June 2003
Township of Red Rock
r e d r o c k m a r i n a p h a s e I I f e a s i b i l i t y s t u d y
T a b l e o f C o n t e n t s
ACKNOWLEDGEMENTS
EXECUTIVE SUMMARY
1.0 INTRODUCTION 1
1.1 Study Objectives 1
1.2 Summary of Public Consultation Process 2
2.0 BACKGROUND STUDY REVIEW 4
2.1 Brief History of Red Rock 4
2.1.1 Historical Uses of the Waterfront 6
2.2 Overview of the Previous Studies & Master Plans 6
2.3 Summary of Waterfront Improvements to Date 7
2.4 National Marine Conservation Area 8
2.5 Great Lakes Heritage Coast 11
3.0 INVENTORY AND ANALYSIS 15
3.1 The Study Site 15
3.2 Current “State of the Waterfront” Assessment 16
3.2.1 Marina Basin 16
i. Navigation/Identification 16
ii. Breakwater 16
Red Rock Park and Marina Phase II Feasibility Study
June 2003
iii. Docking Facilities 16
iv. Marina Services and Operations 16
v. Boat Launch 17
vi. Parking 17
vii. Boat Storage 17
viii. Marina Lighting, Safety and Security 17
3.2.2 Pul-a-Log Park 18
i. Access 18
ii. Pedestrian and Vehicular Circulation 18
iii. Boardwalk 18
iv. Existing Buildings/Structures 18
v. Lighting and Infrastructure 18
vi. Landscaping 19
vii. Recreational Use 19
viii. Parking 19
3.2.3 NORAMPAC Inc. 20
3.2.4 Habitat Initiatives 21
3.2.5 Community Context and Adjacent Land Uses 21
3.3 Land Ownership 22
3.4 Summary of Stakeholders 23
3.4.1 Community Members 23
3.4.2 Township of Red Rock 23
3.4.3 NORAMPAC Inc. 24
3.4.4 Red Rock Historical Society 24
3.4.5 “Live from the Rock” Blues & Folk Society 24
3.4.6 Red Rock Fish & Game Club 25
3.4.7 National Marine Conservation Area 25
& Great Lakes Heritage Coast
3.4.8 Provincial and Federal Ministries/Agencies 25
Red Rock Park and Marina Phase II Feasibility Study
June 2003
4.0 ISSUES AND OPPORTUNITIES 27
4.1 Summary of Key Issues 27
4.2 Summary of Opportunities 27
4.2.1 Integration with NMCA Initiatives 28
4.2.2 Integration with GLHC Initiatives 28
4.2.3 Recreational Boater/Tourism Market 30
4.2.4 Opportunities for Marina and Waterfront 30
Improvements
4.2.5 Connections and Linkages 31
4.3 Summary of Potential Constraints 31
5.0 CONCEPTUAL WATERFRONT MASTER PLAN 32
5.1 Conceptual Master Plan 32
5.2 Design Brief 35 5.2.1 Marina and Marina Services 35
5.2.2 Waterfront Centre Building 36
5.2.3 RV Park and Campground 40
5.2.4 Vehicular Access 41
5.2.5 Parking and Vehicular Circulation 41
5.2.6 Pedestrian Circulation 42
5.2.7 Pul-a-Log Park 42
5.2.8 Plantings 44
5.2.9 Habitat Enhancement Opportunities 45
5.2.10 Additional Angling Opportunities 46
5.2.11 Recreational Facilities 46
5.3 Preliminary Cost Estimate 47
Red Rock Park and Marina Phase II Feasibility Study
June 2003
6.0 IMPLEMENTATION PRIORITIES & PHASING STRATEGY 54
6.1 Introduction 54
6.2 Implementation Priorities 55
6.2.1 Implementation Priority No. 1 55
6.2.2 Implementation Priority No. 2 56
6.2.3 Implementation Priority No. 3 56
6.3 Phasing Strategy 57
6.4 Phasing Summary 66
7.0 LAND OWNERSHIP & OPERATIONS STRATEGY 67
7.1 Township of Red Rock Ownership & Operation 67
7.2 Township Ownership/Private Lease Combination 68
8.0 TOURISM AND MARKETING ANALYSIS 69
8.1 Introduction 69
8.2 Current Marina Operation and Profitability 70
8.2.1 Current Utilization 70
8.2.2 Financial Performance 71
8.3 Additional Demand Projections 72
8.3.1 Potential Sources of Additional Demand 72
8.3.2 Demand Projections 74
8.3.3 Integration with the Waterfront Master Plan 75
8.4 Profitability of an Expanded Marina Operation at 76
Red Rock
8.4.1 Profitability of the Marina Operation Itself 76
8.4.2 Economic Impact on the Community 77
Red Rock Park and Marina Phase II Feasibility Study
June 2003
Red Rock Park and Marina Phase II Feasibility Study
8.5 Market Potential of an RV Park and Campground 78
8.5.1 Introduction 78
8.5.2 Potential Demand 79
8.5.3 Development Concept and Capacity 79
8.5.4 Occupancy and Utilization 79
9.0 PARTNERSHIP AND FUNDING OPPORTUNITIES 82
9.1 Introduction 82
9.2 Partnership Opportunities 83
9.3 Funding Opportunities 84
9.4 Next Steps 84
10.0 MANAGEMENT & MAINTENANCE PLAN 80
10.1 Introduction 80
10.2 Potential Management & Maintenance Model 81
11.0 CONCLUSION 82
11.1 Conclusion 82
APPENDIX
Appendix A – Proposed Waterfront Centre Building program
June 2003
Township of Red Rock
r e d r o c k m a r i n a p h a s e I I f e a s i b i l i t y s t u d y
L i s t o f F i g u r e s a n d T a b l e s
Table 2.1 Previous Waterfront Studies 7
Figure 2.1 Proposed National Marine Conservation Area 9
Figure 2.2 Great Lakes Heritage Coast Boundary 12
Figure 5.1 Waterfront Master Plan 34
Figure 5.2 Waterfront Centre Building Rendering 37
Figure 5.3 Waterfront Centre Floorplan & Elevation 38
Figure 5.4 Waterfront Centre Elevations 39
Figure 5.5 Bandshell and Events Lawn Rendering 43
Table 5.1 Preliminary Cost Estimate 48
Table 6.1 Phasing Strategy 58
Figure 6.1 Phasing Strategy Plan 65
Table 8.1 Current Marina Utilization 70
Table 8.2 Marina Revenue 71
Table 8.3 Effective Operating Subsidy 71
Table 8.4 Forecast Marina Profitability 77
Table 8.5 Demand for Campground Relative to Market 80
Table 9.1 Potential Funding Agency Contacts 85
Red Rock Park and Marina Phase II Feasibility Study
June 2003
Township of Red Rock
r e d r o c k m a r i n a p h a s e I I f e a s i b i l i t y s t u d y
A c k n o w l e d g e m e n t s
The following members of the Red Rock community were generous with their time,
enthusiasm and ideas; we thank them for their participation in the various stakeholder
meetings and public meetings (with our apologies for any misspelled names):
Jeannette Barr
Richard Cormier
Rose Ann Crevier
Brian Davis
Tracy Enders
Doug Garlick
Mic Groulx
Harriet Hanson
Liz Harvey-Foulds
John Humphrey
Rita Imhoff
Vincent Kennesy
Dale Kivilahti
Erin Langevin
Lewis Martin
Kathleen McFadden
Lorne Morrow
Dave Petterson
Tony Pimeau
Diane Poulin
Doug Poulin
Kal Pristanski
Danny Saunders
Bill Scott
Donna Smeltzer
Murray Smeltzer
Sam Soblesh
Judith Soblesh
Helge Swanson
Judy Swanson
Joe Williams
Stan Zapcic
Carol Zechner
John Zechner
Red Rock Park and Marina Phase II Feasibility Study
June 2003
Township of Red Rock
r e d r o c k m a r i n a p h a s e I I f e a s i b i l i t y s t u d y
E x e c u t i v e S u m m a r y
Building upon the success of the first phase of waterfront improvements at Red
Rock, the Township of Red Rock initiated this Phase II Feasibility Study to address
further improvements to the waterfront and the exploration of opportunities
associated with the proposed National Marine Conservation Area (Parks Canada)
and the Great Lakes Heritage Coast (Ministry of Natural Resources).
After the completion of background study reviews, stakeholder interviews and a
public brainstorming workshop, the preliminary waterfront master plan was
developed and presented to the public for feedback. Comments received from the
public were very positive; refinements were made to the master plan and study and
the final findings were presented to the public in May 2003. This final report is the
result of the combined efforts of the Township of Red Rock, members of the
community and the consultant team.
The three main issues associated with further waterfront improvements were
determined to be the following:
i. land ownership
ii. National Marine Conservation Area and Great Lakes Heritage Coast
involvement
iii. marina function
An agreement in principle has been reached to transfer the ownership of the study
lands from NORAMPAC Inc. to the Township of Red Rock, and it is strongly
recommended that any further proposed improvements to the Red Rock waterfront
be planned with a conscious awareness of the overall goals and objectives of both
the National Marine Conservation Area and the Great Lakes Heritage Coast.
Red Rock Park and Marina Phase II Feasibility Study
June 2003
Red Rock Park and Marina Phase II Feasibility Study
Key components of the master plan include the following:
marina improvements/expansion to accommodate larger boats
multi-functional marina building
RV park
campground
Pul-a-Log Park improvements
multi-functional bandshell
additional habitat creation
additional angler opportunities
additional plantings
walking trails/connections and boardwalk extension
natural interpretation area north of Big Trout Creek
long-term parking and boat storage
With the objective of enhancing the position of the Township of Red Rock in terms of
capitalizing on funding opportunities, it is important that several activities be initiated
immediately:
i. land securement
ii. environmental assessment
iii. continued communication with potential funding and implementation
partners
As part of the scope of work for this study, the consultant team met with numerous
potential partners and funding agencies. Response to the concept was consistently
positive and encouraging. As a result, significant opportunities exist to obtain
funding from FedNor, the Trillium Foundation, the Great Lakes Renewal Foundation,
Parks Canada (NMCA) and the Ministry of Natural Resources (Great Lakes Heritage
Coast and Ontario Living Legacy Trust). A number of local organizations were also
consulted and it is anticipated that they will act as participants and partners in any
further waterfront improvements.
As stated in the feasibility study, the phasing of implementation of various
components of the Master Plan will be determined in large part by the timing of the
NMCA and GLHC initiatives and the availability of funding from other sources. It is
recommended that improvements be phased over a five-year implementation
period – while allowing for flexibility depending upon funding availability.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
1
Township of Red Rock
r e d r o c k m a r i n a p h a s e I I f e a s i b i l i t y s t u d y
1 . 0 I N T R O D U C T I O N
The Red Rock waterfront – with the simple complexity of its
northern beauty and its scenic character, as eloquently
captured by A.Y. Jackson – has the potential to become a
regional tourist destination and a significant node along the
Great Lakes Heritage Coast. With the successes of previous
planning and implementation initiatives already well
documented and widely applauded, Red Rock is poised to
build upon the momentum and achievement of the past to
ensure a socially, economically and ecologically healthy future.
At this point in the region’s development, by taking the time to
objectively assess the strides that have been accomplished
thus far, the preparation of this feasibility study for Phase II of
the Red Rock Park & Marina will be a useful tool for
determining the next steps in the development of the
waterfront.
1.1 STUDY OBJECTIVES
The Township of Red Rock initiated a Waterfront Master Plan study in 1991, and this
plan resulted in the implementation of a number of significant waterfront
improvements in Red Rock as part of the first phase of work. An innovative and
award-winning “living breakwater” was constructed in 1993-1994 in order to create
a safe marina basin; additional phase one improvements included a service dock
(fuel, pump-out services and concession sales), docking facilities for a number of
small boats, two habitat enhancement islands, an illuminated boardwalk and
waterfront park landscaping.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
2
Building upon the success of the first phase of waterfront improvements, the
Township of Red Rock initiated this phase two feasibility study in the fall of 2002.
Since the initial waterfront study (1991), Parks Canada has announced the proposed
development of a National Marine Conservation Area (NMCA) and the Ontario
Provincial Government has announced the creation of the Great Lakes Heritage
Coast (GLHC) initiative. Red Rock is located within the proposed boundaries of both
the NMCA and GLHC, and as such the objectives of this feasibility study include the
identification of recreational and economic opportunities (in relation to both the Red
Rock town site and the surrounding region) associated with these two significant
initiatives. The original Waterfront Master Plan will act as the foundation for
recommended phase two improvements.
The specific objectives for this feasibility study, as stated in the project Terms of
Reference (July 2002) include the following tasks:
review, make recommendations on and prepare cost estimates for
outstanding waterfront components;
prepare cost benefit analysis and preliminary design for new marina building;
identify potential partners;
identify a theme, design and estimate for ways to enhance and promote
economic and recreational opportunities in Red Rock and surrounding areas;
identify primary and secondary employment opportunities;
explore development of an RV Park and long-term parking facility;
explore the development of a deep water docking facility;
review and assess operations to date;
identify opportunities to be developed in concert with the GLHC and NMCA
goals and objectives;
identify potential funding sources.
1.2 SUMMARY OF PUBLIC CONSULTATION PROCESS
The Red Rock waterfront – despite its potentially increasing value and reputation to
tourists and federal and provincial agencies – belongs first and foremost to the
residents of the community of Red Rock. Integral to the success of any future
improvements at the Red Rock waterfront is the consideration of the views, wishes
June 2003
Red Rock Park and Marina Phase II Feasibility Study
3
and feedback presented by members of the community and the Township of Red
Rock.
The preparation of this feasibility study involved the following opportunities for
gathering public feedback:
i. Local Stakeholder Interviews (October 2002)
- Township of Red Rock
- Red Rock Historical Society
- Red Rock Horticultural Society
- Live from the Rock Blues & Folk Society (via telephone)
ii. Public Meeting No. 1 (October 2002)
A public meeting was held to share ideas and discuss issues related
to the phase 2 development of the Red Rock Marina. Members of the
public provided valuable insight into the function of the existing
waterfront amenities, the patterns of use by community members and
the community vision, goals and expectations for the second phase of
waterfront improvements. The information, ideas and concerns
voiced formed the foundation for this feasibility study.
iii. Public Meeting No. 2 (January 2003)
The preliminary master plan for the phase II improvements was
presented to members of the public at an informal open house to
receive input and comments on the preliminary master plan.
Feedback from the public was very positive, and this preliminary
master plan for phase II improvements was further refined and
resulted in the master plan contained within this document.
iv. Public Meeting No. 3 (May 2003)
Upon completion of the master plan and final draft of this report, a final
public meeting was facilitated to present the findings of this feasibility
study to representatives of the community and the Township of Red
Rock.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
4
2 . 0 B A C K G R O U N D S T U D Y R E V I E W
The Red Rock Waterfront & Marina have been the focus of several
comprehensive studies and precedent-setting implementation
projects over the past decade. In the process of preparing of this
feasibility study, it was imperative to consider the results of previous
project work, research and waterfront studies as a starting point for
this next phase of study. An overview of the previous Master Plan
(1991) and a summary of waterfront improvements implemented to
date are addressed in the following sections of this document.
The improvement and expansion of services at the Red Rock
waterfront is a potentially long-term project with subsequent long
lasting potential benefits. While it is recognized that current Council
members, residents and stakeholders have an intrinsic and deep-
rooted knowledge of the history of the area, the following information is
included as part of this report for the benefit of people who may
become involved in the project in the future who do not possess a
thorough understanding of the unique history of Red Rock. It is our
hope that this document may act as a case study for future projects in
other regions, and the following information includes important
contextual references.
2.1 BRIEF HISTORY OF RED ROCK
Red Rock – whose name reflects the large red cuesta rock formation located along
Highway 17 between Red Rock and Nipigon – has grown from a small, isolated rural
Northern Ontario settlement into a well-established community.
Prior to the 1920s, Red Rock was a small rural community of widely scattered farms
and was accessible only by rail. The settlers were mostly of Finnish heritage, and
they made their living from raising hay and root crops and cutting pulp to be sold for
firewood. The construction of the Nipigon Highway in the 1920s was soon followed
by the construction of the first school and a general improvement in overall living
conditions in the town. In 1936, The Lake Superior Sulphite Pulp and Paper
June 2003
Red Rock Park and Marina Phase II Feasibility Study
5
Company purchased property, including the present town site, for the construction of
a paper mill. The current town site was literally carved from the forest along the
edge of Lake Superior. As the mill and town site were under development, the Red
Rock Inn and Quebec Lodge were also constructed – and they remain in operation
to this day.
