Annual Environmental and Social Monitoring Report
This report has been submitted to ADB by the Borrower and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.
Project Number: LN2627 January to December 2012
PRC: Songhua River Basin Water Pollution Control and Management Project, Private Sector Facility - Phase 1
Prepared by
LJEP Group Co., Ltd.
Annual Environmental & Social Performance Report
Longjiang Environmental Protection Group Co., Ltd.
Harbin·China
April 30, 2013
Reporting Period: January 2012 to December 2012
Report Completion Date: April 30, 2013
Prepared by LJEP Group Co., Ltd.
Disclaimer
The following information is only for reference instead of serving as formal legal documents or any other professional opinions. This report will not guarantee for statements or implications in any form.
This report is drafted by Longjiang Environmental Protection Group Co., Ltd. Unless specially noted, discoveries, instructions and conclusions herein only represent opinions from Longjiang Environmental Protection Group instead of ADB board or its working staff.
Table of Contents I INTRODUCTION ....................................................................................................................... 2
A Background .......................................................................................................................... 2
B Objective .............................................................................................................................. 3
II ENVIRONMENTAL AND SOCIAL MANAGEMENT ............................................................. 4
A ESPR Prepareration ............................................................................................................. 4
B Environmental and Social Responsibility ............................................................................ 4
C1 Overall Staff and Institutional Arrangement .................................................................... 7
C.2 Environmental and Social work plan ............................................................................. 9
III Environmental and social requirements compliance ......................................................... 14
A National requirements compliance..................................................................................... 14
A.1 Quality and Environmental Management System .......................................... 14
A.2 Compliance with Legislative and Regulatory Requirements ........................ 15
A.3 Regular environment monitor inspection ............................................................... 19
A.4 Emerging Environmental and Social Issues .................................................... 26
B Compliance with ADB Safeguards Requirements ............................................................. 27
IV PROGRESS OF ONGOING SUBPROJECTS/ACTIVITIES............................................. 28
V Summary of safety performance and corrective action ..................................................... 33
VI Sustainable Development Activities and Exchange ........................................................... 35
A Sludge Treatment Plan ....................................................................................................... 35
B Corporation Social Responsibility Report ......................................................................... 37
Annex 1 ............................................................................................................................................. 38
Annex 2 ............................................................................................................................................. 41
Annex 3 ............................................................................................................................................. 43
Annex 4 ............................................................................................................................................. 48
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
1
GLOSSORY OF TERMS & ACRONYMS
A2/O Anaerobic-Anoxic-Oxic Biochemical Reactor Process
CASS Cyclic Activated Sludge System
CSRR Corporation Social Responsibility Report
EA Executing Agency
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EPB Environmental Protection Bureau
ESMS Environment al and Social Management System
ESPR Environmental and Social Performance Report
ESA Environmental and Social Affairs
ESU Environmental and Social Unit
IPP Indigenous People Plan
IRP Involuntary Resettlement Plan
LJEP Longjiang Environmental Protection Group Co., Ltd.
QEMS Quality and Environmental Management System
SBR Sequencing Batch Reactor
SEPA State Environmental Protection Agency
SHMP Safety and Health Management Panel
SIA Social Impact Assessment
SMI Safety Management Institution
SRB Songhua River Basin
TTWE Tsinghua Tongfang (Harbin) Water Engineering Co., Ltd.
WWTP Wastewater Treatment Plant
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
2
ENVIRONMENTAL & SOCIAL PERFORMANCE REPORT
ESPR (2012)
Reporting Period: January 2012 to December 2012
Report Completion Date: April 30, 2013
I INTRODUCTION
A Background
1. Longjiang Environmental Protection Group Co., Ltd. (hereinafter referred to as “Longjiang Environmental Protection”), with its predecessor Qinghua Tongfang (Harbin) Water Affairs Co., Ltd. established in May, 2004 (hereinafter referred to as “Tongfang Water Affairs”), is a shareholding company mainly engaged in water affairs environment protection project investment, construction and operation and owns living sewage level A operation qualification issued by P.R.C Ministry of Environmental Protection. In order to introduce strategic cooperation partner, get listed in the stock market and issue shares to ADB, Qinghua Holding Co., Ltd and other investors, the company adheres to the people-oriented operation ideas to serve the society and actively perform social responsibilities by relying on environment management system. Through close cooperation with Heilongjiang Provincial Committee and government and various regional Committees and governments, the company is committed to resolving long-term water pollution and worsening water quality issues in Heilongjiang, SRB based on public services privatization in multiple forms, e.g. BOT, TOT, cooperation construction and other franchised operation mode.
2. During the 11th five-year plan,, Longjiang Environmental Protection undertook more than 70% water environmental emission reduction assignment in Heilongjiang Province, among which, accumulated sewage disposal within 0.42 billion ton, cut COD 110,000 ton in the capital city Harbin. By the end of 2011 , invested and operated nearly 30 sewage disposal plants, faucet water company, etc, with total disposal capacity 2,600,000 m3/day; the total investment for the last 7 years approached 5 billion Yuan.
3. Based on the water affairs sector and expanding water affairs market, the company is hanging on to the favorable opportunity of environmental protection industry upgrade fully implemented by the national government, accelerating the pace of deeply extending to the environmental protection sector and committed to operating frontline environmental protection project, including low-carbon economy, renewable resources development and recycling advocated by the government. In line with the continued cooperation and development strategy, in order to further enhance operation performance of urban water supply, drainage, sludge disposal facilities, increase the recycling capacity of abandoned appliance, electronic product, dismantled auto parts and improve the urban living environment, in 2010, Longjiang Environmental Protection Group and Heilongjiang Provincial Government signed Investment Strategy Cooperation Agreement on Water Affairs Project and Sewage Disposal Plant in the Key Tourist Towns of Heilongjiang Province; in 2012, the company signed Strategic Cooperation Agreement on Water Affairs and Recycling Project in Heilongjiang Province with Heilongjiang Provincial Environmental
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
3
Protection Bureau and Heilongjiang Construction Bureau.
4. In 2012, there were 3,836 urban wastewater treatment facilities in operation in China, with a total designed treatment capacity of 149 million cubic meters/day and average daily treated wastewater amount of 116 million cubic meters. In 2012, there were 65 urban wastewater treatment facilities in operation in Heilongjiang, with a total designed treatment capacity of 3.1052 million cubic meters/day and average daily treated wastewater amount of 1.8175 million cubic meters, of which the total designed treatment capacity of the water factories under Long Jiang Environment Protection Group Share Company was 2.015 million cubic meters/day and average daily treated wastewater amount was 1.0814 million cubic meters.
5. Harbin Taiping Wastewater Treatment Plant is the first wastewater treatment project of Long Jiang Environment Protection Group Share Company and was officially put into operation in December 2005. By the end of 2012, 14 wastewater treatment plants had been obtained, located in Harbin, Mudanjiang, Jamusi, Jixi, Heihe, Zhaodong, Fujin, Anda and Ning’an respectively and three water supply companies had been acquired, i.e. For example, Mudanjiang Longjiang Environment Protection Water Supply Company, Jiamusi Running Water Company and Jixi Running Water Company. Of the projects above, by the end of December 2012, 14 wastewater treatment plants (Harbin Taiping, Harbin Wenchang, Harbin Pingfang, Harbin Xinyi, Acheng Phases I, Mudanjiang Phases I, Jiamusi East Region, Jixi, Anda, Zhaodong Phases I and Ⅱ, Heihe Phases I, Ning’an, Fujin and Jiamusi West Region) and all water supply companies (Mudanjiang, Jiamusi and Jixi)had been put into operation. The upgrade transformation of an existing wastewater treatment plant had been at the environmental acceptance stage. (Harbin Taiping and Harbin Wenchang1). The project preliminary design, feasibility study report and environmental impact assessment report of Mudanjiang Wastewater Treatment Project, PhaseⅡ had been completed, ready for construction commencement. Heihe Wastewater Treatment Project, PhaseⅡ had been at the water passing and debugging stage. Acheng PhaseⅡ and Harbin Sludge Disposal had been at the engineering construction stage.
6. For the introduction of ADB equity investment, in 2010, LJEP has obtained direct loan 9,410,000 USD. In the same year, ADB provides RMB loan 0.25 billion RMB.In the near future, ADB about to provide category B joint financing scheme, with total amount 0.1 billion USD (converted into RMB 0.65 billion Yuan). Meanwhile, the disposal plants affiliated with LJEP include two sewage disposal plants with sovereignty loan provided by ADB East Asia Bureau, which are separately Harbin Xinyi Sewage Disposal Plant and Fujin Sewage Disposal Plant. Both of them use ADB public sector loan approved in 20082, constructed by state-owned company and handed over to Longjiang Environmental Protection for operation, maintenance and management.
7. Attachment I provides basic information of sewage disposal plant and water supply company affiliated with LJEP , including the current operation status or different stages governing expansion.
B Objective
8. Environment and social performance report (ESPR) is to disclose the company's implementation of environment and social management system during the report period and compliance with ADB environment and social requirements, its sub-project (or activity)’s adaptation to national and actual local condition and regulations, including environment monitor plan, environment management implementation, stakeholder participation,
1 Harbin Taiping WWTP and Harbin Wenchang WWTP are neighboring with each other. The undergoing project actually is an upgrade to both WWTPs by adding a combination of biofilter and sedimentation treatment. 2 Loan-2487 PRC:Songhua River drainage area water pollution control and management project
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
4
community relation, gender equality, health and occupation safety. In 2011, the ESPR is mainly centered on the implementation of all stages of sub-project (or activity) of LJEP, including:
i. Various sub-project (or activity)'s compliance with environment and social management requirements;
ii. Various sub-project (or activity)'s implementation in terms of environment and social management;
iii. Occupational health and safety performance and major highlights;
iv. Sustainable development programme, and community relations.
II ENVIRONMENTAL AND SOCIAL MANAGEMENT
A ESPR Prepareration
Report prepared by: EASEN International Co., Ltd.
Telephone: +86-451-86036638 / 86036639 (Fax)
Email: [email protected]
Enterprise web site: www.ljep.com.cn
Signature: Piao Yongjian
Date: April 30, 2013
B Environmental and Social Responsibility
9. In order to conform to environment and social management system requirements, LJEP establishes Environment and Social Management Union (ESU) based on the existing organizational structure, a special authority in charge of environment and social affairs management, under the supreme management board, guide and coordinate various departments and sub-projects in terms of environmental and social aspect implementation; connect the governmental function mechanism in charge of environmental and social affairs; disclose related information; interaction and exchange with the community. The following figure shows LJEP’s environment and social management framework structure.
