02High Season Energy Charge:Peak - 324.55Standard - 207.38Off-peak - 111.31 Municipal Purchase TariffLow Season Energy Charge:Peak - 96.16Standard - 66.91Off-peak - 42.45High Season Energy Charge:Peak - 294.81Standard - 89.31Off-peak - 48.50

Page 28: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

26

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Hessequa 6.84%

Indigent Prepaid Single Phase 20 AmpsBlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70

Non Indigent Single Phase Prepaid 21-32AmpBlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 94.89 Non Indigent Prepaid Single Phase 33 - 45ABlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge -174.00 Non Indigent Prepaid Single Phase 46- 63A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 189.79

Non Indigent PrepaidSingle Phase 64- 80A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 323.00

Commercilal Single Phase 0 -32A (Prepaid)Basic Charge - 116.18Energy Charges - 142.50 Commercial Single Phase 33-45A (Prepaid)Basic Charge - 207.00Energy Charges - 142.50 Commercial Single Phase 46-63 (Prepaid)Basic Charge - 232.37Energy Charges - 142.50 Commercial Single Phase 64-100A (Prepaid)Basic Charge - 459.00Energy Charges - 142.50 Commercial Three Phase 0-32A (Prepaid)Basic Charge - 302.08Energy Charges - 142.50 Commercial Three Phase 33-45A (Prepaid)Basic Charge - 588.00Energy Charges - 142.50

Commercial Single Phase 0 -32A (Conventional)Basic Charge - 247.20Energy Charges - 142.50 Commercial Single Phase 33-45A (Conventional)Basic Charge - 439.00Energy Charges - 142.50 Commercial Single Phase 46-63A (Conventional)Basic Charge - 494.40Energy Charges - 142.50 Commercial Single Phase 64-80A (Conventional)Basic Charge - 781.00Energy Charges - 142.50 Commercial Three Phase 0-32A (Conventional)Basic Charge - 642.72Energy Charges - 142.50 Commercial Three Phase 33-45A (Conventional)Basic Charge - 1 251.00Energy Charges - 142.50

Industrial 71kVA -500kVABasic Charge - 3 113.00Energy Charge - 77.60Demand Charge - 190.50

Industrial >500kVABasic Charge - 6 856.00Energy Charge - 77.60Demand Charge - 190.50

N/A

Page 29: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

27

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Hessequa (Continued)

Non Indigent Prepaid Single Phase 21-32A (<Alternative)Block 1 (0- 50kWh) - 99.40Block 2 (51-350kWh) - 126.20Block 3 (351-600kWh) - 175.70Block 4 (>600kWh) - 193.70 Non Indigent Prepaid 33-45A Single Phase <=150KWhBlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 87.00 Non Indigent Prepaid 46-63A Single Phase<=150KWhBlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 94.90 Non Indigent Prepaid Three Phase 0- 32A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 246.71

Commercial Three Phase 46 -63A (Prepaid)Basic Charge - 604.16Energy Charges - 142.50 Commercial Three Phase 64 -100A (Prepaid)Basic Charge - 1 006.93Energy Charges - 142.50 StreelightsEnergy Charge -205.00 SSEG Feed InEnergy Charge -66.17

Commercial Three Phase 46- 63A (Conventional)Basic Charge - 1 119.00Energy Charges - 142.50 Commercial Three Phase 64-100A (Conventional)Basic Charge - 1 976.00Energy Charges - 142.50 Agriculture <25kVABasic Charge - 795.15Energy Charges - 114.00 Agriculture 26kVA - 50kVABasic Charge - 1 590.30Energy Charges - 114.00 Agriculture 51kVA - 100kVABasic Charge - 3 180.60Energy Charges - 114.00

Page 30: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

28

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Hessequa (Continued)

Non Indigent Prepaid Three Phase 33- 45A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 493.45 Non Indigent Prepaid Three Phase 46- 63ABlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 493.45 Domestic Conventional Single Phase 0- 32A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 201.90 Domestic Conventional Single Phase 33- 45A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 369.00

Page 31: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

29

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Hessequa (Continued)

Domestic Conventional Single Phase 46- 63A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 403.80 Domestic Conventional Single Phase 64- 80ABlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 637.00 Domestic Conventional Three Phase 0- 32A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 524.94 Domestic Conventional Three Phase 33- 45ABlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 1 040.00

Page 32: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

30

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Hessequa (Continued)

Domestic Conventional Three Phase 46- 63A Block 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 1 049.88 Domestic Conventional Three Phase 64- 80ABlock 1 (0- 50kWh) - 91.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 193.70Basic Charge - 1 953.00

Kannaland 6.84%

Domestic LifelineSummerBlock 1 (0-350kWh) - 113.00Block 2 (>350kWh) - 124.00Block 3 (>600kWh) - 179.00WinterBlock 1 (0-350kWh) - 137.00Block 2 (350- 600kWh) - 151.00Block 3 (>600kWh) - 196.00

Domestic Conventional 0-59ASummerBlock 1 (0-350kWh) - 137.68Block 2 (>350kWh) - 154.00WinterBlock 1 (0-350kWh) - 156.60Block 2 (0-350kWh) - 170.00Basic Charge - 54.22 Domestic Conventional 60-100ASummerBlock 1 (0-350kWh) - 143.00Block 2 (>350kWh) - 175.00WinterBlock 1 (0-350kWh) - 182.00Block 2 (0-350kWh) - 193.00Basic Charge - 359.52

Small to Medium Consumer (Prepaid)Energy Charge - Summer- 191.00Energy Charge - Winter- 196.00 Large Consumer 60-150A (Prepaid)Basic Charge - 281.61Energy Charge- Summer- 181.00Energy Charge - Winter- 192.00

Small to Medium Consumer 30 - 60 (Conventional)Basic Charge - 466.62Energy Charge -Summer- 154.00Energy Charge - Winter - 193.00 Large Consumer 60-150A (Conventional)Basic Charge - 523.18Energy Charge -Summer- 164.42Energy Charge - Winter -183.43

Bilk Consumers <500kVABasic Charge - 1 130.00Demand Charge - 200.00Energy Charge -Summer- 102.00Energy Charge - Winter - 162.00

Bulk Consumers>500kVABasic Charge - 3 605.00Demand Charge - 200.00Energy Charge -Summer- 96.00Energy Charge - Winter - 156.00

Industrial Time Of Use 50-500kVABasic Charge - 42.90/dayEnergy Charge: Low SeasonPeak - 114.00Standard - 76.00Off - Peak - 58.00Energy Charge: High SeasonPeak - 369.00Standard - 108.00Off - Peak - 66.00Demand Charge - 89.69Access Charge - 41.52

Page 33: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

31

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Kannaland(Continued)

Domestic Prepaid 60-100ASummerBlock 1 (0-350kWh) - 138.10Block 2 (>350kWh) - 143.00Block 3 (>600kWh) - 161.00WinterBlock 1 (0-350kWh) - 163.96Block 2 (350- 600kWh) - 170.00Block 3 (>600kWh) - 184.00

Industrial Time Of Use >500kVABasic Charge - 222.96/dayEnergy Charge: Low SeasonPeak - 136.62Standard - 97.45Off - Peak - 69.60Energy Charge: High SeasonPeak - 389.03Standard - 125.55Off - Peak - 82.03Demand Charge - 87.37Access Charge - 39.56

Knysna6.84%

Prepaid Meters Electrification SchemeBlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12

All inclusive Energy Charge 60A PrepaidBlock 1 (0-50kWh) - 117.89Block 2 (51-350kW) - 145.97Block 3 (351-600kWh) - 165.99Block 4 (>600kWh) - 194.85 Prepaid Meter One Phase 30ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 2.07/day

Prepaid 60ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 3.92/day

Commercial One Phase Prepaid Meter 30ABasic Charge - 172.74Energy Charges - 171.06 Commercial One Phase Prepaid Meter 60ABasic Charge - 337.65Energy Charges - 171.06 Commercial Three Phase Prepaid Meter 30ABasic Charge - 477.41Energy Charges - 171.06 Commercial Three Phase Prepaid Meter 60ABasic Charge - 946.98Energy Charges - 171.06

Commercial One Phase Credit Meter 30ABasic Charge - 233.59Energy Charge - 171.06 Commercial One Phase Credit Meters 60ABasic Charge - 445.65Energy Charge - 168.27 Commercial Three Phase Credit Meters 30ABasic Charge - 620.56Energy Charge - 168.27 Commercial Three Phase Credit Meters 60ABasic Charge - 1 227.57Energy Charge - 168.27

Bulk Supply Low Voltage (<400V)Basic Charge - 772.83Energy Charge - 72.39Network Demand Charge - 207.19Network Access Charge - 39.73 Residential Bulk Low VolatgeBasic Charge - 781.32Energy Charge - 123.36Network Access Charge - 40.17 Street LightingEnergy Charge - 177.97 Athletics and Sports Club Single Phase 30ABasic Charge - 100.68Energy Charge - 162.73

Bulk Supply High Voltage (>=400V and <=22kV)Basic Charge - 781.32Energy Charge - 68.80Network Demand Charge - 196.91Network Access Charge - 37.76

Time of Use: Low Voltage Supply (<500V)Basic Charge - 772.83Network Demand Charge - 52.47Network Access Charge - 39.73Reactive Energy Charge - 14.66High Energy chargesPeak - 346.26Standard - 110.84Off-peak - 64.08Low Energy chargesPeak - 118.70Standard - 84.35Off-peak - 56.64

Page 34: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

32

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Knysna(Continued)

Domestic Three Phase Prepaid Meter 30ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 106.16Block 3 (351-600kWh) - 152.31Block 4 (>600kWh) - 179.82Basic Charge - 5.76/day Three Phase 60A PrepaidBlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 11.30/day Domestic Phase Credit Meter 30ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 100.68 Domestic Phase Credit Meter 60ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 190.49

Commercial Three Phase Prepaid Meter 100ABasic Charge - 1 572.97Energy Charges - 171.06

Commercial Three Phase Credit Meters 100ABasic Charge - 2 045.25Energy Charge - 168.27

Athletics and Sports Club Single Phase 60ABasic Charge - 190.49Energy Charge - 162.73 Athletics and Sports Club Three Phase 30ABasic Charge - 280.29Energy Charge - 162.73 Athletics and Sports Club Three Phase 60ABasic Charge - 549.69Energy Charge - 162.73 Availability Charge - Single Residential Energy Charge - 234.33 Availability Charge - OtherEnergy Charge - 644.42

Time of Use: High Voltage Supply Basic Charge - 772.83Network Demand Charge - 49.32Network Access Charge - 37.35Reactive Energy Charge - 14.66High Energy chargesPeak - 325.48Standard - 104.19Off-peak - 60.24Low Energy chargesPeak - 111.58Standard - 79.29Off-peak - 53.25

Page 35: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

33

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Knysna(Continued)

Domestic Three Phase Credit Meter 30ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 280.29 Domestic Three Phase Credit Meter 60ABlock 1 (0-50kWh) - 89.36Block 2 (51-350kW) - 113.42Block 3 (351-600kWh) - 162.73Block 4 (>600kWh) - 192.12Basic Charge - 549.69

Laingsburg 6.84%

Domestic Low PrepaidEnergy Charge - 156.01

Domestic High Prepaid 20 - 30 and 60AEnergy charge -156.01 Domestic High Conventional 30ABasic Charge - 141.00Energy Charge - 149.97 Domestic High Conventional 45ABasic Charge - 221.00Energy Charge - 149.97 Domestic High Conventional 60ABasic charge - 359.00Energy Charge - 149.97

Commercial Prepaid 20AEnergy Charge - 180.43 Commercial Prepaid 60AEnergy Charge - 183.31 Commercial Prepaid 90AEnergy Charge - 203.00

Commercial Conventional 71-100ABasic Charge - 875.50Energy Charge - 151.15 Commercial Conventional 101-150ABasic Charge - 951.00Energy Charge - 151.15 Commercial Conventional 151-200ABasic Charge - 1 150.00Energy Charge - 151.15

Commercial Conventional 201-250A Basic Charge - 1 270.00Energy Charge - 151.15

Large User 251-300ABasic Charge - 4 03.00Energy Charge - 155.83 Large User 301-400ABasic Charge - 5 728.00Energy Charge - 155.83 Large User 401-500ABasic Charge - 7 390.00Energy Charge - 155.83

Large User 501-600ABasic Charge - 9 235.00Energy Charge - 155.83 Large User 601-700ABasic Charge - 10 207.00Energy Charge - 155.83 Large User 701-800ABasic Charge - 13 149.00Energy Charge - 155.83

Page 36: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

34

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Langerberg6.84%

Domestic Indigent Conventional and Prepaid Single Phase <=60ABlock 1 (0- 50kWh) - 90.80Block 2 (51-350kWh) - 111.10Block 3 (351-600kWh) - 158.70Block 4 (>600kWh) - 175.80

Domestic Conventional Single Phase <=60ABlock 1 (0- 50kWh) - 90.80Block 2 (51-350kWh) - 111.10Block 3 (351-600kWh) - 158.70Block 4 (>600kWh) - 175.80Basic Charge - 173.00 Domestic Prepaid Single Phase <=60A and Three Phase <=80ABlock 1 (0- 50kWh) - 90.80Block 2 (51-350kWh) - 117.50Block 3 (351-600kWh) - 164.10Block 4 (>600kWh) - 188.40 Domestic Conventional Three Phase <=80ABlock 1 (0- 50kWh) - 90.80Block 2 (51-350kWh) - 111.10Block 3 (351-600kWh) - 158.70Block 4 (>600kWh) - 175.80Basic Charge - 520.00

Commercial Prepaid Single Phase <=60AEnergy Charge - 156.00 Commercial Prepaid Three Phase <=80AEnergy Charge - 185.70 Commercial Conventional Single Phase <=60ABasic Charge - 430.00Energy Charge - 134.40 Commercial Conventional Three Phase <=25ABasic Charge - 757.00Energy Charge - 134.40 Commercial Conventional Three Phase <=50ABasic Charge - 926.00Energy Charge - 134.40 Commercial Conventional Three Phase <=100ABasic Charge - 1 095.00Energy Charge - 134.40

Street Lighting MaintenanceFixed Charge - 40.71 Sports Ground Prapaid Single Phase <=60A and Three Phase <=80AEnergy Charge - 164.10 Sports Ground Conventional Single Phase <=60ABasic Charge - 173.00Energy Charge - 158.70 Sports Ground Conventional Single Phase <=80ABasic Charge - 520.00Energy Charge - 158.70 Telkom <10AEnergy Charge - 1 535.00 SSEG Feed-InEnergy Charge - 68.34 Street LightingEnergy Charge - 129.34

Agriculture Conventional Single Phase <=60A

Industrial Large Power User <11kVBasic Charge - 1 687.00Energy Charge - Low Season: 64.80Energy Charge - High Season: 76.73Demand Charge - Low Season: 191.08Demand Charge - High Season: 216.65Access Charge - 13.56 Industrial Large Power User 11kVBasic Charge - 1 687.00Energy Charge - Low Season: 59.72Energy Charge - High Season: 68.21Demand Charge - Low Season: 182.55Demand Charge - High Season: 211.56Access Charge - 13.20

Time of Use Large Power<11KVBasic Charge - 1 687.00Demand Charge - 35.13Access Charge - 28.03Reactive Energy Charge - 14.89Low Energy chargesPeak - 120.62Standard - 85.72Off-peak - 57.54High Energy chargesPeak - 351.85Standard - 112.64Off-peak - 65.12 Time of Use Large Power 11KVBasic Charge - 1 687.00Demand Charge - 32.32Access Charge - 25.80Reactive Energy Charge - 14.89Low Energy chargesPeak - 119.41Standard - 84.85Off-peak - 56.98High Energy chargesPeak - 348.33Standard - 111.52Off-peak - 64.48

Basic Charge - 258.00

Energy Charge - 134.40

Agriculture Conventional Three Phase <=25ABasic Charge - 908.40

Energy Charge - 134.40

Agriculture Conventional Three Phase <=50A

Basic Charge - 1 111.20

Energy Charge - 134.40

Agriculture Conventional Three Phase <=100A

Basic Charge - 1 314.00

Energy Charge - 134.40

Page 37: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

35

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Matzikama6.84%

Indigent UsersBlock 1 (0- 50kWh) - 90.91Block 2 (51-250kWh) -117.56Block 3 (251-600kWh) -149.37Block 4 (>600kWh) - 193.39

Domestic Regular Prepaid Block 1 (0- 50kWh) - 97.49Block 2 (51-250kWh) - 124.48Block 3 (251-600kWh) -173.15Block 4 (>600kWh) -207.55 Single Phase Block 1 (0- 50kWh) - 91.44Block 2 (51-250kWh) -117.56Block 3 (251-600kWh) -165.46Block 4 (>600kWh) -194.85Basic Charge - 210.56 Three PhaseBlock 1 (0- 50kWh) - 91.44Block 2 (51-250kWh) -117.56Block 3 (251-600kWh) -165.46Block 4 (>600kWh) -194.85Basic Charge - 240.42

Commercial PrepaidEnergy Charge - 203.88

Commercial Single Phase Basic Charge - 377.83Energy Charge - 173.36 Three Phase Basic Charge - 675.90Energy Charge - 167.03

Schools and ChurchesBasic Charge - 647.70Energy Charge - 151.83

Large Power UserBasic Charge -1 333.92Energy Charge - 95.44Demand Charge - 243.62

N/A

Mossel Bay6.84%

Prepaid for Indigent HouseholdsBlock 1 (0- 50kWh) - 0.00Block 2 (51-350kWh) - 115.90Block 3 (351-600kWh) - 156.70Block 4 (>600kWh) - 188.00 SSEG Single PhaseFixed Charge - 267.97Energy Charge - 127.30 ExportEnergy Charge - 42.00

Single Phase One PartEnergy Charge - 156.50 Single Phase Two PartBasic Charge - 269.87Energy Charge - 125.50 Three Phase Two PartAmpere Charge - 22.14Energy Charge - 117.00

Single Phase Prepaid One partEnergy Charge - 184.40 Three Phase Prepaid One partEnergy Charge - 184.40 Agriculture >2000 unitsEnergy Rate -164.10 Agriculture <2000 unitsEnergy Rate -207.39

Single Phase Two Part PrepaidAmpere Charge - 20.59Energy Charge - 108.90 Three Phase Two PartAmpere Charge - 46.41Energy Charge - 103.50 Street Lighting (Municipal)Energy Rate - 106.88 Street Lighting (Prvate) Fixed charge - 107.37

Industrial 40kVA to 100kVABasic Charge- 1 032.75Energy Charge - 90.50Demand Charge - 182.91

Industrial > 100kVABasic Charge - 2 522.31Energy Charge - 73.30Demand Charge - 227.75 Petro SABasic Charge- 2 552.31Energy Charge - 68.10Demand Charge - 225.48

Non-Standard Tariff Time of UseScale 40T Urban 40R Peri - Urban >2000KVAFixed Charge - 2 506.96Energy chargesPeak - 250.80Standard - 144.30Off-peak - 58.80

Page 38: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

36

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mossel Bay(Continued)

SSEG Three PhaseAmpere Charge - 22.46Energy Charge - 119.70 ExportEnergy Charge - 42.00

Agriculture For Water PumpingEnergy Rate - 112.70 SSEG Single PhaseAmpere Charge - 20.45Energy Charge - 108.10 ExportEnergy Charge - 42.00 SSEG Three PhaseAmpere Charge - 46.08Energy Charge - 102.80 ExportEnergy Charge - 42.00

Sports Grounda (Lighting)Energy Rate - 183.65

Oudtshoorn6.84%

Single Conventional or Prepaid Indigent 20AEnergy Charge - 159.49

Single Prepaid = 20AEnergy Charge - 170.67 Single Prepaid = 30AEnergy Charge - 170.92 Single ConventionalBasic Charge- 35.23Energy Charge - 160.01Ampere Charge - 4.70 Single Phase Prepaid 30ABasic Charge- 35.23Energy Charge - 160.01Ampere Charge - 4.70

Three Phase Prepaid <80ABasic Charge- 60.90Energy Charge - 134.60Ampere Charge - 6.89 Three Phase Conventional <80ABasic Charge- 60.90Energy Charge - 134.60Ampere Charge - 6.89 Three Phase Municipal Sport <80ABasic Charge- 60.90Energy Charge - 134.60Ampere Charge - 6.89

Irrigation PumpBasic Charge- 409.06Energy Charge - 109.40Demand Charge - 15.71 Municipal TariffBasic Charge- 60.90Energy Charge - 134.60Ampere Charge - 6.89

Industrial Bulk LV (400V) ThermalBasic Charge - 807.02Energy Charge - 97.64Demand Charge - 208.90 Street Lighting and Telephone BoothEnergy Charge - 127.10 Geyser ControlBasic Charge - 66.59 Availability ChargeBasic Charge - 227.84

Industrial Bulk LV (400V) BlockBasic Charge - 807.02Energy Charge - 97.64Demand Charge - 219.34

Bulk Time Of Use 11000VBasic Charge - 1 941.20Energy Charge: Low SeasonPeak - 116.98Standard - 86.71Off - Peak - 62.22Energy Charge: High SeasonPeak - 317.93Standard - 110.04Off - Peak - 75.67Network Demand Charge - 97.74Network Access Charge - 83.08Reactive Energy Charge - 0.033

Page 39: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

37

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Oudtshoorn (Continued)

Bulk Time Of Use (400V) for Pilot OnlyBasic Charge - 970.63Energy Charge: Low SeasonPeak - 122.86Standard - 91.02Off - Peak - 65.37Energy Charge: High SeasonPeak - 333.80Standard - 115.61Off - Peak - 79.46Network Demand Charge - 107.52Network Access Charge - 91.39Reactive Energy Charge - 0.033 Bulk Time Of Use InfeedEnergy Charge: Low SeasonPeak - 88.70Standard - 60.90Off - Peak - 38.50Energy Charge: High SeasonPeak - 272.40Standard - 82.30Off - Peak - 51.30

Page 40: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

38

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Overstrand6.84%    

Lifeline 1 Part Tariff (Prepaid Meters) ≤30AEnergy Charge - 107.28

Domestic Single Phase 2 Part Credit Meters 60ABlock 1 (0- 350kWh) - 114.88Block 2 (351-600kWh) - 167.82Block 3 (>600kWh) - 206.02Basic Charge - 291.60 Domestic Single Phase 2 Part Prepaid Meters 60ABlock 1 (0- 350kWh) - 106.12Block 2 (351-600kWh) - 158.14Block 3 (>600kWh) - 198.03Basic Charge - 291.60 Domestic Three Phase 2 Part Prepaid Meters 100ABlock 1 (0- 350kWh) - 114.87Block 2 (351-600kWh) - 167.82Block 3 (>600kWh) - 205.24Basic Charge - 583.19 Domestic Three Phase 2 Part Prepaid Meters 100ABlock 1 (0- 350kWh) - 106.12Block 2 (351-600kWh) - 158.14Block 3 (>600kWh) - 197.15Basic Charge - 583.19

One Part Tariff Local EconomicDevelopment ProjectsEnergy Charge - 185.35 Single Phase Cerdit MetersBasic Charge - 291.60Energy Charge - 171.02 Single Phase Prepaid MetersBasic Charge - 291.60Energy Charge - 161.16

Three Phase 2 Part Credit (Up to 100A)Basic Charge - 583.19Energy Charge - 171.02 Three Phase 2 Part Prepaid (Up to 100A)Basic Charge - 583.19Energy Charge - 161.17 Three Phase 1 Part Prepaid (Up to 100A)Energy Charge - 203.41 Streetlights (Metered)Energy Charge - 74.24 Streetlights (Consumption)Energy Charge - 26.04 Illuminated Street Sign BoardsEnergy Charge - 26.04

N/A

N/A

Time Of Use Medium Voltage >500kVABasic Charge - 2 820.47Energy ChargesPeak - 273.84Standard - 84.26Off-Peak - 46.81Demand Charge - 26.57Network Capacity Charge - 21.14 Time Of Use Low Voltage >70kVABasic Charge - 2 820.47Energy ChargesPeak - 277.36Standard - 87.77Off-Peak - 50.33Demand Charge - 26.57Network Capacity Charge - 21.14

Page 41: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

39

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Prince Albert6.84%

Domestic Indigent Households PrepaidBlock 1 (0- 50kWh) - 0.00Block 2 (51-350kWh) - 106.89Block 3 (351-600kWh) - 136.71Block 4 (>600kWh) - 162.94

Domestic 2PartAmpere Charge - 51.358/5AmpEnergy Charge - 103.73 Domestic 1PartEnergy Charge - 184.80 Domestic Three PhaseAmpere Charge - 18.8038/AmpEnergy Charge - 103.73

N/A

Business Small ConventionalBasic Charge - 73.2709/5AmpEnergy Charge - 103.73 Business Medium ConventionalBasic Charge - 136.0073/5AmpEnergy Charge - 103.71 Commercial/Guesthouse Energy Charge - 203.85

Industrial Low 40 - 100kVABasic Charge - 758.87/AmpEnergy Charge - 93.39Demand Charge - 151.7342 Industrial Low >100kVABasic Charge - 2 082.0338/AmpEnergy Charge - 65.75Demand Charge - 198.3805

Sports Field/Municipality and Street LightingEnergy Charge - 203.87 Private Street LightingFixed Charge/Light - 87.5447

Time Of Use Large Power 11kV ConnectionBasic Charge - 2 183.4143Energy ChargePeak - 219.50Standard - 127.46Off-Peak - 52.24

Saldanha Bay 6.84%

Prepaid Low<30 Amp Single PhaseBlock 1 (0- 350kWh) - 110.64Block 2 (351-600kWh) - 162.18

Prepaid>30 Ampere Single PhaseBlock 1 (0- 350kWh) - 109.51Block 2 (351-600kWh) - 152.40Service Charge - 21.37Connection Charges - 4.17

All CommercialEnergy Charges - 138.89Service Charge - 21.37Connection Charges - 6.09 SSEG Feed In TariffEnergy Charge - 55.92

 

Bulk LV Up to 70kVABasic Charge - 2 127.41Energy Charge - 75.67Demand Charge - 231.84 Bulk LV 71kVA - 500kVA and MV up to 500kVABasic Charge - 2 137.00Energy Charge - 75.67Demand Charge - 231.84

Bulk 501kVA - 630kVABasic Charge - 16 000.00Energy Charge - 75.67Demand Charge - 231.84 Bulk MV 501-1000kVABasic Charge - 20 978.16Energy Charge - 75.67Demand Charge - 231.84 Bulk MV>1000 kVABasic Charge - 31 303.63Energy Charge - 77.46Demand Charge - 231.84

N/A

Page 42: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

40

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Stellenbosch 6.84%

Domestic (Dom 1) Prepaid Lifeline Block 1 (0- 100kWh) - 91.44Block 2 (101-300kWh) - 114.42Block 3 (301-600kWh) - 170.54Block 4 (>600kWh) - 196.38

Domestic (Dom 2) Regular PrepaidBlock 1 (0- 50kWh) - 91.60Block 2 (51-350kWh) - 134.00Block 3 (351-600kWh) - 174.33Block 4 (>600kWh) - 195.25 Domestic (Dom 3) Regular PrepaidBlock 1 (0- 50kWh) - 91.44Block 2 (51-350kWh) - 117.29Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85Basic Charge - 125.39 Domestic (Dom 4) Regular ConventionalBlock 1 (0- 50kWh) - 91.44Block 2 (51-350kWh) - 117.29Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85Basic Charge - 154.67 Domestic Renewal EnergyGeneration For Own Use Block 1 (0- 50kWh) - 91.44Block 2 (51-350kWh) - 117.29Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85Basic Charge - 154.67Reading Cost - 70.00Reactive Energy Charge - 17.97

Commercial Low <=20A (1 and 3 Phase Prepaid)Energy Charge - 198.00 Commercial Low (Com 4) Regular 80A (Credit Meter)and Own Generation ( 1 and 3 Phase Prepaid)Basic Charge - 287.93Energy Charge - 175.80 Commercial (Com 5) Renewable EnergyBasic Charge - 290.50Reading Cost - 70.00Energy Charge - 175.80Reactive Energy Charge - 17.97 NGO: single Phase 20 Amp Prepayment (NPO1)Energy Charge - 198.00 NGO: Low Voltage Max 80A Prepayment SARS Approved (NPO2)Energy Charge - 189.96 Municipal Street and Traffic Lights (MUN1)Energy Charge - 197.47

Commercial Low (Com 2), Non-Profitable Charirities 40A and Own Generation ( 1 and 3 Phase Prepaid)Basic Charge -155.00Energy Charge - 159.00 Commercial Low (Com 3) Regular 80A Prepaid and Own Generation ( 1 and 3 Phase Prepaid)Basic Charge - 265.41Energy Charge - 188.64 Agricultural: Regular (Prepaid and Credit Meters 80A 3 Phase) (AGR1) and Own GenerationBasic Charge - 306.97Energy Charge - 190.00 Agricultural: Renewable Energy (AGRI 1.1) Generation For Own Use & ExportBasic Charge - 306.97Reading Cost - 70.00Energy Charge - 186.57Reactive Energy Charge - 17.97

Industrial Power LV> 80A andGeneration For Own Use (IND1)Basic Charge - 1 621.21Energy Charge - 86.46Demand Charge - 219.71Utilised Demand Charge - 39.57 Industrial: (IND 1.1 & IND 1.2) Renewable Energy - Generation For Own Use & ExportBasic Charge - 1 621.21Reading Cost - 70.00Energy Charge - 86.46Demand Charge - 219.71Utilised Demand Charge - 39.57Reactive Energy Charge - 17.97

Industrial Medium Voltage (IND2)Basic Charge - 3 073.89Energy Charge - 85.29Demand Charge - 218.09Utilised Demand Charge - 38.94 Industrial: (IND 2.1 ) RenewableEnergy - Generation For Own Use & ExportBasic Charge - 3 073.89Reading Cost - 70.00Energy Charge - 85.29Demand Charge - 218.09Utilised Demand Charge - 38.94Reactive Energy Charge - 17.97 Wheeling TariffLV (400V) Energy Charge: 66.78MV (400V) Energy Charge: 43.33

Time Of Use Low Voltage>80A and for Own Generation Use (TOU1)Basic Charge - 3 098.00Low Season Energy Charge:Peak - 137.40Standard - 90.54Off - Peak - 67.90High Season Energy Charges:Peak - 430.87Standard - 129.32Off - Peak - 75.98Demand Charge - 42.00Access Charge - 42.00Reactive Energy - 17.91 Time of Use (TOU1.1 ) Renewable Energy - Generation For Own Use & ExportBasic Charge - 3 098.00Reading Cost - 70.00Demand Charge - 42.00Access Charge - 42.00Reactive Energy - 17.97Low Season: Energy ChargePeak - 137.40Standard - 90.54Off - Peak - 67.90High Season: Energy ChargePeak - 430.87Standard - 129.32Off - Peak - 75.98

Page 43: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

41

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Stellenbosch(Continued)

Exports Rates for domestic,commercial and agricultureLow Season: Energy ChargePeak - 87.35Standard - 60.49Off - Peak - 39.47High Season: Energy ChargePeak - 269.42Standard - 81.63Off - Peak - 44.34

Municipal: Low Voltage Max 80A (MUN2)Energy Charge - 179.50 Municipal: Low Voltage >80A (MUN3)Demand Charge - 243.56Energy Charge - 82.27 Municipal: Medium Voltage (MUN4)Demand Charge - 237.00Energy Charge - 73.67 Sport: Low Consumers Max 80 and Prepayment (SPO1)Energy Charge - 168.29 Sport: High Consumers Maximum Demand (SPO2)Demand Charge - 242.74Energy Charge - 77.01

Time of Use Medium Voltage for own use (TOU2)Basic Charge - 5 633.00Low Season Energy Charge:Peak - 127.97Standard - 83.71Off - Peak - 62.74High Season Energy Charges:Peak - 422.74Standard - 120.08Off - Peak - 70.59Demand Charge - 41.00Access Charge - 39.00Reactive Energy - 18.14 Time of Use (TOU2.1 ) Renewable Energy - Generation For Own Use & ExportBasic Charge - 5 633.00Reading Cost - 70.00Demand Charge - 41.00Access Charge - 39.00Reactive Energy - 18.14Low Season Energy Charge:Peak - 127.97Standard - 83.71Off - Peak - 62.74High Season Energy Charges:Peak - 422.74Standard - 120.08Off - Peak - 70.59

Page 44: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

42

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Stellenbosch(Continued)

Exports Rates for industrial and time of useLow Season: Energy ChargePeak - 89.36Standard - 61.51Off - Peak - 39.01High Season: Energy ChargePeak - 273.96Standard - 82.99Off - Peak - 45.07

Swartland 6.84%

Prepaid Households IndigentBlock 1 (0-50kWh) - 83.82Block 2 (51-350kWh) - 109.94Block 3 (351-600kWh) -156.74Block 4 (>600kWh) - 188.31 Prepaid -Households Non Indigent AlternativeBlock 1 (0-350kWh) - 174.69Block 2 (>350kWh) - 187.60

Households and Farming ConsumersNon IndigentBlock 1 (0-50kWh) - 91.43Block 2 (51-350kWh) -117.56Block 3 (351-600kWh) - 165.45Block 4 (>600kWh) - 194.84Basic Charge - 181.27 Households Alternative <20 AmpBlock 1 (0-50kWh) - 83.82Block 2 (51-350kWh) - 109.94Block 3 (351-600kWh) -156.74Block 4 (>600kWh) - 188.31

Commercial PrepaidEnergy Charge - 203.86 Commercial Alternative <15 AmpEnergy Charge - 203.75 Street Lighting - Internal TariffEnergy Charge - 96.49 Net Metering TariffBlock 1 (0-600kWh) - 138.43Block 2 (>600kWh) - 194.84Basic Charge - 181.27Export Energy Charge - 74.56 Sports Ground FloodLightingEnergy Charge - 303.32

Commerce<20kVABasic Charge - 416.06Energy Charge - 152.54 Commerce 20 to 40kVABasic Charge - 606.46Energy Charge - 152.54 Commerce>40kVABasic Charge - 1 106.84Energy Charge - 152.54 Commerce/Non StandardBasic Charge - 638.19Energy Charge - 152.54

Industrial Basic Charge - 1 247.70Energy Charge - 58.67Demand Charge - 240.04

N/A

Bulk Time of Us: AlternativeBasic Charge - 1 247.70Network Demand Charge - 160.99Energy Charge: Low SeasonPeak - 101.73Standard - 70.01Off-peak - 44.40Energy Charge: High SeasonPeak - 311.87Standard - 94.47Off-peak - 51.29

Page 45: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

43

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Swellendam 6.84%

Prepaid 1 Phase IndigentBlock 1 (0-50kWh) - 88.00Block 2 (51-350kWh) - 113.00Block 3 (351-600kWh) - 160.00Block 4 (>600kWh) - 189.00

Prepaid 1 Phase 0-30ABlock 1 (0-50kWh) - 89.00Block 2 (51-350kWh) - 115.00Block 3 (351-600kWh) - 162.00Block 4 (>600kWh) - 191.00Basic Charge - 95.10 Prepaid 1 Phase 0-30A (Alternative)Block 1 (0-50kWh) - 144.00Block 2 (51-350kWh) - 152.00Block 3 (351-600kWh) - 168.00Block 4 (>600kWh) - 199.00 Prepaid 1 Phase 31-60ABlock 1 (0-50kWh) - 89.00Block 2 (51-350kWh) - 115.00Block 3 (351-600kWh) - 162.00Block 4 (>600kWh) - 191.00Basic Charge - 174.60 Preapaid 3 Phase 21 - 60ABlock 1 (0-50kWh) - 89.00Block 2 (51-350kWh) - 115.00Block 3 (351-600kWh) - 162.00Block 4 (>600kWh) - 191.00Basic Charge - 235.50