The construction of the mill and town site was halted in 1937 when The Lake
Superior Sulphite Pulp and Paper Company went into receivership. In 1940, the
abandoned site was bought by the Canadian government to house a prisoner of war
camp that encompassed the area from Trout Creek in the north to the railway tracks
in the west and the Lake to the east. A total of 1145 prisoners were housed in the
camp for eighteen months until its closure in 1941.
Construction on the mill was restarted in 1944, and the Improvement District of Red
Rock was incorporated in 1945, followed closely by the start of production at the mill.
The construction of the town site was completed, and by 1945 there were nearly 100
new homes ready for use by the mill employees.
Over subsequent years, amenities have been added to the town site to
accommodate the needs of the population. Operations at the mill continued to
expand and respond to environmental concerns, and the Town was incorporated as
a Township in 1980. In the 1990s, the newsprint operation at the mill was shut
down, and production was converted from newsprint to craft board. The work force
at the mill was significantly downsized, and the need for a secondary industry for the
area was first identified.
After the downsizing of the mill in the 1990s, NORAMPAC Inc. purchased the mill
and productivity increased significantly.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
6
2.1.1 Historical Uses of the Waterfront
As with most waterfront communities along the North Shore of Lake Superior,
the initial uses associated with the Red Rock waterfront were purely utilitarian
in nature. The town site was constructed in order to provide the support
needed to run the mill – and the mill site was chosen due to its proximity to
Lake Superior.
As outlined above, the current waterfront had a very unique use in the early
1940s while the prisoner of war camp was in operation; after the demolition
of the camp, the mill was finished and the waterfront was primarily used for
mill operations purposes. In 1973, the era of the river drive ended, meaning
that wood no longer arrived at the mill by water; as a result, the iconic
“slasher-reclaimer” was demolished and a waterfront landmark – both from
the land and the water – was lost.
At present, the operation of the mill is dependent upon the use of the railway
lines and roads that lead directly to the mill. The railway lines were built at a
time when access to the waterfront for recreation and tourism was neither
needed nor even contemplated. As a result, the placement of the train tracks
resulted in a significant physical and figurative barrier between the town site
and the waterfront continues to pose challenges to waterfront development.
2.2 OVERVIEW OF PREVIOUS STUDIES AND MASTER PLANS
As summarized in the 1991 Red Rock Waterfront Study (Marshall Macklin
Monaghan Limited, 1991), a marina development for Red Rock was first proposed
in the Red Rock Economic Development Strategy. This report was the first to
address the feasibility of the marina development and emphasized the definite need
to develop the waterfront. This was followed by a detailed Waterfront Development
Program Report that provided a detailed financial analysis of a number of proposed
development initiatives.
The purpose of the Red Rock Waterfront Study was to develop a strategic
development plan for the Red Rock Harbourfront. The goal was to provide the
Township of Red Rock with a detailed site plan outlining a design theme along with
June 2003
Red Rock Park and Marina Phase II Feasibility Study
7
the location and size of specific components. The study built upon the work of
previous consultants and incorporated the work undertaken by the Small Craft
Harbours Branch of Public Works Canada.
The following provides a list of documents that either incorporated or endorsed the
development of marina facilities on the waterfront:
Table 2.1 – Previous Waterfront Studies
STUDY DATE PREPARED BY
Water Feasibility Study 1989 Quadra Consultants
Economic Development Strategy 1989 Quadra Consultants
Official Plan 1990 Proctor & Redfern
Recreation Master Plan 1990 Marshall Macklin Monaghan
Red Rock Harbourfront Master Plan 1991 Marshall Macklin Monaghan
“Economic and Social Impact Analysis of 1992 Quadra consulting et al.
the Downsizing of the Forestry Industry on
the Red Rock, Nipigon and Dorion Region”
2.3 SUMMARY OF WATERFRONT IMPROVEMENTS TO DATE
The development of the Red Rock waterfront area to date has been the result of
ongoing cooperation and partnerships between volunteers, NORAMPAC Inc.
(formerly Domtar), the Township of Red Rock, provincial and federal governments
and public agencies. The Township – in partnership with the Ontario Ministry of
Northern Development and Mines; Nipigon Bay Remedial Action Plan; the Ontario
Ministry of Natural Resources; the Ontario Ministry of the Environment and the Federal
Department of Fisheries and Oceans – invested in excess of $2.5 million into the
construction of a waterfront park and full service marina in 1993 and 1994.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
8
The contributions of community volunteers to date deserves special recognition. The
development of the waterfront area – especially Pul-a-Log Park – has been in no
small part the result of the ongoing volunteer contributions of numerous groups and
individual community members.
The most significant waterfront improvement to date was the
construction of the precedent setting and award-winning “Living
Breakwater” in 1994. This breakwater allowed for the creation of a
safe harbour at Red Rock, and it is now the primary attraction – aside
from the beauty of the natural environment – of the Red Rock
waterfront. The construction of the breakwater incorporated a variety
of innovative and successful habitat enhancement initiatives, in
addition to two habitat islands. The breakwater was featured as one
of three case studies in the CSLA (Canadian Society of Landscape
Architects) award-winning publication entitled Achieving Integrated
Habitat Enhancement Objectives – A Technical Manual (Schollen
1998).
Additional waterfront improvements implemented to date include marina services
(kiosk, fuel, pump-out), docking facilities, a boat launch, an illuminated boardwalk, a
children’s play area and park landscaping.
A more detailed inventory and analysis of the waterfront components is contained in
section 3.0 of this document.
2.4 NATIONAL MARINE CONSERVATION AREA
Parks Canada initiated a feasibility study in 1997 to explore the possibility of
establishing a National Marine Conservation Area (NMCA) on Lake Superior, and a
June 2002 publication outlined some key elements of the vision for the NMCA.
Prime Minister Jean Chretien announced in October 2002 that the Lake Superior
National Marine Conservation Area is one of five NMCAs and ten National Parks that
will be created by 2008.
Parks Canada (Department of Canadian Heritage) is responsible for National Parks
and National Historic Sites, in addition to establishing a national system of marine
June 2003
Red Rock Park and Marina Phase II Feasibility Study
9
protected areas – The National Marine Conservation Areas Program – to represent
the full range of marine ecosystems found in Canada. The goal is to represent each
of the 29 marine ecosystems contained within the Canadian waters of the Atlantic
Ocean, Pacific Ocean, Arctic Ocean and the Great Lakes. At present, three NMCAs
have been established in Canada: Fathom Five National Marine Park (Georgian
Bay, Ontario), Gwaii Haanas National Marine Conservation Area Reserve (Queen
Charlotte Islands, British Columbia), and Saguenay-St.Lawrence Marine Park
(located at the confluence of the Saguenay Fjord and the St. Lawrence River
Estuary). The current vision for the NMCAs as supported by Parks Canada is “ . . .
to respect our natural and cultural heritage by balancing preservation and
responsible use by all, for present and future generations.”
Figure 2.1 – Proposed National Marine Conservation Area
(Parks Canada)
At present, three levels of participation have been identified:
i. Gateway direct access to Lake Superior;
ii. Port of Discovery * access to the Lake, along with
education and interpretation
opportunities;
iii. Marine Operations Base * use not yet identified.
* Red Rock has been identified as both a potential Port of Discovery and
Marine Operations Base for the NMCA initiative
June 2003
Red Rock Park and Marina Phase II Feasibility Study
10
National Marine Conservation Areas (NMCAs) are marine areas managed for
sustainable use, containing smaller zones of high protection. They include the
seabed, the water above it and any species that occur there, and they may also
include wetlands, estuaries, islands and other coastal areas. NMCAs are federally
protected from dumping, undersea mining, oil and gas exploration and
development. Traditional fishing activities will be permitted, but they will be
managed with ecosystem conservation as the main goal.
Parks Canada is in the process of establishing National Marine Conservation Areas
in order to:
represent each of Canada’s 29 marine ecosystems;
demonstrate how protection and conservation practices can be harmonized
with resource use in marine ecosystems;
represent the diversity of Canada’s ocean and Great Lakes environments;
maintain ecological processes and life support systems;
provide a model for sustainable use of marine species and ecosystems;
encourage marine research and ecological monitoring;
protect depleted, vulnerable, threatened or endangered species and their
habitats.
Proposed Lake Superior NMCA Visitor Services
The proposed focus of visitor activities for the Lake Superior NMCA will be
along the Trans-Canada Highway corridor. Quality visitor services along this
corridor will be supported by an overall theme that seeks to share the history
of the area, offers interpretive and educational experiences, and allows
people to participate in the unique culture of the north shore of Lake Superior.
Operation of the NMCA will require a central administrative facility (to be
potentially located in Nipigon) along with seasonal operations bases (one of
which is to be potentially located in Red Rock). The history and the nature of
the area suggest the need for a number of interpretive centres of varying
scales dispersed along the corridor. United by a shared vision, these centres
– one of which to be located in Red Rock – will be “Ports of Discovery” – each
representing a unique theme. The operational role of Parks Canada will be in
the provision and maintenance of facilities in support of a range of outdoor
recreational experiences, including access, docks, trails, lookouts,
interpretation features and signage.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
11
Lake Superior NMCA Resource Conservation
The majority of the Lake Superior NMCA will be zoned for sustainable use
that is compatible with the purposes of an NMCA. Special areas containing
unique or endangered resources will be protective zones (some may be
seasonal only). Fish and wildlife resources will be conserved and protected
using existing legislation and regulations where applicable, as supported by
Parks Canada through enforcement activities.
Lake Superior NMCA Management
Parks Canada will be responsible for managing the Lake Superior NMCA,
while a Management Board – established by the Minister of Canadian
Heritage – will support the operations of the NMCA. The successful
management of the NMCA will require the development of partnerships with
regional stakeholders, communities, citizens, Aboriginal peoples and
provincial or territorial governments.
2.5 GREAT LAKES HERITAGE COAST
In 2000, the Ontario Government launched a major project to establish the Great
Lakes Heritage Coast as the centrepiece of the Ontario’s Living Legacy strategy.
The Great Lakes Heritage Coast – totaling 2,900 km in length – includes the entire
Ontario coastline of Lake Superior, the north shore of the St. Mary’s River and the
coastline of Lake Huron to the eastern coast of Georgian Bay. The community of
Red Rock is located within the limits of the Great Lakes Heritage Coast, and is in the
company of other Ontario communities including Thunder Bay, Nipigon, Marathon,
Wawa, Sault Ste. Marie, Killarney, Parry Sound and Port Severn. The GLHC covers
1.1 million hectares of coastline and inland areas, ranging from two to five kilometers
inland from the shoreline.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
12
Figure 2.2 – Great Lakes Heritage Coast Boundary
(Ontario Ministry of Natural Resources)
The Government of Ontario has identified the Great Lakes Heritage Coast as “ . . . an
area for special planning and management.” The goal is to take a comprehensive
approach to developing an overall vision for protecting and enjoying the significant
values along the coast. While the GLHC policies do not apply to Aboriginal or
privately owned lands, the goal is to encourage owners of these lands to support
and embrace the Great Lakes Heritage Coast initiatives.
Ontario’s Living Legacy strategy establishes the long-term goals for the GLHC as:
i. ecosystem protection
ii. tourism promotion
iii. partnership development
The Living Legacy establishes that the Heritage Coast will be managed to ensure the
following:
protection of its outstanding beauty and natural ecosystems;
promotion of its recreation and tourism potential through the establishment of a
system of parks and protected areas and complementary sustainable tourism
infrastructure;
development of Crown lands that is compatible with the overall policy intent for
the area; and
June 2003
Red Rock Park and Marina Phase II Feasibility Study
13
co-operation and partnerships actively pursued with other levels of government,
Aboriginal communities, and interest groups in the planning and management of
the coastal area.
The theme for the Great Lakes Heritage Coast project is Imagine the Possibilities.
This theme is intended to “ . . . encourage and challenge leaders along the coast to
come forward with ideas to attract more tourists, build new businesses, strengthen
communities and bring the world to the distinctive cultural heritage and outdoor
beauty of the Great Lakes heritage coastline.” A vision statement for the Great
Lakes Heritage Coast initiative is still being formulated, but it will be based on the
principles of protection, balance, stewardship, education and knowledge,
development and management.
i. Protection
The long-term protection of the wilderness beauty of the Heritage
Coast and protection and restoration of its ecosystem is the number
one priority.
ii. Balance
To ensure the long-term future of the Heritage Coast, its pristine
beauty and “accessible wildness” must be maintained. Within this
wilderness setting, efforts will be made to promote tourism use and
strategically located tourism development that compliments a
collective vision for the coast.
iii. Stewardship
Stewardship initiatives that provide private land stakeholders with the
tools they need to support the coastal ecosystem should be
encouraged and supported. Stewardship should also encourage local
initiatives and decision-making while providing effective grassroots
guardianship.
iv. Education and Knowledge
The coast presents a “living classroom” of global significance. It is
important to accumulate new and existing information, use it
effectively in decision-making and make it available for educational
use throughout the coast.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
14
v. Development
New sustainable development that takes place should compliment the
coastal ecosystem and be consistent with a collective vision for the
Heritage Coast. Quality tourism facilities and infrastructure should be
directed to existing communities. Crown shoreline and island
development should generally be limited to recreational infrastructure,
such as campsite facilities, trails, access points and docks.
vi. Management
These principles and the collective vision for the coast, while
recognizing and providing for regional differences, must guide
management of the Heritage Coast. Co-ordination and co-operation
among municipal, provincial and federal governments, First Nations
and stakeholders are vital. Promotion of the coast will require
significant efforts and resources to ensure that increased use does not
negatively affect the natural values of the coast.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
15
3.0 I N V E N T O R Y & A N A L Y S I S
3.1 THE STUDY SITE
The Township of Red Rock is located 80 km east of Thunder Bay, Ontario,
approximately 8 km south of highway 11-17 at the end of highway 628. The town
site is nestled between the Nipigon Bay and the cuesta formation of How Mountain.
The waterfront feasibility study site is located along the shores of Nipigon Bay and is
comprised of two distinct parcels of land that are separated by the Big Trout River.
The overall area of the study site is approximately 24 hectares (60 acres).
The following description is excerpted from the Township of Red Rock Waterfront
Study (Marshall Macklin Monaghan, 1991):
“Big Trout Creek flows through the site bisecting it into two parcels which are distinct
in character and composition. The 7.5 hectare parcel north of Big Trout Creek is
densely wooded and largely undeveloped, [while] the remaining area south of Big
Trout Creek has been cleared and developed to support park uses. The shoreline
adjacent to the wooded portion of the site is heavily vegetated and relatively diverse
with some deadfall and boulders scattered intermittently along its length . . . Nipigon
Bay is shallow in the vicinity of the study site [with] an average depth of 0.9m at a
distance of 300m from the water’s edge. The soft bottom is comprised of silt and
organic material.
The site topography is gently rolling, dropping in grade some 4m from the railway
right-of-way to the water’s edge. Some poorly drained pockets are evident on the
site. These low-lying areas are fringed with native tree and shrub species. The soil
report for the site . . . indicates that methane is present.”
