Appendix D TBM Tunnel Assumptions and Cost Estimating Output

Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Embed Size (px)

Citation preview

Page 1: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Appendix D TBM Tunnel Assumptions and Cost Estimating Output

Page 2: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Appendix D TBM Tunnel Assumptions and Cost Estimating Output

Discussion:

The tunnel costs were estimated using TBM cost estimating software and cost database developed by Hatch Mott MacDonald. Appendix D contains output from the software for each TBM type and tunnel diameter. Please note the following about the output:

1. ‘Rock Types’ are called ‘TBM Types’ in the main body of the report.

2. ‘Rock Type A/B’ is called ‘TBM Type B’ in the main body of the report.

3. The costs for concrete inverts were not included in the output in the appendices. These were added in the CNA cost estimating spreadsheet. The inverts are needed to provide a flat working surface. Inverts were added to TBM Types A and C only because it was assumed that the TBM Type B cast-in-place liner could be formed with a flat bottom.

4. The costs of grouting for water control were not included in the appendices. These were added in the CNA cost estimating spreadsheet. Grouting was added to TBM Types A and B only. TBM Type C is a sealed system that does not allow water to enter the tunnel so grouting is not required.

List of Abbreviations:

CIP Cast-in-place

H Hour

m2 Square meters of tunnel face

Nr Number (equivalent to ‘Each’)

W Week

mW per meter per week

kWh Kilowatt hour

l Liter

m Meter

m3 Cubic meter

Page 3: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Page 1 of 2

s:\fermi_vlhc\pm\reports\hmm assumptions.doc TEXT-P.DOT, 00/01v

Fermilab Tunnels

Cost Estimates

Assumptions

General

The following assumptions apply to all tunnel drives:

• 4800 metres of tunnel from shaft to shaft

• 2 ten hours shifts undertaken daily, 5 days per week

• Tunnels excavated using 3.66 metre or 4.88 metre finished diameter rock TBM

• 75 percent of TBM cost written off in first drive, 15 percent in second drive, 10 percent in third drive, and 0 percent in fourth and fifth drives

• Labour rates based on Minneapolis Project for Year 2001. (Similar to Illinois)

Specific

Assumptions used for 3.66m (12ft) diameter tunnel in Rock Type A as follows:

• No areas of difficult excavation

• A total of 400 3 metre long rockbolts installed sporadically in the tunnel crown in jointed or potentially weak zones

• Average tunnel advance rate of 225 metres per week

• No secondary lining required

Assumptions used for 3.66m (12ft) diameter tunnel in Rock Type A/B (requiring CIP liner) as follows:

• No areas of difficult excavation

• Three rockbolts, 3 metres in length, installed in each 6 metre length of tunnel

• Average tunnel advance rate of 211 metres per week

• Secondary cast-in-place concrete lining installed to prevent long term degradation of the rock

Assumptions used for 3.66m (12ft) diameter tunnel in Rock Type C as follows:

• Areas of difficult excavation encountered, slowing normal advance rate by 20 percent, over 20 percent of the tunnel length

Page 4: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Page 2 of 2

s:\fermi_vlhc\pm\reports\hmm assumptions.doc TEXT-P.DOT, 00/01v

• No primary support provided with a 200mm thick segmental concrete lining installed immediately behind the TBM following each excavation cycle

• Average tunnel advance rate of 102 metres per week

Assumptions used for 4.88m (16ft) diameter tunnel in Rock Type A as follows:

• No areas of difficult excavation

• A total of 400 3 metre long rockbolts installed sporadically in the tunnel crown in jointed or potentially weak zones

• Average tunnel advance rate of 225 metres per week

• No secondary lining required

Assumptions used for 4.88m (16ft) diameter tunnel in Rock Type A/B (requiring CIP liner) as follows:

• No areas of difficult excavation

• Three rockbolts, 3 metres in length, installed in each 4.5 metre length of tunnel

• Average tunnel advance rate of 195 metres per week

• Secondary cast-in-place concrete lining installed to prevent long term degradation of the rock

Assumptions used for 4.88m (16ft) diameter tunnel in Rock Type C as follows:

• Areas of difficult excavation encountered, slowing normal advance rate by 20 percent, over 20 percent of the tunnel length

• No primary support provided with a 225mm thick segmental concrete lining installed immediately behind the TBM following each excavation cycle

• Average tunnel advance rate of 102 metres per week

Page 5: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Fermilab Tunnels

Estimate Summary

12 ft dia tunnel (3.66 m)

Rock Type Tunnel Drive Tunnel Length Drive Cost TBM setup Total(m)