Prepaid 1 Phase 30ABasic Charge - 3.64/dayEnergy Charge - 185.00 Prepaid 1 Phase 60A -80ABasic Charge - 3.64/dayEnergy Charge - 196.00 Prepaid 3 Phase 60A -80ABasic Charge - 3.64/dayEnergy Charge - 199.00 Street Lighting (Municipal)Energy Charge - 150.00 Sports Clubs 0 -30AEnergy Charge - 185.00 Sports Clubs 31 -60AEnergy Charge - 185.00 Show GroundsEnergy Charge - 201.00 Drosty Water MillEnergy Charge - 185.00 School 1 Phase 31 -60ABasic Charge - 270.00Energy Charge - 180.00

Conventional 1 Phase 20A-30ABasic Charge - 240.00Energy Charge - 168.00 Conventional 1 Phase 31-60ABasic Charge - 445.00Energy Charge - 164.00 Conventional 3 Phase 20-30ABasic Charge - 580.00Energy Charge - 152.00 Conventional 3 Phase 31-60ABasic Charge - 1 150.00Energy Charge - 150.00 Conventional 3 Phase 61-100ABasic Charge - 1 915.00Energy Charge - 150.00

Normal BulkBasic Charge - 660.00Energy Charge - 80.00Demand Charge - 219.51

N/A

Time Of UseBasic Charge - 660.00Demand Charge - 65.71Reactive Energy charge - 14.00Energy Charge: Low SeasonPeak - 123.00Standard - 88.00Off-peak - 58.00Energy Charge: High SeasonPeak - 356.00Standard - 114.00Off-peak - 66.00

Page 46: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

44

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Swellendam(Continued)

Conventional 1 Phase 1-30ABlock 1 (0-50kWh) - 90.00Block 2 (51-350kWh) - 116.00Block 3 (351-600kWh) - 163.00 Block 4 (>600kWh) - 192.00Basic Charge - 150.00 Conventional 1 Phase 31-60ABlock 1 (0-50kWh) - 90.00Block 2 (51-350kWh) - 116.00Block 3 (351-600kWh) - 163.00Block 4 (>600kWh) - 192.00Basic Charge - 290.00 Conventional 3 Phase 21-30ABlock 1 (0-50kWh) - 90.00Block 2 (51-350kWh) - 116.00Block 3 (351-600kWh) - 163.00Block 4 (>600kWh) - 192.00Basic Charge - 384.27 Conventional 3 Phase 31-100ABlock 1 (0-50kWh) - 90.00Block 2 (51-350kWh) - 116.00Block 3 (351-600kWh) - 163.00Block 4 (>600kWh) - 192.00Basic Charge - 720.00

School 3 Phase 31 -60ABasic Charge - 720.00Energy Charge - 170.00 School 3 Phase 61 -100ABasic Charge - 1 915.00Energy Charge - 151.00 School Sports Grounds 34 -60AEnergy Charge - 185.00

Page 47: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

45

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Theewaterskloof 6.84%

Life PrepaidBlock1 (0-350kWh)- 127.17Block2 (>351kWh) - 167.11

Single Phase Credit MeterBasic Charge - 53.37Energy Charge - 157.65 Three Phase Credit MeterBasic Charge - 88.85Energy Charge - 169.34

One Part PrepaidEnergy Charge - 167.11

Commercial 25kVABasic Charge - 335.42Energy Charge - 151.71 Commercial 26kVA to 50kVABasic Charge - 532.70Energy Charge - 151.71 Commercial 51 to 100kVABasic Charge - 807.71Energy Charge - 150.64

Commercial PrepaidEnergy Charge - 206.45 Street Light TariffBasic Charge - 52.04Energy Charge - 41.00

Non-Standard Time of UseLow Voltage <100kVABasic Charge - 1 775.80Energy Charge: High SeasonPeak - 358.84Standard - 106.22Off-peak - 64.88Energy Charge: Low SeasonPeak - 112.79Standard - 75.85Off-peak - 58.35Network Access Charge - 16.89Network Demand Charge - 105.03Reactive Energy Charge - 0.0923 Low Voltage >101-500kVABasic Charge - 3 748.77Energy Charge: High SeasonPeak - 358.84Standard - 106.22Off-peak - 64.88Energy Charge: Low SeasonPeak - 112.79Standard - 75.85Off-peak - 58.35Network Access Charge - 16.89Network Demand Charge - 105.03Reactive Energy Charge - 0.0923

Medium Voltage <100kVABasic Charge - 1 775.80Energy Charge: High SeasonPeak - 335.36Standard - 99.25Off-peak - 60.63Energy Charge: Low SeasonPeak - 105.43Standard - 70.88Off-peak - 54.53Network Access Charge - 15.78Network Demand Charge - 98.16Reactive Energy Charge - 0.0923 Medium Voltage >101-500kVABasic Charge - 3 748.77Energy Charge: High SeasonPeak - 335.36Standard - 99.25Off-peak - 60.63Energy Charge: Low SeasonPeak - 105.43Standard - 70.88Off-peak - 54.53Network Access Charge - 15.78Network Demand Charge - 98.16Reactive Energy Charge - 0.0923

Page 48: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

46

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Theewaterskloof(Continued)

Low Voltage >500kVABasic Charge - 8 560.69Energy Charge: High SeasonPeak - 358.84Standard - 106.22Off-peak - 65.17Energy Charge: Low SeasonPeak - 113.00Standard - 75.85Off-peak - 58.76Network Access Charge - 16.89Network Demand Charge - 105.03Reactive Energy Charge - 0.0923 Non-Starndard Time Of UseApplication Fee: 00.00Inspection Fee: 00.00Admin Fee : 00.00Energy Charge: High SeasonPeak - 273.98Standard - 82.80Off-peak - 45.07Energy Charge: Low SeasonPeak - 89.36Standard - 61.51Off-peak - 39.00

Medium Voltage >500kVA Basic Charge - 8 560.69Energy Charge: High SeasonPeak - 335.36Standard - 99.25Off-peak - 60.63Energy Charge: Low SeasonPeak - 105.43Standard - 70.88Off-peak - 54.53Network Access Charge - 15.78Network Demand Charge - 98.16Reactive Energy Charge - 0.0923

Vleesbaai Dienste -6.44% 

N/A 

Domestic ConventionalNon-peak Energy Rate - 101.00Peak Energy Rate - 167.00Fixed Annual Levy/annum - 1 542.74

N/A N/A N/A N/A N/A

Page 49: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

47

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Witzenberg 6.84%

Prepaid Single PartBlock 1 (0-600kWh) - 117.50Block 2 (>600kWh) - 203.00

Single part single phaseBlock 1 (0-600kWh) - 133.60Block 2 (>600kWh) - 180.60 Two Part Three PhaseBlock 1 (0-600kWh) - 75.90Block 2 (>600kWh) - 109.00Basic Charge - 527.79

Commercial PrepaidBlock 1 (0-600kWh) - 181.60Block 2 (>600kWh) - 197.70

Single Phase 20ABasic Charge - 318.38Energy Charge - 151.70 Single Phase 40ABasic Charge - 582.28Energy Charge - 151.70 Single Phase 60ABasic Charge - 720.10Energy Charge - 151.70 Single Phase 80ABasic Charge - 721.17Energy Charge - 151.70 Single Phase 100ABasic Charge - 941.26Energy Charge - 151.70 Single Phase 150ABasic Charge - 1 038.39Energy Charge - 149.24 Single Phase 200ABasic Charge - 1 186.40Energy Charge - 149.24 Single Phase 250ABasic Charge - 1 312.70Energy Charge - 149.24

Industrial <1 MVA Low Tension RuralBasic Charge - 3 946.67Energy Charge - 79.10Demand Charge - 202.34 Industrial Low Tension Urban Basic Charge - 8 099.54Energy Charge - 112.20Demand Charge - 110.08

Industrial <1 MVA High Tension RuralBasic Charge - 6 698.87Energy Charge - 86.50Demand Charge - 153.07 Industrial >1 MVA High Tension UrbanBasic Charge - 12 226.77Energy Charge - 106.80Demand Charge - 107.99 Industrial <1 MVA High Tension for UrbanBasic Charge - 9 956.42Energy Charge -103.60Demand Charge - 116.37 SportEnergy Charge - 177.40 StreetlightsEnergy Charge - 170.90

Time of Use<1MVA High Tension (Rural)Basic Charge - 6 999.09Demand Charge - 120.57Low SeasonPeak - 113.30Standard - 81.20Off-Peak - 54.50High SeasonPeak - 324.80Standard - 104.70Off-Peak - 62.00 Time of Use< 1MVA Low Tension (Rural)Basic Charge - 4 486.21Demand Charge - 112.00Low SeasonPeak - 125.00Standard - 88.70Off-Peak - 59.80High SeasonPeak - 357.90Standard - 115.40Off-Peak - 68.40

Page 50: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

48

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Witzenberg(Continued)

Three Phase 20ABasic Charge - 1 022.46Energy Charge - 134.60 Three Phase 40ABasic Charge - 1 148.53Energy Charge - 134.60 Three Phase 60ABasic Charge - 1 225.45Energy Charge - 134.60 Three Phase 80ABasic Charge - 1 310.93Energy Charge - 134.60 Three Phase 100ABasic Charge - 1 586.57Energy Charge - 134.60 Three Phase 150ABasic Charge - 1 946.62Energy Charge - 134.60 Three Phase 200ABasic Charge - 2 325.91Energy Charge - 134.60

Three Phase 250ABasic Charge - 2 377.19Energy Charge - 134.60

Time of Use>1MVA High Tension (Urban)Basic Charge - 14 652.04Demand Charge - 84.67Low SeasonPeak - 130.30 Standard - 94.00Off-Peak - 62.00High SeasonPeak - 379.30Standard - 122.90Off-Peak - 71.60 Time of Use<1MVA High Tension (Urban)Basic Charge - 8 771.56Demand Charge - 94.20Low SeasonPeak - 140.00Standard - 99.40Off-Peak - 68.40High SeasonPeak - 403.90Standard - 130.30Off-Peak - 75.90

Page 51: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

49

APPROVED MUNICIPAL ELECTRICITY TARIFFS

WESTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Witzenberg(Continued)

Agricultural Customers <25kVABasic Charge - 613.26Energy Charge - 162.40 Agricultural Customers 25kVA<=50kVABasic Charge - 896.39Energy Charge - 162.40 Agricultural Customers 50kVA<=100kVABasic Charge - 1 212.63Energy Charge - 162.40

Time of Use<1MVA Low Tension (Urban)Basic Charge - 7 967.63Demand Charge - 109.03Low SeasonPeak - 140.27 Standard - 99.57Off-Peak - 67.45High SeasonPeak - 405.82Standard - 130.63Off-Peak - 77.75

Page 52: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

50

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCE

Page 53: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

51

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Southern Free State 6.84%

Tariff I: IBT Indigent (Conventional and Prepaid)SummerBlock 1(0-50kWh) - 107.20Block 2(51-350kWh) -115.40Block 3(>350kWh) - 169.40WinterBlock 1(0-50kWh) - 140.40Block 2(51-350kWh) - 149.90Block 3(>350kWh) - 197.30

Tariff II: Domestic IBT (Conventional and Prepaid)SummerBlock 1(0-350kWh) - 169.80Block 2(> 350kWh) -169.80WinterBlock 1(0-350kWh) - 188.30Block 2(> 350kWh) -188.30

Tariff IV: Flat Business Commercial Prepaid & Rotary BusinessSummer Energy Charge - 204.31Winter Energy Charge - 209.99

Tariff V: DepartmentalEnergy Charge Summer Energy Charge - 157.80Winter Energy Charge - 157.80

N/A N/A Tariff II: Homeflex - Three PhaseBasic charges - 390.18Energy Charges - Low Season:Peak - 183.60Standard - 142.50Off-peak - 129.50Energy Charges - High Season:Peak - 347.20Standard - 200.20Off-peak - 191.80 Tariff II: Homeflex - Single PhaseBasic charges - 128.29Energy Charges - Low Season:Peak - 183.60Standard - 142.50Off-peak - 129.50Energy Charges - High Season:Peak - 347.20Standard - 200.20Off-peak - 191.80 Tariff VI: Comflex ( old age home, schools, clinics - 80 to 150 Amp per phase)Basic charges - 152.84Energy Charges - Low Season:Peak - 239.85Standard - 133.84Off-peak -124.21Energy Charges - High Season:Peak - 355.49Standard - 217.37Off-peak - 159.54

Page 54: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

52

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Southern Free State (Continued)

Tariff VII: Elecflex 2 Time of UseBasic charge - 2 082.94Access charge - 50.04Demand charge - 127.01Energy Charges - Low Season:Peak - 139.60Standard - 89.60Off-peak - 83.90Energy Charges - High Season:Peak - 282.10Standard -134.00Off-peak - 93.80 Tariff VII: Elecflex 3 Time of UseBasic charge - 1 661.71Network Acess Charge - 56.57Demand charge - 145.64Energy Charges - Low Season:Peak - 172.10Standard - 113.00Off-peak - 103.80Energy Charges - High Season:Peak - 333.50Standard - 162.40Off-peak - 153.20 Tariff V: Departmental TOUEnergy Charges - Low Season:Peak - 171.10Standard - 114.80Off-peak - 85.50Energy Charges - High Season:Peak - 319.90Standard - 159.30Off-peak - 146.50

Page 55: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

53

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Southern Free State (Continued)

Tariff V: Sport Stadiums on Time Of UseEnergy Charges - Low Season:Peak - 228.60Standard - 165.50Off-peak - 158.90Energy Charges - High Season:Peak - 309.10Standard - 248.20Off-peak - 216.60 Bulk Resell 2 (AMI)Basic charge - 2 187.68Demand charge - 81.19Energy Charges - Low Season:Peak - 141.90Standard - 102.90Off-peak - 85.40Energy Charges - High Season:Peak - 234.50Standard -146.70Off-peak - 139.50 Comflex 3 PhaseBasic charge - 1 440.04Demand charge - 71.13Energy Charges - Low Season:Peak - 173.40Standard - 124.60Off-peak - 119.20Energy Charges - High Season:Peak - 244.70Standard -145.40Off-peak - 126.80

Page 56: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

54

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Southern Free State (Continued)

Bulk Resell 3 (AMI)Basic charge - 472.04Energy Charges - Low Season:Peak - 225.10Standard - 143.10Off-peak - 128.10Energy Charges - High Season:Peak - 355.70Standard -218.20Off-peak - 210.10

CENTLEC Mangaung 6.84% 

Domestic IBT SummerLifeline (0-100kWh) -100.50Block 2(101-350kWh) - 106.96Block 3(> 350kWh) - 145.95WinterLifeline (0-100kWh) - 127.66Block 2(101-350kWh) - 136.31Block 3(> 350kWh) - 161.70

Domestic IBT SummerBlock 1(0-350kWh) - 120.00Block 2(351>600kWh) - 129.00WinterBlock 1(0-350kWh) - 150.00Block 2(351>600kWh) - 155.00

Flat Business Commercial Prepaid Summer Energy Charge - 192.00Winter Energy Charge - 200.88 Non Profit Organisations SummerBlock 1(0-50kWh) - 120.00Block 2(>51kWh) - 129.00WinterBlock 1(0-50kWh) - 150.00Block 2(>51kWh) - 155.00

Flat Business Commercial ConventionalSummer Energy Charge - 192.00Winter Energy Charge - 200.88 Alternative ResellBasic charge - 719.80Summer Energy Charge - 161.33Winter Energy Charge - 174.15 DepartmentalSummer Energy Charge - 145.86Winter Energy Charge - 145.86

Net Metering TariffSummerLow Season - 85.47High Season - 111.11

N/A N/A Tariff II: Homeflex- Single Phase Time of UseBasic charge - 137.87Energy Charges - Low Season:Peak - 179.17Standard - 134.38Off-peak - 113.41Energy Charges - High Season:Peak - 329.94Standard - 181.36Off-peak - 174.80 Tariff II: Homeflex -Three Phase Time of UseBasic charge - 392.71Energy Charges - Low Season:Peak - 179.17Standard - 134.38Off-peak - 113.41Energy Charges - High Season:Peak - 329.94Standard - 181.36Off-peak - 174.80

Page 57: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

55

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Mangaung(Continued)

Tariff III: Bulk Reselling 2Basic charge - 2 496.76Demand charge -18.05Energy Charges - Low Season:Peak - 156.13Standard - 124.97Off-peak - 92.46Energy Charges - High Season:Peak - 226.31Standard - 161.06Off-peak - 135.82 Tariff III: Bulk Reselling 3Basic charge - 2 598.07Demand charge - 12.89Energy Charges - Low Season:Peak - 159.99Standard - 130.37Off-peak - 93.55Energy Charges - High Season:Peak - 227.16Standard - 188.15Off-peak - 131.39 Tariff VI: Comflex - Single PhaseBasic charge - 154.52Energy Charges - Low Season:Peak - 239.85Standard - 133.84Off-peak - 124.21Energy Charges - High Season:Peak - 355.49Standard - 217.37Off-peak - 159.54

Page 58: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

56

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Mangaung(Continued)

Tariff VI: Comflex - Three PhaseBasic charge - 463.57Energy Charges - Low Season:Peak - 239.85Standard - 133.84Off-peak - 124.21Energy Charges - High Season:Peak - 355.49Standard - 217.37Off-peak - 159.54 Tariff VII: Elecflex 1 Time Of UseBasic charge - 3 078.40Access charge - 41.83Demand Charge - 116.58Energy Charges - Low Season:Peak - 143.54Standard - 94.16Off-peak - 87.27Energy Charges - High Season:Peak - 282.49Standard - 144.69Off-peak - 135.50

Page 59: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

57

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Mangaung(Continued)

Tariff VII: Elecflex 2 Time Of UseBasic charge - 2 039.79Access charge - 46.34Demand Charge - 125.76Energy Charges - Low Season:Peak - 143.54Standard -94.16Off-peak - 83.10Energy Charges - High Season:Peak - 282.09Standard - 144.32Off-peak - 132.29 Tariff VII: Elecflex 3 Time Of UseBasic charge - 1 590.00Access charge - 48.41Demand Charge - 135.82Energy Charges - Low Season:Peak - 150.85Standard - 98.85Off-peak - 88.47Energy Charges - High Season:Peak - 282.37Standard -143.90Off-peak - 134.67 Tariff V:Sport Stadiums Time Of UseEnergy Charges - Low Season:Peak - 254.71Standard - 161.09Off-peak - 137.15Energy Charges - High Season:Peak - 456.08Standard - 247.09Off-peak - 222.06

Page 60: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

58

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

CENTLEC Mangaung(Continued)

Tariff V: Departmental Time Of UseEnergy Charges - Low Season:Peak - 154.57Standard - 99.05Off-peak - 87.07Energy Charges - High Season:Peak - 290.63Standard - 165.45Off-peak - 157.83 Net Metering TariffLow Season - 85.47High Season - 111.11

Damplaas Kragbon (PTY) Ltd 

N/A 

N/A 

N/A 

Farms

Summer Energy Charge - 105.00

Winter Energy Charge - 158.00

Dihlabeng6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 97.28Block 2(51-350kWh) - 122.26Block 3(351-600kWh) - 161.74Block 4(>600kWh) - 194.56 Depart. Residential (BE/EL0111)Basic Charge - 514.52Energy Charge - 154.82

Domestic ConventionalBlock 1(0- 50kWh) - 97.28Block 2(51-350kWh) - 122.26Block 3(351-600kWh) - 161.74Block 4(>600kWh) - 194.56Basic Charge - 187.04

Commercial Prepaid Energy Charge - 201.28

Commercial Conventional( Fouriesburg, Rosendal and Paul Roux)Basic Charge - 514.52Energy Charge - 161.50 Business and Churches ( Fouriesburg, Rosendal and Paul Roux)Basic Charge - 514.52Energy Charge - 161.50 Businesses from HomeBasic Charge - 412.17Energy Charge - 167.26

Industrial <500kVABasic Charge - 8 292.60Energy Charge - 152.00Demand Charge - 77.42

N/A Time Of Use Bulk Basic Charge - 8 364.86Energy Charge Low SeasonPeak - 116.90Standard -77.17Off - peak - 58.12Demand Charge - 164.63Energy Charge High SeasonPeak - 397.46Standard - 125.10Off - peak - 80.50Demand Charge - 167.73

Page 61: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

59

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Dihlabeng(Continued)

DepartmentalBasic Charge - 514.52Energy Charge - 154.82 Departmental Bulk Above 500kVABasic Charge - 1 442.47Energy Charge - 71.06

Letsemeng6.84%   

Domestic PrepaidBlock 1(0-50kWh) - 90.51Block 2(51-350kWh) - 114.78Block 3(351-600kWh) - 158.17Block 4(>600kWh) - 188.63

Domestic ConventionalBlock 1(0-50kWh) - 88.19Block 2(51-350kWh) - 112.44Block 3(351-600kWh) - 157.00Block 4(>600kWh) - 188.63Basic Charge - 207.40

Commercial PrepaidEnergy Charge - 204.11

Commercial ConventionalCommercial LowBasic Charge - 377.36Energy Charge - 172.29 Commercial >50kVABasic Charge - 4 370.71Energy Charge - 138.21 MunicipalEnergy Charge - 162.63

Industrial MediumBasic Charge - 6 455.72Energy Charge - 79.50Demand Charge - 227.43

N/A

N/A

Mafube6.84% 

Domestic PrepaidDomestic Prepaid Flat Rate Single PhaseBlock 1(0-100kWh) - 114.83Block 2 (>100kWh) -147.65 Domestic Prepaid Flat Rate Three PhaseBlock 1(0-100kWh) - 114.83Block 2 (>100kWh) -147.65

N/A Municipal and Public SchoolsPrepaid Single PhaseEnergy Charge - 160.31 Municipal and Public Schools Prepaid - Three PhaseEnergy Charge - 160.31 Municipal and Public Schools Prepaid - Three Phase Customers pre 2012Energy Charge - 160.31

Municipal and Public Schools Conventional - Single PhaseEnergy Charge - 160.31 Municipal and Public Schools Conventional - Three PhaseEnergy Charge - 160.31

N/A N/A Time Of Use TariffDomestic Prepaid Single PhaseEnergy Charges - Summer:Peak - 171.66Standard - 141.51Off-peak - 124.11Energy Charge Winter:Peak - 365.37Standard - 180.94Off-peak - 131.07

 

Page 62: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

60

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mafube(Continued)

Domestic Prepaid Three PhaseEnergy Charges - Summer:Peak - 171.66Standard - 141.51Off-peak - 124.11Energy Charge Winter:Peak - 365.37Standard - 180.94Off-peak - 131.07 Domestic Conventional (E009) Single PhaseBasic charge: 98.35Energy Charges - Summer:Peak - 162.04Standard - 134.55Off-peak - 104.16Energy Charge Winter:Peak - 363.28Standard - 170.74Off-peak - 112.88 Domestic Conventional Three PhaseBasic charge: 276.27Energy Charges - Summer:Peak - 151.41Standard - 125.98Off-peak - 97.53Energy Charge Winter:Peak - 340.15Standard - 159.87Off-peak - 105.67

Page 63: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

61

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mafube(Continued)

Bulk Domestic Conventional Three PhaseBasic charge: 491.76Energy Charges - Summer:Peak - 161.71Standard - 134.55Off-peak - 104.16Energy Charge Winter:Peak - 363.28Standard - 170.74Off-peak - 112.86 Business and General Single Phase < 80ABasic charge: 525.96Energy Charges - Summer:Peak - 197.93Standard - 168.65Off-peak -137.03Energy Charge Winter:Peak - 374.79Standard - 193.25Off-peak - 148.29 Business and General Three Phase < 80ABasic charge: 878.01Energy Charges - Summer:Peak - 192.74Standard - 164.23Off-peak -133.44Energy Charge Winter:Peak - 364.96Standard - 188.18Off-peak - 139.14

Page 64: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

62

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mafube(Continued)

Business and General Prepaid Single Phase < 30AEnergy Charges - Summer:Peak - 219.54Standard - 187.06Off-peak -151.99Energy Charge Winter:Peak - 415.69Standard - 214.34Off-peak - 158.48 Business and General Prepaid Single Phase 30A - 80AEnergy Charges - Summer:Peak - 236.05Standard - 201.13Off-peak -163.42Energy Charge Winter:Peak - 446.96Standard - 230.46Off-peak - 170.40 Business and General Prepaid Three Phase < 80AEnergy Charges - Summer:Peak - 236.05Standard - 250.47Off-peak -170.40Energy Charge Winter:Peak - 446.96Standard - 230.47Off-peak - 170.40

Page 65: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

63

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mafube(Continued)

Large Power Users TOUBasic charge: 2 882.99Access Charge: 52.72Demand Charge :36.24Energy Charges - Summer:Peak - 169.24Standard -133.52Off-peak - 105.41Energy Charge Winter:Peak - 372.56Standard - 152.84Off-peak -112.79 Municipal Tariffs and Public School:Prepaid Single PhaseEnergy Charges - Summer:Peak -181.34Standard - 153.74Off-peak -124.73Energy Charge Winter:Peak - 341.66Standard - 176.08Off-peak - 131.41 Municipal Tariffs and Public School:Prepaid Three Phase Pre 2012Energy Charges - Summer:Peak -181.34Standard - 153.74Off-peak -124.73Energy Charge Winter:Peak - 341.66Standard - 176.08Off-peak - 131.41

Page 66: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

64

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mafube(Continued)

Municipal Tariffs and Public School:Conventional Three PhaseEnergy Charges - Summer:Peak -181.34Standard - 153.74Off-peak -124.73Energy Charge Winter:Peak - 3341.66Standard - 176.08Off-peak - 131.41 Net Metering Connection for Surplus Renewable Energy ExportedEnergy Charges - Summer:Peak - 96.38Standard - 66.33Off-peak -42.09Energy Charge Winter:Peak - 295.45Standard - 89.52Off-peak - 46.81 Net Metering Connection for Surplus Renewable Energy ExportedEnergy Charges - Summer:Peak - 96.38Standard - 66.33Off-peak -42.09Energy Charge Winter:Peak - 295.45Standard - 89.52Off-peak - 46.81

Page 67: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

65

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Maluti -a-Phofung 6.84%    

N/A

Domestic Conventional IBT Single Phase Non RuralSummerBlock 1(0- 50kWh) - 90.64Block 2(51-350kWh) - 116.54Block 3(351-600kWh) - 164.02Block 4(>600kWh) - 186.68Basic Charge - 204.97WinterBlock 1(0- 50kWh) - 94.96Block 2(51-350kWh) - 125.17Block 3(351-600kWh) - 181.29Block 4(>600kWh) - 192.08Basic Charge - 204.97 Domestic Prepaid IBTSingle Phase Non RuralSummerBlock 1(0- 50kWh) - 104.67Block 2(51-350kWh) - 139.20Block 3(351-600kWh) - 188.84Block 4(>600kWh) - 203.95WinterBlock 1(0- 50kWh) - 111.15Block 2(51-350kWh) - 152.15Block 3(351-600kWh) - 188.54Block 4(>600kWh) - 203.95

Commercial PrepaidSummerEnergy Charge - 199.63WinterEnergy Charge - 208.32

Commercial ConventionalBasic Charge - 644.20Energy Charge:Summer -161.04Winter -184.05 Departmental UseEnergy Charge - 172.65 Conventional Farm Dwellings and BusinessBasic Charge - 222.96Energy Charge:Summer -200.08Winter -240.50 Farm Dwellings and Businesses PrepaidEnergy Charge - 202.10 Dairies, Pumps, Feeding LotsBasic Charge -645.46Energy Charge - 219.71 Advertisement SignsBasic Charge - 223.68Energy Charge - 215.11

Industrial Low Summer Basic Charge - 1 194.45Energy Charge - 69.57Demand Charge - 266.90Winter Basic Charge - 1 194.45Energy Charge - 122.39Demand Charge - 266.90 Industrial Rural BasicSummer Basic Charge - 1 177.34Energy Charge - 71.32Demand Charge - 271.69Winter Basic Charge - 1 177.34Energy Charge - 125.38Demand Charge - 271.69

Industrial High Summer Basic Charge - 1 290.89Energy Charge - 67.87Demand Charge - 271.69Winter Basic Charge - 1 290.89Energy Charge - 119.63Demand Charge - 271.69 Industrial RuralSummer Basic Charge - 1 279.20Energy Charge - 63.52Demand Charge - 254.30Winter Basic Charge - 1 279.20Energy Charge - 111.97Demand Charge - 254.30

N/A

Page 68: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

66

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Maluti -a-Phofung(Continued)

Domestic Conventional IBT Three Phase Non RuralSummerBlock 1(0- 50kWh) - 94.96Block 2(51-350kWh) - 127.33Block 3(351-600kWh) - 182.37Block 4(>600kWh) - 190.18Basic Charge - 204.97WinterBlock 1(0- 50kWh) - 100.35Block 2(51-350kWh) - 145.35Block 3(351-600kWh) - 189.92Block 4(>600kWh) - 194.24Basic Charge - 204.97 Domestic Prepaid IBT Three Phase Non RuralSummerBlock 1(0- 50kWh) - 104.67Block 2(51-350kWh) - 139.20Block 3(351-600kWh) - 188.84Block 4(>600kWh) - 203.95WinterBlock 1(0- 50kWh) - 111.15Block 2(51-350kWh) - 152.15Block 3(351-600kWh) - 188.54Block 4(>600kWh) - 203.95

Page 69: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

67

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Maluti -a-Phofung(Continued)

Domestic Conventional IBT Single and Three Phase RuralSummerBlock 1(0- 50kWh) - 102.51Block 2(51-350kWh) - 141.36Block 3(351-600kWh) - 185.60Block 4(>600kWh) - 194.24Basic Charge - 210.00WinterBlock 1(0- 50kWh) - 98.20Block 2(51-350kWh) - 139.20Block 3(351-600kWh) - 184.52Block 4(>600kWh) - 200.71Basic Charge -200.71 Domestic Prepaid IBT Single and Three Phase RuralSummerBlock 1(0- 50kWh) - 104.67Block 2(51-350kWh) - 139.20Block 3(351-600kWh) - 188.84Block 4(>600kWh) - 203.95WinterBlock 1(0- 50kWh) - 115.15Block 2(51-350kWh) - 152.15Block 3(351-600kWh) - 188.84Block 4(>600kWh) - 203.95

Page 70: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

68

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mantsopa 6.84%

Domestic IBT IndigentSummerBlock 1(0- 50kWh) - 90.71Block 2(51-350kWh) - 113.33Block 3(351-600kWh) - 162.36Block 4(>600kWh) - 191.28WinterBlock 1(0- 50kWh) -91.57Block 2(51-350kWh) -113.88Block 3(351-600kWh) - 167.00Block 4(>600kWh) - 196.67

Domestic Conventional and PrepaidSummerBlock 1(0- 350kWh) - 116.46Block 2(351-600kWh) - 163.90Block3 (>600kWh) - 191.28WinterBlock 1(0- 350kWh) -120.86Block 2(351-600kWh) -170.10Block 3 (>600kWh) - 196.67

Business Flate Rate ( Prepaid)Basic Charge - 192.31Energy Charge - 197.71

Business Flate Rate (Conventional)Basic Charge - 192.31Energy Charge - 197.71 DeparmentalBasic Charge - 183.76Energy Charge - 188.92

Bulk SupplyBasic Charge - 392.71Summer Energy Charge - 80.13Winter Energy Charge - 97.50Demand Charge - 122.86 Unbuild Erven/ Vacant StandDemand Charge - 115.00Summer Energy Charge - 78.28 Winter Energy Charge - 94.88

N/A Elecflex Time- Of - UseElecflex 1Basic charge - 3 078.39Access charge - 41.83Demand charge - 116.56Energy Charges - Low Season:Peak - 143.54Standard -94.16Off-peak - 87.27Energy Charges - High Season:Peak - 282.49Standard -144.69Off-peak - 135.50 Elecflex 2Basic charge - 2 039.78Access charge - 46.34Demand charge - 125.75Energy Charges - Low Season:Peak - 143.54Standard -94.16Off-peak - 87.27Energy Charges - High Season:Peak - 282.49Standard -144.69Off-peak - 135.50

Page 71: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

69

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mantsopa (Continued)

Elecflex 3Basic charge - 1 589.90Access charge - 48.41 Demand charge - 135.82Energy Charges - Low Season:Peak - 150.85Standard -98.85Off-peak - 88.47Energy Charges - High Season:Peak - 282.37Standard -143.90Off-peak - 134.67

Masilonyana 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 79.00Block 2(51-350kWh) - 93.00Block 3(351-600kWh) - 134.00Block 4(>600kWh) - 160.00Basic Charge - 72.01 Farms Residential PrepaidBasic Charge - 178.96Energy Charge - 141.90

Domestic ConventionalBlock 1(0- 50kWh) - 72.00Block 2(51-350kWh) - 93.00Block 3(351-600kWh) - 134.00Block 4(>600kWh) - 160.00Basic Charge - 96.93 Farms Residential ConventionalBasic Charge - 178.96Energy Charge - 120.40

Commercial PrepaidBasic Charge - 300.00Energy Charge - 135.00 Schools and Old Age Homes - PrepaidBasic Charge - 134.11Energy Charge - 118.30 Farms Commercial PrepaidBasic Charge - 400.00Energy Charge -160.00

Commercial (Conventional < 50kVA

Industrial Large Power use 400v (scale 3A)Basic Charge - 1 003.84Energy Charge - 69.23Demand Charge - 190.37

Industrial Large Power use 11kV (scale 3B)Basic Charge - 617.60Energy Charge - 60.00Demand Charge - 196.00

N/A

Basic Charge - 300.00

Energy Charge - 135.00

Commercial (Conventional) > 50kVA

Basic Charge - 446.29

Energy Charge - 75.00

Demand Charge - 165.00

Departmental

Basic Charge - 280.00

Energy Charge - 136.00

Schools and Old Age Homes - Conventional

Basic Charge - 269.26

Energy Charge - 118.30

Page 72: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

70

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Masilonyana(Continued)

Farms Commercial Conventional < 50kVABasic Charge - 400.00Energy Charge -160.00

Matjhabeng6.84%

Domestic PrepaidSummerEnergy Charge - 159.31WinterEnergy Charge - 172.49

Domestic IBTSummerBlock 1(0- 350kWh) - 152.02Block 2(>350kWh) - 168.39WinterBlock 1(0- 350kWh) - 174.03Block 2(>350kWh) - 187.33

N/A Commercial ConventionalBasic Charge - 391.88SummmerEnergy Charge - 160.44WinterEnergy Charge - 176.44 Street LightBasic Charge - 62.65SummmerEnergy Charge - 112.23WinterEnergy Charge - 129.84 DepartmentalBasic Charge - 58.01SummmerEnergy Charge - 111.03WinterEnergy Charge - 128.44

Industrial LVElec Large LV SummerBasic Charge - 861.53Energy Charge - 131.63Demand Charge - 172.64 Elec Large LV WinterBasic Charge - 861.53Energy Charge - 146.39Demand Charge - 172.64