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
5
10. The individuals below (Table 1) hold responsibility for environmental and social performance in the organizational structure of LJEP and at the subprojects/activities sites. All the listed staffs in Table 1-1 are also LJEP’s ESU leading group members who together ensure the corporation performs well in environmental and social front. In Table 1-2 is the list of environmental and social management working groups of each subproject and in Table 1-3 is the list of members of the Environmental and Social Management Office.
Table1-1 Environmental and social Management Leading Group
Headman: Piao Yongjian(CEO)
Deputy Head: Yu Xibo(Standing Deputy CEO)
Liu Song(Deputy CEO, In charge of investment and social affairs)
Zhang Fugui(Deputy CEO, In charge of environmental management)
Members:
Name Department Title Contact Information
Liu Qiang Financial Department General Manager 13845106042
Xu Runzhi Investment Department General Manager 13603656133
Chen Lingjun Human Resource
Department person in charge 13359705598
Dong Peng Chairman office deputy director 18246644777
Liu Wensheng Engineering construction
management department General Manager
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
6
Zhang
Haiyanga Production plan department
deputy general
manager 13704816580
Li Xiaowei Dispatch centre director 13633625641
Wang Naa
Environmental protection
and social management
union person in charge 13946050289
An Jiuhai Mudanjiang LJEP water
supply company
General Manager,
Assistant resident 13836367905
Wang Jingyu Jiamusi water supply
company General Manager 13555422666
Li Xiaoqiang Jixi Running Water
Company General Manager 13604687977
Wang Jie Mudanjiang WWTP General Manager
Factory Director 13904839088
Zhou Qingzhu
Jiamusi LJEP Company
Jiamusi Eastern/Western
WWTP
General Manager
Factory Director 13945460148
Zhu Dejun Jixi Jiguan District WWTP Factory Director 13846009199
Yang Weidong Heihe WWTP Factory Director 13904560953
Guan Fucai Fujin WWTP Factory Director 13945406588
Li Yan Ning’an WWTP Factory Director 13604631588
Ma Kuna Anda WWTP Factory Director 18245988620
He Xiangguo Zhaodong WWTP Factory Director 15246695718
Guan Zhenguo Harbin Xinyi WWTP Factory Director 15804631684
Zhao Feng Harbin Pingfang WWTP Factory Director 13804500256
aaaa
Female employees
Table1-2 Sub-project environmental and social management workgroup list
Name Department Title Contact Information
Shen Xuge Mudanjiang LJEP water
supply company
Minister of Production
Department 13359389838
Guo Hongtu Jiamusi water supply
company
Minister of Production
Department 15046479896
Yan Hua Jixi Running Water
Company
Minister of Production
Department 13946823933
Xu Zhiqiang Taiping WWTP Process owner 18745068950
Sun Yulong Mudanjiang WWTP Process owner 13766601960
Xue Kaijing Jiamusi Eastern/Western
WWTP Office Director 13704545082
Liu Chen Jixi WWTP Process owne 13836559745
Cao Han Heihe WWTP Process owne 13845679425
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
7
aaaa
Female employees
Table1-3 Environmental and social management office members list
aaaa
Female employees
C1 Overall Staff and Institutional Arrangement
11. In the aforementioned organizational diagram and table 1, LJEP will entrust a batch of high qualified staff from various departments to serve as ESU members. All environmental protection and social management leadership personnel and work staff has good professional and academic background (the leadership group boasts of 6 senior engineers, 12 engineers and 5 assistant engineers), in 2012,LJEP conducted at least two internal training concerning environmental and social management plan implementation, In November, the Group employed Dr. Zhou Jian, a consultant from ADB to provide the Environmental and Social Management Department and the Investment Department with training related to ADB’s Safeguard Policy Statement, social management systems and corporate social responsibility. In addition, the Environmental and Social Management Department provided the water factories under the Group with special poisonous chemicals-related training to enhance their ability to purchase, use and manage poisonous chemicals. All members are from LJEP management layer , all function departments and the affiliated branches or water plant; Further more, each of them have the ability to assume the task of management study, policy and management rule formulation and organization authority, implement quality and environmental management system and environmental monitor and information disclosure during implementing social management scheme of all sub-projects (or activity). In order to perform its duties, the ESU recruits 12 staff owning bachelor or master degree in environmental science, environmental engineering, water supply and drainage, chemical analysis, ecology, etc. With rapid expansion of LJEP, in order to strengthen capacity, the ESU needs training. Column 1 shows major assignments and
Zhao Lihong Zhaodong WWTP Process owne 13694621752
Xiao Tie Fuji WWTP Comprehensive
administra 15845151755
Wang Hongbin Anda WWTP Comprehensive
administra 13634890133
Huo Xueyu Ning’an WWTP Process owner 13624631221
Hou Fangzhou Harbin Xinyi WWTP Assistant factory
director 15246695775
Sun Jian Harbin Pingfang WWTP Process owne 15331888029
Shi Shengyu
Harbin Jincheng
Longjianghuanbao
Company
Name Department Title Contact Information
Wang Naa Environmental protection and
social management union person in charge 13946050289
Xu Linghuia Environmental protection and
social management union Assessment Officer 15004541817
Ma Yuntao Quality & Managerial Center deputy director 18845763110
Kang Shuanga Investment Department Project Manager 13703624610
Chen Chao Investment Department Project Manager 13766812433
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
8
duties of ESU.
12. In order to ensure sound management on safety and occupational health, LJEP establishes safety and health management panel (SHMP) from group legal person to all sub-projects. In terms of the company's high-level management, the SHMP is led by chief executive vice president, who is in charge of operation management and directly report to the president. The SHMP consists of representatives from security department, project management department, HR development management department, ESU, finance department and investment department. With regard to sub-project of LJEP, the SHMP is usually composed of sub-project company general manager, deputy general manger, HR principal, safety engineer, technical personnel and safety technicians. All special safety and health personnel have received training on related regulations, rule, articles of association, standard and other governing compulsory regulations and are capable of implementing daily
Column 1. The main tasks and responsibilities of ESU
� The research and formulation of environmental and social policies, laws,
regulations and management aspects.
� Responsible for the preparation of environmental impact assessment (EIA),
social impact assessment (SIA), environmental management plan (EMP),
involuntary resettlement planning (IRP), and indigenous people plan (IPP),
and environmental and social performance report (ESPR) .
� Organizing the completion environmental protection acceptance and
operation qualification and wastewater discharge permit handling of each
project undertaken by the Group Company.
� Supervise and inspect the implementation of the ISO9001-14001 system
and ESMS, to put forward the improvement plan for the deficiency identified.
� Coordinating the environmental projection management and environmental
protection monitoring work of the Group Company.
� Supervision and evaluation of subproject (or activities) on the environmental
and social effect aspects.
� Managing energy-saving and emission-reduction work, organizing the
preparation of annual energy-saving and emission-reduction project plans
and monitoring the implementation of such plans.
� Communication with government function institutions, general public ,ADB,
stakeholders and other personnal; Coordinate social relations; Information
disclosure and resolve complaints, In response to environmental and social
questions.
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
9
management.
C.2 Environmental and Social work plan
13. In the reporting period, LJEP mainly focused its environmental and social efforts on implementation and upgrade of its certified Quality and Environmental Management System (QEMS based on ISO 9001-14001); enforcement of ESMS according to ADB’s requirements and integrating it into existing system; environmental monitoring and reporting; public relationships related to environmental and social affairs; relevant trainings for environmental and social staff; safety and occupational health care; development and adoption of innovative technologies in wastewater and sludge treatment.
14. In 2011, LJEP Function Departments, major environmental and social work is classified as:
i. The ESU authorizes to advance the company's overall environmental management
system and social management implementation to maintain their effectiveness,
consistence and continuous update. Another task of the company is to monitor
operation activities, gather, analyze, report and disclose data related to environment,
provide feedback advice to related department and board and coordinate relief
measures taken by various departments. This department shall also ensure
communication among environmental management departments at various levels and
resolve the public complaint on environmental issues. It is worth mentioning that during
the report period, the three projects, Acheng Phase II, Mudanjiang Phase II and Harbin
Sludge undergone the audit of ADB and submitted relevant documents, including
social audit reports and environmental management plans, as required. The Group has
formulated its project environment and social management process to facilitate the
smooth progress of environmental and social management work.
ii. The Security Department is responsible for examining and approving the structure of
the safe production management system of each unit under the Group; establishing
and perfecting the standardized management system for safe production; organizing
the preparation of safe production and safe construction targets, and implementing
safety evaluation; responsible for evaluating the safety of protective equipment and
facilities, setting, monitoring and managing key points of safety management,
organizing safety inspection and hidden danger rectification and implementation;
organizing each unit’s preparation of emergency rescue plans for work safety accidents;
organizing the drills of such emergency rescue plans for work safety accidents and the
construction of emergency rescue teams; organizing each unit’s safety publicity,
education and training work and helping relevant departments to publicize safety
science and technology and advance the construction of enterprise safety culture;
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
10
supervising and inspecting the safety management of construction projects; organizing
the investigation and treatment of work safety accidents; responsible for safety
management of fire fighting, fire prevention, security, safety facilities and special
equipment; responsible for vehicle management of each unit (please provide detailed
decomposition); responsible for occupational health and industrial hygiene
management, coordinating protective equipment, facilities and supplies management
and monitoring on-site safety management of production units; responsible for the
archiving management of all inner safety data and inspecting and guiding each unit’s
inner safety management.
iii. The Financing Center is responsible for working out financing resource planning,
preparing and organizing the implementation financing resource optimization schemes;
formulating annual financing plans, working out and implementing special financing
implementation plans; participating in capital operation and asset reorganization
management.
iv. The production planning department integrates environmental and social requirements
into LJEP’s operational specifications, codes, and production planning. It is also
demanded to take environmental and social requirements into account when designing
investment and operational modalities, which is a key task of the department. This
department has a command center under it ,taking care of daily operational activities of
all the components of LJEP including the environmental and social performance. The
command center supervises implementation of QEMS and ESMS in
subprojects/activities, and carries out actions to correct any arising incompliance. It
also plays as a statistician to provide timely and accurate statistics reflecting the
environmental and social achievements.
v. The human resource department sets up appropriate staffing standard to ensure
adequate and qualified management and/or technical personnel will be allocated to the
positions with environmental and social responsibility. It also undertakes due diligence
on the staff performance. Meanwhile, this department makes and implements
environmental, safety, and occupational training plans; arranges physicals for the
whole staff; and promotes health care and other welfare for the employees. This
department, the Party-Masses Work Department and the Planning Department works
in a united office, mainly responsible for affairs management, trade union management
and enterprise culture construction and publicity work.
vi. The investment department is entitled to manage preparation, finalization and
acceptance to operation of the construction projects. Hence it takes charge of ESAs
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
11
emerged in the two kinds of phases of the project cycle. This department also
communicates with ADB and other shareholders about ESAs on behalf of LJEP’s
management board. Theoretically, the investment department may be confronted with
resettlement complaint and indigenous people grievance, therefore a resettlement plan
(RP) and a indigenous people plan would be readily prepared and implemented.