A First 4800 8,160,000 400,000 8,560,000A Second 4800 6,070,000 200,000 6,270,000A Third 4800 5,910,000 200,000 6,110,000A Fourth 4800 5,600,000 200,000 5,800,000A Fifth 4800 5,600,000 200,000 5,800,000

A/B with CIP First 4800 18,930,000 400,000 19,330,000A/B with CIP Second 4800 16,350,000 200,000 16,550,000A/B with CIP Third 4800 16,140,000 200,000 16,340,000A/B with CIP Fourth 4800 15,710,000 200,000 15,910,000A/B with CIP Fifth 4800 15,710,000 200,000 15,910,000

C First 4800 26,630,000 400,000 27,030,000C Second 4800 23,190,000 200,000 23,390,000C Third 4800 22,940,000 200,000 23,140,000C Fourth 4800 22,430,000 200,000 22,630,000C Fifth 4800 22,430,000 200,000 22,630,000

16 ft dia tunnel (4.88 m)

Rock Type Tunnel Drive Tunnel Length Drive Cost TBM setup Total(m)

A First 4800 10,930,000 400,000 11,330,000A Second 4800 7,360,000 200,000 7,560,000A Third 4800 7,080,000 200,000 7,280,000A Fourth 4800 6,520,000 200,000 6,720,000A Fifth 4800 6,520,000 200,000 6,720,000

A/B with CIP First 4800 24,410,000 400,000 24,810,000A/B with CIP Second 4800 20,160,000 200,000 20,360,000A/B with CIP Third 4800 19,810,000 200,000 20,010,000A/B with CIP Fourth 4800 19,100,000 200,000 19,300,000A/B with CIP Fifth 4800 19,100,000 200,000 19,300,000

C First 4800 33,360,000 400,000 33,760,000C Second 4800 27,830,000 200,000 28,030,000C Third 4800 27,400,000 200,000 27,600,000C Fourth 4800 26,550,000 200,000 26,750,000C Fifth 4800 26,550,000 200,000 26,750,000

Page 6: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 7: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 8: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 9: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 10: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 11: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 12: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 13: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 14: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 15: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 16: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 17: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 18: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 19: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 20: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 21: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 22: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 23: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 24: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 25: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 26: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 27: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 28: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 29: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 30: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 31: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 32: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 33: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 34: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 35: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 36: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 37: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 38: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 39: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 40: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 41: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 42: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 43: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 44: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 45: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 46: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 47: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 48: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 49: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 50: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 51: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 52: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 53: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 54: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 55: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 56: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 57: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 58: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 59: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 60: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 61: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 62: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 63: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 64: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 65: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 66: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 67: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 68: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 69: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 70: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 71: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 72: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 73: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 74: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 75: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 76: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 77: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 78: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 79: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 80: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 81: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 82: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 83: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 84: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Appendix E TBM Tunnel Assumptions and Cost Estimating Output (Not

Used)

Page 85: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Appendix E TBM Tunnel Assumptions and Cost Estimating Output (Not Used)

Discussion:

The tunnel costs were estimated using TBM cost estimating software and cost database developed by Hatch Mott MacDonald. Appendix E contains output from the software for TBM types and tunnel diameters not used in the final estimate, but is included here for completeness. Please note the following about the output:

1. ‘Rock Types’ are called ‘TBM Types’ in the main body of the report.

2. Appendix E contains Rock Types B and B+, which are not used in the final estimate.

List of Abbreviations:

CIP Cast-in-place

H Hour

m2 Square meters of tunnel face

Nr Number (equivalent to ‘Each’)

W Week

mW per meter per week

kWh Kilowatt hour

l Liter

m Meter

m3 Cubic meter

Page 86: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Page 1 of 2

s:\fermi_vlhc\pm\reports\hmm assumptions (not used).doc TEXT-P.DOT, 00/01v

Fermilab Tunnels

Cost Estimates

Assumptions

General

The following assumptions apply to all tunnel drives:

• 4800 metres of tunnel from shaft to shaft

• 2 ten hours shifts undertaken daily, 5 days per week

• Tunnels excavated using 3.66 metre or 4.88 metre finished diameter rock TBM

• 75 percent of TBM cost written off in first drive, 15 percent in second drive, 10 percent in third drive, and 0 percent in fourth and fifth drives

• Labour rates based on Minneapolis Project for Year 2001. (Similar to Illinois)

Specific

Assumptions used for 3.66m (12ft) diameter tunnel in Rock Type B as follows:

• Areas of difficult excavation encountered, slowing normal advance rate by 35 percent, over 20 percent of the tunnel length

• Tunnel support consists of 3 metre long rockbolts with steel straps, installed in sets of 3 in the tunnel crown, with each set spaced at 3 metre centres. Additional support in the form of 2 sq.m. of timber laggings per metre of tunnel and associated ribs over 50 percent of the tunnel length.