Residential Time -of -UseBasic Charge - 173.25Energy Charge Low SeasonPeak - 163.72Standard - 125.85Off-peak - 102.22Energy Charge High SeasonPeak - 295.41Standard - 162.11Off-peak - 158.80 Commercial Conventional Time-of-UseBasic Charge - 547.11Energy Charge Low SeasonPeak - 186.97Standard - 169.88Off-peak - 157.05Energy Charge High SeasonPeak - 242.53Standard - 196.59Off-peak - 181.63

Page 73: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

71

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Matjhabeng(Continued)

Resell Time-of-UseBasic Charge - 428.82Energy Charge Low SeasonPeak - 124.59Standard - 101.06Off-peak - 75.38Energy Charge High SeasonPeak - 304.92Standard - 126.49Off-peak - 93.74 Industrial LV Time-of-UseBasic Charge - 1 250.18Demand Charge - 46.75Demand Access - 105.61Energy Charge Low SeasonPeak - 149.90Standard - 96.37Off-peak - 85.66Energy Charge High SeasonPeak - 315.88Standard - 150.98Off-peak - 137.06 Industrial MV Time-of-UseBasic Charge - 2 897.65Demand Charge - 45.26Demand Access - 102.27Energy Charge Low SeasonPeak - 148.03Standard - 93.61Off-peak - 82.72Energy Charge High SeasonPeak - 316.75Standard - 149.12Off-peak - 134.97

Page 74: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

72

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Metsimaholo6.84% 

Domestic Prepaid SummerBlock 1(0- 50kWh) -91.44Block 2(51-350kWh) - 117.29Block 3(351-600kWh) - 162.10Block 4(>600kWh) - 186.90WinterBlock 1(0- 50kWh) -96.01Block 2(51-350kWh) - 129.00Block 3(351-600kWh) - 190.80Block 4(>600kWh) - 214.93

Domestic ConventionalSummerBlock 1(0- 50kWh) -91.44Block 2(51-350kWh) - 117.29Block 3(351-600kWh) - 162.10Block 4(>600kWh) - 186.90WinterBlock 1(0- 50kWh) -96.01Block 2(51-350kWh) - 129.00Block 3(351-600kWh) - 190.80Block 4(>600kWh) - 214.93Basic Charge - 57.47

N/A Commercial Conventional- Single PhaseBasic Charge - 189.94Energy Charge - 177.73 Commercial Conventional- Three PhaseBasic Charge - 190.37Energy Charge - 178.14 Commercial Conventional(Four meters)Basic Charge - 368.25Energy Charge - 177.75

Industrial - >50 kVABasic Charge - 380.25Energy Charge - 94.02Demand Charge - 170.22

Industrial - 11 kWBasic Charge - 368.41Energy Charge - 94.02Demand Charge - 164.61

N/A

Moqhaka6.84%  

Home Light (Indigent) Prepaid Rural / UrbanBlock 1(0- 50kWh) - 91.27Block 2(51-350kWh) -114.07Block 3(351-600kWh) - 162.74Block 4(>600kWh) - 174.80 Home Power(other) Prepaid Urban / RuralBlock 1(0- 50kWh) - 109.07Block 2(51-350kWh) - 109.07Block 3(351-600kWh) - 158.40Block 4(>600kWh) - 158.40

Home Power Urban/Rural Block 1(0- 50kWh) - 109.07Block 2(51-350kWh) - 109.07Block 3(351-600kWh) - 158.40Block 4(>600kWh) - 158.40Basic Charge - 176.92 Home Power Bulk Urban/RuralBasic Charge - 1 012.30Energy Charge - 136.60

Commercial PrepaidEnergy Charge - 197.66

Business Rate UrbanBasic Charge - 455.77Energy Charge - 170.57 Business Rate RuralBasic Charge - 463.97Energy Charge - 180.09 Street Lights Energy Charge - 50.27 Unmetered Urban / RuralEnergy Charge - 72.82

Industrial Urban Bulk Demand 1Basic Charge - 1 067.37Energy Charge - 73.57Demand Charge - 239.45 Industrial Urban Bulk Demand 2Basic Charge - 1 067.37Energy Charge - 72.89Demand Charge - 244.55 Industrial Urban Bulk Demand 3Basic Charge - 1 066.19Energy Charge - 73.57Demand Charge - 239.45 Industrial Rural Bulk Demand 1Basic Charge - 1 246.63Energy Charge - 73.57Demand Charge - 239.45

N/A N/A

Page 75: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

73

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Moqhaka(Continued)

Industrial Rural Bulk Demand 2

Basic Charge - 1 246.63

Energy Charge - 73.57

Demand Charge - 239.45

Industrial Rural Bulk Demand 3

Basic Charge - 1 246.63

Energy Charge - 73.57

Demand Charge - 239.45

Municipal Bulk

Basic Charge - 1 046.52

Energy Charge - 72.21

Demand Charge - 235.03

Nala6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 122.82Block 3(351-600kWh) - 173.24Block 4(>600kWh) - 203.96

Domestic Conventional Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.12Block 3(351-600kWh) - 157.00Block 4(>600kWh) - 187.46Basic Charges - 170.94

Commercial PrepaidEnergy Charge - 162.18 Commercial Prepaid IBTBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.12Block 3(351-600kWh) - 157.00Block 4(>600kWh) - 187.46

Commercial Conventional Single PhaseBasic Charge - 427.36Energy Charge - 176.92 Commercial Conventional Three PhaseBasic Charge - 427.36Energy Charge - 176.92 Departmental ConsumptionBasic Charge - 199.18Energy Charge - 176.92 FarmsBasic Charge - 178.99Energy Charge - 132.41

Industrial > 100kVABasic Charge - 641.04Energy Charge - 122.09Demand Charge - 159.06 Industrial Conventional Three PhaseBasic Charge - 178.99Energy Charge - 132.41

N/A N/A

Page 76: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

74

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ngwathe6.84%

Domestic Prepaid IndigentEnergy Charge - 108.85 Domestic Prepaid Energy Charge - 165.21

Domestic Conventional IndigentEnergy Charge - 108.85 Domestic ConventionalEnergy Charge - 165.21

Commercial Prepaid Basic Charge - 631.32Energy Charge - 157.83

Commercial Conventional Basic Charge - 631.32Energy Charge - 157.83 Small BusinessBasic Charge - 380.97Energy Charge - 157.83 Small HoldingsBasic Charge - 380.97Energy Charge - 157.83 Government, Schools & Sports OrganizationsBasic Charge - 749.31Energy Charge - 150.51 Municipal and Sundry ConsumersBasic Charge - 637.57Energy Charge - 156.12 ChurchesBasic Charge - 283.01Energy Charge - 172.63 Street LightsBasic Charge - 326.55Energy Charge - 120.82 Vacant Stands Basic Charge - 119.74

Industrial (<10kWh - 30kWh) Basic Charge - 749.31Energy Charge - 128.46 Industrial (> 30kWh) Basic Charge - 639.54Energy Charge - 86.39Demand Charge - 156.63

N/A N/A

Page 77: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

75

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Nketoana6.84%    

Domestic PrepaidBlock 1(0- 50kWh) - 87.26Block 2(51-350kWh) - 111.88Block 3(351-600kWh) -160.87Block 4(>600kWh) - 189.72Basic Charge - 99.82

Domestic ConventionalBlock 1(0- 50kWh) - 87.62Block 2(51-350kWh) - 114.67 Block 3(351-600kWh) - 163.58Block 4(>600kWh) - 194.83Basic Charge - 181.06

Commercial Conventional-Schools, Goverment & Old Age HomesBlock 1(0- 1000kWh) - 166.94Block 2(>1000kWh) - 182.22Basic Charge - 389.29 Farms Residential PrepaidBasic Charge - 250.37Energy Charge - 188.88

Commercial Conventional-Schools, Goverment & Old Age HomesBlock 1(0- 1000kWh) - 167.72Block 2(>1000kWh) - 182.22Basic Charge - 389.29 Commercial Conventional > 70 kVAGoverment & Old Age HomesBasic Charge - 594.93Energy Charge -85.42Demand Charge - 205.76 Farms Residential ConventionalBasic Charge - 264.72Energy Charge - 191.23 Farms Conventional and Prepaid (> 70 kVA)Basic Charge - 378.24Energy Charge -188.36 Municipal (Internal/ own use)Basic Charge - 355.79Energy Charge -156.14

N/A Industrial Large(400 kV-Scale 3A)Basic Charge - 920.55Energy Charge - 79.95Demand Charge - 237.09 Large Power(11 kV-Scale 3B)Basic Charge - 949.36Energy Charge - 102.46Demand Charge - 129.07

N/A

Page 78: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

76

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Phumelela6.84%

Domestic Prepaid Summer Energy Charge - 146.23Winter Energy Charge - 150.70

IBT Domestic PrepaidSummerBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.77Block 4(>600kWh) - 194.84WinterBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.77Block 4(>600kWh) - 194.84

Domestic ConventionalBasic Charge - 105.80Summer Energy Charge - 146.23Winter Energy Charge - 150.70 IBT Domestic ConventionalSummerBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.77Block 4(>600kWh) - 194.84WinterBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.77Block 4(>600kWh) - 194.84 Non IBT Domestic ConventionalBasic Charge - 111.19Summer Energy Charge - 153.68Winter Energy Charge - 158.38 Non IBT Domestic ConventionalSummer Energy Charge - 153.68Winter Energy Charge - 158.38

Commercial PrepaidSummer Energy Charge - 157.00Winter Energy Charge - 181.89

Commercial Conventional Basic Charge - 257.82Summer Energy Charge - 157.00Winter Energy Charge - 181.89 Commercial Conventionl 26-50kVABasic Charge - 356.18Energy Charge - 157.00 Commercial Conventional 51-100kVABasic Charge - 578.90Energy Charge - 157.00 Hostel / SchoolsBasic Charge - 373.98Summer Energy Charge - 141.14Winter Energy Charge - 146.20 DepartmentalEnergy Charge - 153.10 Non Residential 1-25kVABasic Charge - 389.86Energy Charge - 207.38 Non Residential 26-50kVABasic Charge - 485.44Energy Charge - 207.38 Non Residential 51-100kVABasic Charge - 680.69Energy Charge - 207.38

IndustrialBasic Charge - 730.31Energy Charge -74.64Demand Charge - 241.34

N/A N/A

Page 79: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

77

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Phumelela(Continued)

Vacant LandBasic Charge - 116.58Energy Charge - 163.57

Setsoto 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 88.68Block 2(51-350kWh) - 117.56Block 3(351-600kWh) -153.85Block 4(>600kWh) - 170.94

Domestic ConventionalBlock 1(0- 50kWh) - 88.16Block 2(51-350kWh) - 117.56Block 3(351-600kWh) -155.99Block 4(>600kWh) - 176.23Basic Charge - 276.63

Commercial Prepaid Basic Charge - 251.57Energy Charge - 125.64

Commercial ConventionalBasic Charge - 251.57Energy Charge - 125.64 Small Holding and FarmsBasic Charge - 653.88Energy Charge - 179.06 Government ProvincialBasic Charge - 653.88Energy Charge - 179.03 SportBasic Charge - 269.13Energy Charge - 127.35 MunicipalBasic Charge - 266.80Energy Charge -127.50

Industrial LowBasic Charge - 304.95Energy Charge - 76.28Demand Charge - 172.86

Industrial HighBasic Charge - 4 287.84Energy Charge - 80.55Demand Charge - 192.50

N/A

Page 80: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

78

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Tokologo6.84%

Domestic PrepaidSummerBlock 1(0- 50kWh) - 92.75Block 2(51-350kWh) - 119.25Block 3(351-600kWh) - 151.75Block 4(>600kWh) - 163.08WinterBlock 1(0- 50kWh) - 95.13Block 2(51-350kWh) - 122.31Block 3(351-600kWh) - 172.14Block 4(>600kWh) - 190.26

Domestic ConventionalSummerBlock 1(0- 50kWh) - 89.15Block 2(51-350kWh) - 114.62Block 3(351-600kWh) - 145.86Block 4(>600kWh) - 156.74Basic Charge - 137.79WinterBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 182.87Basic Charge - 147.20

Commercial Prepaid - Single PhaseSummer Energy Charge - 159.90Winter Energy Charge - 162.69 Commercial Prepaid - Three PhaseSummer Energy Charge - 159.90Winter Energy Charge - 162.69

Commercial Conventional BusinessBasic Charge - Energy Charge - Commercial Conventional ChurchesBasic Charge - 108.92Summer Energy Charge - 145.99Winter Energy Charge - 148.54 Commercial Conventional Old AgeBasic Charge - 108.92Summer Energy Charge - 145.99Winter Energy Charge - 148.54 Commercial Conventional - Single PhaseBasic Charge - 364.72Summer Energy Charge - 151.32Winter Energy Charge - 153.96 Commercial Conventional - Three PhaseBasic Charge - 364.72Summer Energy Charge - 151.32Winter Energy Charge - 153.96 Government - Single PhaseBasic Charge - 379.46Summer Energy Charge - 159.90Winter Energy Charge - 162.69

Industrial Bulk SupplySummerBasic Charge - 514.11Energy Charge - 79.09Demand Charge - 133.33WinterBasic Charge - 514.11Energy Charge - 98.22Demand Charge - 165.33

Industrial Bulk SupplySummerBasic Charge - 864.23Energy Charge -62.00Demand Charge - 188.08WinterBasic Charge - 864.23Energy Charge - 66.34Demand Charge - 233.33

N/A

Page 81: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

79

APPROVED MUNICIPAL ELECTRICITY TARIFFS

FREE STATE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Tokologo(Continued)

Government - Three Phase

Basic Charge - 379.46

Summer Energy Charge - 159.90

Winter Energy Charge - 162.69

Tswelopele 10%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84

Domestic ConventionalBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84

N/A

Commercial ConventionalBasic Charge - 344.03Summer Energy Charge - 149.81Winter Energy Charge - 164.79 Municipal DepartmentalEnergy Charge - 103.80 Sport BodiesBasic Charge - 176.33Summer Energy Charge - 106.18Winter Energy Charge - 116.80 Vacant StandBasic Charge - 67.24

IndustrialBasic Charge - 4 137.00Demand Charge - 202.82Summer Energy Charge - 80.45Winter Energy Charge - 88.50 Industrial Bulk 60ABasic Charge - 14 839.00Demand Charge - 202.82Summer Energy Charge - 80.45Winter Energy Charge - 88.50 Industrial 294kVA - Per SilosBasic Charge - 57 252.79Demand Charge - 202.82Summer Energy Charge - 80.45Winter Energy Charge - 88.50

Industrial Silos 294kVABasic Charge - Energy Charge - Demand Charge -

N/A

Page 82: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

80

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCE

Page 83: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

81

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

David Kruiper 6.84%(Formely Khara Hais)

Domestic Prepaid 5 - 30 A (Indigents)Energy Charge - 116.49 Domestic Prepaid 35 - 60 AEnergy Charge - 185.12 Domestic Prepaid 5-60A Energy Charge - 184.80

Domestic 30ABasic Charge - 110.53Energy Charge - 146.78 Domestic 15kVABasic Charge - 263.63Energy Charge - 146.20 Domestic 30kVABasic Charge - 461.52Energy Charge - 150.71 Domestic 45kVABasic Charge - 698.25Energy Charge - 152.31

Prepayment single phase5- 60AEnergy Charge - 195.78 Prepayment 3 phase 5- 60AEnergy Charge - 195.68

Commercial Conventional 15kVABasic Charge - 390.49Energy Charge - 154.06 Commercial Conventional 25kVABasic Charge - 726.51Energy Charge - 150.90 Commercial Conventional 45kVABasic Charge - 1 399.60Energy Charge - 149.60 Commercial Conventional 70kVABasic Charge - 2 354.39Energy Charge - 149.00

Industrial Low Voltage <=100kVABasic Charge - 2 944.72Energy Charge - 80.52Demand Charge - 216.48

Industrial MediumVoltage >100kVABasic Charge - 5 887.44Energy Charge - 74.79Demand Charge - 211.94

N/A

Dikgatlong6.84%       

Domestic Prepaid (Indigent)Energy Charge - 152.78

Domestic ConventionalBasic Charge- 107.00Energy Charge- 154.42

Commercial PrepaidEnergy Charge - 201.93 Commercial MediumBasic Charge-210.20Energy Charge- 183.76Deamnd Charge-81.80

Commercial ConventionalBasic Charge -210.20Energy Charge - 194.43 Municipal / SchoolsBasic Charge -334.21

Energy Charge - 186.97Serviced Vacent LandBasic Charge - 103.40

Industrial LowBasic Charge -367.85Energy Charge - 158.21Demand Charge -116.21

N/A    

N/A      

Emthanjeni6.84%

Domestic PrepaidBlock 1(0-50kWh) - 87.00Block 2(51-350kWh) - 115.00Block 3(351-600kWh) - 163.00Block 4(>600kWh) - 192.00

Domestic Conventional HouseholdsBlock 1(0-50kWh) - 91.00Block 2(51-350kWh) - 115.00Block 3(351-600kWh) - 158.00Block 4(>600kWh) - 168.00Basic Charge - 151.55

Commercial PrepaidEnergy Charge - 188.00 Street LightsEnergy Charge - 197.00

Commercial ConventionalBasic Charge - 197.26Energy Charge - 162.60 Commercial External CustomersBasic Charge - 197.26Energy Charge - 162.60

Industrial / TransnetBasic Charge - 162.78Energy Charge - 107.00Demand Charge - 219.41

N/A

N/A

Page 84: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

82

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emthanjeni(Continued)

Departmental Bulk Consumers Basic Charge - 153.72Energy Charge - 82.00Demand Charge - 93.39 Departmental Large/ Rural Small ConsumersBasic Charge -143.53Energy Charge - 107.00Demand Charge - 77.57

Gamagara6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.19Block 2(51-350kWh) - 115.68Block 3(351-600kWh) - 165.42Block 4(>600kWh) - 194.56

Domestic ConventionalBlock 1(0- 50kWh) - 90.71Block 2(51-350kWh) - 115.92Block 3(351-600kWh) - 152.39Block 4(>600kWh) - 176.33Basic Charge - 114.29

Commercial Prepaid Single PhaseEnergy Charge - 192.15 Commercial Prepaid Three PhaseEnergy Charge - 192.60

Commercial Conventional Single PhaseBasic Charge - 279.52Energy Charge - 173.25 Commercial Conventional Three PhaseBasic Charge -404.58Energy Charge - 155.26 Government Schools >100ABasic Charge -411.27Energy Charge - 153.48 Agricultural ConventionalBasic Charge - 975.00Energy Charge - 122.05

IndustrialBasic Charge -771.84Energy Charge - 128.44Demand Charge - 97.96

N/A N/A

Ga-Segonyana 6.84%

Domestic PrepaymentBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 161.56Block 4(>600kWh) - 157.00

Domestic Conventional Block 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 161.56Block 4(>600kWh) - 157.00Basic Charge - 113.53

Commercial PrepaidEnergy Charge -196.59 Guest House and Multi use PrepaidBasic charge-165.00

Commercial ConventionalBasic Charge - 522.92Energy Charge - 140.00

Large Power User 40 - 69kVABasic Charge -703.42Energy Charge - 95.30Demand Charge -208.00

Bulk Users (70kVA&more)Basic Charge -2 043.44Energy Charge - 73.72Demand Charge -236.09

N/A

Page 85: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

83

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ga-Segonyana (Continued)

Domestic lifelineBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 115.74Block 3(351-600kWh) - 151.62

Guest House and Multi use ConventionalBasic charge-294.46Energy Charge -135.00

Large Power User After peak hoursBasic Charge -710.26Energy Charge - 95.30Demand Charge -207.00 Homes, showgrouds, old age home, Churches & Sporting FacilitiesEnergy Charge - 186.00 Availability ChargeBasic charge- 280.01

Bulk Users 2 (70 kVA and more)Basic Charge -2 760.12Energy Charge - 99.00Demand Charge -220.97 Bulk Users 2 (70 kVA and more)Basic Charge -2 965.60Energy Charge - 72.00Demand Charge- 238.00

Hantam6.84%

Domestic PrepaidEnergy Charge - 170.26

Domestic Convevtional 30ABlock 1(0-50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh)- 165.46Block 4(>600kWh)- 194.85Basic Charge - 203.31 Domestic Convevtional 60ABlock 1(0-50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh)- 165.46Block 4(>600kWh)- 194.85Basic Charge - 452.81

N/A

Single Phase Conventional 30ABasic Charge - 174.04Energy Charge - 173.00 Single Phase Conventional 60ABasic Charge - 471.13Energy Charge - 175.52

IndustrialBasic Charge - 481.02Energy Charge - 121.80Demand Charge - 68.48

N/A

N/A

Joe Morolong 6.84%

Domestic PrepaidBasic Charge - 95.48Energy Charge - 176.00Avalialbility Charge - 111.26

Domestic Conventional

Prepaid Business Basic Charge - 95.48Energy Charge - 176.00Avalability Charge - 111.26

Normal metered InustrialBais Charge - 139.06Energy Charge - 176.00Availability Charge - 111.26

N/A   

N/A  

Page 86: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

84

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Kai!Garib6.84%

Domestic Prepaid Single Phase IndigentsBlock 1 (0-350kWh) - 141.15Block 2 (>350kWh) - 161.65

Prepaid Single Phase Block 1 (0-350kWh) - 166.12Block 2 (>350kWh) - 166.91 Domestic Conventional Supply Single Phase 5-60AmpBlock 1 (0-350kWh) - 142.78Block 2 (>350kWh) - 157.37Basic Charge - 238.37 Domestic Conventional Supply Three Phase 5-60AmpBlock 1 (0-350kWh) - 142.78Block 2 (>350kWh) - 157.37Basic Charge - 369.95

Prepaid Single PhaseEnergy Charge - 203.86 Prepaid Three PhaseEnergy Charge - 203.86

Conventional Single Phase 5- 60AmpBasic Charge - 700.22Energy Charge - 153.77 Conventional Three Phase 5- 60AmpBasic Charge - 1 173.54Energy Charge - 153.77 Conventional Three Phase 70 - 100AmpBasic Charge - 1 580.37Energy Charge - 153.77

Industrial Low and High TensionBasic Charge - 1 678.12Energy Charge - 93.31Demand Charge - 205.30

Non- Standard TariffsHigh Mass Lighting Basic Charge - 1 028.74Energy Charge - 99.20 Street LightsBasic Charge - 1 030.17Energy Charge - 35.97 Availability ChargeFixed Charge - 153.42

N/A

Kamiesberg6.84%

Domestic PrepaidEnergy Charge - 151.71

Domesic ConventionalBasic Charge - 202.16Energy Charge - 151.71

Commercial PrepaidEnergy Charge - 190.08

Commercial Three Phase Basic Charge - 800.04Energy Charge - 155.99 Commercial ConventionalBasic Charge - 553.06Energy Charge - 154.92

N/A    

N/A  

N/A   

Kareeberg 6.84%

Domestic PrepaidBlock 1(0-50kWh) - 91.00Block 2(51-350kWh) - 118.00Block 3(351-600kWh) - 166.00Block 4(>600kWh) - 194.00

Domesic ConventionalBlock 1(0-50kWh) - 91.00Block 2(51-350kWh) - 116.00Block 3(351-600kWh) - 165.00Block 4(>600kWh) - 193.00Basic Charge - 150.28 Municipal UsageEnergy Charge - 149.11

Non-Standard TariffsAvailability Charge- 149.11

Schools, Hotels and Old Age HomesBasic Charge - 798.07Energy Charge - 137.14 Telkom BoothsBasic Charge - 131.99Energy Charge - 137.14

Industrial TariffBasic Charge- 5 396.96Energy Charge - 134.00

N/A

N/A

Page 87: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

85

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Kareeberg(Continued)

Churches, Halls, Sport Clubs and Agricultural UnionsBasic Charge - 159.66Energy Charge - 137.14

Karoo Hoogland 6.84%

PrepaidEnergy Charge - 201.00 Indigent PrepaidEnergy Charge - 142.10

ConventionalBasic Charge - 100.95Energy Charge - 201.00

N/A

Single Phase 30AAmpere Charge - 14.95Energy Charge - 195.49 Single Phase 60AAmpere Charge - 15.89Energy Charge - 195.49 Three Phase 60AAmpere Charge - 31.50Energy Charge - 153.85 General Consumers Max 100AAmpere Charge - 36.96Energy Charge - 170.94 Church/ Schools /CommunityAmpere Charge - 22.21Energy Charge - 141.51 Guest HousesEnergy Charge - 207.27

N/A

Industrial >100AmpsEnergy Charge<20 000kWh - 170.94Energy Charge>20 000kWh- 131.41Demand Charge - 150.94

N/A

Kgatelopele 6.84%

Domestic Prepaid and IndigentsBlock 1(0- 50kWh) -90.89Block 2(51-350kWh) - 116.78Block 3(351-600kWh) - 165.51Block 4(>600kWh) - 194.41

Domestic ConventionalBlock 1(0- 50kWh) -90.89Block 2(51-350kWh) - 116.78Block 3(351-600kWh) - 165.51Block 4(>600kWh) - 194.41Basic Charge - 17.55

Commercial PrepaidEnergy Charge - 201.93

Commercial ConventionalBasic Charge - 263.61Energy Charge - 201.93 Schools and Public benefit OrganisationBasic Charge - 237.65Energy Charge - 165.32

IndustrialBasic Charge - 552.08Energy Charge - 174.47Demand Charge - 160.12

N/A

N/A

Page 88: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

86

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Khai-Ma 6.84%

Domestic Low Single TariffEnergy Charge - 161.11

Domestic HighBasic Charge -77.12Energy Charge - 189.17 Avalialbility ChargeEnergy Charge - 77.12

N/A

Commercial Single PhaseBasic Charge - 258.26Energy Charge - 171.200 Commercial Three PhaseBasic Charge - 582.28Energy Charge - 168.03 Municipal Single PhaseBasic Charge -258.26Energy Charge - 157.15 Municipal Three PhaseBasic Charge - 582.28Energy Charge - 157.15

N/A      

N/A        

N/A       

Magareng6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.44Block 4(>600kWh) - 194.83

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.44Block 4(>600kWh) - 194.83Basic Charge - 130.63

Commercial PrepaidEnergy Charge - 137.15

Commercial ConventionalBasic Charge - 335.90Energy Charge - 137.15 DepartmentalEnergy Charge - 41.00

N/A

IndustrialBasic Charge - 3 737.97Energy Charge - 104.49Demand Charge - 198.01

N/A

Nama Khoi 6.84%

Domestic Low Prepaid IndigentSummer Energy ChargeBlock 1(0- 50kWh) - 91.42Block 2(51-350kWh) - 134.28Block 3(351-600kWh) - 151.41Block 4(>600kWh) - 161.41Winter Energy ChargeBlock 1(0- 50kWh) -99.98 Block 2(51-350kWh) - 137.13Block 3(351-600kWh) - 159.99Block 4(>600kWh) - 167.13

Domestic PrepaidSummer Energy ChargeBlock 1(0- 50kWh) - 135.79Block 2(51-350kWh) -140.05 Block 3(351-600kWh) - 172.25Block 4(>600kWh) -193.37 Winter Energy ChargeBlock 1(0- 50kWh) - 140.05Block 2(51-350kWh) - 144.29Block 3(351-600kWh) -184.77Block 4(>600kWh) - 212.83

Commercial Single Phase PrepaidSummer Energy Charge -198.05Winter Energy Charge - 202.34Basic Charge - 132.45 Commercial Three Phase PrepaidSummer Energy Charge - 199.99Winter Energy Charge - 204.17Basic Charge - 164.28

Commercial Conventional SmallSummer Energy Charge -142.85Winter Energy Charge - 161.42Basic Charge - 425.04 Commercial Three Phase ConventionalSummer Energy Charge -142.85Winter Energy Charge - 161.42Basic Charge - 667.81

Industrial LowSummer Energy Charge - 76.82Winter Energy Charge -88.58 Basic Charge - 796.72 Summer Network Demand Charge - 103.56Winter Network Demand Charge -171.39

N/A   

N/A   

Page 89: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

87

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Nama Khoi (Continued)

Domestic ConventionalSummer Energy ChargeBlock 1(0- 50kWh) -135.79 Block 2(51-350kWh) -140.06 Block 3(351-600kWh) - 149.94Block 4(>600kWh) - 159.84Winter Energy ChargeBlock 1(0- 50kWh) - 140.05Block 2(51-350kWh) - 144.29Block 3(351-600kWh) -158.43 Block 4(>600kWh) - 165.51Basic Charge - 195.22 Domestic Large > 40kVASummer Energy Charge - 147.82Winter Energy Charge - 153.74Basic Charge - 212.19

Commercial Large >40kVASummer Energy Charge - 141.46Winter Energy Charge - 149.94Basic Charge -611.00 Demand Charge - 70.74

Phokwane 6.84%

Domestic Prepaid <60AmpsBlock 1(0- 50kWh) - 93.62Block 2(51-350kWh) - 117.46Block 3(351-600kWh) - 165.17Block 4(>600kWh) - 196.23Basic Charge - 137.95

Domestic ConventionalBlock 1(0- 50kWh) - 93.62Block 2(51-350kWh) - 117.46Block 3(351-600kWh) - 176.28Block 4(>600kWh) - 195.27Basic Charge - 137.95Energy Charge - 196.23

Commercial PrepaidEnergy Charge - 196.23

Commercial <200AmpsBasic Charge - 522.76Energy Charge - 175.65 Commercial Government /Schools & SportBasic Charge - 136.41Energy Charge - 144.60- Churches/NGOsBasic Charge- 133.89Energy Charge-145.31

Industrial >200AmpsBasic Charge -3 562.73Energy Charge - 124.84Demand Charge - 194.01

N/A

N/A

Page 90: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

88

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Renosterberg6.84%  

Domestic indigentBlock 1(0- 50kWh) - 98.58Block 2(51-350kWh) - 142.93

Domestic ConventionalBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.84Basic Charge - 123.67

N/A

Commercial TariffBlock 1(0-300kWh) - 124.80Block 2(301-7000kWh) - 161.51Block 3 (>700kWh) - 247.11Basic Charge - 147.20

Industrial TariffBlock 1(0-300kWh) - 127.39Block 2(301-7000kWh) - 194.81 Block 3 (>700kWh) - 258.30Basic Charge - 85.73Demand Charge - 209.05

N/A  

N/A  

Richtersveld 6.84%   

Domestic LowPrepaid (Indigent)Block 1(0- 350kWh) - 114.45Block 2(>350kWh) - 166.04 Domestic Low Conventional (Indigent ) Block 1(0- 350kWh) - 112.93Block 2(>350kWh) - 158.11Basic Charge - 130.63

Domestic PrepaidBlock 1(0- 350kWh) - 118.55Block 2(>350kWh) - 178.80 Domestic Single PhaseBlock 1(0- 350kWh) - 117.16Block 2(>350kWh) - 173.60Basic Charge - 130.63 Domestic Three PhaseBlock 1(0- 350kWh) - 117.16Block 2(>350kWh) - 173.60Basic Charge - 147.33

Commercial PrepaidBlock 1(0- 350kWh) - 197.73Block 2(>350kWh) - 204.47 Gaste Huis PrepaidBlock 1(0- 350kWh) - 197.73Block 2(>350kWh) - 204.47

Commercial ConventionalBlock 1(0- 350kWh) - 149.71Block 2(>350kWh) - 169.89Basic Charge - 160.95

Gaste Huis ConventionalBlock 1(0- 350kWh) - 149.71Block 2(>350kWh) - 169.89Basic Charge - 160.95 Availability Charge - Vacant LandCommercial- domestic charge - 269.79Domestic- basic charge - 89.88

Industrial Low Voltage/Weskus MotorsBasic Charge - 0.00Block 1(0- 10000kWh) - 99.59Block 2(>10000kWh) - 82.56Demand Charge - 123.29

Industrial Medium VoltageBasic Charge - 260.07Block 1(0- 10000kWh) - 99.59Block 2(>10000kWh) - 82.56Demand Charge - 123.29

N/A

Siyancuma6.84%    

Domestic PrepaidEnergy charge - 162.00

Domestic ConventionalEnergy charge - 162.00 MunicipalBasic Charge - 352.69Energy Charge - 161.28

Commercial PrepaidBasic Charge - 331.03Energy charge - 172.17

Commercial Conventional Block 1(0- 300kWh) - 152.36Block 2(301-700kWh) - 176.15Block 3(>700kWh) - 183.95Basic Charge - 331.04 PumpsBlock 1(0- 300kWh) -180.43Block 2(301-700kWh) - 195.66Block 3(>700kWh) - 240.19Basic Charge - 352.69

Industrial LowBlock 1(0- 300kWh) - 79.33Block 2(301-700kWh) - 96.23Block 3(>700kWh) - 118.31Basic Charge - 2 853.96Demand charge - 121.89

TopkosBasic Charge - 3 685.57Demand charge - 218.11Energy Charge - SummerPeak - 379.61Standard - 137.08Offpeak - 92.56Energy Charge - WinterPeak - 379.61Standard - 137.08Offpeak - 92.56

N/A

Page 91: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

89

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Siyancuma(Continued)

Correctional Services Block 1(0- 300kWh) -70.72Block 2(301-700kWh) - 81.82Block 3(>700kWh) - 92.91Basic Charge - 58 245.38

Siyathemba6.84%

Domestic Low/PrepaidEnergy Charge -182.24

Domestic ConventionalBasic Charge -447.94Energy Charge - 147.27

N/A

Commercial <1000kWhBasic Charge - 1 154.83Energy Charge - 142.69 Commercial >1000kWhBasic Charge - 1 404.11Energy Charge - 142.46 Commercial MunicipalEnergy Charge -135.91

Industrial Basic Charge - 16 597.07Energy Charge - 52.11Demand Charge - 221.35 Industrial MunicipalBasic Charge - 63.15Energy Charge - 231.67

N/A   

N/A  

Sol Plaatjie 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.85Basic Charge - 226.09

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.85Basic Charge - 226.09

Commercial PrepaidBasic Charge - 210.90Energy Charge - 206.68

Street LightsEnergy Charge - 137.80

Commercial ConventionalBasic Charge - 210.90Energy Charge - 206.68

Public Benefit Activities and SchoolsBasic Charge - 260.00Energy Charge - 175.00

N/A

N/A

Industrial Time of UseIndustrial TOU < 75kVABasic Monthly - 1 000Demand Charge - 133.31Network Access - 45.19Energy Charge Low SeasonPeak - 151.78Standard - 109.84Off-peak - 90.98Energy Charge High SeasonPeak - 402.68Standard - 137.80Off-peak - 94.43

Page 92: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

90

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Sol Plaatjie(Continued)

Industrial TOU 75 - 99 kVABasic Monthly - 2 000Demand Charge - 133.31Network Access - 45.19Energy Charge Low SeasonPeak - 151.78Standard - 109.84Off-peak - 90.98Energy Charge High SeasonPeak - 402.68Standard - 137.80Off-peak - 94.43 Industrial TOU > 100 kVABasic Monthly - 3 400Demand Charge - 133.31Network Access - 45.19Energy Charge Low SeasonPeak - 151.78Standard - 109.84Off-peak - 90.98Energy Charge High SeasonPeak - 402.68Standard - 137.80Off-peak - 94.43

Thembelihle6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.13Block 4(>600kWh) - 194.84Basic Charge - 91.89

Domestic Conventional Single PhaseBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.13Block 4(>600kWh) - 194.84Basic Charge - 187.09

N/A

Commercial Conventional Single PhaseBasic Charge - 483.60Energy Charge - 174.95 Commercial Conventional Three PhaseBasic Charge - 575.27Energy Charge - 199.18

N/A

N/A

N/A

Page 93: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

91

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Thembelihle(Continued)