However, as explained in paragraph 26 and 27 below, there were never such
challenges appearing in the reporting period.
vii. The project management center is commissioned to engage all the ESAs during the
project construction phase. Potential ESAs include conventional air pollution,
wastewater, noise & vibration, impairment on ecosystem, and any other social impacts
that are liable to causing serious complaint and impedance to the project. Nevertheless,
the project staff actually had little troubles in the reporting period.
viii. The technical management and R&D department mainly keeps close track of
advanced and innovative technologies applicable to LJEP’s subprojects/activities. It
also takes independent or joint studies to provide solutions for immediate and
impending technical challenges. Whenever or whatever it is possible, new techniques
will be introduced into LJEP in time. As a good example, the technical center
collaborated with Harbin Industrial University to search an optimized sludge treatment
technology for reduction and recycling of the huge sludge dump. They made it. This
department has a water quality monitoring center under it, whose mainly
responsibilities include: participating in quality objective formulation, organizing the
preparation of water quality management plans for water supply and wastewater
treatment; establishing and perfecting water quality management systems, formulating
water quality inspection, monitoring and management rules, regulations and technical
specifications and preparing internal control standards; organizing water quality testing,
monitoring, inspection and appraisal work involved in water supply projects and
wastewater treatment projects and responsible for water quality sampling work;
organizing preventive treatment of unqualified water quality issues such as outlet water
quality abnormalities; guiding water quality inspection and monitoring business,
organizing technical training of laboratory personnel and monitoring personnel;
organizing annual business assessment of inspection personnel, monitoring personnel
and laboratory personnel; cooperating with relevant government departments in the
investigation of pollution accidents and submitting unified water quality monitoring data
to be released to the outside; water quality equipment and facility management.
ix. The financial department commits fully to providing financial support for ESAs as cost
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
12
of environmental training, expenditure in monitoring, payment for new techniques of
sludge treatment, etc.
x. President Office: Under the guidance of President and Vice President, the President’s
Office is mainly responsible for administrative management, general affairs
management, non-investment legal affairs coordination and management, letter and
call management of the Group Company and the organization and implementation of
large-scale theme activities. There is an archives office under it, working in a united
office with the Enterprise Management Office, mainly responsible for participating in
organization setting and adjustment and defining responsibilities and duties of each
department; coordinating the construction of rules and regulation systems; organizing
and optimizing the business process of the Group Company; coordinating the
operation performance appraisal of each department and the units directly under the
Group Company; Working out development plans, establishing management systems
and promoting enterprise cultural construction.
15. For the sewage disposal plants and faucet water plants under operation, major environmental and social tasks within the report period include:
i. Carrying out QEMS and ESMS in their operational and maintenance activities to
ensure satisfactory environmental and social performance.
ii. Keeping wastewater treatment/water supply facilities in good conditions and
working well; tail water/running water meeting regulatory criteria respectively;
sludge being properly disposed; and other significant adverse impacts (e.g. odor,
garbage, sludge, and sewage per se) within allowable limits.
iii. Ensuring the on-line monitoring system doing well and reading out real time data
ceaselessly, as mandatory requirements of the environmental authority.
iv. Formulating environmental monitoring plans and preparing monitoring reports.
v. Preparing corrective action plans in view of the adverse impact of projects on the
environment and society.
vi. Keeping vigilant and good scores of risk management by ensuring all the positions
and processes subject to potential risks (e.g. equipment failure, power outage,
overflow, pipeline damage, fire incident, and flood/water logging) closely watch
dogged and in control.
vii. Strengthening safety management and staff health care to avoid or minimize
incidental casualties and health hazard.
viii. Enhancing working skills and environmental awareness of the employees by
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
13
periodic training and routine education.
ix. Maintaining a good relationship with neighboring communities, governmental
administrators, and other stakeholders by proactive communication, information
disclosure, and transparency.
16. Major environmental and social tasks concerning the ongoing sub-project:
i. Strengthen environmental and social management and capacity building to cope
with thorny potential or newly emerged issues.
ii. Formulating and implementing mitigation measures against the possible adverse
impact on the environment during the project construction period and preparing
compliance monitoring reports.
iii. Superintending construction activities and ensuring that the contractors strictly
adhere to requirements of the project EIA and the detailed design, and all the
prescribed environmental protection measures (mainly for soil erosion, noise &
vibration, dust pollution, small volume of camp sewage and garbage, etc.) are put
in place according to the time-bound schedule.
iv. Undertaking due diligence on safety and occupational health of construction labor
force and promoting welfare for workers as much as possible; maximizing social
benefits.
v. Maintaining a good relationship with neighboring communities, governmental
administrators, and other stakeholders by proactive communication, information
disclosure, and transparency.
vi. Involuntary immigration and original inhabitant issue: when LJEP obtained
sub-projects, the local government and EA have completed land acquisition and
honored all compensations. According to the agreement signed between LJEP and
local government, when the permanent or temporary land use has been handed
over to LJEP, the power, water supply and road are already available. The legal
responsibilities arising out of immigration, compensation and claim belong to the
local government. On the other side, among the 2010 projects, Mudanjiang
Sewage Disposal Plant Phase II needs land acquisition; the current project is not
started yet. For this project, all land acquisition and other social issues belong to
the governmental scope, the government is responsible for land acquisition and
resettlement and shoulders related expenses. The same shall not be borne to
LJEP.
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
14
III Environmental and social requirements compliance
A National requirements compliance
17. From the very beginning when LJEP was founded, environmental and social commitment has been always the core value of the corporation. Following and being compliance with environmental and social laws, ordinances, regulations, codes, and standards of national and local levels should be the first things first of LJEP's environmental and social management. In fiscal year of 2012, the environmental and social performances of LJEP and its all subjects/activities scored high points.
A.1 Quality and Environmental Management System
18. Prior to the establishment of environment and social management system required by ADB, LJEP already established complete quality and environment management system in 2009, in compliance with ISO9001 and ISO14001. Both systems were certified on July 17, 2009 by HBQA and passed re-rating in 2012 (see attachment 2), including all sewage service and related activities. ISO9001-14001 system plays a very important role in LJEP’s sub-project. Related issues arising out of environmental and social aspect are seen in column 2.
Column 2. Certified Quality and Environmental Management System
� Continuing commitment environment friendly, social responsive and
sustainable development.
� Policy framework defining LJEP’s strategy, principles, and objectives in
environmental and social fields and ensuring the national and local statutory
safeguard requirements are fully met.
� Environmental, safety and occupational health responsibilities and
obligations assigned to every operation and activity.
� Operational instructions to guide and regulate response to environmental,
safety and occupational health stresses for minimizing and mitigating risks
and adverse impacts of subprojects/activities.
� Performance inspection and evaluation procedures to ensure due diligence
on and ever lasting improvement of environmental, safety and occupational
health performances.
� Prompt, proper and effective correcting action plans for any emerging or
potential faults and defects in environmental, safety and occupational health
fields, including a scrutinized contingency scheme.
� Records and reporting system to track the interactions with environmental,
safety and occupational health matters from top to bottom.
� Institution for various types of training to promote environmental capacity
building and provide qualified staff with sufficient knowledge and skills in
environmental and safety domains.
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
15
19. LJEP's QEMS environmental factor identification needs yearly update3. In 2011, the environment verification involved 161 items in environment and resources, covering three major sub-protects, including LJEP Taiping Sewage Disposal Plant, Mudanjiang Sewage Disposal Plant and Jiamusi East Area Sewage Disposal Plant; thereinto, 9 highlighted environmental factors are classified into 3 categories (e.g. water and soil pollution, air pollution and energy conservation) which gets adequate attention. For each environment and resource constraint, the QEMS confirms anticipated impact, possible operation status and time framework, responsible department (or personnel) and prevention complaint and relieving measures. Through this set of standard method, LJEP guarantees quality of three sub-protects and continued improvement of environmental management system so that different regulations and rules are met. At the same time, 2012 quality and environmental management system supervision and examination work is to be conducted in late May 2013 and completed by July 2013.
A.2 Compliance with Legislative and Regulatory Requirements
20. Harbin Pingfang Sewage Disposal Plant, Harbin Xinyi Sewage Disposal Plant and Jiamusi West Area Sewage Disposal Plant constructed before 2011 were put in operation in 2011, whose construction and installation were done in the factory site of the front phase project. During the report period, LJEP's expansion project includes Zhaodong Sewage Disposal Phase II and Heihe Sewage Disposal Phase II. Harbin Sludge Disposal Project is still ongoing, obtaining approval from all related authority, including EIA approval, thereinto, Zhaodong Phase II has been put in operation in the end of 2011; Heihe Phase II is still under construction. Land acquisition concerning Ning'an Anda, Pingfang, Zhaodong Phase II has been resolved, with land certificate obtained, see attachment 3 in details. The front phase design concerning Phase II engineering of Mudanjiang Sewage Disposal Plant is ongoing, with governmental administrative approval before land acquisition being handled. Previously, Longjiang Environmental Protection has no resettlement issue and/or case of impacting former local inhabitants.