• Average tunnel advance rate of 122 metres per week

• No secondary lining required

Assumptions used for 3.66m (12ft) diameter tunnel in Rock Type B+ as follows:

• Areas of difficult excavation encountered, slowing normal advance rate by 35 percent, over 20 percent of the tunnel length

• Tunnel support consists of 3 metre long rockbolts with steel straps, installed in sets of 3 in the tunnel crown, with each set spaced at 3 metre centres. Additional support in the form of 2 sq.m. of timber laggings per metre of tunnel and associated ribs over 50 percent of the tunnel length.

• Average tunnel advance rate of 122 metres per week

• 300mm thick concrete secondary lining installed on completion of tunnel boring

Page 87: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Page 2 of 2

s:\fermi_vlhc\pm\reports\hmm assumptions (not used).doc TEXT-P.DOT, 00/01v

• Average lining installation rate of 225 metres per week

Assumptions used for 4.88m (16ft) diameter tunnel in Rock Type B as follows:

• Areas of difficult excavation encountered, slowing normal advance rate by 40 percent, over 20 percent of the tunnel length

• Tunnel support consists of 3 metre long rockbolts with steel straps, installed in sets of 3 in the tunnel crown, with each set spaced at 3 metre centres. Additional support in the form of 3 sq.m. of timber laggings per metre of tunnel and associated ribs over 50 percent of the tunnel length.

• Average tunnel advance rate of 114 metres per week

• No secondary lining required

Assumptions used for 4.88m (16ft) diameter tunnel in Rock Type B+ as follows:

• Areas of difficult excavation encountered, slowing normal advance rate by 40 percent, over 20 percent of the tunnel length

• Tunnel support consists of 3 metre long rockbolts with steel straps, installed in sets of 3 in the tunnel crown, with each set spaced at 3 metre centres. Additional support in the form of 3 sq.m. of timber laggings per metre of tunnel and associated ribs over 50 percent of the tunnel length.

• Average tunnel advance rate of 114 metres per week

• 300mm thick concrete secondary lining installed on completion of tunnel boring

• Average lining installation rate of 225 metres per week

Page 88: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated

Fermilab Tunnels

Estimate Summary

12 ft dia tunnel (3.66 m)

Rock Type Tunnel Drive Tunnel Length Drive Cost TBM setup Total(m)

B First 4800 13,900,000 400,000 14,300,000B Second 4800 11,570,000 200,000 11,770,000B Third 4800 11,390,000 200,000 11,590,000B Fourth 4800 11,030,000 200,000 11,230,000B Fifth 4800 11,030,000 200,000 11,230,000

B+ First 4800 23,380,000 400,000 23,780,000B+ Second 4800 20,610,000 200,000 20,810,000B+ Third 4800 20,400,000 200,000 20,600,000B+ Fourth 4800 19,970,000 200,000 20,170,000B+ Fifth 4800 19,970,000 200,000 20,170,000

16 ft dia tunnel (4.88 m)

Rock Type Tunnel Drive Tunnel Length Drive Cost TBM setup Total(m)

B First 4800 17,740,000 400,000 18,140,000B Second 4800 13,560,000 200,000 13,760,000B Third 4800 13,250,000 200,000 13,450,000B Fourth 4800 12,610,000 200,000 12,810,000B Fifth 4800 12,610,000 200,000 12,810,000

B+ First 4800 29,000,000 400,000 19,031,000B+ Second 4800 24,380,000 200,000 14,206,000B+ Third 4800 24,020,000 200,000 13,852,000B+ Fourth 4800 23,320,000 200,000 13,144,000B+ Fifth 4800 23,320,000 200,000 13,144,000

Page 89: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 90: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 91: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 92: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 93: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 94: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 95: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 96: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 97: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 98: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 99: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 100: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 101: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 102: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 103: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 104: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 105: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 106: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 107: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 108: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 109: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 110: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 111: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 112: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 113: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 114: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 115: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 116: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 117: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 118: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 119: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 120: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 121: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 122: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 123: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 124: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 125: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 126: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 127: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 128: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 129: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 130: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 131: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 132: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 133: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 134: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 135: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 136: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 137: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 138: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 139: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 140: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 141: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated
Page 142: Appendix D TBM Tunnel Assumptions and Cost - VLHCvlhc.org/cna/hmm_appendix.pdf · Appendix D TBM Tunnel Assumptions and Cost Estimating Output Discussion: The tunnel costs were estimated