Domestic Conventional Three PhaseBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.58Block 3(351-600kWh) - 165.13Block 4(>600kWh) - 194.84Basic Charge - 225.52

Municipal DepartmentEnergy Charge - 201.79

Tsantsabane 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 104.12Block 2(51-350kWh) - 141.76Block 3(351-600kWh) - 183.92Block 4(>600kWh) - 201.34

Domestic ConventionalBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 116.07Block 3(351-600kWh) - 156.69Block 4(>600kWh) - 194.56Basic Charge - 295.94

Commercial PrepaidEnergy Charge - 189.72

Commercial ConventionalBasic Charge - 566.81Energy Charge - 162.54

Industrial PrepaidBasic Charge - 168.53 Industrial Conventional Basic Charge - 264.20Energy Charge - 159.49Demand Charge - 179.69

Industrial Bulk UsersBasic Charge - 264.20Energy Charge - 154.21Demand Charge - 178.26

N/A

Ubuntu6.84%

Domestic PrepaidBlock 1 (0-50kWh) - 91.44Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85

Domestic ConventionalBlock 1 (0-50kWh) - 91.44Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85Basic Charge - 133.35

Commercial PrepaidEnergy Charge - 191.34

Commercial Conventional 1PhaseBlock 1 (2000kWh) - 187.23Block 2 (3000kWh) - 182.87Block 3 (7000kWh) - 162.19Basic Charge - 376.07 Commercial Conventional 3PhaseBlock 1 (2000kWh) - 180.69Block 2 (3000kWh) - 163.28Basic Charge - 376.07

N/A

N/A

N/A

Page 94: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

92

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTHERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Umsobomvu6.84%

Domestic PrepaidBlock 1 (0-50kWh) - 96.28Block 2 (51-350kWh) - 118.10Block 3 (351-600kWh) - 163.66Block 4 (>600kWh) - 193.03

Domestic ConventionalBlock 1 (0-50kWh) - 96.28Block 2 (51-350kWh) - 118.10Block 3 (351-600kWh) - 163.66Block 4 (>600kWh) - 193.03Basic Charge - 87.51

Prepaid Business Single & Three PhaseEnergy Charge - 201.00

Business Government& SchoolsBasic Charge - 218.29Energy Charge - 181.82Other DepartmentalEnergy Charge - 170.65

Business & Industrial KVABasic Charge - 209.79Energy Charge - 89.34Demand Charge - 228.72 Agriculture ConventionalBlock 1 (0-50kWh) - 96.28Block 2 (51-350kWh) - 118.10Block 3 (351-600kWh) - 163.66Block 4 (>600kWh) - 193.03Basic Charge - 87.51 Availability Charges - Empty StandsBasic Charge - 99.43

N/A

N/A

Page 95: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

93

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPEPROVINCE

Page 96: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

94

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Amahlathi 6.84%

Domestic Prepaid 20A & 60ABlock 1(0-50kWh) - 91.43Block 2(51-350kWh) - 117.44Block 3(351-600kWh) - 165.12Block 4(>600kWh) - 194.84

Domestic Conventional 20A & 60ABlock 1(0-50kWh) - 92.76Block 2(51-350kWh) - 117.55Block 3(351-600kWh) - 165.20Block 4(>600kWh) - 194.84Basic Charge - 265.32

Commercial Prepaid Energy Charge - 203.55

Commercial Conventional - Single Phase >20ABasic Charge - 700.63Energy Charge:≤500kWh - 180.77>500kWh - 159.17 Commercial Conventional - Three Phase <70ABasic Charge - 1 311.66Energy Charge:≤500kWh - 179.93>500kWh - 159.17

Agricultural Conventional Low 3PhaseBasic Charge - 1 396.19Energy Charge:≤500kWh - 187.29>500kWh - 166.42

Industrial Large Power UserBasic Charge - 954.77Energy Charge - 182.57Demand Charge - 137.13

N/A

Scale 40T Urban 40R Peri-Urban >200kVABasic Charge - 1 321.42Demand Charge - 131.93Energy Charges : Low SeasonPeak - 201.59Standard - 58.94Off- peak - 51.49Energy Charges : High SeasonPeak - 295.20Standard - 124.74Off- peak - 77.17

Blue Crane Route 6.84%

Domestic Prepaid Indigent Tariff 1&7Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84Basic Charge - 107.02

Domestic Town Prepaid Tariff 1&7Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84Basic Charge - 152.89

Commercial Prepaid Tariff 8Basic Charge - 547.36Energy Charge - 168.18

Business Town Tariff 2Basic Charge - 547.36Energy Charge - 168.48 Agriculture Rural ≤50kVA Tariff 5Basic Charge - 633.65Energy Charge - 166.29 Agriculture Rural ≥50 & ≤100kVA Tariff 5Basic Charge - 1 009.08Energy Charge - 170.99

Agriculture Rural kVA Tariff 6Basic Charge - 1 239.41Energy Charge - 89.63Demand Charge - 224.09

Consumers Town(Bulk) Tariff 3Basic Charge - 1 251.86Energy Charge - 91.18Demand Charge - 228.73

N/A

Page 97: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

95

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Buffalo City6.84%

Domestic FBE Prepaid Scale 1CEnergy Charge - 128.33Domestic Prepaid Scale 1BEnergy Charge - 180.08

Domestic Credit Scale 1ABasic Charge - 38.40Energy Charge - 178.52

Small Power Users Prepaid Scale 2BEnergy Charge - 203.56

Commercial Small Power Users Scale 2ABasic Charge - 188.96Energy Charge - 182.50 Commercial Small Power Users Scale 2A (Non-Profit Organisations)Basic Charge - 172.883Energy Charge - 166.973 Street LightsEnergy Charge - 128.230 Traffic SignalEnergy Charge - 154.752 Temporary & ItenerantEnergy Charge - 474.895 Sportsfield Lighting & SchoolEnergy Charge :First 2 000kWh - 267.032Next 8 000kWh - 198.087Above 10 000kWh - 278.641

Availability Charges - Vacant Land (Domestic)Basic Charge - 81.189

Large Power User 400LV Scale 3ABasic Charge - 866.135Energy Charge - 72.574Demand Charge - 267.002 Large Power User LV Scale 3A (Non-Profit Organisations)Basic Charge - 792.428Energy Charge - 66.398Demand Charge - 244.280

Large Power User 11kV (HV) Scale 3BBasic Charge - 1 301.863Energy Charge - 67.154Demand Charge - 250.737 Large Power User 11kV (HV) Scale 3B (Non-Profit Organisations)Basic Charge - 1 191.075Energy Charge - 61.439Demand Charge - 229.399 Large Power Prepaid Scale 3C 50kVA up to150kVAEnergy Charge - 206.46

Time Of Use 80kVA≤800kVA Scale 4ABasic Charge - 770.295Low demand SeasonEnergy Charges:Peak - 190.408Standard - 111.707Off-Peak - 69.681Reactive Energy - 13.099Demand Charge - 113.813High Demand SeasonEnergy Charges:Peak - 343.752Standard - 124.301Off-Peak - 74.371Demand Charge - 125.516 11kV; 1MVA ≤10MVA Scale 4BBasic Charge - 1 460.460Low demand SeasonEnergy Charges:Peak - 184.450Standard - 105.154Off-Peak - 64.599Reactive Energy - 13.367Demand Charge - 95.886High Demand SeasonEnergy Charges:Peak - 334.484Standard - 113.266Off-Peak - 64.979Demand Charge - 106.284

Page 98: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

96

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Buffalo City(Continued)

Availability Charges - Vacant Land (Non-Domestic)Basic Charge - 164.437 Small Scake Embedded Generation (SSEG) Limited to 5kVA 1Phase & 15kVA 3PhaseEnergy Charge (Import) - 181.478 Energy Charge (Export) - (-40.745)

11kV >10MVA Scale 4CBasic Charge - 1 345.007Low demand SeasonEnergy Charges:Peak - 178.192Standard - 99.633Off-Peak - 57.263Reactive Energy - 13.448Demand Charge - 95.886High Demand SeasonEnergy Charges:Peak - 327.924Standard - 111.043Off-Peak - 63.705Demand Charge - 106.153

Dr Beyers Naude 7.00%Former Baviaans Area: Willowmore and Steytleville 

Low Domestic Town Indigent Scale 1Block 1(0- 50kWh) - 86.00Block 2(51-350kWh) - 111.00Block 3(351-600kWh) - 129.00Block 4(>600kWh) - 153.00Basic Charge - 156.83 Domestic Prepaid Town/Zaamainshoek IndigentBlock 1(0- 50kWh) - 89.00Block 2(51-350kWh) - 117.00Block 3(351-600kWh) - 158.00Block 4(>600kWh) - 185.00

Domestic Town Scale 1Block 1(0-50kWh) - 95.00 Block2 (51-350kWh) - 120.00 Block3 (351-600kWh) - 153.00Block4 (>600kWh) - 178.00Basic Charge - 224.19 Domestic Prepaid 60AmoBlock 1(0-50kWh) - 126.00Block2 (51-350kWh) - 137.00Block3 (351-600kWh) - 166.00Block4 (>600kWh) - 195.00

Small Business Prepaid Up to 60A 1P & 3P Scale 2Energy Charge - 179.27

Business 1P 30A & 60A Scale 2Basic Charge - 211.28Energy Charge - 141.66 Business 3P 30A & 60A Scale 2Basic Charge - 418.86Energy Charge - 127.87 Business >200 & >800Basic Charge - 652.39Energy Charge - 127.87

Industrial Large Power User (KVA)Energy Charge - 111.19Demand Charge - 166.81

N/A     

N/A     

Page 99: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

97

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Dr Beyers Naude (Continued) Former Camdeboo Area: Aberdeen and Graaff-Reinet

Domestic Prepaid IndigentBlock 1(0-50kWh) - 88.94 Block2 (51-350kWh) - 116.64 Block3 (351-600kWh) - 158.07Block4 (>600kWh) - 185.32 Low Domestic Town Idigent Scale 1Block 1(0-50kWh) - 85.98 Block2 (51-350kWh) - 111.43 Block3 (351-600kWh) - 129.06Block4 (>600kWh) - 152.61Basic Charge - 156.83

Domestic 60AMP 3PBlock 1(0-50kWh) - 126.00 Block2 (51-350kWh) - 137.19 Block3 (351-600kWh) - 165.70Block4 (>600kWh) - 195.13 Domestic Town Scale 1Block 1(0-50kWh) - 95.28 Block2 (51-350kWh) - 119.57 Block3 (351-600kWh) - 152.61Block4 (>600kWh) - 177.68Basic Charge - 224.15 Domestic Departure Use Scale 1Block 1(0-50kWh) - 95.11 Block2 (51-350kWh) - 119.57 Block3 (351-600kWh) - 152.61Block4 (>600kWh) - 177.68Basic Charge - 405.26 Domestic Farm ( Jansenville & FM Lines)Block 1(0-50kWh) - 95.28 Block2 (51-350kWh) - 119.64 Block3 (351-600kWh) - 152.61Block4 (>600kWh) - 177.68Basic Charge - 224.15Maintenance :Jansenville - 305.73FM Lines - 241.43

Commercial Prepaid Up to 60A 1Phase & 3 phaseEnergy Charge - 185.00

Commercial Conventional Scale2 Municipal DepartmentsBasic Charge - 297.20Energy Charge - 129.20 Commercial Conventional Scale2 Small Power up to 50kVAWinter (Peak):Basic Charge - 405.26Energy Charge - 177.68Summer (Off-Peak):Basic Charge - 698.94Energy Charge - 125.36

Caravan Parks/Umas Scale2Basic Charge - 348.27Energy Charge - 152.61 Agricultural Scale 2Small Power up to 50kVA Farms(Jansenville & FM Lines)Winter (Peak):Basic Charge - 405.26Energy Charge - 177.68Summer (Off-Peak):Basic Charge - 698.95Energy Charge - 125.36Maintenance :Jansenville - 305.73FM Lines - 241.43

Large Power above 100kVA (Scale 4)Basic Charge - 1 220.46Energy Charge - 79.02Demand Charge - 250.00 Large Power: Municipal Departments (Scale 4)Energy Charge - 67.50Demand Charge - 213.52 Large Power above 50 to 100kVA (Scale 3)Basic Charge - 1 207.40Energy Charge - 79.02Demand Charge - 247.77Demand charge/kVA; Where kVA>40 - 9 910.90

Bulk Power: Special above 600kVA (Scale 5)Basic Charge - 1 220.46Energy Charge: ≤150 000 - 77.39>150 000 - 45.79Demand Charge: ≤600 - 250.19>600 - 198.66

Time Of Use ≤50kVA(Scale 6)Basic Charge - 241.25Energy Charges: High/Low SeasonPeak - 308.50Standard - 119.91Off-Peak - 67.59Reactive Charge - 12.84 Time Of Use > 50kVA(Scale 7)Basic Charge - 482.48Energy Charges: High/Low SeasonPeak - 171.15Standard - 94.84Off-Peak - 43.60Reactive Charge - 19.00Demand Chrage - 106.14

Page 100: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

98

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Dr Beyers Naude (Continued) Former Ikwezi Area:Jansenville

Domestic Prepaid IndigentBlock 1 (0-50kWh) - 89.05Block 2 (51-350kWh) - 117.00Block 3 (351-600kWh) - 158.00Block 4 (>600kWh) - 185.00

Domestic Prepaid 60ABlock 1 (0-50kWh) - 97.96Block 2 (51-350kWh) - 121.75Block 3 (351-600kWh) - 167.80Block 4 (>600kWh) - 195.12

Commercial Prepaid Energy Charge - 185.00

Commercial Conventional Basic Charge - 427.47Energy Charge - 156.00

N/A    

N/A    

N/A    

Elundini6.84%

Domestic Prepaid 20ABlock 1(0-50kWh) - 96.74Block2(51-350kWh) - 117.56Block3(351-600kWh) - 162.67Block 4(>600kWh) - 192.37Basic Charge - 88.89

Domestic Prepaid 60ABlock 1(0-350kWh) - 113.37Block2(>350kWh) - 164.03Basic Charge - 133.85

Business Prepaid Single Phase 60ABasic Charge - 269.72Energy Charge - 198.08

Business Three Phase25kVABasic Charge - 687.91Energy Charge - 198.08 Business Conventional 50kVABasic Charge - 746.26Energy Charge - 159.19 Municipal Own UseBasic Charge - 691.39Energy Charge - 151.86Demand Charge - 123.12

Business Conventional low 100kVABasic Charge - 805.48Energy Charge:Off-Peak - 151.87Peak - 154.81Demand Charge - 123.12 Business Conventional Medium 100kVABasic Charge - 947.62Energy Charge:Off-Peak - 179.38Peak - 188.36Demand Charge - 123.12

Business Conventional High 200kVABasic Charge - 1 094.50Energy Charge:Off-Peak - 173.11Peak - 194.20Demand Charge - 123.12 Business Conventional Medium 315kVABasic Charge - 1 264.15Energy Charge:Off-Peak - 157.12Peak - 165.58Demand Charge - 118.34

N/A

Emalahleni_EC 6.84%

Domestic Prepaid IndigentBlock 1(0-50kWh) - 96.31Block2(51-350kWh) - 121.80Block3(351-600kWh) - 160.63Block 4(>600kWh) - 189.96 Domestic Prepaid & Conventional 1PBlock 1(0-50kWh) - 96.31Block2(51-350kWh) - 121.80Block3(351-600kWh) - 165.33Block 4(>600kWh) - 194.64

Domestic Prepaid & Conventional 3PBlock 1(0-50kWh) - 128.21Block2(51-350kWh) - 139.96Block3(351-600kWh) - 169.87Block 4(>600kWh) - 194.45

Small Commercial Prepaid 1PhaseEnergy Charge - 200.35 Small Commercial Prepaid 3PhaseEnergy Charge - 203.55

Commercial Conventional 1PhaseBasic Charge - 407.61Energy Charge - 156.22 Commercial Conventional 1PhaseBasic Charge - 799.78Energy Charge - 149.86

Large Commercial Consumers >3 500kWhBasic Charge - 804.58Energy Charge - 88.16Demand Charge - 209.10

N/A

N/A

Page 101: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

99

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Enoch Mgijima 6.84%: Former Lukhanji Area:

Domestic Prepaid T2Block 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.85

Domestic High T1Block 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.85Basic Charge - 195.00

Commercial Prepaid 1Phase T4Energy Charge - 201.93

Commercial Small Users T3Basic Charge - 692.98Energy Charge :≤500kWh - 198.51>500kWh - 154.96 FarmlinesGeneral Power UsersBasic Charge - 704.45Energy Charge :≤500kWh - 203.85>500kWh - 159.32 Old Age HomesBasic Charge - 798.95Energy Charge :≤500kWh - 54.17>500kWh - 148.39

Large Power users <80kVA Basic Charge - 1 356.17Energy Charge - 90.20Demand Charge - 246.83Demand Charge c/kVA; where demand <80kVA - 8 174.89

N/A

T6: Tx <100 000kWh/<80kVA Basic Charge - 625.54Low SeasonEnergy Charges:Peak - 323.37Standard - 140.60Off - peak - 72.64High SeasonEnergy Charges:Peak - 329.23Standard - 146.45Off - peak - 72.64Reactive Energy - 15.23 T7: Tx <100 000kWh/ >80kVABasic Charge - 1 201.94Low SeasonEnergy Charges:Peak - 193.31Standard - 119.50Off - peak - 67.99Demand Charge - 98.91High SeasonEnergy Charges:Peak - 214.41Standard - 119.50Off - peak - 72.64Reactive Energy - 15.23Demand Charge - 105.70

Page 102: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

100

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Former Inkwanca Area:

Domestic Prepaid IndigentBasic Charge - 162.82Energy Charge - 107.31

Domestic Consumers High Basic Charge -164.35Energy Charge - 146.19

N/A Small Commercial & Government Basic Charge - 430.76Energy Charge - 177.46

Industrial Large ConsumersBasic Charge - 297.63Energy Charge - 63.97Demand Charge - 138.47

N/A

N/A

Former Tsolwana Area:

Domestic Prepaid IndigentEnergy Charge - 133.00

Domestic : Demand 0-59 Incl. ChurchesEnergy charge - 151.76

Commercial PrepaidEnergy Charge - 170.21

Commercial Credit Metering Basic Charge - 200.14Energy Charge - 170.20 Business BakeryBasic Charge - 187.21Energy Charge - 153.85

Industrial Large kVABasic Charge - 352.54Energy Charge - 59.73Demand Charge - 195.62

N/A  

N/A 

Great Kei 6.84%

Domestic IndigentBlock 1 (0-50kWh) - 92.57Block 2 (51-350kWh) - 114.80Block 3 (351-600kWh) - 144.00Block 4 (>600kWh) - 168.00Basic Charge - 145.79

Domestic ConventionalBlock 1 (0-50kWh) - 92.57Block 2 (51-350kWh) - 114.80Block 3 (351-600kWh) - 144.00Block 4 (>600kWh) - 168.00Basic Charge - 165.91 Domestic PrepaidBlock 1 (0-50kWh) - 96.07Block 2 (51-350kWh) - 117.16Block 3 (351-600kWh) - 144.00Block 4 (>600kWh) - 167.98

Business PrepaidEnergy Charge - 195.67

Business Credit SingleBasic Charge - 209.49Energy Charge: ≤1000kWh - 155.83>1000kWh - 168.00

Industrial Bulk PowerBasic Charge - 217.22Energy Charge:≤1000kWh - 87.52>1000kWh - 91.75Demand Charge - 194.06

N/A

N/A

Page 103: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

101

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Inxuba Yethemba 6.84%

Domestic IndigentBlock 1(0- 50kWh) - 90.17Block 2(51-350kWh) - 117.40Block 3(351-600kWh) - 144.20Block 4(>600kWh) - 157.12

Domestic PrepaidBlock 1(0- 50kWh) - 109.98Block 2(51-350kWh) - 145.83Block 3(351-600kWh) - 175.49Block 4(>600kWh) - 191.90 Domestic Conventional Incl. ChurchesBlock 1(0- 50kWh) - 98.31Block 2(51-350kWh) - 126.19Block 3(351-600kWh) - 162.94Block 4(>600kWh) - 180.21Basic Charge - 119.24

Business, Industry & Govt PrepaidEnergy Charge - 203.56

Business, Industry & Govt ConventionalBasic Charge - 295.45Energy Charge - 178.35 Business, Old Age Homes & Dept. Energy Charge - 158.57 Consumer Brakriver Line: Middelberg Basic Charge - 178.21Energy Charge - 181.25

Bulk Supply > 50kVA 3pBasic Charge - 450.25Demand Charge - 205.84Energy Charges: Low Season≤30 000kWh - 102.29>30 000kWh - 100.76 High Season≤30 000kWh - 127.72>30 000kWh - 132.51

N/A

N/A

King Sabata Dalindyebo 6.84%

Domestic Prepaid Indigent Tariff 2Energy Charge - 122.87

Domestic Prepaid Tariff 1Energy Charge - 150.64

Commercial Prepayment Small Tariff 3 & Big Tariff 4Energy Charge - 203.56

Commercial Conventional Basic Charge - 391.31Energy Charge - 174.18

Large Power users ≤100kVABasic Charge - 1 311.10Energy Charge - 91.77Demand Charge - 278.78

Large Power users >100kVABasic Charge - 1 148.84Energy Charge - 65.59Demand Charge - 278.85

N/A

Kou Kamma6.84%

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 91.00Block 2(51-350kWh) - 118.00Block 3(351-600kWh) - 172.00Block 4(>600kWh) - 195.00

N/A

N/A

N/A

N/A

N/A

N/A

Page 104: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

102

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Kouga 6.84%

Domestic Low Prepayment 20A 1Phase Block 1 (0-50kWh) - 84.30Block 2 (51-350kWh) - 110.10Block 3 (351-600kWh) - 157.20Block 4 (>600kWh) - 189.10

Domestic Prepaid 60A 1Phase Block 1 (0-50kWh) - 84.30Block 2 (51-350kWh) - 110.10Block 3 (351-600kWh) - 157.20Block 4 (>600kWh) - 189.10Basic Charge - 154.08 Domestic Prepaid 60A 3Phase Block 1 (0-50kWh) - 84.30Block 2 (51-350kWh) - 110.10Block 3 (351-600kWh) - 157.20Block 4 (>600kWh) - 189.10Basic Charge - 431.42 Domestic Conventional 60A 1Phase Block 1 (0-50kWh) - 84.30Block 2 (51-350kWh) - 110.10Block 3 (351-600kWh) - 157.20Block 4 (>600kWh) - 189.10Basic Charge - 192.60 Domestic Conventional 60A 3Phase Block 1 (0-50kWh) - 84.30Block 2 (51-350kWh) - 110.10Block 3 (351-600kWh) - 157.20Block 4 (>600kWh) - 189.10Basic Charge - 539.28

Commercial Prepaid 60A 1& 3PhaseEnergy Charge - 180.00

Commercial Conventional 60A 1Phase Basic Charge - 422.40Energy Charge - 134.00 Commercial Conventional 60A 3PhaseBasic Charge - 1 182.72Energy Charge - 134.00 Commercial conventional 100A 3PhaseBasic Charge - 1 971.20Energy Charge - 134.00

Industrial Normal Bulk Low Voltage <500Basic Charge - 775.00Energy Charge - 67.00Demand Charge:Network Demand charge - 203.06Access Demand charge - 30.54

Industrial Normal Bulk High Voltage ≥500 & <66kVBasic Charge - 775.00Energy Charge - 62.31Demand Charge:Network Demand charge - 188.85Access Demand charge - 28.40

Low Voltage <500VBasic Charge - 775.00Demand Charges:Network demand charge - 33.99Access demand charge - 30.54Energy Charges:Low SeasonPeak - 117.50Standard - 83.50Offpeak - 56.07High SeasonPeak - 342.78Standard - 109.74Offpeak - 63.46Reactive Energy - 14.51 High Voltage ≥500V & <66kVBasic Charge - 775.00Demand Charges:Network Demand Charge - 31.61Access Demand Charge - 28.40Energy Charges:Low SeasonPeak - 109.28Standard - 77.66Offpeak - 52.15High SeasonPeak - 318.79Standard - 102.06Offpeak - 59.02Reactive Energy - 14.51

Page 105: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

103

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Makana6.84%

Domestic Prepaid 1P 20AEnergy Charge - 153.48 Domestic Prepaid 1Phase 40AEnergy Charge - 162.99

Domestic Prepaid 60A 1Phase Energy Charge - 167.21 Domestic Conventional 1Phase 20A Scale 4Capacity Demand Charge - 6.92Energy Charge - 144.34 Domestic Conventional 1Phase 40A Scale 4Capacity Demand Charge - 6.92Energy Charge - 147.05 Domestic Conventional 1Phase 60A Scale 4Capacity Demand Charge - 7.50Energy Charge - 153.85 Domestic Conventional 3Phase 25A Scale 4Capacity Demand Charge - 7.25Energy Charge - 158.57 Domestic Conventional 3Phase 40A Scale 4Capacity Demand Charge - 7.25Energy Charge - 158.57

Commercial, Industrial & General PrepaidEnergy Charge - 186.68 Commercial, Industrial & General 1Phase Scale 3.1Capacity Demand Charge - 10.47Energy Charge - 169.58 Municipal Basic Scale 3.1Capacity Demand Charge - 10.17Energy Charge - 169.58 Sports Clubs Scale 3Capacity Demand Charge - 9.85Energy Charge - 147.24 Commercial, Industrial & General Scale 3.2Capacity Demand Charge - 9.43Energy Charge - 169.58

Bulk Supply Low Voltage Scale 2Basic Charge - 1 171.65Energy Charge - 86.74Demand Charge - 226.48 Bulk Supply Medium Voltage Scale 1ABasic Charge - 2 343.29Energy Charge - 105.16Demand Charge - 187.38 Bulk Supply Munic Basic Scale 1AEnergy Charge - 105.16Demand Charge - 205.52 Bulk Supply Munic Basic Scale 2Energy Charge - 90.71Demand Charge - 226.07

N/A

N/A

Low VoltageBasic Charge - 1 088.49Energy Charges:Low SeasonPeak - 129.96Standard - 103.51Offpeak - 74.16Demand Charge - 70.10High SeasonPeak - 353.82Standard - 131.56Offpeak - 82.05Reactive Energy - 3.51Demand Charge - 89.63 Medium VoltageBasic Charge - 2 176.97Energy Charge:Low SeasonPeak - 123.77Standard - 98.58Offpeak - 70.63Demand Charge - 63.73High SeasonPeak - 336.97Standard - 125.30Offpeak - 78.14Reactive Energy - 3.51Demand Charge - 84.36

Page 106: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

104

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Matatiele6.84%

Domestic PrepaidBlock 1 (0-50kWh) - 84.40Block 2 (51-350kWh) - 110.05Block 3 (351-600kWh) - 155.99Block 4 (>600kWh) - 186.97

Domestic ConventionalBlock 1 (0-50kWh) - 85.23Block 2 (51-350kWh) - 110.73Block 3 (351-600kWh) - 156.67Block 4 (>600kWh) - 187.74Basic Charge - 384.30

N/A

Commercial 1PhaseBasic Charge - 426.16Energy Charge - 167.04 Commercial 3PhaseBasic Charge - 1 588.65Energy Charge - 169.80Schools & School HostelsBasic Charge - 306.59Energy Charge - 115.38

Large Power UsersBasic Charge - 9 295.51Energy Charge - 169.80

N/A N/A

Mbizana6.84%

Domestic PrepaidBlock 1 (0-50kWh) - 91.44Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85

Domestic ConventionalBlock 1 (0-50kWh) - 91.44Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.85Basic Charge - 186.80

Commercial 1Phase Prepaid & ConventionalBasic Charge - 394.42Energy Charge - 173.03

Commercial 3Phase Prepaid & ConventionalBasic Charge - 733.40Energy Charge - 164.94

Large Power User >100kVABasic Charge - 1 227.29Energy Charge - 80.14Demand Charge - 212.01

   

Ndlambe6.84%

Domestic Credit & PrepaidScale 1 & 2Block 1 (0-50kWh) - 91.44Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.00Basic Charge - 203.78

Domestic Credit & PrepaidScale 1 & 2Block 1 (0-50kWh) - 91.44Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 165.46Block 4 (>600kWh) - 194.00Basic Charge - 203.78

N/A

Commercial Scale 3<55kVABasic Charge - 365.41Energy Charge - 162.00

N/A

N/A

Time Of Use Scale 7>50kVABasic Charge - 669.76Low SeasonEnergy Charges:Peak - 107.00Standard - 66.00Off - peak - 47.00High SeasonEnergy Charges:Peak - 375.00Standard - 99.00Off - peak - 79.00Demand Charge - 79.38

Page 107: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

105

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Nelson Mandela Bay 5.48%

Domestic Prepaid Indigent ATTPBlock 1(0-75kWh) - 89.51Block2 (76-350kWh) - 98.27Block 3(351-600kWh) - 163.26Block 4(601-900kWh) - 184.13Block 5(>900kWh) - 184.13

Domestic Credit & Prepaid Non ATTPBlock 1(0-350kWh) - 137.91Block2 (351-600kWh) - 166.43Block 3(601-950kWh) - 184.13Block 4(>950kWh) - 191.23 Domestic Customers Time-Of-Use Embedded GenerationBasic Charge - 60.00Energy Charges: Peak - 205.00Standard - 120.00Off-peak - 95.00

Small Business PrepaidEnergy Charge - 175.76 Business Prepaid Scale 33 Prepaid Urban & 38 Prepaid Peri-UrbanEnergy Charge - 167.50

Small Business Credit MetersBasic Charge - 195.37Energy Charge - 177.35 Medium Business 400V Multi Rate Basic Charge - 776.08Energy Charge:Peak - 225.98Off-Peak - 72.32 Medium Business Single RateScale 33 & 38Basic Charge - 776.08Energy Charge:Winter - 221.12Summer - 139.43

Medium Business MeteredDemand ≥200kVA (Min 70kVA)Scale 34 & 39Basic Charge - 783.71Energy Charge : Winter - 192.12Summer - 99.34Demand Charge:Winter - 116.45Summer - 116.45

Large Business Scale 35 Urban30 Peri-Urban & 35PBasic Charge - 3 192.01Energy Charge :Winter - 173.68Summer - 88.07Demand Charge: Winter - 111.12Summer - 111.12Investment TariffEnergy Charge - 160.00

Medium Business >200kVA Scale 34T Urban & 39T Peri-UrbanBasic Charge - 783.71Demand Charge - 102.46Low Demand SeasonEnergy Charges: Peak - 129.41Standard - 92.95Off-peak - 63.09High Demand SeasonEnergy Charges: Peak - 379.99Standard - 121.95Off-peak - 73.19 Large Business >1MVA Scale 40TUrban & 40R Per-UrbanBasic Charge - 3 192.38Demand Charge - 99.48Low Demand SeasonEnergy Charges: Peak - 118.75Standard - 81.68Off-peak - 56.90High Demand SeasonEnergy Charges: Peak - 345.72Standard - 110.96Off-peak - 64.34

Page 108: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

106

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Raymond Mhlaba 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 94.24Block 2(51-350kWh) - 119.65Block 3(351-700kWh) - 169.83Block 4(700-1000kWh) - 195.93

Domestic Conventional Block 1(0- 50kWh) - 94.24Block 2(51-350kWh) - 119.65Block 3(351-700kWh) - 169.83Block 4(700-1000kWh) - 195.93Basic Charge - 110.00

Commercial PrepaidEnergy Charge - 166.76

Commercial Conventional & Street LightsBasic Charge - 523.61Energy Charge - 166.76

Industrial Bulk SupplyBasic Charge - 471.79Energy Charge - 134.43Demand Charge - 176.20

Street LightsBasic Charge - 523.61Energy Charge - 166.76

N/A

Sakhisizwe6.84%

Domestic Prepaid Block 1(0- 50kWh) - 91.05Block 2(51-350kWh) - 115.96Block 3(351-600kWh) - 159.13Block 4(>600kWh) - 190.96

Domestic Conventional Block 1(0- 50kWh) - 91.05Block 2(51-350kWh) - 115.96Block 3(351-600kWh) - 159.13Block 4(>600kWh) - 190.96

N/A

Commercial Small Users 0 - 59AmpBasic Charge - 287.43Energy Charge - Commercial Medium 60 - 100AmpBasic Charge - 467.50Energy Charge - 152.71

Large Power Users 0 - 15AmpBasic Charge - 1 040.20Energy Charge - 114.75Demand Charge - 107.47 Large Power Users 16 - 30AmpBasic Charge - 1 040.20Energy Charge - 114.75Demand Charge - 121.37 Large Power Users >100AmpBasic Charge - 1 040.20Energy Charge - 114.75Demand Charge - 148.50

N/A

N/A

Senqu 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.59Block 3(351-600kWh) - 181.98Block 4(>600kWh) - 198.90

Domestic Credit 0-60A & >60ABlock 1(0- 50kWh) - 91.72Block 2(51-350kWh) - 115.10Block 3(351-600kWh) - 165.23Block 4(>600kWh) - 192.12Basic Charge - 149.67

Commercial Prepaid MeteringEnergy Charge: 203.33

Commercial Small/ Medium CreditBasic Charge - 434.92Energy Charge - 168.38

Commercial LargeBasic Charge - 1 271.63Energy Charge - 165.54Demand Charge - 68.31 Agricultural FarmsBasic Charge - 430.61Energy Charge - 166.32Demand Charge - 68.38

N/A

N/A

Page 109: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

107

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Sundays River Valley 6.84%

Domestic PrepaidBlock 1 (0-50kWh) - 99.30Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 158.15Block 4 (>600kWh) - 164.36

Domestic ConventionalBlock 1 (0-50kWh) - 99.30Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) - 158.15Block 4 (>600kWh) - 164.36Basic Charge - 44.01

Electricity Street Light 434Energy Charge - 32.65 Electricity Municipal Service Charge 2459Basic Charge - 9.51Energy Charge - 148.31 Municipal Tariff 444Block 1 (<300kWh) - 93.61 Block 2 (300-700kWh) - 104.49 Block 3 (>700kWh) - 138.24 Municipal Tariff 446Block 1 (<300kWh) - 161.10Block 2 (300-700kWh) - 171.98Block 3 (>700kWh) - 181.78 Small Business Prepaid (70 Amps 1Phase)Block 1 (<300kWh) - 160.01Block 2 (300-700kWh) - 165.45Block 3 (>700kWh) - 179.60

Small Business Conventional( 70 Amps 1Phase)Block 1 (<300kWh) - 161.10Block 2 (300-700kWh) - 165.45Block 3 (>700kWh) - 180.69Basic Charge - 321.39 Medium Business Prepaid( 70 Amps 3Phase)Block 1 (<300kWh) - 180.69Block 2 (300-700kWh) - 187.22Block 3 (>700kWh) - 190.49 Medium Business Conventional( 70 Amps 3Phase)Block 1 (<300kWh) - 180.69Block 2 (300-700kWh) - 187.22Block 3 (>700kWh) - 190.49Basic Charge - 321.39

Large Business >70 Amps 3 PhaseBasic Charge - 336.24Energy Charge : High Season - 126.26 Low Season - 97.96Demand Charge :High Season - 310.59Low Season - 218.22 Bulk Supply Consumers Energy Charge : High Season - 126.26 Low Season - 64.22Demand Charge :High Season - 388.46Low Season - 236.24

N/A

N/A

Page 110: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

108

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Walter Sisulu 6.84%:Former Gariep Area