The marina and living breakwater (constructed 1993-1994) extend into Nipigon Bay
at the southern end of the study site.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
16
3.2 THE CURRENT “STATE OF THE WATERFRONT” ASSESSMENT
3.2.1 Marina Basin
i. Navigation/Identification
- entrance not clearly visible for incoming boats
- navigational lighting does not meet Canadian Coast Guard
standards
ii. “Living” Breakwater
- adequately protects marina basin from predominant – but
not all – wave action
- provides fish habitat
- lack of fishing platforms/piers is a concern
- additional protection required from waves entering the
marina from the east
iii. Docking Facilities
- 65 serviced slips (water and electricity)
- capable of housing in excess of 250 slips
- only accommodates small boats (largest slip currently
accommodates boats up to 36’ in length)
- marina currently at full capacity for the larger boats within
the size range that it can accommodate
- does not adequately accommodate large (40-50’) boats
- large boats forced to dock alongside fuelling area, resulting
in conflict of uses and congestion
- all slips are currently accommodated on floating docks
iv. Marina Services & Operations (including fuel)
- concession sales
- staffed seasonally by local students
- lack of washrooms, showers and laundry services is a
major concern
- insufficient marina services building
- insufficient storage/garbage storage areas
- pump-out works very well
June 2003
Red Rock Park and Marina Phase II Feasibility Study
17
- signage insufficient
- insufficient shelter from the elements
- insufficient shade protection
- diesel tank is undersized
- conflicts occur at the fuel area – large boats can only be
currently accommodated in areas intended for fuelling and
pump-out uses
v. Boat Launch
- double wide launch ramp
- considered to be one of the best boat launches along the
north coast of Lake Superior
- concerns expressed about the depth of water at the toe of
the launch for larger keeled boats
vi. Parking
- parking areas are centrally located close to the docks, boat
launch and boardwalk
- parking areas are surfaced with gravel – uneven surface
- particulate from the mill sometimes settles on cars in
parking lot
vii. Boat Storage
- boats are stored for the winter in areas identified for parking
- area identified for boat storage is not easily accessible and
therefore not typically used by the public
viii. Marina Lighting, Safety and Security
- lighting is adequate
- no major public safety or security issues
June 2003
Red Rock Park and Marina Phase II Feasibility Study
18
3.2.2 Pul-a-Log Park
i. Access
- pedestrian and vehicular access is restricted to one location
due to the presence of the shunting tracks
- pedestrian and vehicular access is gained via the single
entry road into the Park and Marina
ii. Pedestrian and Vehicular Circulation
- vehicular circulation is initiated via the single entry road into
the Park and Marina
- vehicular circulation at the Marina is casual and relatively
unrestricted – cars can access the marina services area,
the parking areas and the breakwater
iii. Boardwalk
- approx. 150m of waterfront boardwalk
- very well used and appreciated by members of the
community
- very well illuminated and well maintained
- isolated element that doesn’t extend to the Marina area
iv. Existing Buildings/Structures
- washrooms located at the north end of the park – to be
renovated in the summer of 2003
- picnic shelter – good condition
- Fish & Game Club building – good condition
- Water Treatment Plant – good condition
v. Lighting and Infrastructure
- boardwalk very well illuminated
- level of lighting in the rest of the park – low
- inadequate electrical services available for festivals and
additional services
- there is no irrigation system
June 2003
Red Rock Park and Marina Phase II Feasibility Study
19
vi. Landscaping
- some grass areas near the boardwalk have settled and
frequently exhibit saturated conditions that hinder use
- the Township of Red Rock continues to plant new trees –
generally short-lived species
- the Red Rock Horticultural Society currently plants and
maintains (8) annual flower beds along the waterfront area
- spring vehicular traffic frequently parks on grass areas,
leaving ruts and uneven areas
- currently only (1) tap that can be connected to a hose for
irrigation/watering purposes
- Township currently has approximately (50) evergreen
saplings growing on site for nursery purposes
- subsoil is very poor – 6” top layer of soil is underlain by
rock/fill material
vii. Recreational Use
- the waterfront area contains a children’s play area that was
installed as part of the phase I improvements
- there are currently no programmed sports/activity fields
along the waterfront – these amenities are located in
proximity to the recreation centre in the town site (these
recreational facilities meet the needs of the population base
and the waterfront area is not envisioned to include
significant programmed sport facilities)
- local children dive from rocks into the water, but there is no
designated swimming area or beach
viii. Parking
- the waterfront park shares informal parking areas with the
Marina
- parking areas are centrally located close to the docks, boat
launch and boardwalk
- parking areas are surfaced with gravel – uneven surface
- particulate from the mill sometimes settles on cars in
parking lot
June 2003
Red Rock Park and Marina Phase II Feasibility Study
20
3.2.3 NORAMPAC Inc.
The community of Red Rock is historically and functionally very closely
associated with the operations of the NORAMPAC Inc. paper mill. The
Lake Superior Sulphite Pulp and Paper Company originally purchased
the current mill site in 1936, and construction of the mill coincided with
the clearing of the town site and the first construction of houses for mill
employees. When the Lake Superior Sulphite Pulp and Paper
Company went into receivership shortly after, the construction of the
mill was stopped; Brompton Pulp and Paper Company purchased the
mill and began producing paper products in 1945.
Since 1945, the mill has endured rises and falls in its productivity and
has changed owners several times. In January, 1998 Domtar Inc. (the
owner of the mill at the time) merged with Cascades Inc. to become
the largest container board producer in Canada and present owner of
the mill – NORAMPAC Inc.
Key issues associated with the NORAMPAC Inc. site in Red Rock
include:
- ownership of the waterfront lands (NORAMPAC currently owns the
waterfront lands and leases them to the Township);
- potential expansion of the shunting tracks that traverse the edge of
the waterfront lands;
- degradation and contamination of the waterfront lands immediately
adjacent to the mill site;
- requirement to maintain safe shunting operation within the railway
corridor; and
- public safety and limitation of access to the mill site from the
waterfront areas.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
21
3.2.4 Habitat Initiatives
i. Habitat Enhancement Islands (constructed 1994)
- plant material has become successfully established
- habitat enhancement initiatives (single log and canopy
shelter structures, spawning shoals and littoral zone
extensions) have resulted in new aquatic habitat
- the islands are also aesthetic features for the waterfront
ii. Breakwater Habitat Enhancement Overlay
- successfully diversifies the breakwater
- provides spawning, forage and shelter habitat for fish
- provides recreational opportunities along the crest of the
breakwater
iii. Big Trout Creek
- now free of boater traffic seeking shelter from wave action
- sediment has built up at the mouth of the Creek
- the Creek supports a sustainable fish community
- the Creek separates a parcel of natural waterfront land from
Pul-a-Log Park
iv. Water Quality
- breakwater opening ensures adequate circulation of fresh
water through the marina basin
3.2.5 Community Context and Adjacent Land Uses
The Red Rock waterfront lands and marina are currently separated
from the Town Site – both physically and visually – by the shunting lines
that lead to the NORAMPAC mill site and by Baker Road which serves
as the primary truck route to the mill. While the Town Site is a short
walk from the waterfront, the connections to the Town Site are not
immediately clear for boaters who arrive at the Marina. Because of
the railway tracks, both vehicular and pedestrian access to the
waterfront is consolidated at one location with an at-grade crossing of
the tracks.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
22
Views to the waterfront from the town site remain relatively
unobstructed in the absence of stopped shunting cars. However, due
to the high productivity of the NORAMPAC Inc. mill, views to the
waterfront and Nipigon Bay from the town site are very frequently
blocked by rail cars. This is a function of the mill operations and is not
anticipated to change any time soon.
Surrounding land uses include industrial lands (the NORAMPAC Inc.
mill) located to the south of the waterfront lands; commercial, open
space (recreation centre), residential, industrial/commercial and rural
surround the remainder of the site.
3.3 LAND OWNERSHIP
NORAMPAC Inc. currently owns the Red Rock waterfront lands and marina,
and the Township of Red Rock currently leases the property from
NORAMPAC Inc. at a rate of $1.00 per year. The lease was drafted in
February 1984 and expires in December 2029. Only the following
recreational uses are permitted on the site under the terms of the lease
agreement:
park
fitness trail
picnic areas
boat launching
The terms of the lease specifically prohibit the on-site use of “over-snow or
all-terrain vehicle including trail bikes or for any other purpose including the
carrying on of any business, profession or trade of any kind …”
In order to meet the terms of the lease, modification to the terms and
conditions or termination of the lease would be required prior to proceeding
with the implementation of any further waterfront improvements. Careful
study of the specific terms and conditions of the lease is recommended.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
23
Under the Official Plan, the waterfront lands are zoned as Waterfront
Development with the following permitted uses:
marine facilities and services
parks and open space
public recreation facilities
conservation
tourist commercial services
facilities appropriate for a waterfront area
3.4 SUMMARY OF STAKEHOLDERS
3.4.1 Community Members
The most important stakeholders for the Red Rock Waterfront Master Plan
are the members of the community who live and work in the town site and
the area. Through the public consultation and facilitation process associated
with this and previous studies, it is apparent that the residents of Red Rock
possess a great sense of pride and interest in their community and
waterfront. All recommendations for the next phase of improvements should
be presented to members of the community in order to continue the open
dialogue between the Township and the community and in order to ensure
that public support, enthusiasm and momentum for the project is maintained.
3.4.2 Township of Red Rock
As the initiator of this Feasibility Study and previous reports and studies, the
Township of Red Rock is obviously a key stakeholder and potential funding
source for the next phase of implementation of waterfront improvements. As
previously mentioned, the Township of Red Rock currently leases the
waterfront lands from NORAMPAC Inc.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
24
3.4.3 NORAMPAC Inc.
As the current landowner of the waterfront lands, NORAMPAC Inc. is also a
key stakeholder and potential funding partner for the project.
3.4.4 Red Rock Historical Society
The Red Rock Historical Society – incorporated as a not-for-profit group in
2000 and with over 1,500 members from around the world – is a valuable
local stakeholder and potential funding partner for the project. Having worked
with the Ontario Historical Society to develop its strategic plan, the Historical
Society has adopted the following Mission Statement: “Preservation of the
Past for the Enrichment of the Future.” The Historical Society has a keen
interest in any improvements to the Red Rock waterfront, and has recently
formed an “Interpretive Centre Committee.” The Historical Society is
particularly interested in the marine history component of the project.
3.4.5 “Live from the Rock” Blues & Folk Society
The Blues & Folk Society is actively promoting its first annual Folk Festival to
be held at Pul-a-L:og Park from August 8-10, 2003. The organization hopes
to make this an annual North of Superior Festival and to have
input/participation from individuals and performers from Thunder Bay to
Marathon, Ontario. The Festival is envisioned as a family-oriented event, with
on-site camping, an artisan’s village and three stages for performances.
The Society has developed a proposed site map, a vision/mission statement
and a schedule of activities for the Festival. They have written grant
applications for funding to four different funding bodies in addition to forming
a fundraising committee and undertaking a corporate sponsorship
campaign. The Society has received a grant from the Ontario Arts Council to
hire a consultant who has completed a needs assessment and is currently
working to develop policies and procedures, a business plan, a budget and a
long-term artistic vision for the festival.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
25
3.4.6 Red Rock Fish & Game Club
The Red Rock Fish & Game Club has been an active contributor to the life of
Red Rock since the completion of its first clubhouse in 1948. The current
clubhouse – built in 1980 on the south bank of the Big Trout Creek – is located
within the boundaries of the study site. It is interesting to note that as recently
as only 100 years ago, hunting and fishing provided almost all the meat for
residents of Red Rock. Currently, the annual Fish Derby (Fish & Game Club
Trout Tournament) is sponsored by the Red Rock Fish and Game Club and
attracts anglers to Red Rock every year.
3.4.7 National Marine Conservation Area and the Great Lakes
Heritage Coast
The National Marine Conservation Area (Parks Canada) and the Great Lakes
Heritage Coast are both significant potential stakeholders for future waterfront
development at Red Rock. Please refer back to sections 2.4 and 2.5 of this
document for further detail related to these initiatives.
3.4.8 Provincial and Federal Ministries/Agencies
The following government ministries/agencies have been key stakeholders in
past studies and initiatives, and as such will be important partners in the next
phase of implementation of the waterfront improvements:
Provincial (Ontario)
Ministry of the Environment
Ministry of Natural Resources
Ministry of Northern Development and Mines
Federal (Canada)
Department of Fisheries and Oceans
Canadian Coast Guard
Parks Canada
June 2003
Red Rock Park and Marina Phase II Feasibility Study
26
North Shore of Lake Superior Remedial Action Plan / Lake Superior
Programs
Canada Customs and Revenue
Approvals from the several of these agencies may be required to facilitate the
implementation of in-water and other works associated with the waterfront
development including the following:
Fisheries and Oceans Canada – Fisheries Act
MNR – Lakes and Rivers Implement Act
Coast Guard – Navigable Waters Protection Act
MOE – Certificate of Approval, stormwater, wastewater, sewage
and fuel storage components.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
27
4 . 0 I S S U E S & O P P O R T U N I T I E S
4.1 SUMMARY OF KEY ISSUES
Prior to the implementation of any further significant improvements to the Red Rock
waterfront, there are several key issues that need to be addressed:
i. Land Ownership
Ownership of the site in relation to permitted uses – both short and
long term – needs to be addressed. As stated earlier, the site is
currently owned by NORAMPAC Inc. and is leased to the Township of
Red Rock.
ii. NMCA and GLHC
The level of potential commitment and involvement from the National
Marine Conservation Area and the Great Lakes Heritage Coast needs
to be understood as clearly as possible.
iii. Marina Functioning
In response to the general tourism trend for larger boats on Lake
Superior, the capacity of the marina and its existing services needs to
be upgraded to accommodate boats of greater size and in larger
numbers.
4.2 SUMMARY OF OPPORTUNITIES
As a result of the unique and fortunate natural setting of Red Rock, the ongoing
implementation processes of the National Marine Conservation Area and the Great
Lakes Heritage Coast have the potential to produce a dramatic and long-lasting
positive effect on Red Rock and the surrounding region. The potential recreational
and economic benefits are extremely significant, and as such they need to be
identified and incorporated into the planning of the second phase of implementation
at Red Rock.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
28
4.2.1 Integration with NMCA Initiatives
The proposed National Marine Conservation Area is an exciting opportunity
for the Township of Red Rock to collaborate with various funding agencies
and levels of government to further build upon the existing improvements to
the waterfront that were completed in 1994. While the specific physical
requirements of the NMCA program remain undetermined (June 2003),
Parks Canada has indicated that Red Rock will potentially be used as a “Port
of Discovery” and a “Marine Operations Base” for the National Marine
Conservation Area. While the specific physical requirements have not been
determined, it is expected that there will be interpretive and educational
components affiliated with the “Port of Discovery” and that there will be a
need for boat docking and operational amenities associated with the “Marine
Operations Base.” The preliminary plans for the NMCA include the
establishment of an administrative centre to be located in Nipigon.
It is strongly recommended that any further proposed improvements to the
Red Rock waterfront be planned with a conscious awareness of the overall
goals and objectives of the National Marine Conservation Area. The
anticipated activities and uses associated with the NMCA are very much
complementary to the collective vision for the waterfront as articulated by the
Township of Red Rock and members of the community. As such, these
anticipated activities and uses offer an unprecedented opportunity to build
upon the existing improvements to the waterfront to realize the goals and
aspirations of members of the community, the Township of Red Rock and the
National Marine Conservation Area.
4.2.2 Integration with GLHC Initiatives
As with the proposed NMCA, the Provincial Government’s Great Lakes
Heritage Coast initiative is a significant opportunity for the Township of Red
Rock. The long-term goals of the GLHC initiative have been identified as
ecosystem protection, tourism promotion and partnership development.
These goals relate directly to the overall direction that the Township of Red
Rock has taken through the implementation of the first phase of waterfront
June 2003
Red Rock Park and Marina Phase II Feasibility Study
29
improvements and the initiation of this feasibility study for phase II waterfront
improvements.
In cooperation with partners such as the Township of Red Rock, the GLHC
strategy should address:
Ecosystem Protection – establishing a collective vision and strategic
direction, providing a framework for resource management, fostering co-
operation and teamwork, and co-ordinating areas such as infrastructure,
information management and education.
Tourism Development and Infrastructure – identifying necessary tourism
facilities and infrastructure, including:
- water-based infrastructure improvements, such as docks, marinas,
access points and mooring areas;
- highway-related facilities and improvements, such as special signage,
rest stops, lookouts and interpretive plaques;
- new tourism facilities and improvement to the existing system of
facilities such as hotels, motels, restaurants and resorts; and
- facilities within Ontario Parks such as trails, interpretive centres and
campgrounds.
As stated in the Great Lakes Heritage Coast Discussion Paper (2000), “ . . .
the need for well-planned, quality tourism facilities and infrastructure was
identified. Quality accommodation and facilities, such as marinas, should be
directed to existing communities, with access provided to the coast through
carefully located access points, trails, campsites and mooring sites. There is
also a need to rehabilitate damaged sites and restore populations in both
terrestrial and aquatic environments. Through careful planning, decisions can
be made on where infrastructure and use should occur while maintaining
wilderness attributes and sensitive features, or making ecological connections
to adjacent watersheds.”