21. Table 2 sets out major environmental and social law (or regulations) and their observance by LJEP
3 In August 2, 2012, pass HBQA and first re-rating review of quality and environment management system certification.
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
16
Table 2. Main Legislative/Regulatory Requirements and Compliance Statuses
Legislative Requirements
Title Correlated Stipulations Compliance Status Note
Environmental Protection Law
The Environmental component should be
designed, built, and operated simultaneously
as the principal component.
Fully met Some mitigation measures even prior to
main constructions.
EIA Law
EIA report should be delivered and a permit
obtained before the feasibility study or
project application gets approval.
Fully met. All the subprojects had been
approved.
Most EIAs for LJEP’s subprojects were
managed by governmental EAs before
transferring to LJEP.
Environmental Protection
Management Ordinance for
Construction Project
EIA requirements for projects. Provisions on
environmental management of the whole
project circle including design, construction,
acceptance to operation, operation and
close down.
Entirely satisfactory. LJEP managed its
subprojects/activities strictly following
stipulated procedures and
requirements.
LJEP mainly engaged itself in
successive construction, acceptance
inspection, and operational mgt.
Water Pollution Control Law; Air
Pollution Control Law; Noise
Pollution Control Law; Solid
Wastes Pollution Control Law
Provisions on control requirements of water,
air, noise, and solid wastes pollutions.
Focuses are put on locating pollution
sources and relevant management,
pollutants treatment and disposal, protection
of water resource and other environmental
sensitive objectives.
Satisfactory. LJEP per se commits fully
to water pollution control and
preservation of water resources, with
considerate inputs on pollution control
of sludge, odor, and noise.
Large quantity of sludge cumulated in
past years was still causing serious
impacts on surroundings. It is the most
intrusive environmental stress and
LJEP’s first priority of environmental
concerns.
Management Regulation on
Environmental Acceptance
Inspection for Completion of
Construction Project
Procedural, functional, and performance
requirements for the specific environmental
acceptance inspection. Violation of this
SEPA Decree by any project could result in
banning to operation.
Fully met. All LJEP’s subsidiaries in
service have fulfilled the specific
environmental acceptance inspection
and got the final permit for operation.
Some subprojects were going to take
the inspection by the end of 2010.
According to latest news, the newly-built
Harbin Pingfang WWTP, Harbin Xinyi,
and Jiamusi Western have commenced
the environmental acceptance
inspection when this report is prepared.
Law of Promoting Clean
Production; Energy Saving Law;
Directive Inventory for
Promotion of adoption of advanced
technologies and equipment, clean materials
and energy; encouragement of recycling
Entirely satisfactory. LJEP has been
pushing clean production and energy
saving cross its all
To address the long term sludge pollution
and transform the feces into a useful
resource, LJEP has started a ambitious
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
17
Adjustment of Industrial
Structure (2005)
industries and comprehensive utilization of
resources; improvement of
production/service processes and
enhancement of production efficiency;
strengthening management of energy
consumption and product’s life-time cycle;
reduction of pollution; investment &
technological categories to be encouraged,
limited and banned.
subprojects/activities. Technologies
adopted by LJEP are listed as
encouraged category in the inventory,
also uptodate or appropriate and
commonly used. The corporation was
entitled with energy saving example of
Harbin Municipal by the government in
the past consecutive two years.
project aimed to devour the huge sludge
dump accumulated within Harbin
Wenchang WWTP compound at a rate of
1,000 t/d by a new composting technology
which mixes the sludge with straw and
then ferments the mixture in high
temperature tank and finally get a
manure. This compost could be used as
an ameliorant for saline soil or for
afforestation.
Land Management Law; Urban
and Rural Planning Law;
Management Ordinance for
House Demolition in Urban
Area4.
Procedures of land acquisition, house
demolition and resettlement, and application
for permits of project locality, building
density, plot ratio, and construction activities.
Fully met. All land acquisition and
resettlement had been finished with
relevant compensation in place. All the
project designs and constructions
strictly abided by relevant permits.
LJEP has never been involved in land
acquisition and resettlement activities up
till now. All its occupied lands either
permanently or temporarily are
appropriated or sold by local
governments.
Labor Law; Labor Contract Law;
Women Rights and Interests
Protection Law
Provisions on employment; establishment,
alteration, and abolishment of labor contract;
labor dispute arbitration; laborer’s rights and
obligations, work hour and break
time/vacation, salary, safety and
occupational health; occupational training;
social insurance and welfare; protection of
women and minors; gender equity on
working, payment, welfare, social insurance,
and political interests.
Totally satisfactory. As a social
responsive corporation, LJEP fully
respects legislative requirements of
social dimension and commits itself and
its subsidiaries to better fulfillment of
relevant duties. All the employees have
signed the labor contract and enjoyed
stipulated rights and interests. Safety,
occupational health, training, social
insurance and welfare, and gender
equity are highly secured. No minor was
employed. All the staffs have
endowment, medical, work injury,
maternity and unemployment
LJEP has a staff of 1,480 employees
among which 455 employees are female
(30.74% of the whole staff). LJEP
ensures every employee receives fair
and equitable treatment. Most of female
employees take on administrative,
technical, financial, and fare collection
positions working on day shifts only and
with middle or upper level of payment.
Female employees can get more health
care. All the employees have a physical
inspection before engaged in position.
Middle and high level management staff
can enjoy physical on yearly basis.
4 This ordinance will be replaced by Ordinance for House Acquisition and Compensation on State-Owned Land, promulgated by Decree of the State Council No. 590, taking effect from Jan. 21, 2011.
Environmental & Social Performance Report (FY2012) LJEP Group Co. Ltd
18
insurance, as well as other welfare.
Constitution of PRC; Law on
Regional National Autonomy;
Ordinance on Religious Affairs;
Relevant Policies of People’s
Government
Provisions on nationality equity, favorable
policies for development of minorities,
freedom of religious belief, etc. In addition,
governmental policies generally give certain
privileges to minority and religious people.
Fully met. LJEP observes statutory
requirements of indigenous people
protection. LJEP and its subsidiaries
provide indiscriminate service to the
people in service area no matter what
nationality they belong to or what
religion they believe.
Within the corporation, LJEP also follows
an indiscriminate policy in terms of
employment, payment, promotion,
training, health care, and other welfare.
Mr. Piao Yongjian, a Korean, as the CEO
of LJEP, provides a live example. Many
employees are Manchu, Korean, Hui,
and Mongolian.
Requirements of Technical Policies/Guidelines/Codes
Title Correlated Stipulations Compliance Status Note
Technical Policy for Urban
Wastewater Treatment and
Pollution Control; Technical
Guidelines for Urban
Wastewater Treatment and
Pollution Control
Detailed conditions for localities of WWTPs,
recommendations and guidelines for
wastewater and sludge treatment
technologies; prevention and mitigation
measures for secondary pollutions on
ambient air, water, soil, acoustic
environment, and groundwater.
Generally satisfactory. LJEP and its
subsidiaries all belong in national
encouraged categories. The localities of
LJEP’s WWTPs are sufficiently
separated form water sources, natural
reserves, residential blocks, and other
sensitive areas.
LJEP has so far been rarely engaged in
the location selection and other earlier
project preparation of WWTPs. While it
could happen in the future, this issue has
always been dealt with by local
governments or governmental EAs till
now.
Technical Policy (Tentative) for
Sludge Treatment and Pollution
Control in Urban and Township
Wastewater Treatment Plant
Technical guidance for sludge treatment and
disposal by adoption of uptodate
technologies; recommendations for pollution
control and proper disposal.
Generally satisfactory. Sludge is
normally dehydrated to certain extent
and sent to landfill or just dumped within
the WWTP compound (e.g. Harbin
Wenchang WWTP).
Sludge dumping to landfill is facing more
and more restrictive conditions. A sludge
composting plant adopting advanced
technology was prioritized and
undergoing construction within Harbin
Wenchang WWTP compound.
Environment Social Performance Report (2012) LJEP Group Co. Ltd
19
A.3 Regular environment monitor inspection
22. According to the above contents, LJEP has established a set of online monitor system, including all its sewage disposal plant and water plant. The monitor system works 24 hours a day so that LJEP's QEMS can respond to over target value to prevent direct or indirect damage on environment. This set of complete monitor system meanwhile provides complete monitor data to provide a sound platform environment performance inspection for LJEP within the report period. Besides, each sewage disposal plant is equipped with professional assay equipment. The following table lists major environment indicator of all sewage disposal plants and water plants. The monitor data shows that all sewage disposal plants and water plants of LJEP meets related standard requirements. Within the report period, there is no over target status.