Domestic IndigentBasic Charge - 108.97Energy Charge - 117.80

Residential Standard (Tariff 1)Basic Charge - 133.62Energy Charges :≤1200kWh - 143.19>1200kWh - 140.24 Residential Standard 3Phase (Tariff 2)Basic Charge - 153.28Energy Charge - 160.39

Commercial Small Prepaid (Tariff 11)Energy Charge - 202.65

Small Commercial 1Phase (Tariff 2)Basic Charge - 503.99Energy Charge - 150.31 Small Commercial 2Phase (Tariff 3)Basic Charge - 704.72Energy Charge - 150.31 Small Commercial 3Phase (Tariff 4)Basic Charge - 898.22Energy Charge - 150.31 Small Commercial 3Phase (Tariff 5)Basic Charge - 1 129.98Energy Charge - 150.31 Small Commercial 3Phase (Tariff 6)Basic Charge - 1 329.28Energy Charge - 150.31 Commercial Old Age Home (Tariff 7)Basic Charge - 1 388.64Energy Charge - 117.57 Commercial Municipal Consumer (Tariff 10)Basic Charge - 211.17Energy Charge - 116.91

Large Power User (Tariff 8)Energy Charge - 102.80Demand Charge - 172.04 Large Power User (Municipal) Tariff 9Energy Charge - 102.02Demand Charge - 184.78

N/A

N/A

Page 111: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

109

APPROVED MUNICIPAL ELECTRICITY TARIFFS

EASTERN CAPE PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Walter Sisulu (Continued) Former Gariep Area

Commercial Farmlines (Tariff 3)Basic Charge - 153.24Energy Charge - 160.44

Former Maletswai Area

Domestic Indigent Prepaid (Summer)Block 1 (0-50kWh) - 91.50Block 2 (51-350kWh) - 116.44Block 3 (351-600kWh) - 163.56Block 4 (>600kWh) - 170.39Basic Charge - 110.08(Winter)Block 1 (0-50kWh) - 95.47Block 2 (51-350kWh) - 117.44Block 3 (351-600kWh) - 164.98Block 4 (>600kWh) - 171.86Basic Charge - 111.04 Domestic Indigent Conventional (Summer)Block 1 (0-50kWh) - 90.64Block 2 (51-350kWh) - 116.44Block 3 (351-600kWh) - 163.56Block 4 (>600kWh) - 170.39Basic Charge - 110.08(Winter)Block 1 (0-50kWh) - 91.67Block 2 (51-350kWh) - 117.44Block 3 (351-600kWh) - 164.98Block 4 (>600kWh) - 171.86Basic Charge - 111.04

Domestic Conventional (Summer)Block 1 (0-50kWh) - 92.79Block 2 (51-350kWh) - 116.44Block 3 (351-600kWh) - 164.81Block 4 (>600kWh) - 171.55Basic Charge - 110.12(Winter)Block 1 (0-50kWh) - 92.96Block 2 (51-350kWh) - 116.66Block 3 (351-600kWh) - 165.41Block 4 (>600kWh) - 172.16Basic Charge - 110.52 Domestic Prepaid(Summer)Block 1 (0-50kWh) - 92.13Block 2 (51-350kWh) - 116.44Block 3 (351-600kWh) - 164.63Block 4 (>600kWh) - 171.25Basic Charge - 110.71(Winter)Block 1 (0-50kWh) - 92.14Block 2 (51-350kWh) - 116.45Block 3 (351-600kWh) - 164.67Block 4 (>600kWh) - 171.30Basic Charge - 110.74

N/A

Commercial Small Business Prepaid Low SeasonBasic Charge - 249.97Energy Charge - 139.79High SeasonBasic Charge - 250.04Energy Charge - 139.79

Bulk Consumers > 400V (Summer)Basic Charge - 1 019.37Energy Charge - 80.78Demand Charge - 223.18 Bulk Consumers >400v (Winter)Basic Charge - 1 029.01Energy Charge - 81.80Demand Charge - 225.23 Bulk Consumers <400v (Summer)Basic Charge - 877.61Energy Charge - 78.57Demand Charge - 222.34 Bulk Consumers <400v (Winter)Basic Charge - 886.84Energy Charge - 79.41Demand Charge - 233.81

N/A

N/A

Page 112: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

110

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCE

Page 113: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

111

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City of Matlosana 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.44Block 2(51-70kWh) - 93.28Block 3(71-350kWh) - 119.22Block 4(350-600kWh) - 158.65Block 5(>600kWh) - 186.96Basic Charge - 127.41

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-70kWh) - 117.56Block 3(71-350kWh) - 158.10Block 4(350-600kWh) - 181.60Block 5(>600kWh) - 191.20Basic Charge - 127.41 Bulk ResidentialBasic Charge - 127.84Energy Charge - 182.00

N/A

Business Up to 40MWhBasic Charge - 298.00Summer Energy Charge - 191.11Winter Energy Charge - 198.66

Industrial Low TensionBasic Charge - 1684.80Summer Energy Charge - 110.30Winter Energy Charge - 157.70Demand Charge - 227.04

Industrial High TensionBasic Charge - 1 137.13Basic Charge (Midvaal) - 5 314.18Summer Energy Charge - 112.20Winter Energy Charge - 163.50Demand Charge - 220.87

N/A

Ditsobotla6.84%

Domestic Low Single TariffEnergy Charge - 157.10

Domestic PrepaidEnergy Charge - 169.40 Domestic Conventional Basic Charge - 202.84Energy Charge - 144.34

Commercial PrepaidEnergy Prepaid - 203.55

Commercial ( Conventional)Basic Charge - 314.20Energy Charge - 189.60

Industrial LowBasic Charge - 987.22Energy Charge - 107.81Demand Charge - R34.56

N/A

Time Of Use Large Power Users >500kVABasic Charge - 1201.31Demand Charge - 162.80Energy ChargesPeak - 253.32Standard - 112.49Off-peak - 59.78

Greater Taung 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 110.26Block 3(351-600kWh) - 153.73Block 4(>600kWh) - 176.98

Domestic Conventional Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 115.06Block 3(351-600kWh) - 159.05Block 4(>600kWh) - 192.62Basic Charge - 91.99

N/A

Commercial ConventionalBasic Charge - 251.18Energy Charge - 143.30 Availability charge (vacant stand)Basic Charge - 241.46

IndustrialBasic Charge - 891.85Energy Charge - 91.77Demand Charge - 160.99

N/A

N/A

Page 114: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

112

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

JB Marks6.84%Formely Ventersdorp & Tlokwe

 

Domestic High (Tariff A IBT)Block 1(0- 350kWh) - 127.06Block 2(51-350kWh) - 127.06Block 3(351- 600 kWh) - 165.46Block 4(>600kWh) - 194.85Basic Charge - 58.90 Residential Reseller (Tariff B)Energy Charge - 392.04Automated meter basic charge-1 840.54Energy Charge - 143.50

N/A

Commercial Tariff AEnergy Charge - 58.87Basic Charge - 194.86 Commercial Tariff BEnergy Charge - 59.74Basic Charge - 159.75Capacity Charge - 14.05 Municipal Street Lighting (Tariff F) Summer Energy Charge - 117.90Winter Energy Charge - 113.63 Municipal Traffic Lighting (Tariff F)Summer Energy Charge - 91.75Winter Energy Charge - 124.35

Industrial Low /Medium Voltage (Tariff C- MV)Basic Charge - 392.04Automated Meter Basic Charge - 1 840.54Summer demand Charge - 79.19Winter Demand Charge - 146.62Network Access charge- 37.60Summer Enregy Charge-112.30Winter Energy Charge - 197.80 Tariff C - MV NGOsBasic Charge - 392.04Automated Meter Basic Charge - 1 840.54Summer demand Charge - 79.19Winter Demand Charge - 146.62Network Access charge- 37.60Summer Enregy Charge-112.30Winter Energy Charge - 197.80

Industrial High (Tariff C-LV)Basic Charge - 392.04Automated Meter Basic Charge - 1 840.54Summer demand Charge - 83.22Winter Demand Charge - 153.94Network Access charge- 39.47Summer Enregy Charge-118.00Winter Energy Charge - 207.60 Tariff C - LV NGOsBasic Charge - 392.04Automated Meter Basic Charge - 1 840.54Summer demand Charge - 83.22Winter Demand Charge - 153.94Network Access charge- 39.47Summer Enregy Charge-118.00Winter Energy Charge - 207.60

Time Of Use Low Voltage (Tariff D LV)Basic Charge - 385.65Automated Meter Basic Charge - 1 840.54Demand Charge - 70.42Network Access Charge - 44.05Summer Energy ChargePeak - 171.87Standard - 111.69Off - peak - 82.45Winter Energy ChargePeak - 466.45Standard - 161.02Off - peak - 94.65 Medium Voltage (Tariff D LV NGOs) Basic Charge - 385.65Automated Meter Basic Charge - 1 840.54Demand Charge - 70.42Network Access Charge - 44.05Summer Energy ChargePeak - 171.87Standard - 111.69Off - peak - 82.45Winter Energy ChargePeak - 466.45Standard - 161.02Off - peak - 94.65

Page 115: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

113

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

JB Marks(Continued)

Medium Voltage (Tariff D -MV)Basic Charge - 385.65Automated Meter Basic Charge - 1 840.54Demand Charge - 67.18Network Access Charge - 42.07Summer Energy ChargePeak - 161.60Standard - 106.43Off - peak - 78.80Winter Energy ChargePeak - 442.63Standard - 154.55Off - peak - 89.20 Medium Voltage (Tariff D MV NGOs) Basic Charge - 385.65Automated Meter Basic Charge - 1 840.54Demand Charge - 67.18Network Access Charge - 42.07Summer Energy ChargePeak - 161.60Standard - 106.43Off - peak - 78.80Winter Energy ChargePeak - 442.63Standard - 154.55Off - peak - 89.20

Page 116: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

114

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

JB Marks(Continued)

High voltage (Tariff E)Basic Charge - 385.65Automated Meter Basic Charge - 1 840.54Demand Charge - 45.17Network Access Charge - 35.71Summer Energy ChargePeak - 152.81Standard - 100.50Off - peak - 73.72Winter Energy ChargePeak - 453.55Standard - 143.66Off - peak - 84.63 High voltage (Tariff E NGOs)Basic Charge - 385.65Automated Meter Basic Charge - 1 840.54Demand Charge - 45.17Network Access Charge - 35.71Summer Energy ChargePeak - 152.81Standard - 100.50Off - peak - 73.72Winter Energy ChargePeak - 453.55Standard - 143.66Off - peak - 84.63

Page 117: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

115

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Kgetleng River 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 92.45Block 2(51-350kWh) - 116.47Block 3(351-600kWh) - 154.07Block 4(>600kWh) - 167.67

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 125.49Block 3(351-600kWh) - 146.00Block 4(>600kWh) - 156.94Basic Charge - 196.55

N/A

Single Phase Business Town / Rural Basic Charge - 336.15Energy Charge - 194.54 Government / Mine TownBasic Charge - 380.06Energy Charge - 168.22c Commercial MunicipalEnergy Charge - 203

Industrial / MunicipalBasic Charge - 1 784.72Energy Charge - 122.87Demand Charge - 209.37

N/A         

N/A         

Lekwa Teemane 6.84%

Domestic Prepaid 20ABlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.66Block 3(351-600kWh) - 165.44Block 4(>600kWh) - 194.83Basic Charge - 160.55

Domestic Conventional Single Phase 60 AmpsBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.66Block 3(351-600kWh) - 165.44Block 4(>600kWh) - 194.83Basic Charge - 176.64 Domestic Conventional Three Phase 80 AmpsBlock 1(0- 50kWh) - 96.33Block 2(51-350kWh) - 121.92Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 197.02Basic Charge - 179.97

N/A

Commercial 1 Conventional <50kVABasic Charge - 239.93Network Access Charge - 197.60Energy Charge - 175.62 Commercial 2 Conventional >50kVA<100Basic Charge - 268.17Network Access Charge - 218.77Energy Charge - 173.84

Industrial Large Power User 100 - 500kVABasic Charge - 827.64Network Access Charge - 470.91Energy Charge - 126.12Demand Charge - 187.81

Industrial Large Power User - Bulk1 >500kVABasic Charge - 1087.85Network Access Charge - 543.97Energy Charge - 101.14Demand Charge - 184.55 Industrial Large Power User - Bulk2 >500kVABasic Charge - 1087.85Network Access Charge - 572.98Energy Charge - 101.14Demand Charge - 184.53

N/A

Page 118: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

116

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Madibeng6.84%

Domestic Single Energy Charge - 160.09

Domestic Conventional: Single Phase Amp Charge - 13.85Service Charge - 98.44Energy Charge - 103.01 Domestic Conventional: Three PhaseAmp Charge - 15.97Service Charge - 103.90Energy Charge - 115.23

N/A

Commercial Single PhaseAmp Charge - 15.93Service Charge - 113.10Energy Charge - 135.30 Commercial Three PhaseAmp Charge - 16.33Service Charge - 105.85Energy Charge - 131.00 AgricultureBasic Charge - 1 199.41Energy Charge:Block 1(0-1000kWh) - 236.32Block 2(>1000kWh) - 131.67

MunicipalEnergy Charge - 143.82

Industrial Low VoltageBasic Charge - 1 603.66/monthEnergy Charge - 108.80Demand Charge - 165.39

Industrial Medium Voltage Basic Charge - 2 447.70Energy Charge - 111.83Demand Charge - 163.60

N/A

Mamusa6.84%

Domestic PrepaidEnergy Charge - 143.07

Domestic ConventionalBlock 1(0- 50kWh) - 91.66Block 2(51-350kWh) - 117.16Block 3(351-600kWh) - 165.63Block 4(>600kWh) - 194.48Basic / Fixed Charge - 150.05

Commercial PrepaidEnergy Charge - 190.49

Commercial Conventional Basic Charge - 111.35Energy Charge - 178.75

Industrial Town & Small HoldingsBasic Charge - 563.22Energy Charge - 86.65Demand Charge - 225.96

Industrial - Sentech Basic Charge - 572.54Energy Charge - 74.00Demand Charge - 233.25

N/A

Page 119: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

117

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Maquassi Hills 6.84%

Domestic Conventional Block 1(0- 50kWh) - 73.63Block 2(51-350kWh) - 80.14Block 3(351-600kWh) - 145.99Block 4(>600kWh) - 133.64Basic / Fixed Charge - 227.65

Domestic Rural PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.16Block 3(351-600kWh) - 161.69Block 4(>600kWh) - 194.49Basic / Fixed Charge - 369.51 Domestic PrepaidBlock 1(0- 50kWh) - 74.94Block 2(51-350kWh) - 81.56Block 3(351-600kWh) - 148.58Block 4(>600kWh) - 136.02Basic / Fixed Charge - 223.35 Domestic Rural scale 2Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.16Block 3(351-600kWh) - 161.69Block 4(>600kWh) - 194.49Basic / Fixed Charge - 376.62

ConventionalBasic Charge - 548.42Energy Charge - 145.32

ConventionalBasic Charge - 558.97Energy Charge - 143.71

Industrial TariffsBasic Charge - 1 412.42Energy Charge - 90.23Demand Charge - 215.56

N/A

Time Of Use SedibengBasic Monthly Charge - 1 348.29Low Season (Summer)Energy Charges:Peak - 292.03Standard - 104.90Off - peak - 60.53High Season (Winter)Energy Charges:Peak - 307.21Standard - 117.64Off - peak - 68.35Reactive energy charge - 10.56 Time Of Use Tau MillsLow Season (Summer)Basic Monthly Charge - 1 348.29Energy Charges:Peak - 287.05Standard - 99.94Off - peak - 47.11High Season (Winter)Energy Charges:Peak - 287.05Standard - 111.28Off - peak - 47.11Reactive energy charge - 10.56

Merafong6.84%

 

Domestic ConventionalBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84Basic Charge - 76.51

Commercial PrepaidEnergy Charge - 166.59

Commercial ConventionalBasic Charge - 854.57Energy Charge - 154.10

IndustrialBasic Charge - 1 240.37Energy Charge - 94.82Demand Charge - 221.76 Council/StreetlightEnergy Charge -103.80

Temporary powerEnergy Charge -172.35

N/A

Page 120: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

118

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Naledi6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 114.32Block 3(351-600kWh) - 158.12Block 4(>600kWh) - 192.31

Domestic Convemtional Single PhaseBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 114.32Block 3(351-600kWh) - 158.12Block 4(>600kWh) - 192.31Basic Charge - 233.98 Domestic Conventional Three PhaseBlock 1(0- 50kWh) - 97.22Block 2(51-350kWh) - 113.25Block 3(351-600kWh) - 158.12Block 4(>600kWh) - 192.31Basic Charge - 463.69

Commercial PrepaidEnergy Charge - 193.75

Commercial Conventional Single PhaseBasic Charge - 615.40Energy Charge - 166.67 Commercial Conventional Three PhaseBasic Charge - 824.800Energy Charge - 156.74

Industrial Medium Bulk 150ABasic Charge - 2 005.39Energy Charge - 117.00Demand Charge - 169.55

Industrial Bulk ConventionalBasic Charge - 2 464.00Energy Charge - 119.66Demand Charge - 179.94 Industrial Bulk Peri Urban Basic Charge - 2 463.73Energy Charge - 117.00Demand Charge - 172.80

Time of Use: Medium Bulk Basic Charge - 1 867.56Demand Charge - 159.19Summer Energy ChargePeak - 121.80Standard - 83.34Off-peak - 58.76Winter Energy ChargePeak - 256.42Standard - 111.11Off-peak - 65.17 Time of Use: Bulk Conventional Basic Charge - 2 293.85Demand Charge - 166.67Summer Energy ChargePeak - 121.80Standard - 83.34Off-peak - 58.76Winter Energy ChargePeak - 256.42Standard - 111.11Off-peak - 65.17 Time of Use: Bulk Peri Urban Basic Charge - 2 293.85Demand Charge - 162.40Summer Energy ChargePeak - 121.80Standard - 83.34Off-peak - 58.76Winter Energy ChargePeak - 256.42Standard - 111.11Off-peak - 65.17

Page 121: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

119

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ramotshere Moiloa 6.84%

Domestic PrepaidBasic Charge - 151.06Energy Charge- 129.53

Domestic ConventionalBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 118.59Block 3(351-600kWh) - 160.01Block 4(>600kWh) - 177.42Basic Charge - 151.36

Commercial PrepaidBasic Charge - 151.06Energy Charge - 192.66

Commercial Conventional Basic Charge - 152.31Energy Charge - 179.60

Government Basic Charge - 138.78Energy Charge - 91.00Demand Charge - 206.86 AgricultureBasic Charge- 410.07Energy Charge- 105.77 GovernmentBasic Charge- 224.36Energy Charge- 107.28

AgricultureBasic Charge - 151.06Energy Charge -96.16Demand Charge - 215.32 Industrial low VoltageBasic Charge - 151.06Energy Charge-207.60Demand Charge-91.00

N/A

Rustenburg7.1%

Domestic LifelineBlock 1(0- 50kWh) - 89.34Block 2(51-350kWh) - 111.67Block 3(351-600kWh) -146.40Block 4(>600kWh) -176.14 Residential town prepaidBlock 1(0- 50kWh) - 96.24Block 2(51-350kWh) - 114.29Block 3(351-600kWh) - 142.22Block 4(>600kWh) - 172.76Basic Charge - 203.55

Residential town ConventionalBlock 1(0- 50kWh) - 88.50Block 2(51-350kWh) - 110.64Block 3(351-600kWh) -144.75 Block 4(>600kWh) - 175.83Basic Charge - 285.35 Residential rural ConventionalBlock 1(0- 50kWh) - 90.08Block 2(51-350kWh) - 110.64Block 3(351-600kWh) - 144.74Block 4(>600kWh) - 175.83Basic Charge -311.34

Commercial PrepaidSummer Energy Charge - 163.10Winetr Energy Charge-217.45Basic Charge - 869.80

Commercial conventionalSummer Energy Charge - 163.10Winetr Energy Charge-217.45Basic Charge - 869.80

Industrial Large Power User400V - Bulk SupplyBasic Charge - 2716.46Summer Energy Charge - 101.90Winter Energy Charge - 171.07

All Season Network Demand Charge-41.39

All Season Network Access Charge-165.54

11kV - Bulk SupplyBasic Charge - 2346.00Summer Energy Charge - 100.50Winter Energy Charge - 158.00

All Season Network Demand Charge-40.00

All Season Network Access Charge-161.00

Time of Use 33KV Bulk SupplyDemand Charge - 39.50Access Charge - 30.00Basic Charge -8600Winter Reactive Energy - 20.50Energy Charge: Low SeasonPeak - 132.00Standard - 89.00Off-peak - 62.50Energy Charge: High SeasonPeak - 415.00Standard - 120.00Off-peak - 70.00

Page 122: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

120

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Rustenburg(Continued)

Residential rural prepaidBlock 1(0- 50kWh) - 90.71Block 2(51-350kWh) - 113.39Block 3(351-600kWh) - 143.10Block 4(>600kWh) - 173.82Basic Charge - 311.34

Time of Use 11KV Bulk SupplyDemand Charge - 45.05Access Charge - 34.74Reactive Energy - 22.26Basic Charge - 9553.43Energy Charge: Low SeasonPeak - 147.64Standard - 99.88Off-peak - 72.74Energy Charge: High SeasonPeak - 461.39Standard -134.62 Off-peak -80.34 Time of Use >150MVA Bulk SupplyDemand Charge - 31.17Capacity Charge - 16.45Transmission Charge - 8.21Reactive Energy - 14.40Basic Charge - 126 039Energy Charge: low SeasonPeak - 111.99Standard - 79.70Off-peak - 53.64Energy Charge: High SeasonPeak - 326.00Standard - 104.60Off-peak - 60.63

Page 123: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

121

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NORTH WEST PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Tswaing 6.84%

Domestic PrepaidEnergy Charge - 167.10

Domestic ConventionalBasic Charge - 159.19Energy Charge - 133.07

Commercial PrepaidEnergy Charge - 201.93

Commercial Conventional Basic Charge - 472.60Energy Charge - 164.53 Churches, Clubs & Old AgeBasic Charge - 158.12Energy Charge - 149.58 Empty StandsBasic Charge - 159.19 Departmental MetersEnergy Charge - 105.77 AgriculturalBasic Charge - 480.78Energy Charge - 168.83 Residential flats -Bulk metersEnergy Charge - 169.00 Household with flatsEnergy Charge - 159.19

Industrial town and small holdingsBasic Charge - 1 059.40Energy Charge - 94.02Demand Charge - 117.35

N/A

 

Page 124: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

122

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU- NATAL PROVINCE

Page 125: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

123

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Abaqulusi 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 105.00Block 2(51-350kWh) - 139.00Block 3(351-600kWh) - 186.00Block 4(>600kWh) - 217.00

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 122.26Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.85Basic Charge - 106.84

Commercial PrepaidEnergy Charge - 214.40

Commercial ConventionalBasic Charge - 728.65Energy Charge - 165.00 StreetlightsEnergy Charge - 188.13 Municipal DepartmentsEnergy Charge - 167.74

N/A

Industrial(kVA)Basic Charge - 912.11Energy Charge - 96.69Demand Charge - 206.98 Outside Peak HoursBasic Charge - 1 132.04Energy Charge - 60.90

N/A

Heartland Umbogintwini 6.84%

N/A

N/A

Commercial Single Part TariffEnergy charge - 174.07

N/A

Industrial Low Voltage Users 2Part 1Energy Charge - 56.63Maximum Demand Charge - R283.09/kW

Industrial H.V.1 3 PartEnergy Charge - 65.59Maximum Demand Charge - R325.84/kWRestricted Discount - R73.59/kW Industrial H.V.2 3 PartEnergy Charge - 65.59Maximum Demand Charge - R339.12/kWRestricted Discount - R73.59/kW

NON STANDARD TARIFFS FOR COMMERCIAL & INDUSTRIALBasic Charge - 3 966.71Network Demand - R99.80/kWNetwork Access Charge - 32.57 Energy-High Demand SeasonPeak - 298.77Standard - 101.79Off - peak - 58.73 Energy-Low SeasonPeak - 103.02Standard - 77.91Off - peak - 51.05

City of Umhlathuze 6.84%

  Domestic ConventionalBlock 1(0- 50kWh) - 66.11 Block 2(51-350kWh) - 84.91Block 3(351-600kWh) - 120.93Block 4(600-1500kWh) - 126.47Block 5(>1500) - 144.31Fixed Charge - 252.56

Commercial Prepaid Energy Charge - 147.56

Commercial ConventionalBasic Charge - 487.71Energy Charge - 129.54

N/A

N/A

Industrial Seasonal 400VoltsBasic Charge - 3 223.43Demand Charge :High Demand Season- 211.69Low Demand Season - 179.33Energy Charges :High Demand Season - 48.97Low Demand Season - 38.92

Page 126: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

124

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City of Umhlathuze(Continued)

Industrial Seasonal 11kVBasic Charge - 3 223.43Network Access Charge - 42.82Demand Charge :High Demand Season- 294.32Low Demand Season - 149.24Energy Charges :High Demand Season - 58.37Low Demand Season - 40.22 Industrial Time Of Use 400VBasic Charge - 3 223.43Network Access Charge - 31.78Reactive Energy Charge - 13.40Demand charge - 31.61Energy Charges c/kWh-High SeasonPeak - 303.02Standard - 92.07Off - Peak - 50.17Energy Charges c/kWh-LowSeasonPeak - 99.11Standard - 68.36Off - Peak - 43.50

Page 127: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

125

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City of Umhlathuze(Continued)

 Industrial Time Of Use 11kVBasic Charge - 3 223.43Network Access Charge - 29.70Reactive Energy Charge - 13.40Demand charge - 28.99Energy Charges c/kWh-High SeasonPeak - 298.78Standard - 90.77Off - Peak - 49.46Energy Charges c/kWh-LowSeasonPeak - 97.73Standard - 67.38Off - Peak - 42.88

Industrial Time Of Use 132kVBasic Charge - 3 223.43Network Access Charge - 26.34Reactive Energy Charge - 13.40Demand charge - 10.11Energy Charges c/kWh-High SeasonPeak - 289.28Standard - 87.87Off - Peak - 47.88Energy Charges c/kWh-LowSeasonPeak - 94.60Standard - 65.22Off - Peak - 41.49

Page 128: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

126

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

eDumbe6.84%

Domestic Prepaid Block 1(0- 50kWh) - 95.66Block 2(51-350kWh) - 119.88Block 3(351-600kWh) - 158.15Block 4(>600kWh) - 164.04

Domestic ConventionalBlock 1(0- 50kWh) - 95.66Block 2(51-350kWh) - 119.88Block 3(351-600kWh) - 158.15Block 4(>600kWh) - 164.04Basic Charge - 205.05

Commercial Prepaid Energy Charge - 190.97

Commercial ConventionalBasic Charge - 720.36Energy Charge - 149.83 Commercial Vacant LandBasic Charge - 576.00

N/A

IndustrialBasic Charge - 3 707.80Energy Charge - 92.20Demand Charge - 189.09

N/A

Emadlangeni 6.84%      

Domestic PrepaidBlock 1(0- 50kWh) - 94.55Block 2(51-350kWh) - 116.33Block 3(351-600kWh) - 149.86Block 4(>600kWh) - 178.78

Domestic ConverntionalBlock 1(0- 50kWh) - 94.55Block 2(51-350kWh) - 116.33Block 3(351-600kWh) - 149.86Block 4(>600kWh) - 178.78

Commercial PrepaidEnergy Charge - 178.05

Commercial ConventionalBasic Charge - 697.81Energy Charge - 156.88

Commercial Vacant landBasic Charge - 586.83

Availability ChargeBasic Charge - 133.88

Industrial Large Power UserBasic Charge - 2 467.96Energy Charge - 76.94Demand Charge - 201.71 Availability ChargeBasic Charge - 2 087.21

N/A

N/A

Emnambithi6.84%

Domestic Prepaid Scale 2Block 1(0- 50kWh) - 109.65Block 2(51-350kWh) - 117.34Block 3(351-600kWh) - 163.67Block 4(>600kWh) - 194.84

Credit Meter Scale 1Block 1(0- 50kWh) - 132.80Block 2(51-350kWh) - 163.65Block 3(351-600kWh) - 193.13Block 4(>600kWh) - 235.97Basic charge- 100.00

Commercial Prepaid MeterEnergy Charge - 183.26 Credit Meter Basic charge- 100.00Energy Charge - 192.80 Temporary Builders supplyEnergy Charge - 550.00 CommercialBasic charge- 6 615.37Energy Charge - 65.20High demandPeak-356.97Standard-114.39Off peak-66.22

Seasonal TariffsBasic Charge - 3 096.91Network Access Charge - 79.12Network Demand Charge - 88.97 Active Energy ChargesActive kWh low demand(Sept-May)06:00-22:00 - 65.9422:00-06:00 - 53.95 Active Energy ChargesActive c/kWh high demand(June-Aug)06:00-22:00 - 174.0022:00-06:00 - 58.01

N/A

N/A

Large Business & Industrial PremisesBasic Charge - 6 615.37Network Access Charge -57.20Low Demand SeasonPeak - 115.66Standard - 82.27Off-peak - 55.31High Demand SeasonPeak - 336.81Standard - 108.00Off-peak - 62.58

Page 129: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

127

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emnambithi(Continued)

Low demandPeak-122.51Standard-87.12Off peak-58.59

Time-Of- Use(TOU) TariffsBasic Charge - 4 679.04Network Access Charge - 75.18 Network Demand Charge - 84.51 Energy Chargesc/kWh low demand(Sep -May)06:00-22:00 - 71.2722:00-06:00 - 58.32 kWh High demand(June - Aug)06:00-22:00 - 189.9622:00-06:00 - 63.32

High Voltage Bulk Commercial ResellersBasic Charge - 7 276.89Network Access Charge -62.50High Demand SeasonPeak - 126.36Standard - 89.87Off-peak - 60.43Low Demand SeasonPeak - 367.98Standard - 118.01Off-peak - 68.36 TOU Commercial Basic Charge - 6 615.37Network Access Charge -65.20 Active Energy ChargesHigh Demand SeasonPeak - 356.97Standard - 114.39Off-peak - 66.22Low Demand SeasonPeak - 122.51Standard - 87.12Off-peak - 58.59

Endumeni6.84%

Domestic 1 Phase (Prepaid&Converntional)Block 1(0- 50kWh) - 99.95Block 2(51-350kWh) - 134.32Block 3(351-600kWh) - 173.52Block 4(>600kWh) - 199.80

Domestic 3Phase (Prepaid&Converntional)Block 1(0- 50kWh) - 99.95Block 2(51-350kWh) - 134.32Block 3(351-600kWh) - 173.52Block 4(>600kWh) - 199.80

Commercial Single phaseEnergy Charge - 204.05 Commercial Three phaseEnergy Charge - 204.05

Commercial converntional single phaseEnergy Charge - 187.28

IndustrialBasic Charge - 1 186.90Energy Charge - 66.42Demand Charge - 271.57

N/A

N/A

Page 130: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

128

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ethekwini6.84%

Domestic Low Scale 12Energy Charge - 98.52

Domestic Customers scale 3,4,8 & 9Energy Charge - 151.61

N/A

Commercial Conventional Scale 1Basic Charge - 224.02Energy Charge - 171.20 Conventional Scale 5,6,7Basic Charge - 220.58Energy Charge - 177.69 Conventional Scale 10 & 11Energy Charge - 190.09 Commercial Obsolete Tariff(021) - scale 2Service Charge - 231.55Peak - 74.04Off-peak - 176.02 Commercial Obsolete Tariff(002) - scale 2Service Charge - 231.55Energy Rate - 74.04Supplementary charge - 176.02

Industrial Low Volt3- Part: Obsolete TariffService Charge - 1 260.20Energy Charge - 73.86Max Demand Charge - 345.47Restricted Discount - 74.52

N/A

Residential Time of use Basic Charge - 119.67Energy Charge:All SeasonsPeak - 222.18Standard - 111.00Off-Peak - 82.21 Industrial Time Of UseBasic Charge - 3 888.00Demand Charge -90.53Network Access Charge - 29.35High Demand Season c/kWhPeak - 280.10Standard - 90.27Off-peak - 52.55Low Demand Season c/kWhPeak - 96.58Standard - 68.90Off-peak - 46.54 Commercial Time Of UseBasic Charge - 314.38Demand Charge - 63.36High Demand SeasonPeak - 296.88Standard - 148.54Off-peak - 72.36Low Demand SeasonPeak - 146.47Standard - 117.83Off-peak - 68.54

Page 131: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

129

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Greater Kokstad 6.84%

 

Domestic High Conventional Block 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 116.90Block 3(351-600kWh) - 187.17Block 4(>600kWh) - 199.47 Domestic Prepaid HighBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 116.90Block 3(351-600kWh) - 187.17Block 4(>600kWh) - 199.47

Commercial PrepaymentEnergy Charge - 178.38

Commercial ConventionalEnergy Charge - 181.99

Seasonal Industrial LowVoltage - 400VBasic Charge - 2 705.36Demand Charge Low season: Notified Demand Charge - 134.49Actual Demand Charge- 14.96Demand Charge High season: Notified Demand Charge- 189.48Actual Demand Charge - 19.85Energy Charges :Low Season - 98.93High Season - 139.37

Industrial High Voltage 11000VBasic Charge - 2 629.17Demand Charge Low season: Notified Demand Charge - 128.44Actual Demand Charge- 14.26Demand Charge High season: Notified Demand Charge- 180.90Actual Demand Charge - 20.14Energy Charges :Low Season - 100.25High Season - 138.35

N/A

Hibiscus6.84%

Domestic LowBlock 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.16Block 3(351-600kWh) - 157.00Block 4(>600kWh) - 187.46Basic Charge - 200.47

N/A

N/A

Conventional 25 -50 AmpsBasic Charge - 11.72/AmpEnergy Charge - 125.77 Conventional 51 - 150 AmpsBasic Charge -16.59 /AmpEnergy Charge - 125.77

Industrial (160 Amps)Basic Charge - 4 047.95/monthEnergy Charge - 107.33

Industrial (4 800 Amps)Basic Charge - 121 438.62/monthEnergy Charge - 107.33

Time Of UseMegaflex TariffsBasic Charge - 384.23Demand Charge - 65.22Reactive Charge - 15.46 Energy Charges: Low SeasonPeak - 130.41Standard - 72.95Off-peak- 41.87Energy Charges: High SeasonPeak - 193.85Standard - 81.33Off-peak- 46.55

Ithala - Ezakheni/Madadeni7.01%

N/A

N/A

N/A

Commercial ConventionalCommercial ≤ 20 KvaBasic Charge - 888.76Energy Charge - 130.67

N/A

Industrial Basic Charge - 3 443.84Energy Charge - 47.32Demand Charge - 287.20

N/A

Page 132: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

130

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ithala - Ezakheni/Madadeni(Continued)

Commercial ≥ 21kVA ≤ 50kVABasic Charge - 1 105.06Energy Charge - 130.67 Commercial ≥ 51kVA ≤ 99kVABasic Charge - 1435.81Energy Charge - 130.67

Ithala - Isithebe/Mandini7.01%

N/A

N/A    

N/A      

Commercial ConventionalBasic Charge - 1207.53Energy Charge - 138.29

Industrial 400VBasic Charge - 1207.53High Demand SeasonEnergy Charge - 51.14Demand Charge - 272.30Low Deamand SeasonEnergy Charge - 49.80Demand Charge - 243.45