Waterfront development at Red Rock supports the principles of the GLHC
and the protection and restoration of its ecosystem. It is clear that the GLHC
initiative will target existing communities – such as Red Rock – that currently
provide access to the coast. As such, the GLHC initiative is an excellent
June 2003
Red Rock Park and Marina Phase II Feasibility Study
30
opportunity – in conjunction with the NMCA – to build upon the existing
waterfront improvements and realize further partnerships and waterfront
improvements.
4.2.3 Recreational Boater/Tourism Market
The North Shore of Lake Superior represents a vast and largely untapped
tourism market. Due to the overall lack of full-service, safe harbours along
the North Shore, the Red Rock Marina and waterfront has the potential to
become a major stop along the Great Lakes Heritage Coast. In order to
capitalize on this untapped market, it will be imperative for the Red Rock
Marina to be able to accommodate larger boats than it can presently
accommodate in addition to providing improved camping/accommodation
and service opportunities.
4.2.4 Opportunities for Marina and Waterfront Improvements
Marina improvements/expansion
Multi-functional marina building
RV Park
Campground
Pul-a-Log Park improvements
Multi-functional bandshell
Additional habitat creation
Additional angler opportunities
Additional plantings
Walking trails/ connections and boardwalk extension
Natural interpretation area to the north of Big Trout Creek
Long-term parking
June 2003
Red Rock Park and Marina Phase II Feasibility Study
31
4.2.5 Connections and Linkages
Physical connections to town site
Connections to the greater open space system
Connections to a regional trail/open space system (connection to
Nipigon)
4.3 SUMMARY OF POTENTIAL CONSTRAINTS
Despite the numerous and significant opportunities for further waterfront
improvements at Red Rock, the following constraints must be acknowledged and
understood prior to the implementation of any further phases of waterfront
improvements:
Limited population base
Distance from Highway 11/17
Distance from major population centres
Land ownership
Funding
Contamination
Existing mill shunting tracks and future track expansion
June 2003
Red Rock Park and Marina Phase II Feasibility Study
32
5 . 0 C O N C E P T U A L W A T E R F R O N T M A S T E R P L A N
Building upon the original 1991 master plan and incorporating
additional input from the Township of Red Rock, community
members, relevant public agencies and the National Marine
Conservation Area and the Great Lakes Heritage Coast, the
conceptual waterfront master plan provides direction and
recommendations regarding the location, size and layout of amenities
related to potential waterfront improvements at Red Rock.
5.1 CONCEPTUAL MASTER PLAN
The conceptual master plan for further improvements to the Red Rock marina and
waterfront is the product of an integrated and collaborative effort between the
Township of Red Rock, members of the community and the consultant team. Local
residents and stakeholders were generous with their time, resources and ideas. The
creativity and enthusiasm of all parties involved resulted in the creation of this master
plan that was endorsed in principle by members of the public at a public meeting in
January 2003. The revised version of this plan that was endorsed by the Township
of Red Rock and members of the public in June 2003 is contained in subsequent
pages of this feasibility study.
As discussed in previous sections of this document, the Red Rock waterfront
currently contains a wide variety of existing amenities and features. The goal of the
following conceptual waterfront master plan is to provide a plan that builds upon the
existing amenities while addressing current and future issues and opportunities.
A detailed description of the plan is contained in section 5.2 of this document; key
features of the plan include the following:
expanded marina capacity (ability to accommodate more and larger
boats)
reconfiguration of existing docks
expanded marina services
multi-purpose marina centre waterfront building
June 2003
Red Rock Park and Marina Phase II Feasibility Study
33
RV park and campground
outdoor performance bandshell
expanded pedestrian trails/boardwalk
nature interpretation area
additional plantings and landscaping improvements
additional habitat enhancement initiatives
June 2003
Red Rock Park and Marina Phase II Feasibility Study
35
5.2 DESIGN BRIEF
5.2.1 Marina and Marina Services
The construction of the Red Rock marina has been a significant first phase of
improvements to the waterfront. The further development of the marina and
marina services are critical components of the next phase of implementation
for the Red Rock waterfront improvements. It is recommended that further
improvements to the marina should focus on the following:
i. Dock Reconfiguration
The marina currently houses two spines of floating docks that can
accommodate up to 65 small boats. Based upon near-unanimous
feedback from members of the public and boater surveys, there is an
immediate need for the marina to be able to accommodate larger
boats. The master plan illustrates the full capacity of dock
reconfiguration and expansion to accommodate up to (243) boats up
to approximately 20m in length. It is important to note that the
reconfiguration and expansion of the marina will result in the ability to
accommodate boats potentially associated with an operations base
for the National Marine Conservation Area.
ii. Fuel & Pump-out Services
The marina currently operates using (1) 5,000 litre diesel tank. Based
upon input received from boaters and the Township of Red Rock, the
master plan includes the addition of (1) 10,000 litre diesel tank and the
re-use of the existing 5,000 litre diesel tank for gasoline. Depending
upon the success of the expanded marina operations, it may be
necessary in the future to add additional fuel capacity. Based upon
input received from boaters and the Township of Red Rock, the
existing pump-out facilities are in good working order and provide
sufficient capacity to service any increased demand.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
36
iii. Navigation
Boaters have commented that it is difficult to accurately locate the
entrance to the marina as one approaches the marina from Nipigon
Bay. While the NORAMPAC Inc. mill provides an unmistakable visual
landmark, the master plan includes the provision for navigational aids
to be placed at the entrance to the marina and on the proposed
habitat island to safely guide boaters into the marina.
iv. Boat Launch
The existing boat launch itself functions very well in its current location
and configuration. However, the removal of the existing rip-rap
retainment between the service/fuel dock and the launch ramp and its
replacement with sheet-pile edging would improve the safety of the
area. In addition, the master plan shows a conceptual location for the
addition of a marine crane to allow for the launching of very large or
fixed keel boats that cannot be launched using the existing ramp.
5.2.2 Waterfront Centre Building
In order to attract and accommodate an increased number of boaters,
tourists and user groups to Red Rock, it is imperative that improved services
be provided. As stated in the Request for Proposals, a key component of the
project is the siting and conceptual design of “ . . . a multi-functional marina
building to provide essential amenities to existing infrastructure in concert with
the NMCA plans and objectives.”
The proposed 337 square metre (3,625 square feet) building is designed to
be a significant landmark on the Red Rock Waterfront that will function as a
new focal point for the marina and a beacon for both land and water traffic to
and from the site. The building’s two-and-a-half story configuration houses
public washrooms, offices for a variety of waterfront related government
agencies, work and sales space for marina and campground support staff, a
coin-operated laundry and vending area, storage and display space for the
Red Rock Historical Society and a general lobby and waiting area for marina
and campground patrons.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
37
The building is strategically situated to address the vehicular access to the
marina and water activities located in the beach area adjacent to the
boardwalk. The entire building is covered by a steeply pitched cedar shingle
roof that contains a high ceiling volume over the public spaces and space for
storage and mechanical equipment above the washrooms. The exterior of
the building is finished in natural stone veneer on the lower portions and
prefinished wood fibre reinforced cement panels and battens on the upper
portion. The gable ends are decorated with lap siding roof margins and the
roof overhangs are supported by Craftsman-style brackets.
A detailed program of use for the building is contained in Appendix A.
Figure 5.2
w a t e r f r o n t c e n t r e b u i l d i n g
(artist’s rendering)
June 2003
Red Rock Park and Marina Phase II Feasibility Study
38
June 2003
Red Rock Park and Marina Phase II Feasibility Study
39
June 2003
Red Rock Park and Marina Phase II Feasibility Study
40
5.2.3 RV Park and Campground
Comments and feedback garnered from community members at the first
public meeting held as part of this feasibility study almost unanimously
included reference to the need for an RV park and campground in Red Rock.
While the historic Red Rock Inn is an excellent local source of
accommodation, there is a need to diversify the level of accommodation in
the Township to include a formal RV park and campground operation for
transient boaters and vehicular tourists. This need can be expected to
increase as the National Marine Conservation Area and Great Lakes Heritage
Coast initiatives are developed.
The master plan illustrates that the RV park and campground are located at
the southeast corner of the site, adjacent to the proposed waterfront centre
building and Pul-a-Log Park. Pedestrian trails and pathways link the area to
the marina and the entire waterfront area. The RV park and campground
contains the following breakdown of sites:
Type of Site Quantity *
Serviced RV sites 15
Serviced trailer sites 11
Unserviced tent/trailer sites 46
* section 7.5 of this document addresses the market potential of an
RV park and campground in Red Rock
Due to the very exposed conditions presently on the site, it is recommended
that significant plantings be included as part of the development of the RV
park and campground for wind protection and visual screening. The finished
grades of the area can be lowered to further buffer the site from the adjacent
shunting tracks and the mill; the excavate generated can be used to assist in
the leveling of the poorly drained portions of Pul-a-Log Park.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
41
5.2.4 Vehicular Access
Due to the location of the shunting tracks that act as a barrier between the
waterfront and the town site, vehicular access to the waterfront is currently
limited to one asphalt roadway (at a level crossing of the shunting tracks).
This road is located to the south of the Township’s water treatment plant, and
it is recommended that it remain as the sole vehicular access route onto the
site. This road traverses the site and will lead vehicles directly to the
proposed waterfront and marina services building. An existing secondary on-
site roadway leads to the Fish & Game Clubhouse.
5.2.5 Parking and Vehicular Circulation
Short-Term Parking
The master plan includes the accommodation of (10) 6m x 3m
standard parking spaces and (5) larger pull-through spaces adjacent
to the proposed waterfront centre building and the campground.
These short-term parking spaces are intended to facilitate the
temporary parking of vehicles for campground registration or marina-
related purposes.
Boat Launch Staging Area
In order to maintain the efficient and safe operation of the boat launch,
the master plan includes a specific boat launch staging area. It is
important that the function of the boat launch neither impedes nor is
impeded by people waiting to either launch or retrieve a boat. Turning
radii must be designed to accommodate large trailer movement.
Marina Parking
At present, parking for the marina is accommodated in a large gravel
area adjacent to the marina. Due to the clear functional advantages of
having the marina parking lot located adjacent to the marina itself, the
master plan shows an efficiently organized parking lot with (294)
parking spaces remaining in this area. The parking lot includes a
secure parking/boat storage area and a specific location intended for
the storage of large craft.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
42
Improvements to the parking lot bring with them the need to treat
stormwater to avoid discharging water borne pollutants directly into
Nipigon Bay. As such, a stormwater management pond is
conceptually located to the south of the parking lot, adjacent to the
campground. While the details of this stormwater feature are not
included in the scope of work of this study, it is important to note that
the overall plan was developed with an awareness of ecologically
sound stormwater management principles.
Additional Waterfront Parking
Additional waterfront parking is located in the vicinity of the Fish &
Game Clubhouse to serve the Fish & Game Club, access to the
proposed natural area north of Big Trout Creek and general activities
at the north end of Pul-a-Log Park.
5.2.6 Pedestrian Circulation
The only safe pedestrian access to the site currently crosses the shunting
tracks alongside the vehicular access road. It is not anticipated that any
further pedestrian crossings will be developed on the site due to restrictions
imposed by shunting operations. The master plan illustrates a series of
internal pedestrian trails, pathways and boardwalks that traverse the site and
link all on-site features and amenities.
The existing illuminated boardwalk is a popular feature of the existing
waterfront that should be lengthened, as illustrated on the master plan, as
budget allows.
5.2.7 Pul-a-Log Park
The master plan recommends that the existing public open space and park-
like qualities of Pul-a-Log Park be retained and enhanced. Public feedback
clearly and repeatedly indicated that residents of the community frequently
use the waterfront park as a destination for walking and passive recreation.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
43
Built Features
A covered bandshell is proposed for the northwest corner of the park,
with dramatic views of Nipigon Bay and the distant cliff formations
forming a spectacular backdrop. The bandshell consists of a 7.3 m x
9.75 metre open stage partially covered with a steeply pitched trussed
roof similar in appearance to the Waterfront Centre Building. The
bandshell is accessed by two covered rear stairs and will be provided
with electrical services. The stage will be equipped with an overhead
theatrical lighting support grid.
The existing picnic shelter is proposed to be relocated to the marina
services/fuel area to provide additional shade and shelter; a new larger
picnic shelter is proposed to be located in Pul-a-Log Park adjacent to
the boardwalk to accommodate food and refreshment concession
during larger events.
Figure 5.5
b a n d s h e l l a n d e v e n t s l a w n
(artist’s rendering)
June 2003
Red Rock Park and Marina Phase II Feasibility Study
44
Grading, Drainage and Stormwater Management
Portions of the park that currently exhibit poor drainage patterns
should be re-graded, leveled and seeded to eliminate standing water
and its associated maintenance and usage challenges. The open
lawn audience space adjacent to the band shell should be tile drained
to ensure that it is suitable for use during the limited outdoor
performance season.
The majority of stormwater runoff from the town site is currently
directed towards the waterfront, and it is therefore recommended that
the existing stormwater management pond in Pul-a-Log Park be
retained and enhanced as an integrated functional and aesthetic
feature.
Additional Park Elements
the master plan recommends that the children’s playground is to
be retained in its existing location and condition;
in order to access the proposed trails in the area to the north of Big
Trout Creek, a new pedestrian bridge will be required to span the
width of the creek;
the existing Memorial Garden will be retained and enhanced;
the park entry features will be enhanced;
the existing flag pole is to be retained in its current location.
5.2.8 Plantings
The Township of Red Rock, in conjunction with community volunteers and
members of the Red Rock Horticultural Society, has been planting trees and
shrubs throughout the waterfront area for a number of years. The master
plan illustrates a planting framework that is intended to act as a guide to
direct the placement of future tree plantings. Given the degree of exposure,
harsh conditions and poor subsurface conditions of the site, it is imperative
that plant materials are chosen that combine the ability to survive in the
conditions with a reasonable life span. Care should be taken to ensure that
improvements and amendments to soil be made as a component of the
planting program.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
45
A significant amount of planting will be required to act as a buffer between
the shunting tracks and the park, but care must be taken to ensure that
filtered views from the town site to the waterfront (in the absence of trains) are
maintained.
Significant plantings will also be required in the RV park and campground to
provide privacy and campsite definition, protection from wind exposure and
to provide a visual screening between the site and the mill operations.
5.2.9 Additional Habitat Enhancement Opportunities
The first phase of implementation of waterfront improvements at Red Rock in
1994 was initiated at the same time as a separate program was being
undertaken by the North Shore of Lake Superior Remedial Action Plan to
determine the health of Nipigon Bay, to document changes in the fishery and
to make recommendations aimed at enhancing the health and vitality of the
ecosystem and fishery. As stated in the award-winning Technical Manual
entitled Achieving Integrated Habitat Enhancement Objectives, “ . . . through
the forging of a partnership between the proponents of both projects,
concepts were developed with an emphasis on integrating habitat and water
quality enhancement initiatives as components of the design of the marina
basin and breakwater. The product of this process successfully achieves
both functional and ecosystem objectives while providing additional
recreational, aesthetic and interpretive attributes.”
The living breakwater and habitat islands at Red Rock have been remarkably
successful. Opportunity exists to expand on the success of these previous
precedents to include further habitat enhancement features as part of further
waterfront improvements.
In response to the need to provide further wave deflection to reduce the
impact of waves entering the marina basin from the east, the master plan
includes a third habitat enhancement island immediately to the east of the
marina opening. This island would combine the benefits of creating
additional habitat enhancement while mitigating the disruptive and
June 2003
Red Rock Park and Marina Phase II Feasibility Study
46
sometimes damaging effects of wave action entering the marina basin from
the east.
Additional habitat enhancement opportunities to create fish spawning habitat
areas exist in the northern portion of the site to the north of Big Trout Creek.
5.2.10 Additional Angling Opportunities
Fishing was an important source of food and revenue for settlers to the area,
and although few residents are still dependent upon fishing for a living, it is
now one of the region’s most important recreational activities. As evidenced
by the success of the annual Red Rock fishing derby, Nipigon Bay and Red
Rock are destination areas for anglers.
In response to the popularity of angling in the area, the master plan includes
(5) proposed fishing platforms to provide anglers with improved opportunities
to fish from the Red Rock waterfront. While the design detailing of these
fishing structures is not within the scope of work for this feasibility study, it is
anticipated that the structures would be constructed in order to provide a safe
and effective way for anglers to get close to the surface of the water and
would incorporate habitat enhancement techniques in the design of their
substructure.