Table 3. Average Daily Air Pollution Monitor Data in 2012
Indicator
Smelly gas1
concentration (no
dimension)
H2S1
mg/m3
Ammonia gas1
mg/m3
Methane2
%
Standard value 20 0.06 1.5 1
Name of sewage
disposal plant
Harbin Wenchang 7~15 0.009~0.026 0.068~0.186 0.09~0.72
Harbin Taiping 8~12 0.011~0.025 0.054~0.221 0.12~0.53
Harbin Pingfang 9~14 0.006~0.010 0.081~0.303 0.11~0.70
Harbin Xinyi 12~15 0.004~0.006 0.062~0.125 0.23~0.29
Harbin Acheng 10~13 0.002~0.004 0.061~0.127 0.20~0.26
Mudanjiang 6~13 0.011~0.025 0.103~0.342 0.07~0.36
Jiamusi East Area 8~12 0.012~0.016 0.007~0.121 0.21~0.53
Jiamusi West Area 11~17 0.010~0.021 0.013~0.023 0.42~0.83
Heihe 8~12 0.006~0.009 0.066~0.208 0.20~0.61
Jixi 8~14 0.003~0.008 0.087~0.316 0.12~0.78
Zhaodong 10~17 0.004~0.006 0.064~0.129 0.22~0.26
Ning’an 11~17 0.015~0.029 0.011~0.023 0.43~0.86
Anda 10~15 0.005~0.012 0.102~0.139 0.12~0.33
Fujin 10~14 0.004~0.008 0.142~0.198 0.19~0.36
Note: 1 Urban sewage disposal plant discharge standard (GB18918-2002), category II 2 Smelly gas emission standard (GB14554-93), category II
Environment Social Performance Report (2012) LJEP Group Co. Ltd
20
Table 4. Noise Monitor Data in 2012
Indicator Continuous equivalent sound level
in daytime (dBA)
Continuous equivalent sound level
at night (dBA)
Standard value 60 50
Name of sewage disposal
plant
Harbin Wengchang 44.1~55.8 36.1~45.3
Harbin Taiping 43.3~56.8 35.3~46.0
Harbin Pingfang 43.0~52.6 41.8~47.6
Harbin Xinyi 36.2~43.9 33.3~39.8
Harbin Acheng 43.6~52.5 41.1~47.5
Mudanjiang 37.6~53.9 33.7~42.4
Jiamusi East 41.4~48.4 32.6~39.2
Jiamusi West 42.3~47.7 31.4~40.8
Heihe 41.1~52.2 34.2~42.9
Jixi 44.3~55.6 34.3~44.7
Zhaodong 43.4~52.6 41.3~46.8
Ning’an 35.5~44.4 34.0~39.9
Anda 41.5~50.8 35.8~42.5
Fujin 45.2~50.9 41.3~45.6
Note: Industrial Company discharge standard, category II (GB12348-2008)
Table 5. Sludge Monitoring Data in 2012
Indicator Sludge quantity in 2012 (ton) Sludge water content (%)
Name of sewage disposal
plant
Harbin Wengchang 79361 77.94
Harbin Taiping 88512 77.84
Harbin Pingfang 8940 77.92
Harbin Xinyi 24537 77.51
Harbin Acheng 11622 79.00
Mudanjiang 37752 79.19
Jiamusi East 11128 78.80
Jiamusi West 5277.5 77.70
Heihe 4744 79.16
Jixi 13828 77.73
Zhaodong 17141 78.44
Ning’an 4714 78.55
Environment Social Performance Report (2012) LJEP Group Co. Ltd
21
Anda 9353 79.18
Fujin 4381 79.30
Total 321290.5
Note: Anda Sludge Disposal Plant was under official operation in November, 2010, with operation of sludge dehydration equipment delayed to April, 2011.
Table 6. Water Supply Plant's Water Quality Monitor in 2012
(Annual average total analysis on a monthly basis)
Test Items
National
Institute of
Standards
Unit Annual average treated water
Mudanjiang Jiamusi Jixi
smell and taste nought / nought nought nought
Visible objects nought / nought nought nought
pH 6.5 -8.5 / 7.1 6.87 6.8
turbidity 3.00 NTU 1.3 2.74 2.54
color 15 Degree 7.9 2.5 13.0
free chlorine ≥0.3 mg/L 0.4 0.45 0.4
Nitrates 10 mg/L 1.3 0.11 4.10
Total Hardness 450 mg/L 46.2 55.8 129.3
The amount of
oxygen
consumed
3 mg/L 3.0 0.9 2.76
Chlorides 250 mg/L 10.1 5.66 21.2
Iron 0.3 mg/L 0.1 0.19 0.3
Total number of
colonies
100 CFU/mL) 2.7 Not detected 10.0
Total coliforms Not detected CFU/100mL Not detected Not detected Not detected
Environment Social Performance Report (2012) LJEP Group Co. Ltd
22
Table 7. Average Value of Monitor Data for Sewage Disposal Plant in 2012
Name
Design disposal
capacity
103m
3/d
Total disposal
volume
103m
3
COD
(mg/L)
BOD5
(mg/L)
SS
(mg/L)
NH3-N
(mg/L)
TN
(mg/L)
TP
(mg/L)
Inlet Outlet Inlet Outlet Inlet Outlet Inlet Outlet Inlet Outlet Inlet Outlet
Standard value (category II)1 350 100 220 30 220 30 30 15 / / 6 3
Harbin Wenchang
325 93488.0 304 49.4 142 8.35 236 16.5 41.34 4.26 46.26 16.29 5.29 0.62
Standard value (agreement)2 420 100 220 20 250 20 50 15 / / / /
Harbin Taiping 325 103277.7 269 49.8 140 8.22 215 16.5 37.51 4.09 42.61 16.10 4.67 0.64
Standard value (agreement)2 350 60 200 20 250 20 35 8 15 45 20 5 1
Harbin Pingfang 150 11463.3 288 41.1 132 10.5 293 15.0 38.31 4.53 45.94 17.56 4.35 0.69
Standard value (agreement)2 500 60 220 20 250 20 40 8 15 50 20 5 1
Harbin Xinyi 100 22170.7 618 40.1 266 7.52 377 11.2 54.74 2.69 62.12 14.79 7.35 0.58
Standard value (agreement)2 400 60 200 20 240 20 25 8 15 35 20 6 1
Harbin Acheng 500 18790.4 405 34.4 135 4.70 244 7.30 19.47 1.05 32.30 13.62 4.91 0.91
Standard value (agreement)2 400 100 180 20 200 20 / / / 20 4 1
Mudanjiang 100 36611.9 204 42.4 73.2 11.2 176 15.9 19.36 1.01 25.81 17.53 3.83 0.85
Standard value (level II) 350 100 160 30 200 30 35 25 / / / /
Jiamusi East 60 23133.9 217 23.3 91.1 5.87 130 11.5 20.52 0.94 23.85 7.99 2.37 0.36
Standard value (agreement)2 350 50 160 10 200 10 35 5 8 40 15 5 0.5
Jiamusi West 50 19255 268 36.7 159 78.4 191 5.00 28.70 2.90 34.50 6.54 3.10 0.23
Standard value (level I B) 450 60 250 20 300 20 65 8 15 70 20 7.5 1
Heihe 50 7858.0 329 24.9 137 9.36 199 10.5 39.67 2.39 43.41 12.67 4.83 0.38
Environment Social Performance Report (2012) LJEP Group Co. Ltd
23
Standard value (level I B) 400 60 200 20 200 20 45 8 15 55 20 6 1
Jixi 50 18332.2 341 36.3 114 12.2 190 15.0 32.53 4.42 42.16 12.16 3.60 0.49
Standard value (level I B) 400 60 180 20 240 20 30 8 15 40 20 6 1.5
Zhaodong3 50 17421.4 461 45.2 155 13.7 193 14.7 42.20 1.70 50.25 13.49 5.35 0.35
Standard value (level I B) 450 60 200 20 250 20 25 8 15 / 20 5 1
Ning’an4 20 6774.0 303 35.3 111 12.4 219 12.0 22.86 5.66 33.66 18.99 3.32 0.84
Standard value (level I B) 350 60 180 20 250 20 35 8 15 50 20 5 1
Anda4 20 8886.0 204 45.4 97.6 11.2 176 16.0 26.43 3.01 37.34 13.24 4.67 0.75
Standard value (level I A) 300 50 200 10 250 10 30 5 8 30 15 4.5 0.5
Fujin4 20 4883.4 297 26.0 114 6.00 264 7.00 33.25 2.54 40.71 12.30 4.49 0.32
Note: 1) For Wenchang Sewage Disposal Plant and Taiping Sewage Disposal Plant, the ammonia and nitrogen in discharged water reduces to 15mg/L, as per the agreement between LJEP and local government. 2) The agreement with Taiping Sewage Disposal Plant takes into consideration of suction water quality and disposal capacity. 3) According to suction water quality and disposal capacity, the total phosphorous standard is 1.0--1.5mg/l. 4) Ningan, Anda and Fujin were under official operation separately in April, 2010, November, 2010 and December, 2010.
Environment Social Performance Report (2012) LJEP Group Co. Ltd
24
Table 8. Construction Period of Heihe Sewage Disposal Plant Phase II-Environmental Monitor
Environmental factor Downstream ground water quality Downstream air
quality
Indicator PH COD (mg/L) BOD5 (mg/L) NH3-N (mg/L) TN (mg/L) TP (mg/L) Oil
category(mg/L) TSP (mg/L)
Standard Value* 6 - 9 20 4.0 1.0 1.0 0.2 0.05 0.3
Monitor value 7.29 12.0 2.5 0.4 0.45 0.08 No inspection 0.17 – 0.30
Table 9. Construction Period of Acheng Sewage Disposal Plant Phase II-Environmental Monitor
Environmental factor Downstream ground water quality Downstream air
quality
Indicator PH COD (mg/L) BOD5 (mg/L) NH3-N (mg/L) TN (mg/L) TP (mg/L) Oil
category(mg/L) TSP (mg/L)
Standard Value* 6 - 9 20 4.0 1.0 1.0 0.2 0.05 0.3
Monitor value 7.26 12.3 2.6 0.5 0.55 0.07 No inspection 0.15 – 0.29
Note: Level III water quality standard in GB3838-2002 and level II standard as per GB3096-1996
Environment Social Performance Report (2012) LJEP Group Co. Ltd
25
23. Within the report period, LJEP's construction activity environment monitor is conducted by local government monitor station, with low monitor frequency, thanks to well-round environment management. Table 8 and 9 list Sewage Disposal Plant's data in terms of environmental performance in the construction period. Due to similar characteristics and environmental background, the selected monitor data is typical and representative. The monitor spot is equipped in the downstream of the construction site. The gathered environment quality data indirectly reflects impact of construction activity. Apparently, the water quality is very good, indicating that the water discharge in the construction site has no obvious impact on water quality.
24. According to the 2012 China National Land and Resources Information, 198 prefecture-level administrative areas have conducted underground water quality monitoring work, with a total of 4,929 monitoring points, including 800 state-level monitoring points. According to the Underground Water Quality Standard (GB/T14848-93), the comprehensive evaluation result is as follows: there are 580 monitoring points with excellent-level water quality, occupying 11.8% of all monitoring points, there are 1348 monitoring points with good-level water quality, occupying 27.3%; there are 176 monitoring points with fair-level water quality, occupying 3.6%; there are 1999 monitoring pointes with poor-level water quality, occupying 40.6%; there are 826 monitoring pointes with extremely poor-level water quality, occupying 16.8 %. Compared with the previous year, there are a total of 4,677 water quality monitoring points with continuous monitoring data, distributed in 187 cities, including 2,974 monitoring points whose comprehensive water quality change show a steady trend, occupying 63.6% of the total number of monitoring points, 793 monitoring points whose water quality has changed for the better, occupying 17.0% and 910 monitoring points whose water quality has changed for the worse, occupying 19. 5%. On the whole, in 2012, of the nationwide water quality monitoring points with continuous monitoring data, the overall change of underground water quality mainly showed a steady trend, with similar proportions of the monitoring points whose water quality changed for the better or for the worse..