Industrial 11000VBasic Charge - 1207.53High Demand SeasonEnergy Charge - 49.80Demand Charge - 266.24Low Deamand SeasonEnergy Charge - 48.34Demand Charge - 235.19 Industrial >10MVABasic Charge - 1207.53High Demand SeasonEnergy Charge - 1.07Low Deamand SeasonEnergy Charge - 0.61 Demand Charge : Low SeasonMax Demand Charge - 73.69Demand Availability Charge - 32.32Energy reactive charge- 13.38

N/A

Page 133: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

131

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

KwaDukuza6.84%

Domestic Indigent T8AEnergy Charge - 106.66 Conventional LowPrepaid T8AEnergy Charge - 160.86

Domestic with NMD of 65 KVA T2Basic Charge - 785.47Energy Charge - 130.00Demand Charge - 87.55 Domestic High T4Basic Charge - 44.48Energy Charge - 170.30 Domestic Religous Organizations T5Energy Charge - 175.70

Commercial Prepaid T8BEnegy Charge - 188.70

Commercial Conventional T3Basic Charge - 301.81Energy Charge - 172.80

Industrial Low Voltage T1Basic Charge - 1 291.74Energy Charge - 137.60Demand Charge - 87.56

Industrial Medium Voltage >1000kVA T7Basic Charge - 1 291.74Energy Charge - 133.00Demand Charge - 76.20

Industrial Supplies to ConsumersExceeding 1,000kVA T9Basic Charge - 1 291.74Demand Charge - 66.80Low SeasonPeak - 154.82Standard - 101.67Off-Peak - 66.83High SeasonPeak - 377.49Standard - 155.02Off-Peak - 85.50 (1A)Off-Peak - 83.98 (1B)

Industrial Commercial & Other Customers(Supplies to ConsumersLess Than 65kVABasic Charge - 1 291.74Peak - 325.70Standard - 102.80Off-Peak - 50.70Demand Charge - 87.56 Residential Time Of UseBasic Charge - 79.07Peak - 236.20Standard - 118.10Off-Peak - 87.40

Page 134: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

132

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mandeni 6.84%

Domestic Prepaid Single PhaseBlock 1(0-50kWh) - 83.55Block 2(51-350kWh) - 113.18Block 3(351-600kWh) - 124.13Block 4(>600kWh) - 168.59Basic Charge - 208.96

Domestic Conventional Three PhaseBlock 1(0-50kWh) - 83.55Block 2(51-350kWh) - 113.18Block 3(351-600kWh) - 124.13Block 4(>600kWh) - 168.59Basic Charge - 323.01

Commercial Prepaid Energy Charge - 193.00

Commercial Conventional Single PhaseBasic Charge - 323.01Energy Charge - 151.00 Commercial Conventional Three PhaseBasic Charge - 891.67Energy Charge - 151.00

Industrial Low VoltageBasic Charge - 1 065.74Energy Charge - 37.00Demand Charge - 238.29 Large Power UserBasic Charge - 1 128.67Energy Charge - 73.00Demand Charge - 238.15

N/A

N/A

Mpofana 6.84%

Domestic Prepaid Block 1(0-50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84

Domestic Conventional Block 1(0-50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84

Commercial PrepaymentEnergy Charge - 195.95

Commercial Credit MeterBasic Charge - 133.84Energy Charge - 188.29

N/A

Industrial Time Of UseHigh Voltage 11000VHigh demand seasonBasic Charge - 9 081.40Network Access Demand Charge- 32.05Network Demand Charge- 37.39Energy Charges - High Demand SeasonPeak - 314.79Standard - 102.84Off - Peak - 59.59Low demand seasonBasic Charge - 8 974.56Network Access Demand Charge- 26.71Network Demand Charge- 32.02Energy Charges - Low Demand SeasonPeak - 111.36Standard - 79.21Off - Peak - 53.26

Industrial Time Of UseLow Voltage 400VBasic Charge - 9 936.12Notified Demand Charge - 63.04Actual Demand Charge - 26.71Energy Charges - High SeasonPeak - 479.78Standard - 154.13Off - Peak - 88.10Energy Charges -Low SeasonPeak - 164.65Standard - 117.08Off - Peak - 78.70

Page 135: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

133

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Msunduzi 6.84%

Domestic IndigentsEnergy Charge - 113.89 Domestic Straight Line 20AEnergy charge - 131.51 Domestic Straight Line 60ABasic Charge - 152.33 Domestic Straight Line 60ABasic Charge - 134.6.9Energy Charge - 172.54 Domestic Straight Line (60-100A)Basic Charge - 107.75Energy Charge - 172.54 Domestic High 100A 3 phaseBasic Charge - 323.25Energy Charge - 172.79

Domestic High (60 -100A)Basic Charge - 168.36Energy Charge - 172.54 Domestic High 100ABasic Charge - 161.62Energy Charge - 172.79 Domestic High 100A 3 phaseBasic Charge - 505.07Energy Charge - 172.79

N/A

Commercial Single PhaseBasic Charge - Energy Charge - Net ampere charge per phase - /Amp Single phase 5A<80ABasic Charge - 25.94Energy Charge - 94.94Net ampere charge per phase - 9.60 /Amp Single phase >80ABasic Charge - 66.53Energy Charge - 104.22Net ampere charge per phase - 20.19 /Amp Three phase 5A<100ABasic Charge - 43.22Energy Charge - 94.94Net ampere charge per phase - 7.07 /Amp Three phase >100ABasic Charge - 119.30Energy Charge - 104.22Net ampere charge per phase - 17.03 /Amp

IndustrialBasic Charge - 521.17Energy Charge - 95.43Demand Charge - 200.25

N/A

Domestic Single Phase Time-of-useBasic Charge - 52.23Demand Charge - 9.60Energy Charge:Low SeasonPeak - 117.42Standard - 84.69Off-Peak - 58.27Energy Charge:High SeasonPeak - 334.31Standard - 109.94Off-Peak - 65.36 Domestic Three Phase Time-of-useBasic Charge - 81.13Demand Charge - 6.94Energy Charge:Low SeasonPeak - 115.25Standard - 83.12Off-Peak - 57.19Energy Charge:High SeasonPeak - 334.31Standard - 109.94Off-Peak - 65.36

Page 136: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

134

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Msunduzi(Continued)

Time Of Use Medium Voltage Basic Charge - 2 605.81 Demand Charge - 84.63Access Charge - 37.85Energy Charges -LowSeasonPeak - 121.84Standard - 92.10Off-Peak - 68.08Energy Charge:High SeasonPeak - 319.02Standard - 115.05Off-Peak - 74.54 Time Of Use Low VoltageBasic Charge - 485.30Demand Charge - 93.10Access Charge - 41.65Energy Charges -LowSeasonPeak - 127.95Standard - 96.70Off-Peak - 71.47Energy Charge:High SeasonPeak - 334.98Standard - 120.81Off-Peak - 78.26

Mthonjaneni6.84%

Domestic PrepaidBlock 1 (0-50kWh) - 100.22Block 2 (51-350kWh) - 119.61Block 3 (351-600kWh) - 167.55Block 4 (>600 kWh) - 193.07

Domestic ConventionalBlock 1 (0-50kWh) - 88.35Block 2 (51-350kWh) - 112.88Block 3 (351-600kWh) - 164.55Block 4 (>600 kWh) - 191.48Basic Charge - 74.79

Commercial PrepaidEnergy Charge - 201.90 Commercial Three Phase Energy Charge - 207.93

Commercial 60 & 70 AmpsBasic Charge - 318.70Energy Charge - 137.45 Commercial Three Phase 100 AMPBasic Charge - 312.06Energy Charge - 143.03

IndustrialBasic Charge - 87.69Energy Charge - 204.93

N/A

N/A

Page 137: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

135

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mthonjaneni(Continued)

Agriculture LowEnergy Charge - 216.91 Agriculture MediumEnergy Charge - 186.35 Agriculture HighEnergy Charge - 176.88

Newcastle8.00%

Domestic Low PrepaidEnergy Charge - 131.02 Domestic Low ConventionalBasic Charge - 43.05Energy Charge - 91.36 Domestic High ConventionalBlock 1(0- 50kWh) - 104.68Block 2(51-350kWh) - 126.23Block 3(351-600kWh) - 134.91Block 4(>600kWh) - 142.10 Domestic high ConventionalBasic Charge - 209.59Energy Charge - 191.79

Domestic High ConventionalBlock 1(0- 50kWh) - 92.43Block 2(51-350kWh) - 118.38Block 3(351-600kWh) - 130.94Block 4(>600kWh) - 134.13Basic Charge - 209.60 Domestic High 60ABasic Charge - 194.07High Demand SeasonPeak - 313.91Standard - 120.45Off-Peak - 71.30Low Demand SeasonPeak - 190.32Standard - 99.34Off-Peak - 54.10

N/A

Commercial ConventionalBasic Charge - 545.64Energy Charge - 127.60 Commercial Time Of UseDomestic High 60ABasic Charge - 544.29High Demand SeasonPeak - 238.93Standard - 101.85Off-Peak - 49.48Low Demand SeasonPeak - 138.36Standard - 88.05Off-Peak - 45.68

Industrial Low VoltageBasic Charge - 1 173.64Energy Charge - 69.18Network Demand Charge - 122.32Network Access Charge - 106.10

Industrial Medium VoltageBasic Charge - 2 305.15Energy Charge - 69.18Network Demand Charge - 111.19Network Capacity Charge - 98.59

Industrial Time Of UseIndustrial Low Voltage Time Of UseBasic Charge - 1 173.64Network Demand Charge -67.16High Demand SeasonPeak - 272.49Standard - 138.20Off-Peak - 77.95Low Demand SeasonPeak - 230.55Standard - 103.71Off-Peak - 64.54 Industrial High Time Of UseBasic Charge - 2 305.15Network Demand Charge -67.16High Demand SeasonPeak - 238.93Standard - 101.85Off-Peak - 49.49Low Demand SeasonPeak - 138.36Standard - 88.05Off-Peak - 45.68

Page 138: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

136

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Nkandla6.84%

Domestic Prepaid LowEnergy Charge - 114.33

Domestic Prepaid HighEnergy Charge - 166.09

N/A

Commercial ConventionalBasic Charge - 872.62Energy charge - 146.24

Business with Maximum Demand MetersBasic Charge - 1 742.78Energy charge - 78.20Demand Charge - 250.82 Industrial>100 KVABasic Charge - 2 235.82Energy charge - 79.50Demand Charge - 254.97

N/A

N/A

Nquthu6.84%

Domestic Indigent Domestic Prepaid Commercial Prepaid Commercial Conventional Industrial Large Power User N/A N/ABlock 1(0- 50kWh) - 91.66 Block 1(0- 50kWh) - 91.66 Energy Charge - 191.29 Basic Charge - 596.96 Basic Charge - 3 613.86

Block 2(51-350kWh) - 117.12 Block 2(51-350kWh) - 117.12 Energy charge - 157.99 Energy charge - 60.50

Block 3(351-600kWh) - 165.63 Block 3(351-600kWh) - 165.63 Demand Charge - 131.80

Block 4(>600kWh) - 194.49

Domestic Conventional

Block 1(0- 50kWh) - 91.66

Block 2(51-350kWh) - 117.12

Block 3(351-600kWh) - 165.63

Block 4(>600kWh) - 194.49

Basic Charge - 143.65

Sasol Sasolburg 6.84%

N/A N/A N/A Commercial - Flat tariff N/A N/A N/A Energy Charge - 1 025.75

Page 139: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

137

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Sasol Synfuels 6.84%

N/A N/A N/A N/A N/A Industrial >132kVTransmission Charge - 9.42Reactive Energy Charge - 134.70Urban Low Voltage Sub - 134.50Electrification and rural Sub - 74.50Peak - 263.11Standard - 79.70Off- peak- 43.29Low Demand SeasonPeak - 85.85Standard - 59.07Off- peak- 37.48Electrification and rural subsidy: 74.50Ancillary Service charge - 3.40Affordability Subsidy Charge - 33.10

Industrial >66kV & <132kVTransmission Charge - 7.46Network Access Charges - 54.50Network Demand Charges - 10.10Reactive Energy Charge - 13.47High Demand Season EnergyPeak - 279.16Standard - 84.56Off- peak- 45.93Low Demand SeasonPeak - 91.08Standard - 62.67Off- peak- 39.77 Electrification and rural subsidy - 74.50Ancillary Service charge - 3.60Affordability Subsidy Charge - 33.10

Ulundi6.84%

 

Domestic Prepaid Low SeasonBlock 1(0- 600kWh) - 118.80Block 2(>600kWh) - 169.31 Domestic Conventional Low SeasonBlock 1(0- 50kWh) - 91.30Block 2(51-350kWh) - 115.99Block 3(351-600kWh) - 156.28Block 4(>600kWh) - 186.71Basic Charge - 253.37

Domestic Prepaid High seasonBlock 1(0- 600kWh) - 152.40Block 2(>600kWh) - 158.93

Domestic Conventional High SeasonBlock 1(0- 50kWh) - 91.87Block 2(51-350kWh) - 117.99Block 3(351-600kWh) - 159.74Block 4(>600kWh) - 188.46Basic Charge - 255.76

Commercial PrepaidEnergy Charge:Low Demand - 197.02High Demand - 203.55

Commercial Conventional ≤40kVABasic Charge -979.07Energy Charge:Low Demand - 141.33High Demand - 145.96 Commercial Conventional≥40kVABasic Charge - 1 292.49Energy Charge:Low Demand - 69.15High Demand - 85.00Demand Charge :Low Demand - 240.05High Demand - 244.00

IndustrialBasic Charge - 1 695.34Energy Charge:Low Demand - 73.81High Demand - 82.02Demand Charge :Low Demand - 244.02High Demand - 252.27 Streetlight Energy Charge - 183.94 Municipal DepartmentEnergy Charge - 177.98

 

N/A

Page 140: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

138

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Umkhanyakude 6.84%

Domestic Prepaid IndigentEnergy Charge - 120.09

Residential and Business Credit metersSingle phase credit meters demand ≤ 25kVAService Charge: 282.09Energy Charge: 147.31 Three phase credit meters demand ≥ 25kVAService Charge: 91.88Energy Charge: 147.31

N/A Commercial Three >PhaseBasic Charge - 114.77Energy Charge - 147.31 Conventional Three PhaseBasic Charge - 451.44Energy Charge - 147.31

IndustrialBasic Charge - 1 377.57Energy Charge - 67.08Demand Charge: 213.82

N/A N/A

Umlalazi 6.84%           

Domestic Prepaid- Low CostBlock 1(0-50kWh) - 91.00Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 164.00Block 4(>600kWh) - 190.00

Domestic PrepaidBlock 1(0-50kWh) - 89.00Block 2(51-350kWh) - 110.00Block 3(351-600kWh) - 126.00Block 4(>600kWh) - 135.00 Domestic High ConventionalBlock 1(0-50kWh) - 91.00Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 164.00Block 4(>600kWh) - 166.00Basic Charge - 251.08

Commercial PrepaidEnergy Charge - 192.00

CommercialConventional Single PhaseBasic Charge - 321.10Energy Charge - 157.00 Conventional Three PhaseBasic Charge - 905.03Energy Charge - 154.50

Industrial 1Basic Charge - 516.42Energy Charge - 85.47Demand Charge - 212.99 Industrial 2Bulk Service Charge - 6 439.91Energy Charge - 84.08Demand Charge - 209.52 Availability chargeBasic Charge - 300.22

N/A N/A

Page 141: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

139

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Umgeni6.84%      

Domestic LowBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 158.80

Domestic Prepaid HighBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 158.83Block 4(>600kWh) - 187.45 Domestic Conventional 60ABlock 1(0-50kWh) - 89.43Block 2(51-350kWh) - 112.11Block 3(351-600kWh) - 152.58Block 4(>600kWh) - 184.29Basic Charge - 141.08 Domestic Conventional 80ABlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84Basic Charge - 176.35 Domestic Conventional Three Phase 80ABlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84Basic Charge - 350.56

Commercial PrepaidEnergy Charge - 195.94

Conventional Conventional: Business &GeneralBasic Charge - 346.55Energy Charge - 157.00 Conventional Conventional: Business &GeneralAmp Charge - 26.75Energy Charge - 157.00

Industrial LowBasic Charge - 2000.00Demand Charge Low Season:Notified Demand - 135.00Actual Demand - 13.10Demand Charge HighSeason:Notified Demand - 179.20Actual Demand - 14.20Energy Charge:Low Season- 101.00High Season- 131.00

N/A

N/A

Page 142: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

140

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Umtshezi6.84%

Domestic Prepaid LowBlock 1(0- 50kWh) - 0.00Block 2(51-350kWh) - 114.80Block 3(351-600kWh) - 135.28Block 4(601-1000kWh) - 182.28Block 5(>1001kWh) - 194.76

Domestic Credit Meter HighBlock 1(0- 50kWh) - 88.62Block 2(51-350kWh) - 111.35Block 3(351-600kWh) - 139.55Block 4(601-1000kWh) - 142.41Block 5(>1001kWh) - 161.58

N/A

Commercial1 (Under 1000 Kwh)Basic Charge - 507.50Energy Charge - 176.67 Conventional 2 (Above 1000 Kwh)Basic Charge - 1 250.37Energy Charge - 137.15

Industrial Low VoltageBasic Charge - 1 251.31Energy Charge - 82.99Demand Charge - 269.78

Industrial Medium VoltageBasic Charge - 2 074.61Energy Charge - 81.56Demand Charge - 247.83Low Load factorBasic Charge - 1 390.97Demand Charge - 143.69Energy Charges -High SeasonPeak - 477.02Standard - 152.78Off - Peak - 88.42Energy Charges -LowSeasonPeak - 144.55Standard - 102.89Off - Peak - 69.04

Low Voltage Time Of UseBasic Charge - 1 333.02Demand Charge - 128.03Energy Charges -High SeasonPeak - 440.60Standard - 144.86Off - Peak - 81.57Energy Charges -LowSeasonPeak - 168.94Standard - 96.32Off - Peak - 54.42 Industrial Medium VoltageBasic Charge - 1 912.82Demand Charge - 89.09Energy Charges -High SeasonPeak - 435.36Standard - 140.17Off - Peak - 78.96Energy Charges -LowSeasonPeak - 156.83Standard - 103.60Off - Peak - 53.82 Industrial High VoltageBasic Charge - 2 224.96Demand Charge - 79.88Energy Charges -High SeasonPeak - 466.27Standard - 134.14Off - Peak - 79.86Energy Charges -LowSeasonPeak - 146.83Standard - 90.57Off - Peak - 51.26

Page 143: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

141

APPROVED MUNICIPAL ELECTRICITY TARIFFS

KWAZULU-NATAL PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Umuziwabantu 6.84%

Domestic PrepaidBlock 1 (0-50kWh) -91.43Block 2 (51-350kWh) -117.56Block 3 (351-600kWh) - 165.45Block 4 (>600 kWh) - 191.57

Domestic ConventionalBlock 1 (0-50kWh) -91.43Block 2 (51-350kWh) - 117.56Block 3 (351-600kWh) -165.45Block 4 (>600 kWh) -191.57Basic Charge - 207.71

Prepaid BusinessEnergy Charge - 197.01

Commercial Small Power UserBasic Charge - 980.37Energy Charge - 149.12 Municipal OfficesBasic Charge - 124.33

Industrial ( 0-50kVA)Basic Charge - 1 182.52Energy Charge - 181.78 Industrial (51-75kVA)Basic Charge - 2 955.87Energy Charge - 177.43

Industrial (76-100kVA)Basic Charge - 5 912.15Energy Charge - 170.89

Industrial (100>KVa)Basic Charge - 11 824.73Energy Charge - 167.62

N/A

Umvoti6.84%

Domestic Prepaid IndigentsEnergy Charge - 119.66 Domestic PrepaidEnergy Charge - 161.85 Domestic Conventional indigentsBasic Charge - 5.37 /month/ampEnergy Charge - 106.10

Domestic Conventional Tariff option 1Basic Charge - 4.96 /month/ampEnergy Charge - 136.70 Domestic Conventional Tariff opttion 2Energy Charge - 171.27

N/A

Commercial ConventionalBasic Charge - 6.06/AmpEnergy Charge - 169.60 Sports Fields & Steet LightingEnergy Charge - 187.76 Availability ChargeAvailability Charge R/month - 119.33

Availability Charge On Lots Commercial / Industrial Use Per Lot Per MonthAvailability Charge R/month - 214.81

Industrial Large Power User with InstalledCapacity In Excess of 65 KVABasic Charge - 1 715.89Energy Charge - 104.97Demand Charge - 230.98

N/A

N/A

Uphongolo6.84%

Undeveloped Stand/Vacant landBasic Charge - 168.02

Domestic ConventionalBasic Charge - 302.48Energy Charge - 127.14 Municipal BuildingBasic Charge - 314.99Energy Charge - 135.30

N/A

Commercial ConventionalBasic Charge - 715.70Energy Charge - 150.29

Industrial Basic Charge - 989.67Energy Charge - 83.26Demand Charge - 193.01

N/A

N/A

Page 144: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

142

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCE

Page 145: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

143

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

AECI Modderfontein 7.1%

N/A

N/A

N/A

Acacia Properties < 100kWSummer Energy Charge -146.15Winter Energy Charge - 196.02 Shanghai Zendai < 100kWSummer Energy Charge - 163.82Winter Energy Charge - 219.72

Acacia Propoerties > 100kWSummer Energy Charge - 138.33Winter Energy Charge - 191.70 Shanghai Zendai > 100kWSummer Energy Charge - 156.46Summer Energy Charge - 227.91

N/A

N/A

City Of Tshwane 6.84%  

1.1 Domestic Standard Supply Single & Three PhaseBlock 1(0-100kWh) - 141.78Block 2(101-400kWh) - 165.92Block 3(401-650kWh) - 180.77Block 4(>650kWh) - 194.88Credit Reverse Energy Charge-0.10

1.2 Domestic Three Phase SupplyBasic Charge - 2 385.74Energy Charge - 108.87Demand Charge - 170.94Credit Reverse Energy Charge-0.10 Domestic Bulk Supply

2.1 Domestic Bulk Standard SupplyBasic Charge - 537.41Energy Charge - 141.46Credit Reverse Energy Charge-0.10 2.2Domestic Bulk Time of UseBasic Charge - 537.41Energy Charges:Peak - 196.69Standard - 132.80Off- peak - 132.80Credit Reverse Energy Charge-0.10

6)Non-Domestic Single Phase:Prepaid

6.1)Single Phase : Prepaid(≤60A)Basic Charge - 871.81Energy Charge - 150.86Credit Reverse Energy Charge-0.10 6.2)Single Phase:Prepaid (≥60A)Basic Charge - 1 164.65Energy Charge - 150.86Credit Reverse Energy Charge-0.10 8)Non-Domestic Three Phase:Prepaid

8.1)Three Phase:Prepaid(≤60A)Basic Charge - 2 643.22Energy Charge -150.86 Credit Reverse Energy Charge-0.10 8.2)Three Phase:Prepaid (≥60A)Basic Charge - 4 000.09Energy Charge - 150.86Credit Reverse Energy Charge-0.10

B)Non-Domestic /Business Tariffs Scales Non-Domestic Single Phase:Conventional

5.1 Single Phase:Conventional(≤60A)Basic Charge - 915.62Energy Charge - 151.50Credit Reverse Energy Charge-0.10

5.2 Single Phase:Conventional(≥60A)Basic Charge - 1 199.81Energy Charge - 151.50Credit Reverse Energy Charge-0.10 7.Non-Domestic Three Phase:Conventional7.1 Three Phase:(≤60A)Basic Charge - 2 786.38Energy Charge -151.50Credit Reverse Energy Charge-0.10

C) Bulk Business/Non Domestic Demand Scales

9)Low Voltage Three Phase Demand Scale: Conventional or Prepaid Industrial TariffsBasic Charge - 2 385.74Energy Charge - 108.87Demand Charge - 170.94Credit Reverse Energy Charge-0.10 11)11kV Supply Scale(Conventional or Prepaid)Basic Charge - 2 040.64Energy Charge - 104.28Demand Charge - 166.67Credit Reverse Energy Charge-0.10

15)132kV Supply Scale-Wind Tunnel (CSIR)Basic Charge - 1 721.19Energy Charge - 257.54Credit Reverse Energy Charge-0.10 D.Industrial Scales

16)275kV Supply Scales: Time of Use (Conventional or Prepaid)The current Eskom Megaflex, Excluding the monthly rental applicable to the MunicipalityCredit Reverse Energy Charge-0.10 17.Renewable/Embedded Generation Tariffs

17.3.11)11 kV Supply Demand ScaleBasic Charge - 2 040.64Wheeling Tariff: 0.10

C)Bulk Business/Non Domestic Demand Scales

10) LV-3Phase Demand scaleBasic Charge - 2 376.12Demand Charge - 170.94Credit Reverse Energy Charge-0.10Energy Charges: Low SeasonPeak - 140.39Standard - 88.41Off- peak - 62.61Energy Charges: High SeasonPeak - 341.78Standard - 130.99Off- peak - 75.00

Page 146: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

144

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Tshwane(Continued)

Reselling to End Users in Domestic Complexes (Residential )

3)Domestic Lifeline(Prepaid)Block 1(0-100kWh) - 141.46Block 2(101-400kWh) - 162.72Block 3(401-650kWh) - 178.53Block 4(>650kWh) - 190.50Credit Reverse Energy Charge-0.10 4)Agriculture and Farm Land: Conventional & Prepaid Agriculture tariffs ConventionalEnergy Charge - 175.86Credit Reverse Energy Charge-0.10 E)Reseller’s Purchase Tariffs at Bulk Points

18)Domestic ComplexesBasic Charge - 1 191.27Energy Charge -141.46Credit Reverse Energy Charge-0.10 F) Reselling tariffs to End Users

23)Domestic ComplexesSingle & Three Phase: Conventional & PrepaidBlock 1(0-100kWh) - 141.78Block 2(101-400kWh) - 165.92Block 3(401-650kWh) - 180.77Block 4(>650kWh) - 194.88

E)Reseller’s Purchase Tariffs at Bulk Points

18.2)Non-Domestic Single Phase: Prepaid tariffs

18.2.1)Prepaid Single Phase(≤60A)Basic Charge - 871.81Energy Charge -141.46 18.2.2)Prepaid Single Phase(≥60A)Basic Charge - 1 164.56Energy Charge -141.46 19)Non Domestic Three Phase:Prepaid Tariffs19.1Three Phase:(≤60A)Basic Charge - 2 643.22Energy Charge -141.56 19.2)Three Phase:(≤60A)Basic Charge - 4 001.16Energy Charge -141.56Credit Reverse Energy Charge-0.10

F) Reselling tariffs to End UsersBusiness/Non-Domestic Single Phase Tariffs:Conventional/Prepaid

 7.2 Three Phase:(≥80A)Basic Charge - 4 257.57Energy Charge -151.50Credit Reverse Energy Charge-0.10

7.3 Three Phase:(≤100A)Basic Charge - 5 956.33Energy Charge -151.50Credit Reverse Energy Charge-0.10 7.4 Three Phase:(≤125A)Basic Charge - 7 480.94Energy Charge -151.50Credit Reverse Energy Charge-0.10 7.5 Three Phase:(≤150A)Basic Charge - 9 096.36Energy Charge -151.50Credit Reverse Energy Charge-0.10 E)Reseller’s Purchase Tariffs at Bulk Points

18.1)Non-Domestic Single Phase: Conventional 18.1.1. Conventional Single Phase(≤60A)Basic Charge - 914.55Energy Charge - 141.56Credit Reverse Energy Charge-0.10

13.11) 11kV Supply Scale: Madibeng (Conventional or Prepaid)As per the agreement based on Eskom’s current tariff applicable to the municipality for the specific feed in point relating to the area or agreementCredit Reverse Energy Charge-0.10 17.Renewable/Embedded Generation Tariffs

17.3.10.Low Voltage Three Phase Demand ScaleBasic Charge - 2 385.74Wheeling Tariff: 0.10

17.3.12)132 kV Supply Demand Scale Basic Charge - 1 721.19Wheeling Tariff: 0.10

12) 11kV Supply Scale (Time of Use)Basic Charge - 2 056.67Demand Charge - 170.41Credit Reverse Energy Charge-0.10Energy Charges: Low SeasonPeak - 130.77Standard - 80.77Off- peak - 57.16Energy Charges: High SeasonPeak - 341.35Standard - 124.68Off- peak - 66.45 D. Industrial Scales

14)132kV Supply scale:Time of UseBasic Charge - 1 721.19Demand Charge - 113.25Credit Reverse Energy Charge-0.10Energy Charges: Low SeasonPeak - 124.69Standard - 76.60Off- peak -54.60Energy Charges: High SeasonPeak - 339.00Standard - 116.35Off- peak - 63.25

Page 147: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

145

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Tshwane(Continued)

17.Renewable/Embedded Generation Tariffs

17.3.1.Domestic Single/Three PhaseBasic Charge - 160.26Wheeling Tariff: 0.10 17.3.2.Domestic Single/Three Phase Demand SupplyBasic Charge - 2 385.74Wheeling Tariff: 0.10

 23.1.1 Conventional/Prepaid(≥20A)Basic Charge - 355.78Energy Charge -151.50 23.1.2 Conventional/Prepaid(≥40A)Basic Charge - 591.89Energy Charge -151.50 23.1.3 Conventional/Prepaid(≥60A)Basic Charge - 828.01Energy Charge -151.50 23.1.4 Conventional/Prepaid(≥60A)Basic Charge - 1 180.58Energy Charge -151.50 23.2 Business/Non-Domestic Three Phase tariffs:Conventional/Prepaid 23.2.1 Conventional/Prepaid (≥20A)Basic Charge - 885.70Energy Charge -151.50

18.1.2)Conventional Single Phase:(≥60A)Basic Charge - 1 198.74Energy Charge - 141.56Credit Reverse Energy Charge-0.10 18.3 Non domestic Three Phase::Conventional

18.3.1)Conventional Three Phase(≤60A)Basic Charge - 2 786.39Energy Charge -141.56 18.3.2)Conventional Three Phase(≤80A)Basic Charge - 4 257.57Energy Charge -141.56 18.3.3)Conventional Three Phase(≤100A)Basic Charge - 5 956.33Energy Charge -141.56 18.3.4)Conventional Three Phase(≤125A)Basic Charge - 7 480.94Energy Charge -141.56Credit Reverse Energy Charge-0.10

20)Low Voltage 3Phase Demand scale (TOU)Basic Charge - 8 335.66Energy Charge - 108.87Demand Charge - 163.36Credit Reverse Energy Charge-0.10Active energy charge: 163.25Energy Charges: Low SeasonPeak - 125.43Standard - 81.04Off- peak -57.27Energy Charges: High SeasonPeak - 305.84Standard - 119.98Off- peak - 68.70 21) 11kV Supply ScaleBasic Charge - 11 908.39Energy Charge - 102.57Off-Scale:101.93Demand Charge:162.18Credit Reverse Energy Charge-0.10

Page 148: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

146

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Tshwane(Continued)

23.2.2 Conventional/Prepaid (≥40A)Basic Charge - 1 772.48Energy Charge -151.50 23.2.3 Conventional/Prepaid (≥60A)Basic Charge - 2 480.82Energy Charge -151.50 23.2.4 Conventional/Prepaid (≥80A)Basic Charge - 3 661.41Energy Charge -151.50 23.2.5 Conventional/Prepaid (≥100A)Basic Charge - 4 369.76Energy Charge -151.50 23.2.6 Conventional/Prepaid (≥125A)Basic Charge - 5 432.81Energy Charge -151.50 23.2.7 Conventional/Prepaid (≥150A)Basic Charge -6 495.87Energy Charge -151.50

18.3.5)Conventional Three Phase(≤150A)Basic Charge - 9 097.43Energy Charge -141.56Credit Reverse Energy Charge-0.10 17.Renewable/Embedded Generation Tariffs

17.3.3.Non-Domestic Single Phase Conventional(≤60A)Basic Charge - 871.81Wheeling Tariff: 0.10 17.3.4.Non-Domestic Single Phase Conventional(≤60A<80A)Basic Charge - 1 164.56Wheeling Tariff: 0.10 17.3.5.Non-Domestic Three Phase Conventional(≤60A)Basic Charge - 2 786.39Wheeling Tariff: 0.10 17.3.6.Non-Domestic Three Phase Conventional(>60A≤80A)Basic Charge - 4 257.57Wheeling Tariff: 0.10

22)11kV Supply Scale:(TOU)Basic Charge - 11 908.39Demand Charge - 162.18Credit Reverse Energy Charge-0.10Energy Charges: Low SeasonPeak - 116.78Standard -73.93 Off- peak -52.14Energy Charges: High SeasonPeak - 304.81Standard - 113.89Off- peak -60.47

Page 149: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

147

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Of Tshwane(Continued)

17.3.7.Non-Domestic Three Phase Conventional(>80A ≤ 100A)Basic Charge - 5 956.33Wheeling Tariff: 0.10 17.3.8.Non-Domestic Three Phase Conventional(>100A ≤ 120A)Basic Charge - 7 480.94Wheeling Tariff: 0.10 17.3.9.Non-Domestic Three Phase Conventional(> 125A ≤ 150A)Basic Charge - 9 097.43Wheeling Tariff: 0.10

Page 150: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

148

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Power7.17%

Domestic PrepaidBlock 1(0-500kWh) - 127.49Block 2(501 -1000kWh) - 141.43Block 3(1001-2000kWh) - 151.86Block 4(2001-3000kWh) - 171.55Block 5(>3000kWh) - 185.91

(IBTs) : Single PhaseDomestic Single Phase 60ABlock 1(0-500kWh) - 118.58Block 2(501 -1000kWh) - 136.08Block 3(1001-2000kWh) - 146.12Block 4(2001-3000kWh) - 154.17Block 5(>3000kWh) - 161.73Service Charge - 123.01Capacity Charge - 362.38 Domestic Single Phase 80ABlock 1(0-500kWh) -118.58 Block 2(501 -1000kWh) - 136.08Block 3(1001-2000kWh) - 146.12Block 4(2001-3000kWh) - 154.17Block 5(>3000kWh) - 161.73Service Charge - 123.01Capacity Charge - 398.47 (IBTs) : Three PhaseDomestic Three Phase 80ABlock 1(0-500kWh) - 118.58Block 2(501 -1000kWh) - 136.08Block 3(1001-2000kWh) - 146.12Block 4(2001-3000kWh) - 154.17Block 5(>3000kWh) - 161.73Service Charge - 123.01Capacity Charge - 496.39

Business PrepaidBlock 1(0-500kWh) - 185.46Block 2(501 -1000kWh) - 203.09Block 3(1001-2000kWh) - 212.74Block 4(2001-3000kWh) - 220.32Block 5(>3000kWh) - 227.31

Commercial Small Business Credit MetersBasic Charges (<50kVA)Service Charge - 370.77Capacity Charge - 355.49 Basic Charges (<100kVA)Service Charge - 370.77Capacity Charge - 507.99 Basic Charges (<500kVA)Service Charge - 370.77Capacity Charge -807.08 Basic Charges (>500kVA)Service Charge -370.77Capacity Charge -1368.58 Energy Charges:Summer :Block 1(0-500kWh) - 180.20Block 2(501 -1000kWh) - 197.78Block 3(1001-2000kWh) -207.41 Block 4(2001-3000kWh) - 214.97Block 5(>3000kWh) - 221.95Winter :Block 1(0-500kWh) - 188.64Block 2(501 -1000kWh) - 205.37Block 3(1001-2000kWh) - 214.54Block 4(2001-3000kWh) - 221.74Block 5(>3000kWh) - 228.38