5.2.11 Recreational Facilities
The master plan envisions the Red Rock waterfront as a destination and
community resource for passive, unprogrammed recreational opportunities
such as walking, jogging and angling (or cross-country skiing, snowshoeing
and ice fishing). The addition of a beach and kayak/canoe launch dock in
close proximity to the waterfront centre building would provide additional
recreational opportunities.
While the character of Pul-a-Log Park is anticipated to remain largely
undisturbed, its open space qualities provide ample opportunity for casual
recreational activities that require a large open space.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
47
The existing Red Rock Recreational Centre/Community Centre located to the
west of the site (across the shunting tracks) provides sufficient programmed
indoor and outdoor recreational facilities for the community of Red Rock.
Input garnered from various public meetings and stakeholder interviews
indicated that there was no need to include programmed recreational
facilities on the study site (i.e. baseball, soccer, etc.).
5.3 PRELIMINARY COST ESTIMATE
A detailed breakdown of the total costs associated with the waterfront master
plan is provided in Table 5.1 for preliminary discussion and budgetary
purposes. The cost estimates are based upon estimated quantities derived
from the master plan drawing, using contractor installed unit or lump sum
allowances derived from recent tender prices for similar works in the Thunder
Bay/Nipigon region. Please note that the cost estimate does not include any
provision for inflation over the duration of a phased implementation period.
In summary, the following total costs are estimated for the project
components:
Description Estimated Cost A. Natural Area $ 247,250.00
B. Pul-a-Log Park $ 712,450.00
C. Waterfront Centre Building $ 919,350.00
D. Marina Improvements $1,920,000.00
E. RV Park and Campground $ 701,900.00
F. Parking Lot $ 77,700.00
G. Downtown Linkage $ 17,500.00
Subotal $4,596,150.00
15% Contingency $ 689,422.50
Subtotal $5,285,572.50
GST $ 369,990.07
TOTAL COST $5,655,562.57
June 2003
Red Rock Park and Marina Phase II Feasibility Study
48
Table 5.1 Preliminary Cost Estimate
* note: this cost estimate is intended for budgetary purposes only
Item Description Quantity Unit Unit Cost Total
A. NATURAL AREA
1 Fish Spawning Area
Excavation, clearing and grading allowance $ 15,000.00 $ 15,000.00
Riverstone shoals allowance $ 7,500.00 $ 7,500.00
Small boulders <1.0m dia. allowance $ 2,500.00 $ 2,500.00
Large boulders >1.0m dia. allowance $ 5,000.00 $ 5,000.00
Logs allowance $ 500.00 $ 500.00
Fish shelter structures allowance $ 5,000.00 $ 5,000.00
Basin plantings allowance $ 25,000.00 $ 25,000.00
Shoreline plantings allowance $ 12,500.00 $ 12,500.00
Submerged boulders allowance $ 1,250.00 $ 1,250.00
Subtotal 1 $ 74,250.00
2 Walking Trails
Clearing and localized grading allowance $ 10,000.00 $ 10,000.00
Granular walkway, 1.5m wide 1,500 sq.m. $ 15.00 $ 22,500.00
Subtotal 2 $ 32,500.00
3 Trout Creek Pedestrian Bridge
Clearing and localized grading allowance $ 7,500.00 $ 7,500.00
Bridge (35m x 4m, incl. footings) 1 each $ 75,000.00 $ 75,000.00
Subtotal 3 $ 82,500.00
4 Trail Bridge (Fish Habitat Area)
Bridge (20m x 2m, incl. footings) allowance $ 15,000.00 $ 15,000.00
Subtotal 4 $ 15,000.00
5 Interpretive Signage allowance $ 5,000.00 $ 5,000.00
Subtotal 5 $ 5,000.00
6 Trail Markers allowance $ 1,000.00 $ 1,000.00
Subtotal 6 $ 1,000.00
7 Infill Plantings allowance $ 35,000.00 $ 35,000.00
Subtotal 7 $ 35,000.00
8 Site Furnishings allowance $ 2,000.00 $ 2,000.00
(benches, waste receptacles)
Subtotal 8 $ 2,000.00
Subtotal A $ 247,250.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
49
Item Description Quantity Unit Unit Cost Total
B. PUL-A-LOG PARK
1 Landscaping
Filling (excavate from campground) allowance $ 10,000.00 $ 10,000.00
Tile drainage 1,500 lin.m. $ 25.00 $ 37,500.00
Rough and fine grading 20,000 sq.m. $ 2.50 $ 50,000.00
Seeding 15,000 sq.m. $ 1.00 $ 15,000.00
Shade trees 100 each $ 300.00 $ 30,000.00
Ornamental plantings allowance $ 20,000.00 $ 20,000.00
Subtotal 1 $ 162,500.00
2 Structures
Bandshell 73.9 sq.m. $ 1,000.00 $ 73,900.00
Picnic shelter allowance $ 35,000.00 $ 35,000.00
Subtotal 2 $ 108,900.00
3 Walkways
Granular walkway, 2m wide 1,850 sq.m. $ 15.00 $ 27,750.00
Boardwalk extension 130 lin.m. $ 900.00 $ 117,000.00
Bridge over existing pond allowance $ 30,000.00 $ 30,000.00
(25m x 2m, incl. footings)
Subtotal 3 $ 174,750.00
4 Memorial Garden
Granular pathway (1.2m wide) 120 sq.m. $ 15.00 $ 1,800.00
Memorial plantings allowance $ 7,500.00 $ 7,500.00
Signage allowance $ 2,000.00 $ 2,000.00
Subtotal 4 $ 11,300.00
5 Miscellaneous
Lookout point/fishing pier allowance $ 25,000.00 $ 25,000.00
Interpretive signage allowance $ 5,000.00 $ 5,000.00
Additional lighting allowance $ 50,000.00 $ 50,000.00
Clearing/grubbing allowance $ 2,500.00 $ 2,500.00
Site furnishings allowance $ 10,000.00 $ 10,000.00
Beach area (sand/filter fabric) allowance $ 12,500.00 $ 12,500.00
Habitat enhancement initiatives allowance $ 75,000.00 $ 75,000.00
Servicing upgrades (electric) allowance $ 75,000.00 $ 75,000.00
Subtotal 5 $ 255,000.00
Subtotal B $ 712,450.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
50
Item Description Quantity Unit Unit Cost Total
C. WATERFRONT CENTRE
1 Waterfront Centre Building
Building 337.8 sq.m. $ 2,000.00 $ 675,600.00
Servicing allowance $ 100,000.00 $ 100,000.00
Subtotal 1 $ 775,600.00
2 Short-term Parking Area
Miscellaneous removals allowance $ 5,000.00 $ 5,000.00
Regrading 2,500 sq.m. $ 2.50 $ 6,250.00
Additional granular sufacing allowance $ 7,500.00 $ 7,500.00
Plantings allowance $ 7,500.00 $ 7,500.00
Signage allowance $ 2,500.00 $ 2,500.00
Subtotal 2 $ 28,750.00
3 Boardwalk
Expanded boardwalk allowance $ 75,000.00 $ 75,000.00
Subtotal 3 $ 75,000.00
4 Canoe Launch Dock
Canoe launch dock allowance $ 15,000.00 $ 15,000.00
Canoe launch pavilion allowance $ 25,000.00 $ 25,000.00
Subtotal 4 $ 40,000.00
Subtotal C $ 919,350.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
51
Item Description Quantity Unit Unit Cost Total
D. MARINA 1 Fuel Service Peninsula
Steel sheet-pile edging 75 lin.m. $ 1,250.00 $ 93,750.00
Fill behind sheet piling allowance $ 25,000.00 $ 25,000.00
Boardwalk 275 lin.m. $ 750.00 $ 206,250.00
Marine crane allowance $ 100,000.00 $ 100,000.00
Shade trees 30 each $ 300.00 $ 9,000.00
Lookout feature/navigational aid allowance $ 50,000.00 $ 50,000.00
Fishing platform allowance $ 25,000.00 $ 25,000.00
Additional fuel tanks allowance $ 15,000.00 $ 15,000.00
Relocated shelter at kiosk allowance $ 5,000.00 $ 5,000.00
Lighting allowance $ 100,000.00 $ 100,000.00
Signage allowance $ 2,500.00 $ 2,500.00
Site furnishings allowance $ 5,000.00 $ 5,000.00
Subtotal 1 $ 636,500.00
2 Marina Basin
Reconfiguration of existing docks allowance $ 25,000.00 $ 25,000.00
Additional docks (steel float, includes allowance $ 500,000.00 $ 500,000.00
supply, install, power pedestal and
water bib)
New boardwalk 200 lin.m. $ 900.00 $ 180,000.00
Boardwalk lighting allowance $ 100,000.00 $ 100,000.00
Dredging allowance $ 75,000.00 $ 75,000.00
Site furnishings allowance $ 25,000.00 $ 25,000.00
Signage allowance $ 5,000.00 $ 5,000.00
Fishing/lookout platforms 3 each $ 10,000.00 $ 30,000.00
Additional plantings allowance $ 20,000.00 $ 20,000.00
Security gates 3 each $ 1,500.00 $ 4,500.00
Subtotal 2 $ 964,500.00
3 Wave Deflection Island
Fill -- armourstone (9m depth) allowance $ 250,000.00 $ 250,000.00
Small boulders <1.0m dia. allowance $ 2,500.00 $ 2,500.00
Large boulders >1.0m dia. allowance $ 5,000.00 $ 5,000.00
Logs allowance $ 500.00 $ 500.00
Fish shelter structures allowance $ 2,500.00 $ 2,500.00
Habitat plantings allowance $ 7,500.00 $ 7,500.00
Submerged boulders allowance $ 2,000.00 $ 2,000.00
Navigational aids 2 each $ 7,500.00 $ 15,000.00
Subtotal 3 $ 285,000.00
4 Boat Launch/Staging Area
Miscellaneous removals allowance $ 5,000.00 $ 5,000.00
Regrading 3,500 sq.m. $ 2.50 $ 8,750.00
Additional granular sufacing allowance $ 10,000.00 $ 10,000.00 Plantings allowance $ 7,500.00 $ 7,500.00
Signage allowance $ 2,000.00 $ 2,000.00
Vehicle access bollard allowance $ 750.00 $ 750.00
Subtotal 4 $ 34,000.00 Subtotal D $ 1,920,000.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
52
Item Description Quantity Unit Unit Cost Total
E. CAMPGROUND
1 Site Preparation
Clearing/grubbing allowance $ 7,500.00 $ 7,500.00
Excavation (reuse at Pul-a-Log Park) allowance $ 50,000.00 $ 50,000.00
Grading 25,000 sq.m. $ 2.50 $ 62,500.00
Servicing (power, water) allowance $ 100,000.00 $ 100,000.00
Subtotal 1 $ 220,000.00
2 Roadways/Pathways
Granular roadway 4,280 sq.m. $ 25.00 $ 107,000.00
Granular RV/trailer pads 3,740 sq.m. $ 22.50 $ 84,150.00
Granular pathways 400 sq.m. $ 15.00 $ 6,000.00
Subtotal 2 $ 197,150.00
3 Stormwater Management Pond
Excavation allowance $ 10,000.00 $ 10,000.00
Grading 600 sq.m. $ 5.00 $ 3,000.00
Boulder edging 70 lin.m. $ 50.00 $ 3,500.00
Hydroseeding allowance $ 750.00 $ 750.00
Perimeter plantings allowance $ 2,500.00 $ 2,500.00
Outlet structure allowance $ 2,500.00 $ 2,500.00
Subtotal 3 $ 22,250.00
4 Plantings
Campground trees allowance $ 75,000.00 $ 75,000.00
Campgound shrubs allowance $ 25,000.00 $ 25,000.00
Hydroseeding 10,000 sq.m. $ 1.00 $ 10,000.00
Bank plantings allowance $ 25,000.00 $ 25,000.00
Railway screening plantings allowance $ 35,000.00 $ 35,000.00
Subtotal 4 $ 170,000.00
5 Miscellaneous
Site furnishings (picnic tables, firepits) allowance $ 75,000.00 $ 75,000.00
Directional signage allowance $ 10,000.00 $ 10,000.00
Lookout (boulders and granular surface) allowance $ 7,500.00 $ 7,500.00
Subtotal 5 $ 92,500.00
Subtotal E $ 701,900.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
53
Item Description Quantity Unit Unit Cost Total
F. PARKING LOT
1 Site Preparation
Clearing allowance $ 5,000.00 $ 5,000.00
Grading 12,500 sq.m. $ 2.50 $ 31,250.00
Additional granular surfacing allowance $ 15,000.00 $ 15,000.00
Security fencing 200 lin.m. $ 65.00 $ 13,000.00
Vehicle access bollard each $ 750.00 $ 750.00
Plantings allowance $ 10,000.00 $ 10,000.00
Granular pathways 180 sq.m. $ 15.00 $ 2,700.00
Subtotal 1 $ 77,700.00
Subtotal F $ 77,700.00
Item Description Quantity Unit Unit Cost Total
G. DOWNTOWN LINKAGE
Sidewalk 200 sq.m. $ 50.00 $ 10,000.00
Plantings allowance $ 5,000.00 $ 5,000.00
Signage allowance $ 2,500.00 $ 2,500.00
Subtotal G $ 17,500.00
SUMMARY
A. Natural Area $ 247,250.00
B. Pul-a-Log Park $ 712,450.00
C. Waterfront Centre $ 919,350.00
D. Marina $ 1,920,000.00
E. Campground $ 701,900.00
F. Parking Lot $ 77,700.00
G. Downtown Linkage $ 17,500.00
Subtotal $ 4,596,150.00
15% contingency $ 689,422.50
Subtotal $ 5,285,572.50
GST $ 369,990.07
TOTAL $ 5,655,562.57
June 2003
Red Rock Park and Marina Phase II Feasibility Study
54
6 . 0 I M P L E M E N T A T I O N P R I O R I T I E S A N D
P H A S I N G S T R A T E G Y
6.1 INTRODUCTION
The process of generating the Red Rock Waterfront Park and Marina Feasibility
Study has advanced to its final stages. A public meeting was held on the evening of
May 12, 2003 to present the final Master Plan and findings of the feasibility study
process to allow the community to provide input prior to the finalization of the study.
The members of the community who participated in the public meeting were very
supportive of the plan as a whole and comments provided focused on the details of
specific components. These comments were recorded and will be addressed in the
process of finalizing the feasibility study.
Throughout the study process, the consultant team has been focused not only on
evaluating alternative designs and confirming the technical and financial feasibility of
the components of the Master Plan, but also on setting the stage for implementation
by involving potential funding partners in the study process and identifying issues that
could emerge as potential barriers to funding and implementation. With the
objective of strengthening the position of Red Rock in terms of funding potential, it is
important that these barriers be addressed in the immediate future. Direction to
address these barriers is provided in the implementation plan outlined in a
subsequent section.
The Master Plan recommends the implementation of a number of initiatives
including the following:
improvements to the existing marina to enhance accommodation for large
boats and to ensure adequate, reliable fuel services are available at Red
Rock;
implementation of a multi-purpose ‘Waterfront Centre’ building that is
designed to address the needs of the marina, with respect to shower,
washroom and laundry services as well as to accommodate the
administrative function of the proposed recreational vehicle park and potential
needs related to the National Marine Conservation Area (NMCA) and Great
Lakes Heritage Coast (GLHC) programs and the Historical Society;
June 2003
Red Rock Park and Marina Phase II Feasibility Study
55
creation of new Recreational Vehicle (RV) and camping park that would
provide the only lakefront camping facility with direct marina access along the
North Shore;
improvements to the park to accommodate seasonal festivals and events,
including a band shell for concerts and music festivals, improvements to
grading and drainage in spectator areas and additional trail, boardwalk and
picnicking opportunities;
improved access to the Lake Superior shoreline including fishing platforms,
observation structures, extension of the boardwalk, creation of waterfront
recreation areas and canoe/kayak launch dock;
implementation of initiatives aimed at enhancing the waterfront park as a
community amenity including recreation trails, improved linkages to
downtown, a memorial garden and upgraded landscaping;
integration of habitat enhancement initiatives that build on the important
precedent established in the process of constructing the marina breakwater
as well as to compensate for potential impacts on fish habitat that may result
form the implementation of other initiatives.
Each of the components described above has been designed with an emphasis on
ensuring that Red Rock becomes recognized as the premier boater service and
tourism destination along the North Shore of Lake Superior.