25. Mudanjiangr Longjiang Environmental Protection Water Supply Co., Ltd. is acquired by LJEP via TOT; Jixi Water supply plant is operated by LJEP entrusted by Jixi government. In 2011 end, in the year end excellency rating for governmental authority and municipal welfare companies by Mudanjiang and Jixi inhabitants, Mudanjiang Water Supply Company and Jixi Water Supply Company run into top-10 from the low-ranking originally, which indicates the water supply service quality gets recognition by users.
26. Generally speaking, LJEP boasts of excellent environmental and social performance in terms of water supply and sewage disposal, there is not major environment issue and social complaint record. LJEP's Sewage Disposal Plant helps to improve the water pollution prevention and control in SRB. According to data published by Heilongjiang Environment Protection Authority, the sewage disposal rate for cities within SRB has exceeded 82%. According to related statistics by China Environment Bullitin5, the water quality in Songhua River has improved a lot, thereinto, I- III water body6 belonging to national monitor section in SRB rise to 45.2% from 33.8% in 2008. Meanwhile, the VI-V water body reduces to 40.5% from 45.2%, V water body has no obvious variation, still accounting for 14.3%. In a certain extent, such scores are attributed to LJEP and its afficiated sewage disposal plant. The following figure shows water quality improvement in 2008-2011 and water quality in Songhua River in
5 China Environmental Protection Ministry, 2008, 2009, 2010 and 2011 China Environment Status Statement 6 As per ground water environmental quality standard (GB3838-2002)
Environment Social Performance Report (2012) LJEP Group Co. Ltd
26
2011.
A.4 Emerging Environmental and Social Issues
27. LJEP has rapidly enlarged its market share in terms of water supply, sewage disposal, sludge disposal and use. With rapid expansion, some new environmental and social issues are emerging, which include:
(i) The sewage disposal plant will produce large quantity of sludge every day. After dehydration, the water content will reduce below 80%, which will be transported outside the factory or transited to the municipal waste burying field. During the report period, Harbin sewage disposal project has been under construction, take LJEPs project in Harbin as an example, the daily newly added sludge in Taiping, Wenchang, Pingfang and Xinyi Sewage Disposal Plant is 650 ton. The sludge stacking field has major environmental safety potential. With the accumulation of sludge, there is no more stacking space; on the other hand, there may be possible secondary pollution on ground water and underground water environment, air and soil environment. The effective and rapid project construction imposes grave challenge on LJEP's wish to build a better environment and gain more social benefits.
(ii) Under most circumstances, the construction of sewage gathering pipeline lags behind sewage disposal plant. Due to lack of gathering pipeline, LJEP's Pingfang Sewage Disposal Plant's actual sewage disposal capacity is inhibited due to inadequate water supply. Although the main pipeline construction is shouldered by the government, in order to prevent or strive to reduce such issues, LJEP needs more communications with the government and design institute with regard to water volume in the front construction stage and strive to obtain confirmation by the National Development and Reform Commission.
(iii) It should be noticed that due to the expansion of Harbin City, the perfection of its piping network and the increase in the amount of domestic sewage in recent years, highly frequent overload situations have occurred in Taiping and Wenchang Wastewater Treatment Plants this year. Due to the combined rainwater and wastewater sewer system in the city, the “sewage overflow” phenomenon occurs in the case of heavy rain. In view of this, Long Jiang Environment Protection Group Share Company has submitted a report to the Environmental Protection Bureau to state the situation.
(iv) Besides, LJEP's follow up pipeline construction may involve land acquisition (usually temporary land acquisition) and related immigration issue. As stated in
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Category I - III Category IV-V Category inferior VWater Quality Improvement of SRB: 2008-2011
2008
2010
2011
Environment Social Performance Report (2012) LJEP Group Co. Ltd
27
table 2, on January 21, 2011, the State Council issued State-owned Land House Acquisition and Compensation Rule to standardize house relocation and related compensation, which has replaced the original urban house relocation management rule. The new rule emphasizes the governmental management obligations on land acquisition and immigrant and enhances immigration requirements. Actually, from the perspective of the company, LJEP basically doesn't involve housing relocation and compensation issue. However, the well-furnished and proper mechanism needs to be set to cope with immigration issue in pipeline construction with regard to LJEP sub-project.
(v) In consideration of different modes of LJEP's sub-project acquisition, construction or operation, it's necessary to confirm LJEP and its sub-project's responsibilities, obligations, task and target in terms of social issues after handover. Besides, LJEP needs to form a set of active and efficient communication method so that it can interface with the government in terms of social aspect and honor commitments regarding social gains.
B Compliance with ADB Safeguards Requirements
28. To satisfy ADB’s Safeguard Policy Statement (SPS) of 2009, LJEP put into effect a tailored ESMS for its relevant subprojects/activities through the help of ADB’s experts. One of the main purposes of the ESMS is to fill the gaps possibly existing between the country requirements and ADB’s policies. In general, these gaps mostly lie in social policies and associated institutional requirements. For example, in the established ESMS detailed frameworks for involuntary resettlement and indigenous people are proposed to address land acquisition and associated house demolition and relocation, compensation for land loss, protection of affected ethnic minority groups, grievance redressing, and so on. While in the country system, relevant responsibilities are required by respective laws and other mandatory rules and not integrated. The most prominent gap could be the difference in requirements for transparent information disclosure and stakeholder engagement. In this regard, ADB is more demanding.
29. In the reporting period, LJEP did not handle any involuntary resettlement issues and was never confronted with indigenous people grievance. As pointed out in ADB’s environmental and social safeguards compliance audit report, LJEP primarily relies on the local government to undertake land acquisition and resettlement as this is done even before a particular concession is brought up for bidding. LJEP plays a very limited role in land acquisition and resettlement. The local governments also promised LJEP would enjoy the same entitlement and arrangement as prior practices in land acquisition and resettlement for its future subprojects. With respect to the indigenous people protection, since all LJEP’s subprojects are located in remote suburbs where local inhabitants are sparsely distributed and ethnic minority people, if any, mix with Han, the majority nationality, LJEP’s activities can hardly affect the ethnic people.
30. During the report period, Acheng Phase II, Mudanjiang Phase II and the Sludge Project have undergone social audit, with the results indicating that the land acquisition, compensation and fund allocation of the three projects have been conducted in accordance with the Land Administration Law of the People’s Republic of China and relevant rules of Heilongjiang Province and that all affected families were very satisfied. Providing various compensation and benefits for all affected families and people comply with the clause about non-voluntary immigration in ADB’s Safeguard Policy Statement. The implementation of all mitigation measures is consistent with the requirements for non-voluntary immigration in ADB’s Safeguard Policy Statement, with no violation of any clauses. During the project preparation and implementation stage, a number of activities with public involvement have been held
Environment Social Performance Report (2012) LJEP Group Co. Ltd
28
to understand the issues that the affected people were concerned about, such as quantity goods investigation, compensation standards and distribution of compensation fees. The complaining channels intended for migrants are clear and effective and all migrants are aware of such channels. All the three subprojects have no effect on ethnic minorities and have no connection with the provisions about aboriginal people stipulated in the Safeguard Policy Statement.
31. According to the agreements between local governments and LJEP, for all subprojects under LJEP, either acquired through particular concession, or constructed from the beginning, land acquisition and resettlement should be undertaken by governmental agency or government commissioned corporation and all the lands permanently or temporarily needed should be appropriated or sold to LJEP by local governments. For the subproject already acquired, the governmental agency should continue to take charge of successive formalities related to resettlement. As the instance of Harbin Xinyi WWTP financed by ADB’s public loan, Harbin Urban Inland Water Construction & Development Co., Ltd. (HUIWCDC) has been handling the resettlement, earlier preparation, and construction management, whenever prior to or after transferring to LJEP. Even with respect to implementation and monitoring of EMP and RP, HUIWCDC is still engaged in everything related and responsible to report to ADB.
32. As for future expansion and development, the LJEP will remain the same approach with the previous land acquisition. On the other hand, pursuant with the newly enacted Regulation on the Expropriation of Buildings on State-owned Land and Compensation, the people’ government at municipal (or county) level and their authorized EA shall be responsible for the land acquisition, immigration and related compensation caused by public services (including environmental protection and resources maintenance). This mandatory command further explains the reasonable arrangements for LJEP not to directly take charge of land acquisition. However, it is expected the LJEP may also directly involve the land acquisition and resettlement when the extended pipeline network (especially part of pipe network that is not under the public road) is carried out in the future. During the report period, the proposed Mudanjiang phase II is in the process of land acquisition. Local Land Resources Bureau has announced the Notice about Examination and Approval of Implementation Plan for the Phase VIII Mudanjiang Urban Construction Farmland Transference and Land Collection in 2009 released by the provincial government as shown in Annex 4 in December 2011. Thus, in the opinion of LJEP, the ESMS that is consistent with ADB's security policy has always been effective.
33. Taking an overview of LJEP’s environmental and social performance, it can be confirmed that there is no phenomenon noncompliant with ADB’s safeguard requirements. If to be more stringent, people may complain LJEP’s information disclosure and stakeholder engagement are not so sufficient. That means there is room for LJEP to improve its transparency and communication with communities in accordance with ADB’s Public Communication Policy.
IV PROGRESS OF ONGOING SUBPROJECTS/ACTIVITIES
34. As shown in Annex 1, during the report period, there is one new project, Heihe Sludge, and only two existing wastewater treatment plant expansion projects, Acheng Wastewater Treatment Phase II and Heihe Wastewater Treatment Phase II. According to the project schedule, at the end of 2012, the environmental assessment and other procedures of all the projects under construction were completed and these projects will be completed in 2013.
Environment Social Performance Report (2012) LJEP Group Co. Ltd
29
35. During the report period, the Wenchang upgrading and reconstruction project is in the midst of transformation from the construction to the operation. For Harbin Taiping Sewage Treatment Plant and Wenchang Wastewater Treatment Plant which are restricted by the construction process standards and influent water quality during the construction period, the COD that is the main indicator of water quality only meets the standard of GB 18918-2002 level II, but should meet the standard of GB 18918-2002 level I in order to improve pollution control projects in key watersheds as required by the country. Thus, LJEP is conducting upgrade projects so as to further reduce the emission of pollutants. The project has entered the trial operation phase in 2011 and is in the process of environmental acceptance at present. The upgrade project is now carried out in Harbin Wenchang Sewage Treatment Plant. Therefore, the construction activities do not involve land acquisition and environmental impact is very limited and controlled.