Industrial Low VoltageBasic Charges :Service Charge - 617.95Capacity Charge - 943.67Energy Charges :Summer -125.30Winter - 146.76Demand Charges :Summer - 187.20Winter - 19.63

Industrial Medium VoltageBasic Charges:Service Charge - 741.53Capacity Charge -4004.35 Energy Charges :Summer - 116.97Winter - 138.44Demand Charges :Summer - 174.97Winter -19.63

Time Of Use Low Voltage Basic Charges:Service Charge -988.71Capacity Charge - 883.95 Energy Charges -SummerPeak - 134.39Standard -103.87 Off - Peak - 79.84Demand Charge - 187.22Energy Charges -WinterPeak - 319.79Standard -125.34 Off - Peak -85.88 Demand Charges All Season Demand Charge -187.22 Reactive Energy ChargeReactive Energy-19.63

Page 151: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

149

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Power(Continued)

Domestic Reseller Conventional 80ABlock 1(0-500kWh) - 106.43Block 2(501 -1000kWh) - 122.88Block 3(1001-2000kWh) - 132.30Block 4(2001-3000kWh) - 139.85Block 5(>3000kWh) - 146.96Service Charge - 123.59Capacity Charge - 498.72 (IBTs) : Seasonal Single PhaseDomestic Single Phase Seasonal (<80A)Summer :Block 1(0-500kWh) - 112.78Block 2(501 -1000kWh) - 130.29Block 3(1001-2000kWh) - 140.33Block 4(2001-3000kWh) - 148.37Block 5(>3000kWh) - 155.93Winter :Block 1(0-500kWh) - 134.55Block 2(501 -1000kWh) - 152.05Block 3(1001-2000kWh) - 162.09Block 4(2001-3000kWh) - 166.85Block 5(>3000kWh) - 177.70Service Charge -123.01Capacity Charge - 398.47

Reseller Summer :Block 1(0-500kWh) - 163.90Block 2(501 -1000kWh) - 180.38Block 3(1001-2000kWh) - 189.40Block 4(2001-3000kWh) - 196.48Block 5(>3000kWh) - 203.02Winter :Block 1(0-500kWh) - 172.62Block 2(501 -1000kWh) - 188.25Block 3(1001-2000kWh) - 196.80Block 4(2001-3000kWh) - 203.52Block 5(>3000kWh) - 209.72Service Charge - 370.77Capacity Charge - 355.49

Time Of Use Medium Voltage Basic Charges:Service Charge - 1359.48Capacity Charge -3781.00Energy Charges -SummerPeak - 134.39Standard -103.87 Off - Peak -79.84Demand Charge - 174.97Energy Charges -WinterPeak -319.79 Standard -125.34 Off - Peak -85.88 Demand Charges All Season Demand Charge - 174.97Reactive Energy ChargeReactive Energy -19.63

Page 152: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

150

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Power(Continued)

Domestic Three Phase Seasonal 80ASummer :Block 1(0-500kWh) - 112.78Block 2(501 -1000kWh) - 130.29Block 3(1001-2000kWh) - 140.33Block 4(2001-3000kWh) - 148.37Block 5(>3000kWh) - 155.93Winter :Block 1(0-500kWh) - 134.55Block 2(501 -1000kWh) -152.05 Block 3(1001-2000kWh) - 162.09Block 4(2001-3000kWh) - 166.85Block 5(>3000kWh) - 177.70Service Charge - 123.01Capacity Charge - 496.39

Agriculture Energy Charges :Summer - 138.56Winter - 160.35Basic Charges - Service Charge - 370.77Capacity Charge - 498.72 Municipal -RobotsEnergy Charge - 213.16 Municipal -Streetlights & BillboardEnergy Charge - 259.13

Time Of Use High Voltage Basic Charges:Service Charge -1370.96Capacity Charge - 17736.52Energy Charges -SummerPeak -134.39 Standard -103.87Off - Peak -79.84 Energy Charges -WinterPeak - 319.79Standard -125.34 Off - Peak -85.88 Demand Charges All Season Demand Charge -162.72Reactive Energy ChargeReactive Energy -19.63

Page 153: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

151

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City Power(Continued)

(TOU) : Single Phase Time of UseDomestic Single Phase 80A Time of useSummer :Peak - 143.78Standard - 113.73Off-Peak - 89.48Winter :Peak - 330.78Standard - 135.50Off-Peak - 95.61Service Charge - 123.01Capacity Charge - 398.47 Domestic Three Phase (<=80A) time of Use Summer :Peak - 143.78Standard - 113.73Off-Peak - 89.48Winter :Peak - 330.78Standard - 135.50Off-Peak - 95.61Service Charge - 123.01Capacity Charge -496.39

Page 154: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

152

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ekurhuleni6.84%

Domestic Tariff A- Flat RateEnergy Charge - 117.61

Domestic Tariff A (IBT)Block 1(0- 600kWh) - 111.19Block 2(>600 to <=700kWh) - 189.00Block 3(>700kWh) - 536.78 Domestic- Tariff B(Residential & Bulk Residential)Basic Charge - 35.86Energy Charge - 166.79

Residential and Bulk Reseller PrepaymentBasic Charge - 35.86Energy Charge - 166.79 Domestic-Tariff B(Residential Resellers) 230/400 VBasic Charge - 306.86Energy Charge - 162.40 Domestic-Tariff B(Residential Resellers) >400 VBasic Charge - 3 877.23Energy Charge - 158.22

Commercial TariffTariff A - Business PrepaymentBasic Charge - 10.68Energy Charge - 194.67 Tariff B - Business PrepaymentBasic Charge - 11.00Capacity Charge - 12.20Energy Charge :High Season - 146.20Low Season - 184.50 Street LightsEnergy Charge :High Season - 168.30Low Season - 136.92 Traffic LightsEnergy Charge :High Season - 155.47Low Season - 115.53

Commercial - Tariff A (Business)Basic Charge - 37.01Energy Charge - 194.67 Commercial- Tariff B (Business, Mixed Business and Residential, Commercial or Industrial)Basic Charge - 38.81Capacity(Amp) Charge - 12.20Energy Charge :High Season - 184.50Low Season - 146.20

Large Business and Industrial (Tariff C) 230 /400VBasic Charge - 1 898.40Network Access Charge - 40.79Demand Charge :High Season - 140.67Low Season - 117.22Energy Charge :High Season - 188.00Low Season - 112.44 230 /400V Direct from SubstationBasic Charge - 1 898.40Network Access Charge - 40.07Demand Charge :High Season - 138.15Low Season - 115.14Energy Charge :High Season - 184.50Low Season - 110.44

230 /400V & <=11kVBasic Charge - 2 694.36Network Access Charge - 39.34Demand Charge :High Season - 135.63Low Season - 113.02Energy Charge :High Season - 181.00Low Season - 108.42 Business & Industrial Customers (Tariff E) 230 /400VBasic Charge - 1 702.50Demand Charge - 72.75Netowrk Access Charge- 44.66Energy Charges -Low SeasonPeak - 170.05Standard - 111.65Off - Peak - 83.80Energy Charges -High SeasonPeak - 559.30Standard - 160.00Off - Peak - 94.26

Large Business and Industrial Tariffs (Tariff D) 230/400V Direct from Substation Time of UseBasic Charge - 2 685.58Network Access Charge -39.78Demand Charge - 66.30Energy Charges -LowSeasonPeak - 150.20Standard - 98.53Off - Peak - 77.75Energy Charges -High SeasonPeak - 404.00Standard - 141.74Off - Peak - 85.74 >230/400V &<=11kVBasic Charge - 2 685.58Demand Charge - 65.09Network Access Charge -39.05Energy Charges -LowSeasonPeak - 147.50Standard - 96.74Off - Peak - 76.29Energy Charges -High SeasonPeak - 396.50Standard - 139.50Off - Peak - 83.94

Page 155: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

153

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ekurhuleni(Continued)

230 /400V- Direct from SubstationBasic Charge - 1 702.50Demand Charge - 71.53 Network Access Charge-71.53Energy Charges -LowSeasonPeak - 167.14Standard - 109.75Off - Peak - 80.81Energy Charges -High SeasonPeak - 549.30Standard - 157.00Off - Peak - 92.52 >230/400V &<=11kVBasic Charge - 2 703.33Demand Charge - 70.14Network Access Charge - 39.34Energy Charges -LowSeasonPeak - 164.03Standard - 107.69Off - Peak - 80.81Energy Charges -High SeasonPeak - 539.50Standard - 154.50Off - Peak - 90.82

Electricity Supplied at a Voltage Higher than 11kVBasic Charge - 4 035.70Demand Charge - 60.28Network Access Charge- 36.14Energy Charges -LowSeasonPeak - 136.57Standard - 89.66Off - Peak - 70.62Energy Charges -High SeasonPeak - 136.57Standard - 89.66Off - Peak - 70.62 Domestic (Tariff H)Single Phase up to 80AMPBasic Charge - 138.15Energy Charges -LowSeasonPeak - 526.17Standard -149.96Off - Peak - 93.39Energy Charges -High SeasonPeak - 184.15Standard - 131.54Off - Peak - 78.92

Page 156: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

154

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ekurhuleni(Continued)

>11kVBasic Charge - 2 703.33Demand Charge - 64.97 Network Access Charge- 39.91Energy Charges -LowSeasonPeak - 151.87Standard - 99.72Off - Peak - 74.84Energy Charges -High SeasonPeak - 499.50Standard - 114.30Off - Peak - 84.10

Three Phase up to 80AMPBasic Charge - 828.89Energy Charges -LowSeasonPeak - 526.17Standard - 149.96Off - Peak - 93.39Energy Charges -High SeasonPeak - 184.15Standard - 131.54Off - Peak - 78.92 Three Phase >80AMPBasic Charge - 276.30Energy Charges -LowSeasonPeak - 526.17Standard - 149.96Off - Peak - 93.39Energy Charges -High SeasonPeak - 184.15Standard - 131.54Off - Peak - 78.92 Tariff ITariff I 230/400Basic Charge - 1 270.63Network Access Charge -27.54Demand Charge - 34.78Energy Charges -LowSeasonPeak - 117.00Standard - 83.20Off - Peak - 56.20Energy Charges -High SeasonPeak - 339.00Standard - 109.10Off - Peak - 63.50

Page 157: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

155

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ekurhuleni(Continued)

Greater than 230/400V less than or equal to 66kVBasic Charge - 9 245.85Network Access Charge -25.21Demand Charge - 31.90Energy Charges -LowSeasonPeak - 114.60Standard - 82.00Off - Peak - 55.20Energy Charges -High SeasonPeak - 334.00Standard - 107.10Off - Peak - 62.10 Tairff JTariff J greater or equal to 6.6kVBasic Charge - 133 558.00Network Access Charge -26.13Demand Charge - 33.05Energy Charges -LowSeasonPeak - 119.00Standard - 84.50Off - Peak - 57.00Energy Charges -High SeasonPeak - 346.00Standard - 111.00Off - Peak - 64.50

Page 158: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

156

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emfuleni 6.84%

Domestic Single Phase/Flat/Town HousesSummer Energy ChargeBlock 1 (0-50kWh) - 94.74Block 2 (51-350kWh) - 110.60Block 3 (351-600kWh) - 147.97Block 4 (>600kWh) - 177.58Winter Energy ChargeBlock 1 (0-50kWh) - 128.59Block 2 (51-350kWh) - 144.91Block 3 (351-600kWh) - 193.91Block 4 (>600kWh) - 232.68Basics Charge - 198.10

Domestic Three PhaseSummer Energy ChargeBlock 1 (0-50kWh) - 94.74Block 2 (51-350kWh) - 110.60Block 3 (351-600kWh) - 147.97Block 4 (>600kWh) - 177.58Winter Energy ChargeBlock 1 (0-50kWh) - 135.14Block 2 (51-350kWh) - 152.30Block 3 (351-600kWh) - 203.79Block 4 (>600kWh) - 244.54Basics Charge - 445.66 Multi-unit Residential DevelopmentSummer Energy Charge - 142.33Winter Energy Charge - 192.68

Commercial Prepaid Basic Charge - 836.07Energy Charge - 182.24 Agricultural Tariffs PrepaidSingle Phase Basic Charge - 205.14 Three Phase Basic Charge - 469.04Energy Charge - 185.17

Commercial ConventionalBasic Charge - 836.07Summer Energy Charge - 161.58Winter Energy Charge - 223.81 Other/Intinerants(Temporary Connections)Basic Charge - 1 490.94 Energy Charge - 196.12 Agricultural Tariffs Single PhaseBasic Charge - 208.54Summer Energy Charge - 171.85Winter Energy Charge - 223.60 Agricultural Tariffs Three PhaseBasic Charge - 469.01Summer Energy Charge - 171.85Winter Energy Charge - 223.60 Agricultural Other TariffsAgricultural Stands Basic Charge - 1 164.27Large customer off-peak energy - 85.60

Industrial Customers Low VoltageBasic Charge - 2936.56Demand Charge - 293.32Summer Energy Charge - 73.90

Winter Energy Charge - 107.62Medium Voltage Basic Charge - 2 936.56Demand Charge - 302.76Summer energy charge - 73.90Winter energy Charge - 107.62

LPU-Medium VoltageMedium voltage demandBasic Charge - 2 931.96Demand Charge - 302.76Summer Energy Charge - 78.12Winter Energy Charge - 108.63High Voltage demandBasic Charge - 2 931.96Demand Charge - 287.90Summer Energy Charge - 78.12Winter Energy Charge - 108.63

Time of UseMiniflexBasic Monthly - 2 865.40Network Excess - 63.24Excess Network Access Charge - 27.67Reactive Energy - 16.09Summer Energy Charge :Peak - 198.82 Standard - 131.78Off- peak - 75.35Winter Enenrgy Charges :Peak - 586.72 Standard - 169.85Off-peak - 79.50 MegaflexBasic Monthly - 16 661.49Networkdemand Charge - 71.38 Network Access Charge - 63.01Excess network access charge (penalty) -27.67Reactive Energy - 27.87Summer Energy Charges Peak - 173.59Standard - 106.36Off- peak - 75.60Winter Energy Charge Peak - 566.01Standard - 147.52Off- peak - 80.08

Page 159: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

157

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emfuleni(Continued)

Ex- Eskom Miniflex Service Charge/day0 to < 100kVA - 14.50100kVA to < 500kVA - 66.22500kVA to < 1000kVA - 203.79>1MVA - 203.79Key Customers - 3 993.44Administrative Charge/day0 to < 100kVA - 3.18100kVA to < 500kVA - 18.57500kVA to < 1000kVA - 36.88>1MVA - 91.84 Key Customers - 127.53Network demand charge- 6.91Network capacity charge- 24.42Excess Network Access Charge (penalty) - 25.19Reactive Energy - 6.26Electrification and Rural Subsidy -7.94Ancillary Service Charge- 0.41Afoordability Subsidy- 3.22Summer Energy Charges Peak - 100.25Standard - 69.01 Off- peak - 42.96Winter Energy Charge Peak - 302.33Standard - 93.11Off- peak - 50.56

Page 160: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

158

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emfuleni(Continued)

Ex-Eskom MegaflexService Charge/day >1MVA - 200.43Key customer- 3 928.40Administrative charge >1MVA - 91.84Key Customers - 127.53Transmission Network Charge - 8.16Network Capacity Charge - 16.28Network Demand Charge - 30.88Reactive Energy - 14.36Electrification Levy - 7.94Affordability levy - 3.21Ancillary services- 0.41Summer Period Energy ChargePeak- 100.25Standard - 69.07Off- Peak- 42.83Winter Period Energy Charge Peak - 302.33Standard- 93.11Off- Peak- 50.55

Page 161: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

159

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emfuleni(Continued)

Ex-Eskom NightsaveService Charge >1MVA - 203.79Key customers- 3 993.44Administrative Charge >1MVA - 91.84Key Customers- 127.53Network Demand Charge- 30.88Network Access Charge- 16.28Transmission Network Charge - 8.16Excess Network Acess Charge (Penalty) - 25.19Winter Energy Charge - 73.04 Summer Energy Charge - 57.00Winyter Energy Demand Charge - 227.11Summer Energy Charge - 31.75Electrifcation Levy - 7.94Ancillary Service Charge - 0.41Affordability Levy -3.22

Page 162: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

160

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emfuleni(Continued)

General ChargesInspection and testing of InstallationsCharge for inspection and testing - 549.38Charge for inspection and issuing of certficate -549.38Charges per hour for business and factory - 328.22Charges for more tha 2 hour for business and factory - 356.30Reconnection of ElectricityDisconnection charges - 692.45Fnal demand charges(warning) - 72.22

Meter ReadingsMeter reading charges- 137.88

Testing of MetresSingle phase meters- 443.55Electromechanical meters- 900.61

ComplaintsCharge for Residential- 247.67Charge for basic and industrial- 301.69

Service ChargesServices Charges- 94.24Additonal Charges- 71.17

Page 163: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

161

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emfuleni(Continued)

Testing of Cables, Switchgear etcCharges for cables - 1 756.80Charges for switch gear - 823.16Automatic Vending Machine Cards Basic Charges - 35.72Network Contribution ChargesAt an 88kV intake sttaion - 48.40At 11kV 8811 station -1 074.22At 11kV downstream of an 88/11 Kv station - 1 945.41At low voltage - 2 907.48

OwnersResidential properties and town house - 2 538.35Flats - 1 532.60Small Holding - 2 012.65

Tenants of:Residential properties and town house - 3 627.05Flats - 4 075.28Small Holding - 3 628.82

Page 164: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

162

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Lesedi6.84%

Domestic IndigentsBlock 1(0- 50kWh) - 0Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.15Block 4(>600kWh) - 194.43

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) -165.46Block 4(>600kWh) - 194.85Basic Charge - 209.82

N/A

Commercial ConventionalCommercial Low (< 100kVA/ 150A, 230/400V)SummerBasic Charge - 775.13Energy Charge - 151.30WinterBasic Charge -775.13Energy Charge - 188.31 Commercial Medium (>100kVA/ 150A; 230/400V & <=11kV)SummerBasic Charge - 1 904.81.Energy Charge - 112.88Demand Charge - 158.61WinterBasic Charge - 1 904.81Energy Charge - 182.17Demand Charge - 188.22SummerBasic Charge - 2 704.82Energy Charge - 108.86Demand Charge - 152.95WinterBasic Charge - 2 704.82Energy Charge - 181.53Demand Charge - 175.65

Bulk Residential Resellers (230/400V)Basic Charge - 307.89Energy Charge - 163.01Demand Charge - 0 Bulk Residential Resellers (230/400V&<=11kV))Basic Charge - 3 848.62Energy Charge - 158.83Demand Charge - 0

N/A

Commercial High ( >230/400V = >11KV) Minimum 1MVABasic Charge - 2 573.96Demand Charge - 102.80Summer Energy Charge :Peak - 145.61Standard - 95.49Off-peak - 75.33Winter Energy Charge :Peak - 363.72Standard -127.62 Off-peak - 77.00

Page 165: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

163

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Midvaal6.84%

Domestic IBTBlock 1(0-50kWh) -98.20Block 2(51-350kWh) -123.40Block 3(351-600kWh) -187.15Block 4(>600kWh) -217.84

Domestic Single PhaseBlock 1(0-50kWh) - 98.20Block 2(51-350kWh) -123.40 Block 3(351-600kWh) -175.17Block 4(>600kWh) - 205.00 Domestic Three PhaseBlock 1(0-50kWh) -98.20 Block 2(51-350kWh) - 123.40 Block 3(351-600kWh) -187.15Block 4(>600kWh) -217.84 Domestic Other / Flats IBTBlock 1(0-50kWh) - 98.20 Block 2(51-350kWh) -123.40 Block 3(351-600kWh) - 175.15Block 4(>600kWh) -205.00

Commercial PrepaidEnergy Charge -197.81

Charitable/ Provincial/Hospitals/churcesEnergy Charge - 177.06 Flats & Townhouse ComplexesEnergy Charge -197.81 Municipal SuppliesEnergy Charge - 151.61 Agriculture Single PhaseEnergy Charge - 212.70 Agriculture Three PhaseEnergy Charge -212.70 Agriculture Night SaveEnergy Charge (7h00-21h00) - 212.70 Energy Charge (21h00-7h00) -104.08 General Lighting & Itinerant SuppliesEnergy Charge - 328.60

Bulk Supply - Low VoltageEnergy Charge -144.81 Demand Charge -130.92 Off-peak Low VoltageEnergy Charge - 90.36Demand Charge -283.08

Bulk Suply Medium VoltageEnergy Charge -144.81Demand Charge - 128.08 Off-peak Medim VoltageEnergy Charge -90.36 Demand Charge - 269.62

Time Of UseMidvaal Megaflex TariffDemand Charge -83.70Reactive Energy - 39.72 Summer Energy Charge :Peak - 211.89Standard -95.09 Off-peak - 74.84 Winter Energy Charge :Peak -316.97 Standard - 132.36 Off-peak - 80.13 Midvaal Miniflex TariffReactive Energy -26.98Summer Energy Charge :Peak -233.24Standard -117.38 Off-peak -73.94 Winter Energy Charge :Peak - 473.11Standard -158.64 Off-peak - 84.95 Heineken BreweryEskomm 11kV Megaflex Key Customer tariff

Page 166: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

164

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mogale City 6.84%

Domestic Pre-Payment LifelineBlock 1(51-350kWh) - 110.00Block 2(351-500kWh) -122.00Block 3(501 - 750kWh) - 147.00Block 4(>751) - 174.00

Domestic prepayment 60A single phaseBlock 1(1-1000kWh) - 155.00Block 2(1001 - 1500kWh) - 167.00Block 3( >1500) - 174.00 Domestic prepayment 60A three phaseBlock 1(1-1000kWh) - 155.00Block 2(1001 - 1500kWh) - 172.00Block 3( >1500) - 179.00 Domestic two part 45ABasic Charge - 5.16Energy Charge - 118.00 Domestic Bulk Consumers three part low VoltBasic Charge - 573.05Energy Charge- 91.24Demand Charge- 105.96Reactive Energy- 21.42 Domestic Bulk Consumers three part low VoltBasic Charge - 5 262.44Energy Charge- 75.61Demand Charge- 75.61Reactive Energy- 21.42

Commercial Prepaid Single Phase Energy Charge - 163.01 Commercial Prepaid Three Phase Energy Charge - 203.55

Commercial convential 60ABasic Charge - 5.93Energy Charge - 146.42

Three part low VoltBasic Charge - 573.05Energy Charge - 91.87Demand charge - 108.86Reactive Energy- 21.42

Three part high VoltBasic Charge - 6 317.88Energy Charge - 106.16Demand charge - 106.16Reactive Energy- 21.42

Lifeline Two partBasic Charge - 5.14Energy Charge:Peak - 300.86Standard - 139.86Off peak- 93.27

Small consumers two partBasic Charge - 6.34Energy Charge:Peak - 316.34Standard - 148.71Off peak- 97.66 Domestic Bulk Consumers high VoltHigh season Energy charges:Basic Charge - 6 317.88Energy Charges :Peak- 449.64Standard - 116.92Off - peak - 62.45Low season Energy Charges:Peak - 125.55Standard - 76.94Off-peak - 62.45Demand Charge - 90.77Reactive Energy - 21.42

Page 167: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

165

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mogale City(Continued)

Domestic Bulk Consumers low VoltHigh season:basic Charge - 573.06High season Energy charges:Peak - 420.87Standard - 117.55Off - peak - 58.44Low season Energy Charges:Peak - 117.55Standard - 72.02Off- peak - 50.35Demand Charge - 102.14Reactive Energy - 21.42 Bulk Consumers low voltageHigh season:Basic Charge - 555.06Energy Charges:Peak - 539.22Standard - 140.20Off - Peak - 74.88Low Season Energy Charges:Peak - 150.60Standard - 92.27Off- Peak - 64.52Demand Charge- 103.15Reactive Energy - 21.42

Page 168: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

166

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mogale City(Continued)

Bulk Consumers High voltageHigh Season:Basic Charge - 6 236.23 Energy Charges:Peak - 525.83Standard - 136.72Off - Peak - 73.03Low Season Energy Charges:Peak - 146.88Standard - 89.97Off - peak - 62.92Demand Charge - 108.18Reactive Energy - 21.42 Municipal Streets, Traffic LightsEnergy Charge - 124.09

Rand West 6.84%Formely Randfontein & Westonaria

Domestic Prepaid: Indigent HouseholdBlock 1(0- 50kWh) - 94.00Block 2(51-350kWh) - 119.00Block 3(351-600kWh) - 167.74Block 4(>600kWh) - 197.65 Domestic Prepaid: Indigent HouseholdBlock 1(0- 50kWh) - 94.00Block 2(51-350kWh) - 119.00Block 3(351-600kWh) - 167.74Block 4(>600kWh) - 197.65

Domestic Conventional Non IndigentBlock 1(0- 50kWh) - 110.00Block 2(51-350kWh) - 124.00Block 4(>600kWh) - 167.74Block 4(>600kWh) - 197.65Basic Charge - 58.76 Domestic conventional Non Indingent HouseholdBlock 1(0- 50kWh) - 110.00Block 2(51-350kWh) - 120.81Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 195.11Basic Charge - 58.76

Commercial Prepayment Basic Charge - 165.60Energy Charge- 195.70 Street lightEnergy Charge- 149.93

Commercial Conventional Basic Charge - 404.43Energy Charge - 163.34

Industrial <1000kVABasic Charge - 2 214.97Energy Charge - 81.86Demand Charge - 217.31

Industrial >1000kVABasic Charge - 2 214.97Energy Charge - 83.34Demand Charge - 221.76

Time Of Use - MV Supply at Bulk sub: above 70kVABasic Charge - 4 429.95Demand Charge - 117.30Access charge - 93.84Reactive Energy - 3.35Low SeasonPeak - 101.04Standard - 72.84Off-peak - 50.20High Season:Peak - 287.87Standard - 94.60Off-peak - 64.92

Page 169: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

167

APPROVED MUNICIPAL ELECTRICITY TARIFFS

GAUTENG PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Rand West(Continued)Formely Randfontein & Westonaria

Bulk TOU MV supply from MV network:Above 70 kVABasic Charge - 2 214.97Demand Charge - 123.98Access Charge- 98.54Reactive Energy- 3.58Low Season:peak- 103.06standard- 74.30off - peak-51.05Off-peak - High Season:Peak - 293.63Standard - 96.49Off-peak - 66.22 Bulk TOU MV supply: Above 70 kVABasic charge-1 107.49Demand Charge-135.00Access Charge- 101.45Reactive Energy- 4.01Low Season:Peak -108.22standard- 78.01off - peak-53.63High Season:Peak- 308.22Standard- 101.31Off -peak- 69.53

West Rand Power Dist 6.84%

N/A Domestic CustomersEnergy Charge - 174.46

N/A Commercial CustomersEnergy Charge - 194.45

N/A N/A N/A

Page 170: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

168

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCE

Page 171: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

169

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ba-Phalaborwa 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.08Block 2(51-350kWh) - 116.44Block 3(351-600kWh) - 157.83Block 4(>600kWh) - 190.49

Domestic ConventionalBlock 1(0- 50kWh) - 91.27Block 2(51-350kWh) - 116.87Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.84Basic Charge - 152.24

Commercial PrepaidEnergy Charge - 195.94

Commercial ConventionalBasic Charge - 268.78Energy Charge - 180.54

Industrial low/High and Business with kVA VoltageBasic Charge - 1 277.77Energy Charge - 101.90Demand Charge - 229.76

N/A

Time of Use tariffBasic Charge - 9 148.45Demand charge -56.74Energy Charges: Low SeasonPeak - 116.54Standard - 82.85Off-Peak - 55.65High Season Peak - 339.80Standard - 108.84Off-Peak - 62.99

Bela- Bela6.84%

Domestic Tariffs Prepaid/ Conventional/ IndigentsEnergy Charge - 149.44

Domestic Tariffs Prepaid/ Conventional/ IndigentsEnergy Charge - 149.44

General Tariff Prepaid:Government,Business- 191.93

General Tariff Conventional/Prepaid >30 Amps Single PhaseBasic Charge - 54.42Amp Charge-14.93Energy Charge - 129.27 General Tariff Conventional/Prepaid Three phaseBasic Charge - 81.64Amp Charge-14.93Energy Charge - 129.27 Agricultural Low Voltage (2000kWh)Basic Charge - 163.27Amp Charge-14.93Energy Charge - 129.27

Industrial LowBasic Charge - 1 261.51Energy Charge - 113.70Demand Charge - 155.10 Medium VoltageBasic Charge - 2 988.95Energy Charge - 111.34Demand Charge - 155.63

N/A

Page 172: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

170

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Blouberg6.84%

Residential CustomersBlock 1(0-50kWh) - 95.09Block 2(51-350kWh) - 118.59Block 3(151-350kWh) - 138.89Block 4(351-600kWh) -157.05 Block 5(>600kWh) - 182.70

N/A

Commercial PrepaidEnergy Charge - 176.32

Commercial ConventionalBasic Charge - 272.10Energy Charge - 165.44 Commercial High ConventionalBasic Charge - 370.00Energy Charge - 191.00

 

N/A

N/A

Elias Motsoaledi 6.84%

Domestic IndigentBlock 1 (0 - 50 kWh) - 91.44Block 2 (51 - 350kWh) - 117.56Block 3 (> 350kWh) - 153.00 Prepaid Single & Three PhaseBlock 1(0-50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 137.15

Domestic ConventionalBlock 1(0-50kWh) - 88.00Block 2(51-350kWh) - 117.56Block 3(>351kWh) - 155.00 Basic Charge - 165.59

Commercial PrepaidEnergy Charge - 168.70 Three Phase Prepaid (5 500kWh)Basic Charge - 550.00Energy Charge - 157.90

Commercial Conventional(40A & 80A)Basic Charge - 181.57Energy Charge - 124.12 Conventional (Medium)Basic Charge - 293.90Energy Charge - 166.86 Conventional (3000kWh)Basic Charge - 293.90Energy Charge - 173.07 Conventional (7000kWh)Basic Charge - 300.00Energy Charge - 154.57 Three Phase Conventional (5 500kWh)Basic Charge - 300.00Energy Charge - 154.57 Three Phase Conventional(11 500 kWh)Basic Charge - 400.00Energy Charge - 150.00

Conventional <100ABasic Charge - 409.37Energy Charge - 88.04Demand Charge - 127.65

Conventional >100ABasic Charge - 1 024.52Energy Charge - 156.26

N/A

Page 173: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

171

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Elias Motsoaledi(Continued)

Three Phase Conventional(22 000 kWh)Basic Charge - 600.00Energy Charge - 147.97 Church /SchoolsBasic Charge - 148.56Energy Charge - 117.00 Agriculture(Low)Basic Charge - 1 100.45Energy Charge - 124.00 Agriculture(High)Basic Charge - 176.07Energy Charge - 162.00

Ephraim Mogale 6.84%

Domestic Prepaid Single PhaseBlock 1(0- 50kWh) - 93.45Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 153.00Block 4(>600kWh) - 185.00

Domestic ConventionalBlock 1(0- 50kWh) - 90.00Block 2(51-350kWh) - 118.76Block 3(351-600kWh) - 147.00Block 4(>600kWh) - 176.00Basic Charge - 167.67 Domestic Conventional Three PhaseBlock 1(0- 50kWh) - 95.00Block 2(51-350kWh) - 122.00Block 3(351-600kWh) - 163.00Block 4(>600kWh) - 194.00Basic Charge - 268.35

Commercial Prepaid (Single Phase)Energy Charge - 183.00 Commercial Prepaid (Three Phase)Energy Charge - 184.07

Commercial Conventional(Three Phase-80A)Basic Charge - 1 358.51Energy Charge - 140.00 Commercial Conventional(Three Phase-150A)Basic Charge - 2 307.67Energy Charge - 140.00 Commercial Conventional(Three Phase-Above 150A)Basic Charge - 4 382.12Energy Charge - 98.00Demand Charge - 151.36

Industrial BulkBasic Charge - 4 382.12Energy Charge - 98.00Demand Charge - 151.36

N/A

N/A

Page 174: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

172

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Ephraim Mogale(Continued)

Agricultural(Single Phase)Basic Charge - 806.71Energy Charge - 131.41 Agricultural(Three Phase 80Amp)Basic Charge - 1 233.86Energy Charge - 131.41 Agricultural(Three Phase 150Amp)Basic Charge - 2 285.60Energy Charge - 131.41 Agricultural(Three Phase > 150Amp)Basic Charge - 4 382.12Energy Charge - 131.41Demand Charge - 131.41 Church/Schools (Single Phase)Basic Charge - 167.67Energy Charge - 123.00 Church/Schools(Three Phase 80Amp)Basic Charge - 335.43Energy Charge - 123.00 Church/Schools(Three Phase> 80Amp)Basic Charge - 553.43Energy Charge - 123.00Energy Charge - 141.11

Page 175: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

173

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Greater Letaba 6.84%

Domestic Prepaid (Indigent)Block 1(0- 50kWh) - 91.08Block 2(51-350kWh) - 112.30Block 3(351-600kWh) - 158.84

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 163.10Block 4(>600kWh) - 194.73

N/A

Commercial Basic Charge - 921.09Energy Charge - 141.11

Industrial LowBasic Charge - 5 011.48Energy Charge - 89.76Demand Charge - 199.32

N/A N/A

Greater Tzaneen 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.17Block 2(51-350kWh) - 117.17Block 3(351-600kWh) - 165.41Block 4(>600kWh) - 194.51

Prepaid High (Holiday Homes)Energy Charge - 176.05 Agriculture/Domestic Tarriff CBasic Charge - 2 705.88Energy Charges:Low Season -72.00High Season - 94.13Demand Charges:Low Season - 191.38High Season - 307.92 Agriculture/Domestic Tariff B

Agriculture/Domestic 16kVA: Single Phase (70Amps)Basic Charge - 367.84Energy Charges - 154.66 Agriculture/Domestic 25kVA:3Phase (45Amps)Basic Charge - 1 463.88Energy Charges - 128.10

Commercial Prepaid (Single & 3Phase)Energy Charge - 187.56

Commercial ConventionalBasic Charge - 1 241.73Energy Charge - 122.68 Business (Tariff C)Basic Charge - 2 595.59Energy Charges :Low Season - 71.10High Season - 96.39Demand Charges:Low Season - 115.13High Season - 235.08 Business Three Phase

Business 50kVA Three: (80Amps)Basic Charge - 1 699.09Energy Charge - 122.68 Business 75kVA Three: (100Amps)Basic Charge - 2 517.18Energy Charge- 122.68

N/A

N/A

Industrial Time Of UseBasic Charge - 9 060.13Demand charge -61.84Energy Charges -Low SeasonPeak - 107.79Standard -77.03Off - Peak - 52.96High SeasonPeak - 357.49Standard -102.05Off - Peak - 59.70

Page 176: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

174

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Greater Tzaneen (Continued)

Agriculture/Domestic 50kVA: Three Phase (80Amps)Basic Charge - 1 940.77Energy Charges - 128.10 Agriculture/Domestic 75kVA: Three Phase (100Amps)Basic Charge - 2 699.26Energy Charges - 128.10 Agriculture/Domestic 25kVA: 25kVA Three Phase (45Amps)Basic Charge - 1 438.72Energy Charges - 122.68

Lephalale6.84%

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 87.61Block 2(51-350kWh) - 111.16Block 3(351-600kWh) - 159.64 Block 4(>600kWh) - 191.84Basic Charge - 107.61