6.2 IMPLEMENTATION PRIORITIES
With the objective of enhancing the position of the Township in terms of capitalizing
on funding opportunities, it is important that the several activities be initiated
immediately. Two of the recommended actions are required to address situations
that may present barriers to funding and the third action is focused on ensuring that
the Township continues to be well aware of funding opportunities and therefore well
positioned to capitalize on funding opportunities as they arise.
6.2.1 Implementation Priority No. 1 – Land Securement
Ownership of the lands by the Township is of paramount importance
since the conditions associated with the existing lease prohibits many
of the uses that are proposed in the Master Plan and which are critical
to the success of the initiative. In addition, many of the candidate
June 2003
Red Rock Park and Marina Phase II Feasibility Study
56
funding agencies are reluctant to invest in projects that are not held in
the ownership of the party requesting funding. Through consultation
with Mr. Jake Vander Wal, Norampac has indicated a willingness to
convey the lands to the Township. Contingent on the appraised value
of the property, this conveyance could represent a donation, or in-kind
contribution of significant value that could be used to lever funding
from a government partner agency. Consequently, it is important that
the Township work with Norampac to identify the lands proposed to
be conveyed and execute the transfer of ownership.
6.2.2 Implementation Priority No. 2 – Environmental Assessment
To satisfy the requirements of both Provincial and Federal funding
partners, the proposed redevelopment of the waterfront any marina
must undergo and Environmental Assessment. An Environmental
Study Report (ESR) was prepared in support of the funding and
implementation of the Phase 1 marina development. This ESR will
require an update in terms of the description of the environmental
resources of the site and revisions to address the potential impacts of
the various components of the Master Plan that were not previously
addressed including the RV park, marina services building, band shell
and improvements to the marina. Based upon a review of the existing
ESR and the anticipated level of effort required to complete the
revisions to the documents, it is anticipated that fees in the order of
$5,000 - $8,000 will be required to prepare the ESR and address the
requirements of both the Provincial and Federal Governments related
to Environmental Assessment.
6.2.3 Implementation Priority No. 3 – Continued Communication with
Potential Funding and Implementation Partners
Throughout the course of preparing thIS feasibility study, important
relationships were fostered with representatives of FEDNOR, Parks
Canada staff related to the NMCA initiative, representatives of the
Provincial Government related to the GLHC initiative, and a number of
other potential funding partners. These partners have provided
important input that was reflected in the Master Plan and they are
June 2003
Red Rock Park and Marina Phase II Feasibility Study
57
aware of and very interested in the Red Rock project. Consequently, it
is imperative that this level of communication and relationship building
continue and that the Township be made aware of any opportunity
that could enhance their position to secure funding or conversely, any
issues of concern that may adversely affect its ability to secure funding
in the future so that they can be addressed proactively. Mr. Jake
Vander Wal of the consulting team was instrumental in building
relationships with potential funding partners and agencies and
consequently it is recommended that the Township retain Mr. Vander
Wal independently to fulfill this role and address this important priority.
6.3 PHASING STRATEGY
As stated in the feasibility study, the phasing of implementation of various
components of the Master Plan will be determined in large part by the timing of the
NMCA and GLHC initiatives and the availability of funding from other sources.
Consequently, it is recommended that the phasing strategy be developed with a
degree of flexibility. Notwithstanding, there are several clear priorities that should
form the foundation of the strategy for phasing the implementation of the project,
these include:
The need to establish Red Rock marina as a facility that provides reliable
services to boaters, including the provision of services for large boats.
The need to establish Red Rock marina as a desirable waterfront destination
through the provision of improved facilities for boaters.
The need to implement alternative tourist amenities that complement the
marina and enhance the attractiveness of the waterfront park as a destination
for the broader tourism market.
The need to enhance the ability for the waterfront park to accommodate
festivals and seasonal events.
The following provides a description of the proposed strategy for phasing the
implementation of the various components of the Master Plan. A schematic phasing
plan diagram is located on page 65 of this document.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
58
Table 6.1
PHASE 1 – 2003/2004
Description Quantity Unit Unit Cost Total
MARINA IMPROVEMENTS
i. Enhance fuel capacity – add additional 100,000 litre fuel tank for increased diesel fuel capacity
allowance 15,000.00 15,000.00
ii. Add navigational lights, (Implemented by Township)
N/C
TOTAL Phase 1 $15,000.00
PHASE 2 – 2004
Description Quantity Unit Unit Cost Total
MARINA IMPROVEMENTS
i. Fuel Service Peninsula Steel sheet-pile edging 75 lin.m. 1,250.00 93,750.00
Fill behind sheet piling allowance 25,000.00 25,000.00
Signage allowance 2,500.00 2,500.00
Site furnishings allowance 5,000.00 5,000.00
Subtotal $126,250.00
ii. Marina Basin Reconfiguration of existing
docks allowance 25,000.00 25,000.00
Additional docks (steel float, includes supply, install, power pedestal and water bib)
allowance 167,000.00 167,000.00
New boardwalk 70 lin.m. 900.00 63,000.00
Signage allowance 1,700.00 1,700.00
Fishing/lookout platforms 1 each 10,000.00 10,000.00
Security gates 1 each 1,500.00 1,500.00
Subtotal $268,200.00
iii. Boat Launch/Staging Area Miscellaneous removals allowance 5,000.00 5,000.00
Re-grading 3,500 sq.m. 2.50 8,750.00
Additional granular surfacing allowance 10,000.00 10,000.00
Plantings allowance 7,500.00 7,500.00
Signage allowance 2,000.00 2,000.00
Vehicle access bollard allowance 750.00 750.00
Subtotal $34,000.00
Subtotal Marina Improvements $428,450.00
WATERFRONT CENTRE
i. Waterfront Centre Building
Building 337.8 sq.m. 2,000.00 675,600.00
Servicing allowance 100,000.00 100,000.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
59
Subtotal $775,600.00
ii. Short-term Parking Area
Miscellaneous removals allowance 5,000.00 5,000.00
Re-grading 2,500.00 sq.m. 2.50 6,250.00
Additional granular surfacing allowance 7,500.00 7,500.00
Plantings allowance 7,500.00 7,500.00
Signage allowance 2,500.00 2,500.00
Subtotal $28,750.00
iii. Boardwalk
Expanded boardwalk allowance 75,000.00 75,000.00
Subtotal $75,000.00
iv. Canoe Launch Dock
Canoe launch dock allowance 15,000.00 15,000.00
Canoe launch pavilion allowance 25,000.00 25,000.00
Subtotal $40,000.00
Subtotal Waterfront Centre $819,350.00
PUL-A-LOG PARK
i. Landscaping Filling (excavate from campground) allowance 10,000.00 10,000.00
Tile drainage 750 lin.m. 25.00 18,750.00
Rough and fine grading 10,000 sq.m. 2.50 25,000.00
Seeding 7,500 sq.m. 1.00 7,500.00
Shade trees 100 each 300.00 30,000.00
Subtotal $91,250.00
ii. Structures Bandshell 73.9 sq.m. 1,000.00 73,900.00
Subtotal $73,900.00
iii. Walkways
Granular walkway, 2m wide 615 sq.m. 15.00 9,225.00
Boardwalk extension 130 lin.m. 900.00 117,000.00
Subtotal $126,225.00
iv. Miscellaneous
Clearing/grubbing allowance 2,500.00 2,500.00
Servicing upgrades allowance 75,000.00 75,000.00
Subtotal $77,500.00
Subtotal Pul-a-log Park $368,875.00
DOWNTOWN LINKAGE Sidewalk 200 sq.m. 50.00 10,000.00
Plantings allowance 5,000.00 5,000.00
Signage allowance 2,500.00 2,500.00
Subtotal Downtown Linkage $17,500.00
CAMPGROUND i. Site preparation Clearing/grubbing allowance 7,500.00 7,500.00
Excavation (reuse at Pul-a-log Park)
allowance 50,000.00 50,000.00
Subtotal $57,500.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
60
ii. Stormwater Management
Pond
Excavation allowance 10,000.00 10,000.00
Grading 600 sq.m. 5.00 3,000.00
Boulder edging 70 lin.m. 50.00 3,500.00
Hydroseeding allowance 750.00 750.00
Perimeter plantings allowance 2,500.00 2,500.00
Outlet structure allowance 2,500.00 2,500.00
Subtotal $22,250.00
iii. Plantings
Campground trees allowance 75,000.00 75,000.00
Bank plantings allowance 25,000.00 25,000.00
Railway screening plantings allowance 35,000.00 35,000.00
Subtotal $135,000.00
Subtotal Campground $214,750.00
PARKING LOT
i. Site preparation
Clearing allowance 2,500.00 2,500.00
Grading 6,250 sq.m. 2.50 15,625.00
Additional granular surfacing allowance 7,500.00 7,500.00
Vehicle access bollard 1 each 750.00 750.00
Plantings allowance 5,000.00 5,000.00
Granular pathways 90 sq.m. 15.00 1,350.00
Subtotal Parking Lot $32,725.00
TOTAL Phase 2 $1,453,200.00
PHASE 3 - 2005
Description Quantity Unit Unit Cost Total
MARINA IMPROVEMENTS
i. Fuel Service Peninsula
Boardwalk 275 lin.m. 750.00 206,250.00
Shade trees 30 each 300.00 9,000.00
Lookout feature/navigational aid
allowance 50,000.00 50,000.00
Fishing platform allowance 25,000.00 25,000.00
Relocated shelter at kiosk allowance 5,000.00 5,000.00
Lighting allowance 100,000.00 100,000.00
Subtotal $395,250.00
ii. Marina Basin
Site furnishings allowance 25,000.00 25,000.00
Subtotal $25,000.00
Subtotal Marina Improvements $420,250.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
61
PUL-A-LOG PARK
i. Landscaping
Tile drainage 750 lin.m. 25.00 18,750.00
Rough and fine grading 10,000 sq.m. 2.50 25,000.00
Seeding 7,500 sq.m. 1.00 7,500.00
Ornamental plantings allowance 20,000.00 20,000.00
Subtotal $71,250.00
ii. Structures
Picnic Shelter allowance 35,000.00 35,000.00
Subtotal $35,000.00
iii. Walkways
Granular walkway, 2m wide 615 sq.m. 15.00 9,225.00
Bridge over existing pond (25m x 2m, incl. footings)
allowance 30,000.00 30,000.00
Subtotal $39,225.00
iv. Memorial Garden
Granular pathway, 1.2m wide 120 sq.m. 15.00 1,800.00
Memorial plantings allowance 7,500.00 7,500.00
Signage allowance 2,000.00 2,000.00
Subtotal $11,300.00
v. Miscellaneous
Lookout point/fishing pier allowance 25,000.00 25,000.00
Interpretive signage allowance 5,000.00 5,000.00
Additional lighting allowance 50,000.00 50,000.00
Site furnishings allowance 10,000.00 10,000.00
Beach area (sand/filter fabric) allowance 12,500.00 12,500.00
Habitat enhancement initiatives
allowance 75,000.00 75,000.00
Subtotal $177,500.00
Subtotal Pul-a-log Park $334,275.00
CAMPGROUND
i. Site preparation
Grading 25,000 sq.m. 2.50 62,500.00
Servicing (power, water) allowance 50,000.00 50,000.00
Subtotal $112,500.00
ii. Roadways/Pathways
Granular roadway 2,140 sq.m. 25.00 53,500.00
Granular RV/trailer pads 3,740 sq.m. 22.50 84,150.00
Granular pathways 400 sq.m. 15.00 6,000.00
Subtotal $143,650.00
iii. Plantings
Campground shrubs allowance 25,000.00 25,000.00
Hydroseeding 10,000 sq.m. 1.00 10,000.00
Subtotal $35,000.00
iv. Miscellaneous
Site furnishings (picnic tables, firepits)
allowance 37,500.00 37,500.00
Directional signage allowance 10,000.00 10,000.00
Lookout (boulders and granular allowance 7,500.00 7,500.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
62
surface) Subtotal $55,000.00
Subtotal Campground $346,150.00
NATURAL AREA
i. Walking Trails
Clearing and localized grading allowance 10,000.00 10,000.00
Granular walkway, 1.5m wide 1,500 sq.m. 15.00 22,500.00
Subtotal $32,500.00
ii. Trout Creek Pedestrian Bridge
Clearing and localised grading allowance 7,500.00 7,500.00
Bridge (35m x 4m, incl. wide) 1 each 75,000.00 75,000.00
Subtotal $82,500.00
iii. Trail Bridge (Fish Habitat Area)
Bridge (20m x 2m, incl. footings) allowance 15,000.00 15,000.00
Subtotal $15,000.00
iv. Interpretative Signage allowance 5,000.00 5,000.00
Subtotal $5,000.00
v. Trail Markers allowance 1,000.00 1,000.00
Subtotal $1,000.00
vi. Infill Plantings allowance 35,000.00 35,000.00
Subtotal $35,000.00
vii. Site Furnishings (benches, waste receptacles)
allowance 2,000.00 2,000.00
Subtotal $2,000.00
Subtotal Natural Area $173,000.00
TOTAL Phase 3 $1,273,675.00
PHASE 4 – 2006/2007
Description Quantity Unit Unit Cost Total
MARINA IMPROVEMENTS
i. Marina Basin
Additional docks allowance 167,000.00 167,000.00
New boardwalk 70 lin.m. 900.00 63,000.00
Boardwalk lighting 4 lights allowance 2,500.00 10,000.00
Signage allowance 1,700.00 1,700.00
Fishing/lookout platforms 1 each 10,000.00 10,000.00
Additional plantings allowance 20,000.00 20,000.00
Security gates 1 each 1,500.00 1,500.00
Subtotal Marina Improvements $263,200.00
PUL-A-LOG PARK
i. Walkways
Granular walkway, 2m wide 620 sq.m. 15.00 9,300.00
Subtotal Pul-a-log Park $9,300.00
CAMPGROUND
June 2003
Red Rock Park and Marina Phase II Feasibility Study
63
i. Site Preparation
Servicing (power, water) allowance 50,000.00 50,000.00
Subtotal $50,000.00
ii. Roadways/Pathways
Granular roadway 2,140 sq.m. $25.00 53,500.00
Subtotal $53,500.00
iii. Miscellaneous
Site Furnishings (picnic tables, firepits)
allowance 37,500.00 37,500.00
Subtotal $37,500.00
Subtotal Campground $141,000.00
PARKING LOT
i. Site Preparation
Security fencing 200 lin.m. 65.00 13,000.00
Clearing allowance 1,250.00 1,250.00
Grading 3,125 sq.m. 2.50 7,812.50
Additional granular surfacing allowance 3,750.00 3,750.00
Vehicle access bollard 1 each 375.00 375.00
Plantings allowance 2,500.00 2,500.00
Granular pathways 45 sq.m. 15.00 675.00
Subtotal Parking Lot 29,362.00
TOTAL Phase 4 $452,862.00 PHASE 5 – 2007+
Description Quantity Unit Unit Cost Total
MARINA IMPROVEMENTS
i. Fuel Service Island
Marine crane allowance 100,000.00 100,000.00
Subtotal $100,000.00
ii. Marina Basin
Additional docks (steel float, includes supply, install, power pedestal and water bib)
allowance 166,000.00 166,000.00
New boardwalk 60 Lin.m. 900.00 54,000.00
Boardwalk lighting 5 lights allowance 2,500.00 10,000.00
Dredging allowance 75,000.00 75,000.00
Signage allowance 16,000.00 16,000.00
Fishing/lookout platforms 1 each 10,000.00 10,000.00
Security gates 1 each 1,500.00 1,500.00
Subtotal $322,500.00
iii. Wave Deflection Island
Fill – armourstone ,9m depth allowance 250,000.00 250,000.00
Small boulders <1.0m dia. allowance 2,500.00 2,500.00
Large boulders >1.0m dia. allowance 5,000.00 5,000.00
Logs allowance 500.00 500.00
Fish shelter structure allowance 2,5000.00 2,500.00
Habitat plantings allowance 7,500.00 7,500.00
Submerged boulders allowance 2,000.00 2,000.00
Navigational aids allowance 15,000.00 15,000.00
Subtotal $285,000.00
June 2003
Red Rock Park and Marina Phase II Feasibility Study
64
Subtotal Marina Improvements $707,500.00
NATURAL AREA i. Fish Spawning Area
Excavation, clearing and grading
allowance 15,000.00 15,000.00
Riverstone shoals allowance 7,500.00 7,500.00
Small boulders <1.0m dia. allowance 2,500.00 2,500.00
Large boulders >1.0m dia. allowance 5,000.00 5,000.00
Logs allowance 500.00 500.00
Fish shelter structures allowance 5,000.00 5,000.00
Basin plantings allowance 25,000.00 25,000.00
Shoreline plantings allowance 12,500.00 12,500.00
Submerged boulders allowance 1,250.00 1,250.00
Subtotal Natural Area $74,250.00
PARKING LOT
i. Site Preparation
Clearing allowance 1,250.00 1,250.00
Grading 3,125 sq.m. 2.50 7,812.50
Additional granular surfacing allowance 3,750.00 3,750.00
Vehicle access bollard 1 each 375.00 375.00
Plantings allowance 2,500.00 2,500.00
Granular pathways 45 sq.m. 15.00 675.00
Subtotal Parking Lot 16,362.00
TOTAL Phase 5 $808,112.00
The phasing strategy identifies the components that are proposed to be
implemented within each of the next five years and beyond. The phasing strategy
was developed with a recognition of the inter-relationships between components in
terms of co-dependencies and also the need to stage the implementation of more
significant components such as the expansion of marina docking capacity in
response to anticipated rates of growth in demand. Each subsequent phase of the
strategy is designed to support and build upon the success of the previously
implemented phase.