Legend
Taiping Sewage Treatment Plant
Phase ⅠProject of Wenchang Sewage Treatment Plant
Phase II Project of Wenchang Wastewater Treatment Plant
Phase III Project of Wenchang Wastewater Treatment Plant
Upgrade and Reconstruction Project of Wenchang Wastewater Treatment Plant
Sludge Disposal Project of Wenchang Wastewater Treatment Plant
Serial
No. Name Remarks
Serial
No. Name Remarks
1 New A2/O tank Upgrade 38 Phase garage Phase II
2 New blower room Upgrade 39 Phase lifting pump Phase
General Layout Plan of Upgrade and Reconstruction & Sludge Disposal Project in
Harbin Wenchang Wastewater Treatment Plant
Environment Social Performance Report (2012) LJEP Group Co. Ltd
30
station
3 Biofilters for
denitrification Upgrade 40
Phase chemical feed
room Phase
4 Methanol storage pool Upgrade 41
三
Phase lifting pump
station and distribution
room ,chemical feed room
Phase
5 Methanol dosing room Upgrade 42 High efficient
sedimentation tank Phase
6 Depth processing and
lifting pump station Upgrade 43 Biological Aerated Filter Phase
7 Mixed flocculation tank Upgrade 44 Distribution room for
biofilter Phase
8 Filter cloth and filter
chamber Upgrade 45 Sludge storage tank Phase
9 UV disinfection room Upgrade 46 Blower room Phase
10 New administration room Upgrade 47 Fine screen room Taiping
11 Sludge thickening and
dewatering room Upgrade 48 Vortex-type grit chamber Taiping
12 Sludge storage pool Upgrade 49 Primary sedimentation
tank Taiping
13 Phase I sludge thickening
tank Phase I 50 A / O tank Taiping
14 Phase I sludge dewatering
room Phase I 51
Secondary sedimentation
tank Taiping
15 Phase I sewage tank and
sewage pump chamber Phase I 52
Sewage secondary lifting
pump station Taiping
16 Phase sludge tank
and sludge pump chamber Phase I 53 Blower room Taiping
17 Phase I office building Phase I 54 Sludge recycle pumping
station Taiping
18 Phase I clean-water tank Phase I 55 Drainage pumping station Taiping
19 Phase water supply
station Phase I 56
Drainage pumping station
gate shaft Taiping
20 Phase I slagging well
chamber Phase I 57
Spoil disposal pumping
station for primary
sedimentation tank
Taiping
21 Phase I boiler room Phase I 58
Slagging well chamber for
primary sedimentation
tank
Taiping
22 Phase I guard room Phase I 59
Distribution well for
primary sedimentation
tank
Taiping
23 Phase II A / O tank Phase II 60
Distribution well for
secondary sedimentation
tank
Taiping
24
Phase II distribution
well for secondary
sedimentation tank
Phase II 61 Sludge thickening and
dewatering room Taiping
25 Phase II secondary
sedimentation tank Phase II 62 Comprehensive building Taiping
26 Phase II blower room Phase II 63 Garage Taiping
27 Phase Ⅰ disinfecting tank Phase II 64 Mail room Taiping
28 Phase II Sewage
secondary upgrading Phase II 65 Phase I grit room Phase I
Environment Social Performance Report (2012) LJEP Group Co. Ltd
31
pumping station
29 Phase Ⅰreturn sludge
pumping station Phase II 66
Phase I primary
sedimentation tank Phase I
30 Phase Ⅰsludge thickening
and dewatering room Phase II 67 Sludge and straw bunker Sludge
31 Phase Ⅰmud hut Phase II 68 Sludge fermentation
workshop Sludge
32 Phase Ⅰdrainage pump
room Phase II 69
Sludge finishing
workshop Sludge
33 Phase Ⅰwastewater
recycle treatment room Phase II 70 Straw storage shed Sludge
34 Phase Ⅰsubstation in the
factory area Phase II 71
Biological deodorization
filter Sludge
35 Phase Ⅰ central control
building Phase II 72 Fire pool and pump room Sludge
36 Phase Ⅰ machine repair
warehouse Phase II 73
Substation and
distribution room Sludge
37 Phase II canteen Phase II 74 Weighing apparatus and
metering plant Sludge
36. The preliminary design of Phase II of Mudanjiang Wastewater Treatment Plant is under way. The environmental impact assessment of the project has been approved and the resettlement plan has been completed. Currently, the preliminary design has been completed and the land acquisition notice has been issued. The project is ready for construction commencement.
37. Harbin Sludge Treatment Plant is the first large-scale sludge treatment plant in the Songhua River Basin, intended to digest and recycle the sludge from the wastewater treatment plants in Harbin. The plant adopts high-temperature fermentation technology to produce fertilizers, located in the existing sludge storage yard in Harbin Wenchang Wastewater Treatment Plant, covering an area of 9.17 hectares7. Expert argumentation shows that if the bioleaching technology is applied to the front end of the process, the treatment capacity can reach 1000 tons, without changing the original area of the plant. According to the project schedule, the environmental impact assessment, feasibility study and preliminary design were prepared and approved in 2010. The diagram below is the schematic diagram of the main process and facilities.
7 The sludge dump is estimated having aggregated up to 500,000 tons of sludge to date.
Environment Social Performance Report (2012) LJEP Group Co. Ltd
32
Environment Social Performance Report (2012) LJEP Group Co. Ltd
33
38. In the preparation of the report, the sludge disposal plant has carried out the preliminary sludge solidification processing work, namely solidification of sludge piled on the construction site, in order to achieve the lower moisture content as well as prevent secondary pollution caused by rainfall or rise of groundwater. During the investigation on the site, it was discovered that construction machinery such as excavators, loaders and heavy-duty trucks has been on the site. The factory site is far away from the nearest buildings as well as from the Songhua River. Thus, it can be concluded that the impact caused by construction noise, dust, odors and other pollutants on the surrounding sensitive target is negligible. In general, the building activities are organized orderly and compliance with conventional environmental requirements.
V Summary of safety performance and corrective action
39. As set forth under the list of main environmental and social laws (or regulations) in Table 2, the LJEP and its subsidiary plants are in full compliance with provisions of the Labor Law, Labor Contract Law, Law on the Protection of Women’s Rights and Interests and other laws and regulations as well as related security and occupational health requirements. During the report period, all subprojects are fully compliance with above-mentioned provisions, and no significant safety and health event occurs.
40. Long Jiang Environment Protection Group Share Company gives priority to employing local labors and encourages construction project contractors to hire workers from local communities. The Wenchang Sludge Treatment Subproject will offer 33 jobs and Phase II of Mudanjiang Wastewater Treatment Plant will offer 25 jobs.
41. The Trade Union holds the staff conference every year to discuss salaries, welfare, management rules and regulations and other matters related to employees and provide suggestions for the management of Long Jiang Environment Protection Group Share Company.
42. During the report period, Long Jiang Environment Protection Group Share Company recruited 579 employees (including the employees in the newly acquired Jiamusi Running Water Factory), including 171 females, all of which are formal employees. The data above show that in spite of the industry restrictions, Long Jiang Environment Protection Group Share Company still offers employment opportunity and the equal treatment to female employees as far as possible, thereby contributing to the increase in the employment rate of the project location.
Construction Site of Harbin Sludge Treatment Plant
Environment Social Performance Report (2012) LJEP Group Co. Ltd
34
43. During the report period, there are 2084 employees in Long Jiang Environment Protection Group Share Company and the plants under it, including professional management personnel, engineers, technicians, manpower analysts, mechanics, operators, electric appliance engineers, drivers, breeders, cleaners, entrance guards and other posts that provide rear service support. Long Jiang Environment Protection Group Share Company encourages contractors to offer equal employment opportunities to female employees and is willing to cooperate with contractors without sex discrimination. Wenchang Wastewater Treatment Plant and Phase II of Mudanjiang Wastewater Treatment Plant will create a total of 58 jobs, 10% of which may be offered to females. All employees have signed a labor contract and enjoy relevant rights and benefits. Long Jiang Environment Protection Group Share Company provide it employees with all legal rights and interests, including salaries, post allowance, old-age insurance, medical insurance, unemployment insurance, housing allowance, maternity insurance, work injury insurance, full attendance bonus and other welfare (such as work clothes, individual protective articles and free lunch). As for the employees exposed to a harmful environment for a long time, subsidies may occupy 15% of their salaries.
44. Anchored to General Principles for Requirements of Safety and Health in Production Process (GB/T12801-2008), Hygiene Design Codes for Industrial Enterprises (TJ36-79), Technical Specification for Operation, Maintenance and Safety of Municipal Wastewater Treatment Plant (CJJ 60-94), and other applicable standards related to safety and health management, LJEP set up a Safety Management Institution (SMI) which covers every position to regulate the procedures, processes, and activities for ensuring compliance with all the legislative and other mandatory safety requirements. SMI explicitly defines the organizational and responsibility aspects of the safety management; and regulates implementation of safety education and training program, safety inspection, accident prevention and aftermath treatment mechanism, contingency plan, rewards and punishment. Through overall screening and identification of key factors potentially impairing safety performance, SMI specially focuses on overflow, accidental release of pollutants, fire, flood, equipment breakdown, pipeline crack, power outage, driving accident, among others. Based on SMI, technical and management measures for securing safety and health dimensions are readily in place. In a word, good institution, conscientiousness, due diligence, and vigorous implementation, all together guaranteed excellent safety performance of LJEP in the reporting period.
45. To strengthen the leadership, supervision and enforcement, LJEP established Safety and Health Management Panels (SHMP) at various administrative levels. As it always being, LJEP came up with an annual environmental, safety and health training program in 2012. By implementing the training program, 579 new recruit received an entering education; four environmental training courses were held accommodating 1910 person-times; four safety training courses for 2027 attendances were finished, and ten occupational education sessions for 3368 person-times were well done. All the input in these trainings got very positive reward and significantly promoted the safety and health capacity building.