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 87.61Block 2(51-350kWh) - 111.16Block 3(351-600kWh) - 159.64 Block 4(>600kWh) - 191.84Basic Charge - 107.61

Commercial Prepaid & ConventionalBasic Charge - 378.32Energy Charge - 165.85

Commercial Prepaid & ConventionalBasic Charge - 378.32Energy Charge - 165.85

Industrial Low Tension(Prepaid & Conventional)Basic Charge - 1 170.45Energy Charge - 98.34Demand Charge - 186.41

Industrial High Tension(Prepaid & Conventional)Basic Charge - 1 118.20Energy Charge - 95.09Demand Charge - 180.22

N/A

Page 177: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

175

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Makhado6.84%

Pre-Light 1:Rural(Domestic Low tariff)Block 1(0- 50kWh) - 88.21Block 2(51-350kWh) - 114.04Block 3(351-600kWh) - 161.26Block 4(>600kWh) - 192.39

Domestic Tariff ConventionalBlock 1(0- 50kWh) - 88.21Block 2(51-350kWh) - 114.04Block 3(351-600kWh) - 161.26Block 4(>600kWh) - 192.39Basic Charge - 186.20

Pre-Light 2: Commercial Prepaid Tariff(Small Business) Urban Energy Charge - 196.93

Urban and Peri-Urban tariff (Small Business)Basic Charge - 529.30Energy Charge - 137.28 Municipal TariffBasic Charge - 186.20Energy Charge - 90.54

Industrial Low Tariff (Urban and Peri-Urban)Basic Charge - 820.50Energy Charge - 90.54Demand Charge - 224.88

Industrial High VoltageBasic Charge - 1 087.80Energy Charge - 88.97Demand Charge - 222.20

Time Of UseBasic Charge - 1 013.10Demand Charge - 120.07Energy Charges: Low SeasonPeak - 131.62Standard - 90.61Off-Peak - 53.37Kilovarts(Summer)-0.20High Season Peak - 288.93Standard - 123.49Off-Peak - 66.39Kilovarts(Winter)- 0.21

Modimolle-Mookgophong (LIM368) 6.84%  

Domestic PrepaidBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.46Block 4(>600kWh) - 194.20

Domestic ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 164.71Block 4(>600kWh) - 193.66Basic Charge - 125.22

Commercial PrepaidMookgophong-ModimolleEnergy Charge - 171.33

Commercial 60A Amperes (Modimolle)Basic Charge - 409.68Energy Charge - 164.38 Conventional 60Amperes (Mookgophong)Basic Charge - 223.22Energy Charge - 164.38

Light Industrial Manufacturing (Modimolle)Basic Charge - 1 116.97Energy Charge - 53.39Demand Charge - 243.95 Light Industrial Manufacturing (Mookgophong)Basic Charge - 1 116.97Energy Charge - 53.39Demand Charge - 243.95

N/A

N/A

Page 178: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

176

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Mogalakwena 6.84%

Domestic Urban & RuralBlock 1(0- 50kWh) - 89.59Block 2(51-350kWh) - 114.32Block 3(351-600kWh) - 164.53Block 4(>600kWh) - 194.84

Domestic Urban & RuralBlock 1(0- 50kWh) - 89.59Block 2(51-350kWh) - 114.32Block 3(351-600kWh) - 164.53Block 4(>600kWh) - 194.84

Commercial Urban & RuralEnergy Charge - 203.56

N/A

Standard Low VoltageService Charge - 44.48Administration Charge- 15.24Energy Charge - 78.90Demand Charge - 251.91

Standard High VoltageService Charge - 178.54Administration Charge- 90.47Energy Charge - 60.75Demand Charge - 222.96

Industrial Time of Use Service Charge - 178.54Administration Charge- 90.47Demand Charge - 88.06Energy Charges :Low SeasonPeak - 122.28Standard - 83.00Off-peak - 42.77High SeasonPeak - 273.54Standard - 122.95Off-peak - 71.59

Molemole6.84%

Domestic Prepaid & Conventional Single PhaseBlock 1(0- 50kWh) - 92.56Block 2(51-350kWh) - 117.16Block 3(351-600kWh) - 165.19Block 4(>600kWh) - 194.49

Domestic Prepaid & Conventional 3 PhaseBlock 1(0- 50kWh) - 117.16Block 2(51-350kWh) - 165.19Block 3(351-600kWh) - 194.49Block 4(>600kWh) - 203.86

N/A

Commercial (Prepaid and Conventional)Block 1(0- 600kWh) - 165.19Block 2(> 600) - 194.49 Commercial (Prepaid and Conventional) 3 Phase Block 1(0- 600kWh) - 195.66Block 2(> 600) - 203.86

N/A

N/A

N/A

Musina6.84%  

Domestic PrepaidBlock 1(0- 50kWh) - 91.15Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.35Block 4(>600kWh) - 194.52

Domestic ConventionalBlock 1(0- 50kWh) - 91.15Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.38Block 4(>600kWh) - 194.52Basic Charge - 73.75

Commercial Prepaid Single PhaseEnergy Charge - 203.56 Commercial Prepaid Three PhaseEnergy Charge - 203.56 Commercial /Small businessEnergy Charge - 170.29

Commercial Conventional Three PhaseBasic Charge - 161.13Energy Charge - 200.62

N/A

IndustrialBasic Charge - 2 265.94Demand Charge - 76.20Energy Charge: Low SeasonPeak - 143.68Standard - 97.96Off-peak - 62.04Energy Charges: High SeasonPeak - 397.30Standard - 133.88Off-peak - 72.93

N/A

Page 179: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

177

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Polokwane6.84%

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 90.00Block 2(51-350kWh) - 112.00Block 3(351-600kWh) - 165.00Block 4(>600kWh) - 194.00Basic Charge - 87.00

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 90.00Block 2(51-350kWh) - 112.00Block 3(351-600kWh) - 165.00Block 4(>600kWh) - 194.00Basic Charge - 87.00

Commercial Prepaid & ConventionalBasic Charge - 485.00Energy Charge - 170.00

Commercial Prepaid & ConventionalBasic Charge - 485.00Energy Charge - 170.00

Industrial Bulk Supply <100 AMPSBasic Charge - 1 136.00Energy Charge - 170.00

Industrial Bulk Supply >100 AMPSBasic Charge - 1 368.00Energy Charge - 74.00Demand Charge - 205.00

N/A

Thabazimbi6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 91.27Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 164.32Block 4(>600kWh) - 194.50 Domestic Prepaid Non-IBT(Poor of the Poorest)Domestic lowEnergy Charge - 125.18Domestic HighEnergy Charge - 153.48

Domestic ConventionalBlock 1(0- 50kWh) - 91.27Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 164.32Block 4(>600kWh) - 194.50Basic Charge - 160.54

(1a) Commercial Pre-paid> 40Amps (Single and 3Phase)Energy Charge - 203.56

Commercial Conventional≤40Amps(Single and 3Phase) Commercial 1Basic Charge - 662.43Energy Charge - 141.34 B Conventional >40 Amps(Single and 3Phase)Commercial 2Basic Charge - 975.09Energy Charge - 133.41 C Conventional ≥100 Amps(Single and 3Phase)Commercial 3Basic Charge -1 181.12Energy Charge - 125.41

(1a) Industrial 1(Low Voltage)>125A to ≤250ABasic Charge - 1 459.43Energy Charge: Low Season-63.19High Season -65.52Demand ChargeLow Season-210.14High Season -214.32 (b)The Alternative Industrial 2 ( Low Voltage)Basic Charge - 1 459.43Energy Charge: Low Season-157.05High Season -159.19

(c)Industrial 2 (Low Voltage)≥300 AmpBasic Charge - 6 791.37Energy Charge: Low Season- 95.82High Season -100.65Demand ChargeLow Season-185.16High Season -214.28

(e) Industrial High VoltageBasic Charge - 8 846.45Energy Charge: Low Season- 89.20High Season -96.00Demand Charge:Low Season-219.55High Season -228.17

N/A

Page 180: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

178

APPROVED MUNICIPAL ELECTRICITY TARIFFS

LIMPOPO PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Thabazimbi(Continued)

(d)The alternative Industrial 2(Low Voltage)≥300AmpBasic Charge -6 791.37Energy Charge: Low Season- 153.54High Season -159.19

Page 181: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

179

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGAPROVINCE

Page 182: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

180

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Chief Albert Luthuli 6.84%

IndigentBlock 1(0-50kWh) - 88.52Block 2(51-200kWh) - 116.63Block 3(201-350kWh) - 116.63Block 3(351-600 kWh) - 159.76Block 5(>600kWh) - 188.64

Prepaid & ConventionalBlock 1(0-50kWh) - 92.00Block 2(51-350kWh) - 118.17Block 3(351-600kWh) - 165.01Block 4(>600kWh) - 194.15

Prepaid 1P 40ABasic Charge - 250.35Energy Charge: Low Season-130.74High Season -143.81

Conventional 41A to 60A:1PBasic Charge - 544.52Energy Charge: Low Season-130.74High Season -143.81 Conventional 61A to 80A:1PBasic Charge - 712.96Energy Charge: Low Season-130.74High Season -143.81 Conventional Up to 60A:3 PhaseBasic Charge - 891.47Energy Charge: Low Season-130.74High Season -143.81 Conventional 61A to 80A:1PBasic Charge - 1 232.98Energy Charge: Low Season-130.74High Season -143.81 Public Benefit OrganisationsUp to 80A-1PBasic Charge - 250.35Energy Charge: Low Season-130.74High Season -143.81

A)Up to 60A 3PBasic Charge - 1 489.60Energy Charge: Low Season - 119.16High Season - 131.07Demand Charge - 119.00

(B)Up to 80A 3PBasic Charge - 1 733.68Energy Charge: Low Season - 119.16High Season - 131.07Demand Charge - 117.18 (C ) 61A Up to 80 A 3PBasic Charge - 1 977.78Energy Charge: Low Season-119.16High Season -131.07Demand Charge-115.90 IndustrialBasic Charge - 3 943.04Energy Charge: Low Season-107.80High Season -118.58Demand Charge-106.01

Time of Use Basic Charge - 2 953.90Energy Charges: Low season PeakLow Season - 130.62High Season - 132.05StandardLow Season-114.70High Season -115.97Off-PeakLow Season - 70.75High Season - 71.53Demand Charge - 72.56Energy Charges:High Season PeakLow Season - 141.35High Season -146.79StandardLow Season - 124.13High Season -128.90Off-PeakLow Season - 76.56High Season - 79.51Demand Charge - 82.87

Page 183: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

181

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Chief Albert Luthuli(Continued)

Up to 80A-3PBasic Charge - 336.10Energy Charge: Low Season-130.74High Season -143.81 Low VoltageBasic Charge - 2 184.32Energy Charge: Low Season-114.70High Season -126.17

Dipaleseng6.84%

Domestic Prepaid IndigentEnergy Charge - 125.18

Domestic Prepaid Non IndigentEnergy Charge - 168.98 Domestic ConventionalBasic Charge - 156.97Energy Charge - 143.83

Commercial PrepaidEnergy Charge - 203.56

Commercial ConventionalBasic Charge - 318.50Energy Charge - 171.30

IndustrialBasic Charge - 971.11Energy Charge - 75.30Demand Charge - 225.36

N/A

N/A

Emakhazeni6.84%

Indigent TariffBlock 1(0-50kWh) - 91.00Block 2(51-350kWh) - 116.00Block 3(351-600kWh) - 164.00Block 4(>600kWh) - 194.00 Prepaid Block 1(0-50kWh) - 94.22Block 2(51-350kWh) - 117.00Block 3(351-600kWh) - 165.30Block 4(>600kWh) - 194.31Basic Charge - 141.17

ConventionalBlock 1(0-50kWh) - 94.22Block 2(51-350kWh) - 117.00Block 3(351-600kWh) - 165.30Block 4(>600kWh) - 194.31Basic Charge - 281.69 Domestic Three PhaseBlock 1(0-50kWh) - 110.00Block 2(51-350kWh) -132.00 Block 3(351-600kWh) - 189.00Block 4(>600kWh) - 222.00Basic Charge - 281.13

Commercial Prepaid(Single Phase:1-60A)Basic Charge - 293.65Energy Charge - 183.00 Commercial Prepaid(Single Phase :61-90A)Basic Charge - 563.93Energy Charge - 183.00 Commercial Prepaid(Single Phase: 80-100A)Basic Charge - 1 007.30Energy Charge - 183.00

Commercial Conventional : (Single Phase 1-60A)Basic Charge - 293.65Energy Charge - 167.00 Commercial Conventional : (Single Phase 61-80A)Basic Charge - 563.93Energy Charge - 167.00 Commercial Conventional : (Single Phase :81-100A)Basic Charge - 1 007.30Energy Charge - 167.00

IndustrialBasic Charge - 6 112.06Energy Charge - 98.00Demand Charge - 233.16

N/A

N/A

Page 184: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

182

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emakhazeni(Continued)

Commercial Prepaid(Single Phase:(40A-25kVA)Basic Charge - 1 084.25Energy Charge - 183.00 Commercial Prepaid(Single Phase:(80A-50kVA)Basic Charge - 1 640.28Energy Charge - 183.00 Commercial Prepaid(Three Phase:(81-100kVA)Basic Charge - 1 084.26Energy Charge - 158.33 Commercial Prepaid(Three Phase:(40A;25kVA) & (80A,50kVA)Basic Charge - 1 167.10Energy Charge - 158.33 Commercial Prepaid(Three Phase:150A;100kVA)Basic Charge - 1 900.48Energy Charge - 158.33

Commercial Conventional : ( Single Phase:40A-25kVA)Basic Charge - 1 084.25Energy Charge - 167.00 Commercial Conventional : ( Single Phase :80A-50kVA)Basic Charge - 1 640.28Energy Charge - 167.00 Commercial Conventional : (Three Phase:1-60A)Basic Charge - 293.65Energy Charge - 167.00 Commercial Conventional : (Three Phase:61-80A)Basic Charge - 563.93Energy Charge - 167.00 Commercial Conventional : (Three Phase:81-100A)Basic Charge - 1 007.30Energy Charge - 167.00 Commercial Conventional : (Three Phase:40A-25kVA)Basic Charge - 1 084.25Energy Charge - 167.00

Page 185: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

183

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emakhazeni(Continued)

Commercial Conventional : (Three Phase:80A-50kVA)Basic Charge - 1 640.28Energy Charge - 167.00 Commercial Conventional : (Three Phase:1-60A)Basic Charge - 316.09Energy Charge - 158.33 Commercial Conventional : (Three Phase:(61-80A)Basic Charge - 607.02Energy Charge - 158.33

Emalahleni MP 6.84%

Indigent Residential CustomersBlock 1(0-50kWh) - 0.00Block 2(51-350kWh) - 117.12Block 3(351-600kWh) - 162.86Block 4(>600kWh) - 189.42 Domestic PrepaidEnergy Charge - 174.69

Normal Domestic (3 Blocks)Block 1(0-50kWh) - 94.55Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 163.62 Normal Domestic(4 Blocks)Block 1(0-50kWh) - 94.55Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 163.62Block 4(>600kWh) - 168.00Basic Charge - 233.81 Normal Domestic (5 Blocks)Block 1(0-50kWh) - 94.55Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 163.62Block 4(600-1000kWh) - 166.51Block 5(>1000kWh) - 166.51Basic Charge - 437.67

N/A

Low Voltage Supply(Commercial & Business)Basic Charge -2 001.72Energy Charges:Low Season - 99.70High Season - 178.35

Low Voltage Supply Three Phase (240-380V) without kVABasic Charge - 2 038.62Energy Charges:Low Season - 105.32High Season - 194.98 Municipality tariffEnergy Charge - 94.64 Schools and WelfareEnergy Charge - 133.82

Low Voltage Supply Three Phase(240-380V) without kVABasic Charge - 2 005.42Demand Charge - 201.21Energy Charges:Low Season - 91.74High Season - 157.90

Industrial Medium(66-11kVA)Basic Charge - 2 038.62Demand Charge - 128.11Network Charge-57.27Energy Charges:Low Season - 94.53High Season - 151.79

Industrial Time of UseBasic Charge -7 225.62Energy Charges:Low SeasonPeak - 130.16Standard - 97.08Off- peak - 64.00Energy Charges:High SeasonPeak - 378.24Standard - 124.64Off- peak - 71.67Demand Charge:Reactive Energy Charge-16.08Energy Demand Charge-35.16Network Capacity Charge-18.56TX Network Charge-9.25Excessive Reactive Energy Charge-0.16

Page 186: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

184

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Emalahleni MP(Continued)

Bulk Consumers (Medium Voltage-Time of Use optionBasic Charge -4 006.50Energy Charges:Low SeasonPeak - 166.23Standard - 102.94Off- peak - 83.95Energy Charges:High SeasonPeak - 331.58Standard - 169.82Off- peak - 92.15Demand Charge:Reactive Energy Charge-22.40Demand Charge - 95.66Network access Charge-59.67

Govan Mbeki 6.84%

Domestic IndigentBlock 1(0- 50kWh) - 85.50Block 2(51-200kWh) - 104.33Block 3(201-350kWh) - 116.90Block 4(351 >600kWh) - 159.50Block 5(>600kWh) - 191.41

Domestic Prepaid & ConventionalBlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 159.50Block 4(>600kWh) - 191.41 Basic Charge - 150.56

Commercial Conventional & Pre-paid Single phase Basic Charge - 652.32Availability Charge - 91.98Network Charge-58.58Energy Charges:Low Season - 152.48High Season - 198.36

Commercial Conventional & Pre-paid Three phase Basic Charge - 1 008.47Availability Charge - 91.98Network Charge-58.58Energy Charges:Low Season - 149.63High Season - 198.36 Institutional Commercial Prepaid & ConventionalDemand Charge - 178.72Availability Charge - 91.98Capacity -58.58Energy Charges:Low Season - 152.48High Season - 198.36Reactive Energy High Season-15.35

N/A

Industrial High VoltageBasic Charge - 1 592.62Availability Charge - 91.98Network Charge-58.58Demand Charge Low Season - 193.13High Season - 206.01Energy Charges:Low SeasonPeak - 87.07Standard - 84.69Off- peak - 65.31Energy Charges:High SeasonPeak - 117.89Standard - 114.79Off- peak - 74.02

Industrial Time Of UseIndustrial Low VoltageBasic Charge - 1 592.62Availability Charge - 91.98Network Charge-58.58Demand Charge Low Season - 75.11High Season - 193.13Energy Charges:Low SeasonPeak - 94.52Standard - 92.33Off- peak - 85.78Energy Charges:High SeasonPeak - 136.22Standard - 124.85Off- peak - 69.29

Page 187: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

185

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Govan Mbeki(Continued)

Time Of Use-Domestic BulkBasic Charge - 413.62Availability Charge - 91.98Network Charge-58.58Demand Charge - 49.17Low SeasonPeak - 60.01Off-peak - 58.24Demand Charge - 57.95High Season Peak - 82.30Off-peak - 79.04Demand Charge - 73.28

Lekwa 6.84%

Three Phase PrepaidBlock 1(0-50kWh) - 96.82Block 2(51-350kWh) - 124.48 Block 3(351-600kWh) - 178.09Block 4(>600kWh) - 206.12Basic Charge - 318.90

Single PhaseBlock 1(0-50kWh) - 92.53Block 2(51-350kWh) - 117.88Block 3(351-600kWh) - 162.39Block 4(>600kWh) - 189.45Basic Charge - 78.27 Conventional /PostpaidBlock 1(0-50kWh) - 92.53Block 2(51-350kWh) - 117.88Block 3(351-600kWh) - 162.39Block 4(>600kWh) - 189.45Basic Charge - 115.37 Three Conventional/PostpaidBlock 1(0-50kWh) - 96.82Block 2(51-350kWh) - 124.48Block 3(351-600kWh) - 178.09Block 4(>600kWh) - 206.12Basic Charge - 336.93

Prepaid(Single phase:0-16kVA)Basic Charge - 280.04Energy Charge :Low Season-182.23High Season-211.00 Prepaid (Three Phase:25-100kVA)Basic Charge - 637.80Energy Charge :Low Season-185.87High Season-211.00

Conventional (Single Phase:0-16kVA)Basic Charge - 392.05Energy Charge :Low Season-168.10High Season-184.91 Conventional (ThreePhase:25-100kVA)Basic Charge - 892.93Energy Charge :Low Season-155.61High Season-169.39

Industrial Below 1MVABasic Charge - 4 435.89Energy Charge - 79.60Demand Charge - 211.15 Industrial (500kVA≤1MVA)Basic Charge - 4 774.71Energy Charge - 79.60Demand Charge - 211.15 Industrial (> 1MVA & ≤ 5MVA)Basic Charge - 5 137.20Energy Charge - 79.60Demand Charge - 211.15 Industrial (> 5MVA)Basic Charge - 5 505.36Energy Charge - 79.60Demand Charge - 211.15

N/A

N/A

Page 188: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

186

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City of Mbombela 6.84%

Domestic Indigent (Bushbuck)Block 1(0-50kWh) - 84.90Block 2(51-350kWh) - 118.38Block 3(351-600kWh) - 163.13Block 4(>600kWh) - 189.18

Domestic Block 1(0-50kWh) - 92.33Block 2(51-350kWh) - 121.40Block 3(351-600kWh) - 164.13Block 4(>600kWh) - 189.55 Umjindi:DomesticBlock 1(0-50kWh) - 92.33Block 2(51-350kWh) - 121.40 Block 3(351-600kWh) - 164.13Block 4(>600kWh) - 189.55

Mbombela:Elephant tariff 3Phase Prepaid & ConventionalFixed Charge - 717.00Energy Charge - 151.38 Prepaid MetersFixed Charge - 568.50Energy Charge - 151.38

Umjindi:Elephant Tariff 3PhaseConventional MetersBasic Charge - 717.00Energy Charge - 151.38

Mbombela: Low Tension- Lion TariffBasic Charge - 1 836.58Energy Charge - 111.93Demand Charge - 68.80Network Access - 76.67 Umjindi:Low tension-Lion TariffBasic Charge - 1 836.58Energy Charge - 106.24Demand Charge - 68.80Network Access - 76.67

Mbombela High Tension- Cheetah TariffBasic Charge - 2 566.30Energy Charge - 108.60Demand Charge - 65.92Network Access - 76.71 Umjindi High Tension- Cheetah TariffBasic Charge - 2 566.30Energy Charge - 108.60Demand Charge - 65.92Network Access - 76.71

Industrial Tariffs:Time Of Use(TOU)Time of Use-Nyala Low Tension Tariff Monthly Consumption of Plus 40MWhBasic Charge - 1 834.00Demand Charge - 54.32Network Access - 47.30Energy Charges: Low SeasonPeak - 171.40Standard - 122.00Off- peak - 82.00Energy Charges: High SeasonPeak - 401.30Standard - 160.10Off- peak - 92.80Reactive Energy - 21.90 Time of Use-Nyala High Tension Tariff Monthly Consumption of plus 40MWhBasic Charge - 2 563.52Demand Charge - 50.78Network Charge - 46.05Energy Charges: Low SeasonPeak - 162.90Standard -115.90Off- peak - 77.90Energy Charges: High SeasonPeak - 383.70Standard - 152.10Off- peak - 88.20Reactive Energy - 20.90

Page 189: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

187

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

City of Mbombela (Continued)

Time of Use-Warthog High Tension Tariff Monthly Consumption of plus 4 GWhBasic Charge - 143 146.00Demand Charge - 35.40Network Charge - 28.10Energy Charges: Low SeasonPeak - 128.40Standard -91.40Off-peak - 61.50Energy Charges: High SeasonPeak - 373.90Standard - 120.00Off- peak - 69.50Reactive Energy - 16.40

Mkhondo6.84%

Residential PrepaidBlock 1(0-50kWh) - 91.43Block 2(51-350kWh) - 117.16Block 3(351-600kWh) - 160.44Block 4(>600kWh) - 194.74Basic Charge - 104.93

Residential ConventionalBlock 1(0-50kWh) - 84.36Block 2(51-350kWh) - 108.97Block 3(351-600kWh) - 157.00Block 4(>600kWh) - 187.46Basic Charge - 104.93

N/A

Business (Small) <80A Single Phase & Business with kVABasic Charge - 403.30Energy Charge - 152.00 Business (Large) > 80 A SinglePhase & Business with kVABasic Charge - 802.54Energy Charge - 134.86

Industrial (Small)Less than 50kVA Maximum in every)Basic Charge - 1 651.73Energy Charge - 78.50Demand Charge - 209.50

Industrial (Large)(50kVA or more in any month in)Basic Charge - 1 849.37Energy Charge - 74.82Demand Charge - 209.50

N/A

MEGA6.84%

N/A

N/A

Commercial Prepaid & Municipality<=25kVAEnergy Charges - 185.78

N/A

Industrial >25kVA LTBasic Charge - 2 098.00Energy Charges :Winter - 96.54Summer - 68.80Demand Charge - 231.00

Industrial>25kVA HTBasic Charge - 2 098.00Energy Charges :Winter - 92.10Summer - 66.58Demand Charge - 220.00

N/A

Page 190: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

188

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

MEGA(Continued)

Municipal <=25kVAEnergy Charges - 183.58

Municipal >25kVAHTEnergy Charges :Winter - 90.15Summer - 63.77Demand Charge - 220.00

Msukaligwa6.84%

Residential Prepaid (Up to 20A)Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 191.03

Residential Conventional and Prepaid (Above 20A)Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 191.03Basic Charge - 152.39 Residential Conventional (Up to 20A)Block 1(0- 50kWh) - 91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 191.03

Business fixed Amp or Up to 20AmpEnergy Charge - 203.55 Departmental tariffEnergy Charge - 169.80

Business(EL 103)Above 20Amp 3PhaseBasic Charge - 3 842.76Energy Charge - 120.06 Business(EL 103)Above 20AmpBasic Charge - 1 285.33Energy Charge - 119.94

IndustrialBasic Charge - 5 144.29Energy Charge - 78.24Demand Charge - 203.55

N/A N/A

Nkomazi6.84%

Domestic PrepaidEnergy Charge - 164.52

ConventionalBasic Charge - 147.70Energy Charge - 134.79

DepartmentalEnergy Charge - 156.66

Conventional Single PhaseBasic Charge - 466.10Energy Charge - 152.70 Conventional Three PhaseBasic Charge - 814.44Energy Charge - 146.29

IndustrialBasic Charge - 1 251.64Energy Charge - 95.05Demand Charge - 193.15

N/A

N/A

Page 191: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

189

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Pixley ka Seme 6.84%

Domestic PrepaidBlock 1(0- 50kWh) - 103.56Block 2(51-350kWh) - 126.16Block 3(351-600kWh) - 161.07Block 4(>600kWh) - 189.98

Domestic ConventionalBlock 1(0- 50kWh) - 103.56Block 2(51-350kWh) - 126.16Block 3(351-600kWh) - 161.07Block 4(>600kWh) - 189.74Basic Charge - 133.00 Business/Farms (0-500kWh)Basic Charge - 272.66Energy Charge - 174.16 Business/Farms (above 500kWh)Basic Charge - 272.66Energy Charge - 185.53

Commercial Prepaid(0-500kWh)Energy Charge - 188.00 Commercial Prepaid (above 500kWh)Energy Charge - 203.77

Vacant StandBasic Charge - 272.66

Registered SME businesses (0-500kWh)Basic Charge - 136.38Energy Charge - 147.41 Registered SME businesses (above 500kWh)Basic Charge - 136.38Energy Charge - 169.59

IndustrialBasic Charge - 158.18Energy Charge - 111.31Demand Charge - 140.60

N/A N/A

Steve Tshwete 6.84%

Indigent 20ABlock 1(0- 50kWh) - 91.44Block 2(51-350kWh) - 119.76 Domestic (40A): LifelineBlock 1(0- 50kWh) - 104.56Block 2(51-350kWh) - 144.25Block 3(351-600kWh) - 163.91Block 4(>600kWh) - 181.86

Domestic High 80ABlock 1(0- 50kWh) - 94.13Block 2(51-350kWh) - 127.59Block 3(351-600kWh) - 160.16Block 4(>600kWh) - 180.28Basic Charge - 63.05 Domestic 3 Phase 80ABlock 1(0- 50kWh) - 94.13Block 2(51-350kWh) - 127.59Block 3(351-600kWh) - 160.16Block 4(>600kWh) - 180.28Basic Charge - 85.50

Business lifeline 40AEnergy Charge - 168.60 Departmental Levies & Sports ClubsEnergy Charge - 160.45

Single Phase ( 40A - 80A)Basic Charge - 17.58Energy Charge - 114.20 Three Phase ( 40A - 80A)Basic Charge - 52.78Energy Charge - 114.20 Schools & Welfare Organisations-80AEnergy Charge - 126.95 Street Light and Traffic ConsumptionEnergy Charge - 160.45Illumination Advert Signs-100.15

N/A

N/A

Time of UseLow Voltage: Three Phase Demand Scale >80ABasic Charge - 2 048.00Demand Charge - 49.07Network Access Charge-25.78Reactive Energy Charge - 23.50Energy Charges: Low SeasonPeak - 156.56Standard - 96.05Off- peak - 67.19High SeasonPeak - 371.59Standard - 142.15Off- peak - 75.97

Page 192: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

190

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Steve Tshwete(Continued)

11 000 - Three Phase Supply ScaleBasic Charge - 3 417.00Demand Charge - 46.76Network Access Charge-24.60Reactive Energy Charge - 22.40Energy Charges: Low SeasonPeak - 146.15Standard - 90.19Off- peak - 62.72High SeasonPeak - 331.58Standard - 132.37Off- peak - 70.82 Schools & Welfare Organisations-80A:Low VoltageBasic Charge - 1 535.44Demand Charge - 36.82Network Access Charge-19.38Reactive Energy Charge - 17.63Energy Charges:Low SeasonPeak - 117.43Standard -72.00Off- peak - 50.38High SeasonPeak - 278.67Standard - 106.54Off- peak - 57.00

Page 193: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

191

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Steve Tshwete(Continued)

Schools & Welfare Organisations-11 000VBasic Charge - 2 597.00Demand Charge - 35.53Network Access Charge-18.69Reactive Energy Charge - 16.52Energy Charges: Low SeasonPeak - 111.07Standard -68.13Off- peak - 47.66High SeasonPeak - 252.00Standard - 100.62Off- peak - 53.81

Thaba Chweu 7.66%

Residential:Houses/Flats(All Towns) Conventional and Prepaid ConsumersBlock 1(0- 50kWh) -91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.56 Residential:Indigent(All towns) Single Phase Single Phase 20Amps Single Phase Prepaid meter onlyBlock 1(0- 50kWh) -87.43Block 2(51-200kWh) - 91.67Block 3(201-350 kWh) - 117.56Block 4(351-600kWh) - 165.45Block 5 ( > 600kWh) - 194.56

Residential:Houses/Flats(All Towns) Conventional and Prepaid ConsumersBlock 1(0- 50kWh) -91.43Block 2(51-350kWh) - 117.56Block 3(351-600kWh) - 165.45Block 4(>600kWh) - 194.56

Commercial tariffs/Residential for Commercial/Government(All Towns) Up to 40A Single Phase (Pre-paid meter only)Fixed Charge-250.35Energy Charge :Low Season-137.05High Season-150.76 41A- 60A Single PhaseFixed Charge-544.52Energy Charge :Low Season-137.05High Season-150.76

Up to 80A Single Phase(All Towns)Fixed Charge-1 489.59Energy Charge :Low Season-124.91High Season-137.40 Up to 60A Three PhaseFixed Charge-1 733.69Energy Charge :Low Season-124.91High Season-137.40 61A up to 80Amps Three PhaseFixed Charge-1 977.78Energy Charge :Low Season-124.91High Season-137.40

N/A

Time Of Use(All Towns)Fixed Charge - 2 953.90Energy Charges: Low SeasonPeak - 130.62Standard - 114.70Off-Peak - 70.75High Season :Energy charges:Peak - 132.05Standard - 115.96Off-Peak - 71.53Demand Charge - Peak - 87.08Demand Charge - Standard - 76.19Demand Charge - Off-Peak - 54.42

Page 194: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

192

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Thaba Chweu(Continued)

Availability Charge:(Per Month)Fixed Charge-52.48 Undeveloped Stands(All towns)Fixed Charge-245.76

61A to 80A PhaseFixed Charge-712.96Energy Charge :Low Season-137.05High Season-150.76 Up to 80A ThreePhaseFixed Charge-891.47Energy Charge :Low Season-137.05High Season-150.76 A up to 80A Three PhaseFixed Charge-1 232.98Energy Charge :Low Season-137.05High Season-150.76 Above 80Amps convert to KVAMaximum demand(Low Voltage)Fixed Charge-2 548.94Energy Charge :Low Season-112.84High Season-124.12Demand Charge-192.22 Public Benefit Organisations(All Towns) Up to 80A Single PhaseFixed Charge-241.50Energy Charge :Low Season-126.24High Season-138.86

Above 80Amps converted to kVA Maximum Demand (Low Voltage)Fixed Charge-3 878.82

Time of Use(All towns)High VoltageFixed Charge - 3 098.36

Page 195: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

193

APPROVED MUNICIPAL ELECTRICITY TARIFFS

MPUMALANGA PROVINCEName of Licensee & Percetage Increase Domestic Low Domestic High Commercial Prepaid Commercial Conventional Industrial Low Industrial High Time of Use tariff

Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month Basic/Service/Fixed Charge: R/month

Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh Energy Charge: c/kWh

Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA Demand Charge: R/kVA

Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA Network Charge: R/kVA

Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh Reactive Energy Charge: c/kvarh

Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp Amp Charge: R/Amp

Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month Availability Charge: R/month

Up to 80A Three PhaseFixed Charge-336.10Energy Charge :Low Season-126.24High Season-138.86 Above 80Amps Converted to kVA Maximum Demand Low VoltageFixed Charge-2 106.92Energy Charge :Low Season-112.84High Season-124.12Demand Charge-186.22 Municipal Buildings (All towns)Energy charge-124.76

Victor Khanye 6.84%

Domestic IndigentBlock 1(0- 50kWh) - 78.76114.78Block 2(51-350kWh) - Block 3(351-600kWh) - 143.98Block 4(>600kWh) - 169.40

Domestic HighBlock 1(0- 50kWh) - 91.09Block 2(51-350kWh) - 116.89Block 3(351-600kWh) - 165.64Block 4(>600kWh) - 194.49Basic Charge - 148.41

N/A

Conventional Single Phase 70ABasic Charge - 698.18Energy Charge - 152.34 Conventional LowBasic Charge - 3 054.98Energy Charge - 96.88Demand charge - 180.84 Three Phase 100ABasic Charge - 1 103.27Energy Charge - 137.50

N/A

Industrial MediumBasic Charge - 5 234.70Energy Charge - 100.12Demand charge - 219.84

N/A

Page 196: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

194

APPROVED MUNICIPAL ELECTRICITY TARIFFS

NOTES

Page 197: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

195

APPROVED MUNICIPAL ELECTRICITY TARIFFS

Page 198: APPROVED MUNICIPAL ELECTRICITY TARIFFSnersa.org.za/Admin/Document/Editor/file/News and Publications... · APPROVED MUNICIPAL ELECTRICITY TARIFFS Definitions Basic charge covers the

196

APPROVED MUNICIPAL ELECTRICITY TARIFFS

Kulawula House, 526 Madiba Street | P.O. Box 40343, Arcadia, 0007, South Africa

Tel: +27 (0) 12 401 4600 | Fax: +27 (0) 12 401 4700

www.nersa.org.za | @NERSAZA | @NERSA_ZA