Although a target calendar year has been assigned to each phase, the actual timing
of implementation may vary depending on a number of factors including partner
participation, funding availability and user demand.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
66
6.4 PHASING SUMMARY
The Red Rock Marina Phase II Feasibility Study identifies a number of initiatives to
enhance the position of the Township of Red Rock as a regional tourism destination
and a gateway to Lake Superior. The recommendations build on the existing
waterfront park and marina development and include improvements to the marina,
creation of an RV park and Waterfront Centre, enhancement of the ability of the park
to accommodate special events and improvements such as expanded trail systems
to address community needs.
In addition, the Master Plan generated as a product of the study recommends the
implementation of facilities that are proposed to accommodate for requirements of
the emerging NMCA and GLHC initiatives. Funding partners have expressed a keen
interest in the project throughout the process of generating the feasibility study and it
is important that the momentum gained through the process be maintained to
optimise the potential for success. Several barriers to funding were identified in
consultation with potential partners and it is important that the Township work to
address these barriers in the immediate future to ensure that funding opportunities
can be capitalized upon.
The implementation of the Master Plan as a whole is an ambitious undertaking, but
the phasing strategy sets out a realistic methodology for staging of the
implementation of the various components of the project in a logical and
manageable sequence over time.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
67
7.0 L A N D O W N E R S H I P & O P E R A T I O N S
S T R A T E G Y
Because of the nature of the improvements associated with the
waterfront master plan, there are two practical land ownership and
operations models that are possible:
1. Township of Red Rock to own and operate all facilities and
components.
2. Township of Red Rock to own all facilities and lease out the
operation of components (i.e. marina, RV park and required
space for operation in the waterfront centre) to independent
operators.
7.1 TOWNSHIP OF RED ROCK OWNERSHIP & OPERATION
It is possible for the Township of Red Rock to control all ownership and operations
responsibilities for the waterfront; however, this model involves the following
advantages and disadvantages:
Advantages
Township of Red Rock solely controls facilities and standards of service;
Township of Red Rock can rely partially on existing staff resources and
equipment to maintain and operate the facilities.
Disadvantages
additional administrative obligations;
additional staff requirements;
revenue directly dependent upon success of operation.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
68
7.2 TOWNSHIP OWNERSHIP / PRIVATE LEASE COMBINATION
The possibility exists for the Township of Red Rock to retain ownership of the site
while leasing out the operation of certain components. This model involves the
following advantages and disadvantages:
Advantages
reduced administrative requirement;
reduced staff requirement;
fixed predetermined rate of revenue base on lease arrangement.
Disadvantages
loss of control over standard of operation and service;
administrative requirements related to leasing of facilities.
The preferred model will be determined by the willingness of the Township of Red
Rock to undertake the additional administrative burden, along with the additional
staff and equipment requirements to assist in operations and maintenance utilizing
existing resources.
Model 7.2 provides flexibility, minimizes administrative and staff obligations and
yields a predictable revenue stream and is therefore preferred if the Township does
not have the capacity within existing resources to support model 7.1.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
69
8 . 0 M A R I N A O P E R A T I O N S : T O U R I S M &
M A R K E T P O T E N T I A L
8.1 INTRODUCTION
Since its inception, Red Rock has always been a “one-industry town,” almost wholly
dependent upon the mill operations for employment and revenue. Changes and
improvements to the functioning of the mill have resulted in the availability of the Red
Rock waterfront to be used for recreation and tourism-related activities.
While tourism is extremely important to the economic health of Northern Ontario,
Red Rock has not historically been a tourist destination. However, through the
ongoing development and refinement of the National Marine Conservation Area and
Great Lakes Heritage Coast initiatives, the Township of Red Rock has been
presented with an unprecedented opportunity to capitalize on a potential growing
regional tourist market.
There are significant natural attractions that could lure visitors to the Red Rock area.
In addition to local attractions, tourists would be attracted to relatively nearby parks
and attractions, including Pukaskwa National Park (Canada), Isle Royale National
Park (U.S.), Ouimet Canyon Provincial Park, Sleeping Giant Provincial Park and other
wilderness areas and attractions. Nearby municipalities such as Nipigon and
Thunder Bay provide additional amenities and attractions of interest to tourists.
Tourists could partake in the vast number of summertime recreational activities in
the area, in addition to winter activities such as cross-country skiing, ice-climbing,
skating, snow-mobiling (sledding), snow-shoeing and ice fishing.
In addition to the development of a master plan to provide tangible direction for
future development, it is important to include an analysis of the market potential for
an expanded marina operation and RV park/campground as part of this feasibility
study. The following sections expand upon the current marina operation and its
profitability, the sources of additional demand for marina facilities and services and
the implications of this additional demand upon the profitability of an expanded
marina operation and a potential RV park/campground.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
70
8.2 CURRENT MARINA OPERATION AND PROFITABILITY
The existing marina operation in Red Rock consists of 65 slips on floating docks with
fresh water access and electrical hook up. At present, the marina can only
accommodate small boats (the largest slip can only accommodate boats of up to 36
feet in length). Larger boats wanting to use the marina facilities are at present forced
to dock alongside the fueling area, resulting in congestion and a potentially
dangerous conflict of uses.
There is considerable physical expansion potential at the marina (it was originally
designed to accommodate approximately 250 boats), and part of this assessment is
to determine what the likely market demand for expansion might be.
8.2.1 Current Utilization
The marina facilities are utilized by two main groups: seasonal boaters
(primarily residents of the area) and transient boaters (tourists “passing
through.” Using figures supplied by the Township, the total utilization of the
marina can be approximately calculated as shown in Table 8.1.
Table 8.1 Current Marina Utilization
Year Transient
Nights
Seasonal Nights Total Use (Nights)
Capacity (Nights)*
Utilization
2002
150 17 seasonal slips * 80 night season =
1,360
1,510 5,200 29%
2001 402 16 seasonal slips * 80 night season =
1,280
1,682 5,200 32%
2000 364 13 seasonal slips * 80 night season =
1,040
1,404 5,200 27%
1999 313 18 seasonal slips * 80 night season =
1,440
1,753 5,200 34%
* 65 slips multiplied by an 80-night season
As illustrated in Table 8.1, the utilization of the marina has fluctuated from
approximately one-quarter to one-third over the previous three years. Clearly
there is presently considerable unused capacity already within the existing
operation to accommodate an increase in the number of smaller boats.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
71
8.2.2 Financial Performance
Over the past several years the marina has consistently lost
revenue; this is illustrated in Table 8.2.
Table 8.2 Marina Revenue
1997 1998 1999 2000 2001 2002
Total Revenues $22,246 $28,755 $26,550 $28,709 $25,432 $35,048 Total Costs $38,770 $43,827 $38,146 $41,488 $37,267 $45,453 Gross Income (Loss) ($16,524) ($15,072) ($11,596) ($12,779) ($11,835) ($10,405) Internal Charges $9,556 $13,707 $6,973 $14,337 $1,663 $5,179 Net Income (Loss) ($26,080) ($28,779) ($18,569) ($27,116) ($13,498) ($15,584)
As shown in Table 8.2, gross revenues have fallen short of covering
costs by an average of approximately $13,000 for each year of
operation since 1997. When internal charges have been applied, the
annual net cost rises still further to an average of nearly $22,000
(although internal costs did fall dramatically in 2001 and 2002 over
previous levels).
It is instructive to examine the effective operating subsidy per boat-
night that in effect applies to the marina operation. This analysis is
shown in Table 8.3.
Table 8.3 Effective Operating Subsidy
Year
Total Number of
Boat-Nights Purchased
Net Loss of Marina
Operation
Effective Operating Subsidy per Boat
Night 2002 1,510 $15,564 $10.31
2001 1,682 $13,498 $8.02
2000 1,404 $27,116 $19.31
1999 1,753 $18,569 $10.59
June 2003
Red Rock Park and Marina Phase II Feasibility Study
72
As illustrated in Table 8.3 the effective subsidy given by the marina
operation ranges from approximately $10 to $20 per boat night.
It must be recognized that there can be several reasons why a
municipality would choose to subsidize a marina operation of this sort.
A community may choose to provide access to boating facilities for its
residents in the same way that it might provide arena or tennis court
facilities – subsidized for the good of the community and to provide a
wide range of recreational opportunities. For tourists, it may well be
worth some small level of subsidy to attract them to the community
where they may spend money on supplies, entertainment/recreation
and souvenirs. The economic impact cycle of tourism can be very
beneficial to some communities, easily in excess of the relatively minor
cost of subsidizing tourists to visit the community.
8.3 ADDITIONAL DEMAND PROJECTIONS
8.3.1 Potential Sources of Additional Demand
There are four key factors that may result in an increased demand for an
expanded marina operation at Red Rock:
i. Change in boater demographics 1
There are a number of changes occurring in the demographics
of recreational boaters on Lake Superior as a result of an aging
population, changing economic circumstances and a relative
decline in fishing opportunities in many areas. The key
changes include:
increasing boat lengths: avg. boat sizes are now 8-12m in
length;
increasing average age of the boating population (from 48 at
present to 57 by the year 2010);
25% of all boating activities will take place in the slip;
1 This information comes in large part from a study of a new marina facility by MAKERS Architecture and Urban Design, 2001.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
73
cruising will become an increasingly popular boating activity (in
response to some decline in fishing opportunities);
by 2010, the number of boating trips will decline, but the
average length of each trip will increase – overall, the number
of boating days will remain approximately unchanged.
ii. Response to the opportunities associated with the Great Lakes
Heritage Coast (GLHC) and the National Marine Conservation
Area (NMCA)
Both the GLHC and the NMCA initiatives will increase tourism to
the area by encouraging tourists who are just passing through
the area to spend some additional time investigating the
interpretive facilities and tourism activities, as well as by
attracting destination tourists who otherwise would not come to
the area.
At this time, neither the GLHC nor the NMCA initiatives have yet
developed estimates or forecasts of the amount of additional
tourism that will be attracted to the area, but the background
information pertaining to both initiatives does concede that
there will be some increase.
iii. Public investment in infrastructure that will have long-term
residual effects and benefits for the area
The Township of Red Rock clearly understands that continued
investment in the construction and operation of an expanded
marina will have a return in the economic impact generated by
additional visitors to the community and the expenditures they
bring.
iv. Venue to host possible revenue-generating events and
activities i.e. fishing derbies, waterfront festivals, etc.
Finally, there is a recognition that and expanded marina facility
will better enable the community to host larger and expanded
June 2003
Red Rock Park and Marina Phase II Feasibility Study
74
waterfront events that are currently impractical because of size
constraints.
The rationale for an expanded marina operation is clear: to enable the
operation to cater to the new trends in boaters and boating traffic, as well as
to provide services to the additional tourism potential foreseen as a result of
the new GLHC and NMCA proposals.
It is worth noting that the aforementioned MAKERS study also noted ways in
which marinas are responding to the changes in demand that are foreseen.
These include:
retrofitting existing slips to accommodate wider and longer boats;
upgrading utilities, especially electricity;
retrofitting facilities to meet the increasing demands of boaters,
including clean restrooms, laundry facilities, restaurants, shuttle
services to recreational and entertainment facilities in the community,
etc.
8.3.2 Demand Projections
This section of the document contains an estimate of the additional boating
demand for the Red Rock Marina in the year 2010 (sufficiently long-term by
which time the GLHC and NMCA initiatives can be expected to be well
underway). In the absence of specific projections from the federal and
provincial planners responsible for both these initiatives, we have accordingly
made the following reasonable assumptions:
general transient utilization of the Red Rock marina will be 25%
more than the highest usage seen in the last 4 years, as a result of
increased cruising and a longer length of stay at the marina;
seasonal (resident) usage of the marina will increase be 5% more
than the highest usage seen in the last 4 years, as residents of the
larger region (including Thunder Bay) choose to dock their boats at
Red Rock;
June 2003
Red Rock Park and Marina Phase II Feasibility Study
75
another Derby-like festival, likely related to the operations of either
(or both) of the GLHC or the NMCA, will be held;
25% of the boats utilizing the marina will be over 36 feet long.
The combined operation of these assumptions results in the following
demand estimate for the year 2010:
• average number of boating nights from general transient use
500 (rounded)
• average number of boating nights from seasonal use 1,500 (rounded)
• boating nights from new festival or event 160 (2 seasonal)
• (equals) total boating nights 2,160 • current capacity 5,200 • % utilization (of existing marina operation) 42%
8.3.3 Integration with the Waterfront Master Plan
The long-term master plan for the marina – which is essentially to expand the
marina to its physical capacity – allows for a potential fourfold increase in the
number of available slips. In light of the modest increase in demand
foreseen, it is recommended that the additional slips be added in phases as
budget allows.
If all the potential expanded slips were to developed in a single phase, the
marina would have approximately 19,000 slip-nights available (243 slips
times an 80 day season); remaining cognizant of the anticipated demand (i.e.
on the order of 2,300 slip-nights), the utilization of the marina would be on the
order of only about 12%. Obviously, then, we are looking at some sort of
phased development over time, where the total build-out takes place only
after some significant period of time where demand has built up to some
point considerably beyond what it is at present.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
76
8.4 PROFITABLITY OF AN EXPANDED MARINA AT RED ROCK 8.4.1 Profitability of the Marina Operation Itself
The additional demand as calculated in the previous section will generate
additional revenues for the marina operation, but it will also incur some
additional costs. Revenues would be expected to increase proportionately
with additional use. However, on the cost side, we expect there will be some
economies of scale, as there will be many cost areas that will not increase,
given the relatively modest increase in demand that is anticipated (in the
order of 37% overall).
It is very difficult to examine the profitability of catering to this additional
demand at some point in the future, given the many uncertainties and
variables involved (e.g. cost of diesel fuel, price of insurance, etc.). However,
a reasonable approach can be taken by examining the most recent marina
operating financial data available, and comparing this to what would have
been the case if the additional demand were already present (in other words
if the last year of operations had catered to the additional demand that we are
predicting). In this way, the cost structures are the same and the only
variable is the additional boating traffic that the marina is catering to. This
approach enables us to examine the true profitability of responding to the
additional demand foreseen.
