APP CHK BY NO. REVISIONS AND RECORD OF USE heating system water return heating system water supply water,

  • View
    0

  • Download
    0

Embed Size (px)

Text of APP CHK BY NO. REVISIONS AND RECORD OF USE heating system water return heating system water supply...

  • D 1

    0 0

    0 0

    PROJECT NO.

    SHEET

    OF

    0 11/2

    IF THIS BAR DOES NOT

    MEASURE 1" THEN DRAWING

    IS NOT TO FULL SCALE

    DATE:

    DESIGNED:

    APPROVED:

    CHECKED:

    DETAILED:

    R E

    V I S

    I O

    N S

    A

    N D

    R

    E C

    O R

    D O

    F U

    S E

    N O

    . B

    Y C

    H K

    A P

    P D

    A T

    E

    C I T

    Y O

    F L

    A K

    E O

    S W

    E G

    O

    R I V

    E R

    I N

    T A

    K E

    P

    U M

    P S

    T A

    T I O

    N U

    P G

    R A

    D E

    S

    VICINITY MAP

    RIVER INTAKE PUMP STATION UPGRADES

    WORK ORDER NO. 290

    DRAWINGS

    OCTOBER 2019

    NO SCALE

    W

    D

    a

    r

    t

    m

    o

    u

    t

    h

    S

    t

    W

    C

    l a

    r

    e

    n

    d

    o

    n

    S

    t

    P

    o

    r

    t

    l a

    n

    d

    A

    v

    e

    B

    a

    r

    t

    o

    n

    A

    v

    e

    205p

    205p

    ~

    W

    i

    l

    l

    a

    m

    e

    t

    t

    e

    R

    i

    v

    e

    r

    ~

    R

    i

    v

    e

    r

    ~

    ~

    C

    l

    a

    c

    k

    a

    m

    a

    s

    R

    i v

    e

    r ~

    ~Clackamas

    213

    C

    a

    s

    c

    a

    d

    e

    H

    w

    y

    E Clackamas Blvd

    W

    C

    l

    a

    c

    k

    a

    m

    a

    s

    B

    l

    v

    d

    W

    A

    r

    l i n

    g

    t

    o

    n

    S

    t

    E

    A

    r

    l i n

    g

    t

    o

    n

    S

    t

    C

    l

    a

    c

    k

    a

    m

    a

    s

    R

    i

    v

    e

    r

    D

    r

    W

    a

    s

    h

    i n

    g

    t

    o

    n

    S

    t

    S

    A

    g

    n

    e

    s

    A

    v

    e

    M c L o u g h l i n B

    l v d

    S

    E

    R

    i

    v

    e

    r

    R

    d

    99E

    W

    G

    l o

    u

    c

    e

    s

    t

    e

    r

    S

    t

    8

    2

    n

    d

    D

    r

    B

    e

    l l e

    v

    u

    e

    A

    v

    e

    C

    o

    r

    n

    e

    l

    l

    A

    v

    e

    F r o n t A

    v e

    A

    p p e r s o n B

    l v d

    S H

    u n t e r A

    v e

    RIPS

    Gladstone

    Portland

    Springfield

    Eugene

    Roseburg

    Bend

    Medford

    Grants Pass

    Salem

    Tigard

    LOCATION MAP

    NO SCALE

    PROJECT

    LOCATION

    WASHINGTON

    IDAHO

    NEVADA

    CALIFORNIA

    5p

    5p

    OREGON

    P a c i f i c O

    c e a n

    Lake Oswego

    Gladstone

    VOLUME 2 OF 2

    DEFERRED SUBMITTALS

    THE FOLLOWING DEFERRED SUBMITTALS SHALL BE SUBMITTED IN THEIR ENTIRETY TO THE

    OWNER AND ENGINEER OF RECORD FOR REVIEW AND BUILDING DEPARTMENT APPROVAL A

    MINIMUM OF 21 DAYS PRIOR TO FABRICATION. ALL DEFERRED SUBMITTALS SHALL BE STAMPED

    AND SIGNED BY A DESIGN PROFESSIONAL PRIOR TO SUBMITTAL.

    1. SEISMIC ANCHORAGES OF MECHANICAL AND ELECTRICAL EQUIPMENT.

    P L

    O T

    T E

    D : 9

    / 3

    0 / 2

    0 1 9 1

    2 : 3 9 P

    M F

    I L E

    : C

    : \ p w

    _ w

    o r k i n

    g \ b

    v w

    _ a

    m e

    r i c a

    s \ d

    0 8

    7 1

    8 2

    5 \ G

    - 0

    1 . d

    w g

    F D

    9 0

    0 0

    A

    ISSUED FOR BID

    G E

    N E

    R A

    L

    C O

    V E

    R S

    H E

    E T

    A

    N D

    L

    O C

    A T

    I O

    N M

    A P

    G-01

    1 24

    402864

    CRT

    RLF

    JAM

    NEB

    OCTOBER 2019

    Di gi

    ta lly

    S ig

    ne d

  • RIVER INTAKE PUMP STATION UPGRADE PROJECT

    SHEET

    NO.

    DRAWING

    NO.