Table 7.4 shows this information; as can be seen, all revenues have been
adjusted upward to account for the additional anticipated demand. Some
costs as well have been adjusted, reflecting the cost of fuel and certain
supplies (which will also increase with additional traffic). Other costs remain
the same, showing the economies of scale at work in that particular cost
area.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
77
Table 8.4 Forecast Marina Profitability in Response to Anticipated
Increase in Demand
Operating Budget Item
2001 Figure
Assumption Relating to Expanded Marina Operation
Expanded Operation
REVENUES Marina Fuel $14,511 • 2001 figure equals $8.63 per boat night
• applied to additional demand of 2,160 boat nights
$18,641
Rents / Concessions $10,921
• 2001 figure equals $6.49 per boat night • applied to additional demand of 2,160 boat nights
$14,018
Total Revenues
$25,432
$32,659
COSTS Marina Attendants $10,379 • assume same as 2001 operation $10,379 Park Attendants $5,634 • assume same as 2001 operation $5,634 Diesel/Gas $13,019 • 2001 figure equals $7.74per boat night
• applied to additional demand of 2,160 boat nights
$16,718
Utilities $3,557 • assume same as 2001 operation $3,557 Insurance $1,191 • assume same as 2001 operation $1,191 General Materials/Marina
$1,059 • 2001 figure equals $0.63per boat night • applied to additional demand of 2,160 boat nights
$1,361
General Materials/Park $2,428 • assume same as 2001 operation $2,428 Total Costs $37,267 $41,268 GROSS INCOME/LOSS
($11,835)
($8,609)
Internal Labour $472 • assume same as 2001 operation $472 Internal Equipment $1,191 • assume same as 2001 operation $1,191 NET INCOME/LOSS
($13,498)
($10,272)
As Table 8.4 implies – even catering to the additional anticipated boating
demand – the marina operation is anticipated to still lose money, although the
net loss is somewhat reduced (by about 24%).
8.4.2 Economic Impact on the Community As previously stated, the other reason to subsidize a marina operation is the
positive economic spin-off to the community. Without undertaking a detailed
economic impact of this upon the community, an order-of-magnitude
estimate can be made. (Here we focus upon transient boaters, as this
market brings in additional expenditures to the community that otherwise
would go elsewhere. We assume that most seasonal boaters are residents
June 2003
Red Rock Park and Marina Phase II Feasibility Study
78
of the area, and their expenditures would occur in the community in any
event, and this cannot be directly attributed to the marina.) This calculation is
as follows:
Assumed transient boating demand: 500 nights
Assumed average expenditure $100/boating night
in the community (beyond that
which is spent at the marina itself;
this may be a conservative estimate 2)
Total potential additional expenditure $50,000.00 in the community
Clearly this amount far exceeds the amount of subsidy involved for the
marina operation. As well, there will be additional expenditure from seasonal
users from outside the immediate community.
8.5 MARKET POTENTIAL OF AN RV PARK AND CAMPGROUND
8.5.1 Introduction In this section of the feasibility study we discuss the potential market available
for an RV park and campground operation in Red Rock (no campground
facilities currently exist in the community). Rather than a detailed market and
financial analysis, which is beyond the scope of this study, we have instead
assessed the demand that might be required to support a campground
operation of the size being proposed, and the ability of the available source
markets to generate this order of demand. This is thus an indicative and
‘ballpark estimate’ only, and more in-depth research into the market
potential, price points, competition, and costs and revenues would have to be
undertaken in order to determine the specific feasibility of the proposed
operation. On the basis of this preliminary review, however, it appears as
though there would be sufficient demand to support an operation of the size
and scale being proposed at Red Rock.
2 For example, the MAKERS study cited earlier reported average expenditure per boat-night of $115 ($US).
June 2003
Red Rock Park and Marina Phase II Feasibility Study
79
8.5.2 Potential Demand Demand for a proposed new RV park/campground operation in Red Rock
will come essentially from two sources: from the local and regional market,
and from pass-by tourists who are driving through the Red Rock area along
Hwy. 17. In a previous study of tourism opportunities in the region3 we had
estimated the size of both these markets respectively as:
i. local / regional market (including Thunder Bay)
approximately 140,000 individuals, or on the order of
50,000 households
ii. tourist market travelling on Hwy 17 (May – October season)
190,000 vehicles
8.5.3 Development Concept and Capacity
Part of the overall waterfront development concept is to create RV
park/campground spaces to cater to the additional tourists that might be
attracted to visit the area as a result of the various initiatives underway and
proposed in the region. The overall development concept calls for 15 RV
sites, 11 serviced trailer sites, and 46 tent/trailer sites: 72 sites in total. Given
an effective 150-day camping season (approximately mid-May to mid-
October), this provides for total capacity of nearly 11,000 party-nights (72 sites
times a 150-day camping season). In reality, of course, only the hardiest of
campers are likely to utilize the facilities in the middle of May and October,
whereas the majority of the demand will take place on weekends in the
summer. There will thus be considerable peaking of demand in the middle
of the season.
8.5.4 Occupancy and Utilization Here we first look at the number of users that would be required to sustain
(which implies at least a break-even operation, or one that generates a profit)
an RV park/ campground operation of the size of that contemplated here.
3 Terrace Bay Regional Gateway Development Feasibility Study, The Planning Partnership, February 2000.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
80
Then, we look at the likelihood that the source markets (i.e. the local/ regional
and tourist markets referred to earlier) could generate the amount of demand
required to carry the operation.
Assuming that . . .
a well-utilized RV park/campground can operate, on average, at 50%
occupancy;
half the available demand might come from the tourist market, and
the other half from the local and regional market; and
the average length of stay per party is 2 nights,
. . . then the demand for RV park/campground spaces relative to the market
potential can be calculated4. This is shown in Table 8.5 below.
Table 8.5 Demand for Campground Spaces Relative to Market Potential
Market
Segment
Demand
Market Size
Required Penetration
Rate
( 50% occupancy)
Local / Regional
Market
1375
households
50,000
households
3%
Tourist
Market
1375
households
140,000 vehicles
1%
As Table 8.5 illustrates, the demand that would be required to sustain an RV
park/ campground operation would require only a small percentage
(penetration rate) of the available market, for both the local/regional market as
well as tourist traffic. Of course, not all local/regional residents engage in
camping activity, and the same is true of tourists. Also there are other
campground facilities available in the greater region that cater to these
markets.
4 Calculated as follows: 50% occupancy of 11,000 campground nights = 5,500 utilized campground nights; at 2 nights per party (average), this implies 2,750 separate visitor parties; assuming a 50/50 split between local/area residents and tourists, this in turn implies 1,375 visitor parties (which for our purposes we can conceptualize as being equivalent to a household) from both source markets.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
81
A new operation at Red Rock, however, would have several compelling
advantages, and thus should be able to capture at least a relative share of
the available market. These advantages would include:
being a brand new operation within a new marina/recreational waterfront
complex;
being located in a very scenic location; and
its relative proximity to the Town, and the various services and amenities
available therein.
Thus on the basis of this preliminary assessment, there does appear to be
sufficient market potential to justify an RV park/campground operation.
However, as previously stated, a more rigorous financial analysis on the costs
and revenues of the operation should be undertaken before major investment
decisions are made.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
82
9 . 0 P A R T N E R S H I P & F U N D I N G O P P O R T U N I T I E S
9.1 INTRODUCTION
In order to ensure their success, waterfront improvement plans of this scale must be
accompanied by realistic and innovative plans for securing partners, funding sources
and ongoing community and business support. The importance of partnership
development and funding acquisition to the future of this initiative cannot be
overstated.
A number of local organizations (the Red Rock Historical Society, the Red Rock
Horticultural Society, Live at the Rock Blues and Folk Society) were consulted during
the preparation of this feasibility study. While these local organizations will be
important contributors to the success of any future waterfront development, it is
anticipated that their role will be as participants and partners – but not as principal
funders.
The consultant team, under the leadership of Jake Vander Wal, approached and
met with a number of potential partners and funding agencies at various times
throughout the preparation of this feasibility study. Response to the concept for the
Red Rock Marina Improvements was consistently positive and encouraging. As a
result, significant opportunities exist to obtain funding contributions from the following
organizations:
Township of Red Rock
Northern Ontario Heritage Fund
Trillium Foundation
Industry Canada (FedNor)
Parks Canada – National Marine Conservation Area
Ministry of Natural Resources
- Living Legacy Trust
- Great Lakes Heritage Coast
- Lake Superior Management Unit
- Great Lakes Renewal Foundation
- Nipigon Bay Remedial Action Plan
June 2003
Red Rock Park and Marina Phase II Feasibility Study
83
In addition to the above listed organizations, NORAMPAC Inc. was approached
regarding the possibility of altering the current lease arrangements and/or property
ownership to facilitate making the project a success. Their preliminary response is
that NORAMPAC Inc. wishes to support the Red Rock Waterfront Master Plan by
donating the required waterfront land to the Township of Red Rock. An agreement
has been reached and the process for completing the transaction is underway.
9.2 PARTNERSHIP OPPORTUNITIES
The following lists those local parties that have expressed an interest in participating
in partnership opportunities associated with the Red Rock Marina Improvements if
resources allow:
NORAMPAC Inc.
Red Rock Historical Society
Live at the Rock Blues and Folk Society
Red Rock Horticultural Society
The following lists those public agencies/municipalities that have expressed an
interest in participating in potential partnership opportunities associated with the Red
Rock Marina Improvements if resources allow:
Township of Red Rock
Northern Ontario Heritage Fund
Nipigon Bay Remedial Action Plan
Trillium Foundation
Industry Canada (FedNor)
Superbuild
Ontario Ministry of Natural Resources – Living Legacy Trust
Ontario Ministry of Natural Resources – Great Lakes Heritage Coast
Parks Canada – National Marine Conservation Area
The consultant team intends to meet with all of the above parties to discuss the draft
master plan and to begin solidifying commitments once the Township of Red Rock
and the community have reviewed and approved the preliminary draft report and
June 2003
Red Rock Park and Marina Phase II Feasibility Study
84
master plan. Opportunity exists for the development of additional partnership
opportunities as the project progresses.
9.3 FUNDING OPPORTUNITIES
The following public agencies/municipalities may potentially act as funding sources
for the Red Rock Marina Improvements:
Township of Red Rock
Northern Ontario Heritage Fund
Nipigon Bay Remedial Action Plan
Trillium Foundation
Industry Canada (FedNor)
Superbuild
Ontario Ministry of Natural Resources – Living Legacy Trust
Ontario Ministry of Natural Resources – Great Lakes Heritage Coast
Parks Canada – National Marine Conservation Area
It is important to note that nearly all parties have stressed the importance of
partnership development as a stipulation for funding.
Most of the funding agencies are prepared to contribute up to 1/3 of the project
costs, while the Northern Ontario Heritage Fund will contribute up to 50% of the
project costs. Funding is available for capital expenditures but not operating costs.
The funding agencies are primarily interested in economic development, tourism
opportunities, fish and wildlife habitat improvement and overall community
development.
9.4 NEXT STEPS
While the scope of work for this document did not include the procurement of
funding commitments from various agencies and organizations, many of the above-
listed organizations have indicated an interest and ability to act as significant funding
June 2003
Red Rock Park and Marina Phase II Feasibility Study
85
sources for future waterfront improvements at Red Rock. It is imperative that the
relationships that have been forged with various potential funding organizations in the
preparation of this document be maintained, enhanced and capitalized upon.
In order to maintain the fundraising and partnership momentum that has been
initiated, it will be imperative for Council to proceed with the next stage in fundraising
and partnership development: gathering commitments and securing financial
funding.
The following is a list of key people at the various potential funding agencies that
have been contacted throughout the preparation of this feasibility study. These
people have been generous with their time and enthusiasm, and it is important that
the relationships that have been developed be continued in order to maintain
momentum and excitement for the Red Rock waterfront improvements.
Table 9.1 – Potential Funding Agency Contact Information
Name Funding Agency Phone No.
Elaine Anderson FedNor 807.766.1807
Maureen Brophy Trillium Foundation 807.623.3822
Ken Cullis Great Lakes Renewal Foundation 807.475.1375
Gail Jackson Parks Canada 705.646.1216
Nat. Marine Conservation Area
Guilene Levesque Northern Ontario Heritage Fund 807.854.0267
Iain Mettam Ministry of Natural Resources 807.475.1413
Great Lakes Heritage Coast
Evan Thomas Ministry of Natural Resources 705.749.1380
Ontario Living Legacy Trust
June 2003
Red Rock Park and Marina Phase II Feasibility Study
86
1 0 . 0 M A N A G E M E N T & M A I N T E N A N C E P L A N
“There is a need to create a careful balance as man[kind]’s use is
accommodated while protecting a pristine, wild, healthy ecosystem.
This can be attained through careful resource management planning.”
(Great Lakes Heritage Coast)
10.1 INTRODUCTION
The long-term success and viability of the Red Rock marina and waterfront is in no
small measure connected with the management and maintenance of the amenities.
The Township of Red Rock – along with any potential partners and stakeholders –
must be willing to make a commitment to the implementation of an effective
management and maintenance plan.
The waterfront improvements that have been implemented to date are in excellent
condition as a direct result of the dedication of the Township of Red Rock and its
residents and volunteer groups. Due to its relatively isolated location, the waterfront
has not experienced vandalism problems in the past. Through the continued
involvement of members of the community – spanning all age groups – a sense of
ownership and pride will continue to manifest itself in a pristine waterfront.
10.2 POTENTIAL MANAGEMENT AND MAINTENANCE MODEL
The waterfront master plan consists of a significant amount of improvements and
expanded amenities. As discussed in previous sections of the report, there are a
number of potential partnership and funding agencies that will no doubt be involved
in the implementation, management and maintenance of the improvements. It is
anticipated that the Township of Red Rock will assume ownership of the site, but the
exact nature and duration of potential partnerships will dictate how management
and maintenance responsibilities are shared.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
87
Individual components of the master plan – including the expanded marina,
waterfront center building and the RV park and campground will eventually develop
with specific management and maintenance requirements. A consistently high
standard of maintenance will assist in ensuring that first-time visitors to the site
become repeat visitors.
June 2003
Red Rock Park and Marina Phase II Feasibility Study
88
1 1 . 0 C O N C L U S I O N
Building on the energy and enthusiasm of the residents of Red Rock;
the interest and resources of the Great Lakes Heritage Coast and the
National Marine Conservation Area; and the success and praise of
past waterfront endeavours, the next phase of improvements to the
Red Rock marina and waterfront are desired, feasible and exciting.
While the associated costs necessitate that potential improvements be
phased over a number of years, the potential long-term economic,
social and recreational benefits to the Township of Red Rock are
significant.
The National Marine Conservation Area and Great Lakes Heritage
Coast initiatives are outstanding opportunities for the Township of Red
Rock to work together with provincial and federal government
agencies to facilitate the next phase of improvements to the
waterfront. These opportunities are unprecedented and must be
capitalized upon.
Through the process of preparing this feasibility study, the consultant
team met with numerous members of the community, volunteers and
agency representatives. Their enthusiasm for the implementation of
further improvements to the waterfront is contagious.
As captured by the theme of the Great Lakes Heritage Coast,
“ . . . imagine the possibilities.”
Township of Red Rock
r e d r o c k m a r i n a p h a s e I I f e a s i b i l i t y s t u d y
A p p e n d i x A
WATERFRONT CENTRE BUILDING FUNCTIONAL PROGRAMME MARINA SERVICES Marina Office 10.00 sq m - includes boat rentals Storage 7.70 sq m Garbage Storage nil - separate building Vending Machines 7.70 sq m - part of vestibule Public Area 38.55 sq m Sales Area 11.00 sq m - part of main public area
Sub Total 74.95 sq m RV / CAMPGROUND / BOATER FACILITIES RV / Campground / Office 7.50 sq m - add to marina office Male and Female Washrooms 63.00 sq m - 5 fixtures each sex Male and Female Showers 35.00 sq m - 3 showers each sex Mechanical Room 10.50 sq m Pay Laundry 9.50 sq m - alcove off main public area Public Area 38.55 sq m Activity / Games Room nil - separate area
Sub Total 164.05 sq m
AGENCY STAKEHOLDERS Coast Guard / NMCA / GLHC 25.80 sq m - open office area
Sub total 25.80 sq m HISTORICAL SOCIETY Exhibit Space 13.00 sq m - part of main public area Storage / Work Space 25.50 sq m
Sub Total 38.50 sq m TOTAL NET FLOOR AREA 303.30 sq m
Gross up factor (11.4%) 34.50 sq m TOTAL GROSS FLOOR AREA 337.80 sq m - enclosed building area only
Copyright Statement
©2003 SCHOLLEN & COMPANY INC. All rights reserved. This document is protected under copyright law and may not be reproduced in any form without the prior written permission of Schollen & Company Inc. Drawings and Specifications are the property of the Landscape Architect. This document is submitted by Schollen & Company Inc. to the client in confidence. The document contains confidential and/or technical information, and its unauthorized disclosure could reasonably result in significant professional and financial harm to Schollen & Company Inc. Any damages arising from unauthorized use of this document or the information contained therein shall be borne by the party making such unauthorized use.