    SHEET TITLE

    GENERAL DRAWINGS

    1 G-01 COVER SHEET AND LOCATION MAP

    2 G-02 LIST OF DRAWINGS

    3 G-03 GENERAL NOTES AND AGENCY APPROVALS

    4 G-04 STANDARD LEGENDS

    5 G-05 ABBREVIATIONS

    CIVIL DRAWINGS

    6 C-01 OVERALL SITE PLAN

    MECHANICAL DRAWINGS

    7 M-01 MECHANICAL LEGEND, ABBREVIATIONS, GENERAL NOTES

    8 M-02 OPERATIONS LEVEL PIPING PLAN

    9 M-03 PUMP LEVEL ENLARGED PLAN AND SECTION

    10 MD-1 MECHANICAL DETAILS

    ELECTRICAL DRAWINGS

    11 E-01 ELECTRICAL LEGEND AND ABBREVIATIONS

    12 E-02 POWER DISTRIBUTION FUNCTIONAL DIAGRAM

    13 E-03 OPERATIONS LEVEL POWER PLAN

    14 E-04 PUMP LEVEL POWER PLAN

    15 E-05 SWITCHBOARD SINGLE LINE DIAGRAM AND ELEVATIONS

    16 E-06 MISCELLANEOUS SINGLE LINE DIAGRAMS

    17 E-07 PLC SINGLE LINE DIAGRAMS

    18 E-08 ELECTRICAL SCHEMATICS

    INSTRUMENTATION DRAWINGS

    19 I-01 P&ID - LEGENDS & ABBREVIATIONS SHEET 1 OF 3

    20 I-02 P&ID - LEGENDS & ABBREVIATIONS SHEET 2 OF 3

    21 I-03 P&ID - LEGENDS & ABBREVIATIONS SHEET 3 OF 3

    22 I-04 P&ID - RIVER INTAKE PUMP STATION

    23 I-05 CONTROL SYSTEM BLOCK DIAGRAM

    24 I-06 INSTALLATION DETAILS

    D 1

    0 0

    0 0

    PROJECT NO.

    SHEET

    OF

    0 11/2

    IF THIS BAR DOES NOT

    MEASURE 1" THEN DRAWING

    IS NOT TO FULL SCALE

    DATE:

    DESIGNED:

    APPROVED:

    CHECKED:

    DETAILED:

    R E

    V I S

    I O

    N S

    A

    N D

    R

    E C

    O R

    D O

    F U

    S E

    N O

    . B

    Y C

    H K

    A P

    P D

    A T

    E

    C I T

    Y O

    F L

    A K

    E O

    S W

    E G

    O

    R I V

    E R

    I N

    T A

    K E

    P

    U M

    P S

    T A

    T I O

    N U

    P G

    R A

    D E

    S

    P L

    O T

    T E

    D : 9

    / 3

    0 / 2

    0 1 9 1

    2 : 4 0 P

    M F

    I L E

    : C

    : \ p w

    _ w

    o r k i n

    g \ b

    v w

    _ a

    m e

    r i c a

    s \ d

    0 8

    7 1

    8 2

    5 \ G

    - 0

    2 . d

    w g

    F D

    9 0

    0 0

    A

    ISSUED FOR BID

    G E

    N E

    R A

    L

    L I S

    T O

    F D

    R A

    W I N

    G S

    G-02

    2 24

    402864

    CRT

    RLF

    JAM

    NEB

    OCTOBER 2019

    Di gi

    ta lly

    S ig

    ne d

  • D 1

    0 0

    0 0

    PROJECT NO.

    SHEET

    OF

    0 11/2

    IF THIS BAR DOES NOT

    MEASURE 1" THEN DRAWING

    IS NOT TO FULL SCALE

    DATE:

    DESIGNED:

    APPROVED:

    CHECKED:

    DETAILED:

    R E

    V I S

    I O

    N S

    A

    N D

    R

    E C

    O R

    D O

    F U

    S E

    N O

    . B

    Y C

    H K

    A P

    P D

    A T

    E

    C I T

    Y O

    F L

    A K

    E O

    S W

    E G

    O

    R I V

    E R

    I N

    T A

    K E

    P

    U M

    P S

    T A

    T I O

    N U

    P G

    R A

    D E

    S

    1. HORIZONTAL CONTROL: COORDINATES ARE BASED ON NAD83.

    COORDINATES ON STRUCTURES DEPICT THE EXTERIOR FACE OF THE

    CONCRETE SUBSTRUCTURE FOUNDATION WALL OR FOOTING WALL.

    2. VERTICAL CONTROL: ELEVATIONS ARE BASED ON NGVD 29.

    BENCHMARKS AND/OR STRUCTURE ELEVATIONS FROM EXISTING

    SURVEYS OR REFERENCE DRAWINGS MAY RESULT IN VARIANCES

    WITH ELEVATIONS INDICATED ON THE DRAWINGS FOR EXISTING

    FACILITIES.

    3. THE PROJECTED 100 YEAR FLOOD ELEVATION IS 44.5 NGVD 29 AND

    THE PROJECTED 500 YEAR FLOOD ELEVATION IS 52.5 NGVD 29.

    4. "SCREENED" (LIGHT) DELINEATION INDICATED ON THE DRAWINGS

    DENOTES EXISTING FACILITIES. "SCREENED" INFORMATION WAS

    TAKEN FROM EXISTING CONSTRUCTION DRAWINGS AND DATA, IS FOR

    REFERENCE ONLY, AND SHALL BE FIELD VERIFIED BY THE

    CONTRACTOR PRIOR TO THE ORDERING OF MATERIALS AND

    BEGINNING OF CONSTRUCTION. "BOLD" DELINEATION IS NEW WORK

    TO BE CONSTRUCTED UNDER THIS CONTRACT.

    5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF

    ALL PROPERTY CORNER MARKERS. PROPERTY CORNER MARKERS

    DAMAGED BY CONSTRUCTION ACT