46. Long Jiang Environment Protection Group Share Company has its procedure guide and requirement standards, all of which have been clearly archived. Administrative personnel provide occupational training and situation description immediately after a new employee is recruited. Through group discussion and the learning activity, employees can receive further training. On Nov. 30th, 2012, the employees in the Environmental and Social Management Department received relevant ability construction training, with the training topics covering the following several aspects:
Environment Social Performance Report (2012) LJEP Group Co. Ltd
35
(i) ADB’s social security policy and procedure;
(ii) Steps for land acquisition and resettlement audit;
(iii) Domestic laws and regulations about social security guarantee;
(iv) Guide for the latest national social impact assessment;
(v) Implementation and monitoring of the environmental and social management system
(vi) International success experience in resettlement
47. As the project owner/proponent, LJEP fulfilled construction safety and health management mainly through specific agreement with the construction contractor. The project management center took charge of daily superintendence of construction safety and health. Construction contractors were required to act following national and local safety/health mandatory rules, and make every effort to avoid work injury and casualties during construction. Moreover, the contractor had to guarantee that the laborers (including farmer-turned-workers) would have timely payment commensurate to their workloads and enjoy necessary social insurance, medical care, personal safety gadgets, appropriate sanitation, and suitable accommodation. LJEP’s project center, together with governmental authorities, supervised and undertook due diligence on the performance of the contractor in terms of construction safety and health.
48. LJEP and its subsidiaries have also maintained a good record of safety and occupational health, but there are still areas that need to be improved. For example, the annual medical examination should not only cover senior management staff and new employees, but should extend to in-service staff, especially those in the harsh conditions. LJEP will expand its health plans and increase the budget so as to benefit all employees. Another proposal is to arrange for a safety and health training. For employees who are exposed to hazardous substances and environmental risk, it is very important that LJEP must ensure that each employee's health, and fully understand the safety and health threats that may be encountered, as well as special programs to deal with such emergencies. Therefore, LJEP should strengthen its training programs to improve the safety and health awareness of employees, so that employees may be aware of the methods and requirements to respond to emergencies or potential threat. All employees, whether new or veteran, are recommended to receive at least once specific safety and health education or training.
49. During the report period, a total of 43 newly hired employees for 10 sewage treatments operation projects of LJEP, including 7 women, belong to certified staff, accounting for 84% of the staff whose hometown are on the project site. The above data indicated that LJEP provides the female employees with employment opportunities and equal treatment as possible even under restrictions by this industry, and makes contributions to the enhancement of the employment rate on the project site.
VI Sustainable Development Activities and Exchange
A Sludge Treatment Plan
50. From the perspective of China's sewage treatment industry, the sludge problem is certainly emerging and will last for long time. The sewage treatment plants across the country perhaps have to face the problem of treatment and disposal of sludge for a long time. A great quantity of discarded sludge contains water, various pathogenic microorganisms and parasites, so as to provide food and breeding conditions for flies
Environment Social Performance Report (2012) LJEP Group Co. Ltd
36
and rats. A small-scale decentralized sludge pile will result in the deterioration and pollution of air. The leachate after sludge disposal will lead to the serious pollution of surface water and groundwater. In the Environmental and Social Audit Report, the ADB inspection team also pointed out that the sludge needs to be solved as the most pressing problem. In order to respond to this problem, LJEP has paid great efforts to the research and development of innovative and applicable solutions. LJEP has participated in the project team led by experts from China Northeast Municipal and Environmental Design and Research Institute to prepare the Sludge Treatment and Disposal Plan of Sewage Treatment Plants in Heilongjiang Province (draft) (hereinafter referred to as" sludge Plan ") which has been submitted to Heilongjiang Provincial Development and Reform Commission, Provincial Environmental Protection Bureau and the Provincial Department of Construction.
51. In accordance with the "12th Five-Year" Plan of Urban Sewage Treatment and Recycling Facilities Construction Plan in Heilongjiang Province, the daily sludge production shall rise from 2,848 t / day in 2010 to 3,375 t / day in 2015 with the rapid increase in sewage treatment capacity. The sludge treatment rate will reach 60% in 2015.
52. In view of the rapid increase in sewage treatment, the sludge issue has become an environmental, social and economic barrier to Heilongjiang Province. For the sludge planning, a comprehensive comparison and selection has been carried out among all mainstream sludge treatment processes, and the final choice is composting approach. The nutritive soil produced by the sludge can be widely applied as soil improver to wide extent of saline-alkali soil in Heilongjiang province. In addition, the nutritive soil can be used for woodland fertilizing, garden and flower nursery, lawn cultivation, road slope protection, highway greening, golf courses, soil improvement, quarry, fixation of open pit, and vegetation recovery, etc. As a pilot, the restoration for one hectare of saline-alkali soil needs about 90 tons of nutritive soil produced by sludge compost each year, and the effect will be achieved after 3-5 year continuous restoration. Based on the existing size of sludge composting process (calculated as per nutritive soil production of 428 tons per day), the saline land of 2080 hectares may be restored every three years, which can be used for the cultivation of commodity crops and trees as well as the construction of greening park, so as to generate enormous ecological and economic benefits. In the future, it is predictable that sludge harmless treatment project will be increased by 50 new ones in the “12th Five-Year” Plan of Heilongjiang Province, with a total investment of 2.137 billion Yuan.
53. As the early participant of the sludge program and the forerunner of such sludge composting plants, LJEP has fully committed itself to the implementation of the proposed sludge planning in the next “Five –Year” plan. During the report period, LJEP has signed strategic agreements with Zhaodong, Anda and other local governments, so that LJEP will take advantage of the supplied saline land of five square kilometer as the restoration land for nutritive soil created by sludge compost of Harbin Sludge Treatment Plant. The pilot program is applied to agricultural development after transformation. Through the cultivation of commodity crops such as marigold and lavender, etc., high density straw crop - silage corn and fast-growing trees such as poplars, the agricultural tourism demonstration zone featured by environmental protection shall be established in Heilongjiang Province so as to promote the integration of ecological, economic and social benefits for salinization soil in Heilongjiang Province. Judging from the long-term expansion of the sludge treatment, LJEP will copy the mode of Harbin Sludge Treatment Plant, that is BOT assignment agreement, or develop other financing, construction and operation modes.
Environment Social Performance Report (2012) LJEP Group Co. Ltd
37
B Corporation Social Responsibility Report
54. As an earlier participant of the sludge plan and sponsor of the first sludge compost plant of its kind, LJEP will fully commit to fulfillment of the proposed sludge plan in the next five years. In the reporting year of 2010, LJEP signed an outline agreement with Zhaodong People’s Government for an arrangement by which LJEP will reclaim a provided saline plot of 5 square km, using all the sludge compost produced by Harbin Sludge Treatment Plant. The reclaimed plot is planned for development of forestry by planting fast-growing poplar trees. In view of further expansion in sludge treatment, LJEP will copy the modality of Harbin Sludge Treatment Plant, namely BOT concession arrangement, or explore other financing, construction and operation modes.
55. For the purpose of better performance in public relations and transparency, LJEP will re-revise corporate website after its listing application, and make an Annual CSRR available on the website. The Annual CSRR will cover a summary of the performance and results of operation and construction, environmental performance and subproject completion status, public relations, and the contribution to social benefits, in order to reflect environmental and social impact as possible. The LJEP even presents the draft about the further improvement in environmental and social aspects of the Company in its Corporate Social Responsibility Report.
56. Taking into account the similarities between the CSRR and Annual Environmental & Social Report submitted to the ADB, the preparation of the annual corporate social responsibility report may be combined with the report for ADB. The managers of LJEP have agreed that once the preparation and distribution mechanisms of the Annual Corporate Social Responsibility Report are established and implemented, LJEP will improve its environmental and social performance and greatly increase its transparence.Annex 1
Environment Social Performance Report (2012) LJEP Group Co. Ltd
38
Annex 1
Summary of Longjiang Environmental Protection Subprojects
Name of
subprojects
Design
capacity
(km3/d)
2011 load
(km3/d)
Total
treatment
capacity
(km3)
COD
pollutant
deduction
(t)
Treatment
process
Mode and
current
status
Date of
conferment
Date of
commencement
Time and
scheduled
completion
date
Remarks
Wastewater Treatment Plant in Operation
Harbin Wenchang 325 196.1 68247.3 18167 A/O BOT
Operation Dec. 2004 May. 2004 Dec. 2005
Existing, Wenchang plant has
experienced with first full year
of operation for 2011 since
2010 after the merger
Harbin Taiping 325 298.8 68247.3 25923 A/O BOT
Operation Sept. 2010 May.2004 Oct.2005 Existing
Harbin Pingfang
Wastewater
Treatment Plant
150 28.0 10330 1975 CASS BOT
Operation Oct. 2008 Dec. 2008 Sept. 2010
Environmental acceptance in
progress
Harbin Xingyi
Wastewater
Treatment Plant
100 59.0 21335 11280 A2/O
BOT
Operation Oct. 2008 Dec. 2008 Sept. 2010
Except the greening project,
the main construction has
already been completed.
Harbin Acheng
Phase I 50 102.95 11840.3 6638.1 CASS
TOT
Operation Sept.2012 / 2012 Existing
Mudanjiang Phase
I 100 101.4 36599.9 8478.5 A/O
BOT
Operation May 2008 NA NA Existing
Jiamusi East 60 63.1 22767.8 2945.2 SBR BOT
Operation July 2005 June 2005 Dec. 2006 Existing
Heihe Phase I 50 41.6 15024.8 5788 CASS BOT
Operation Nov. 2009 July 2008 Sept. 2009 Existing
Jixi 25 26.1 9412.7 2430.9 CASS BOT
Operation Oct. 2009 April 2009 Oct. 2009 Existing
Environment Social Performance Report (2012) LJEP Group Co. Ltd
39
Zhaodong Phase I 30 24.6 8895.5 3201.2 CASS BOT
0peration June 2009 March 2009 Sept. 2009 Existing
Zhaodong Phase II 20 / / / CASS BOT
Expansion / Aug. 2010 July 2011
Existing, environmental
acceptance in progress
Ning’an 20 13.7 3776.8 1133 Improvement
of A/O
BOT
Operation Oct. 2009 Aug. 2009 May 2010
Existing, started to run
formally in April 2010.
An’da 45 19.6 1078 161 A2/O
BOT
Operation Dec. 2010 NA NA
Existing, started to run
formally in November 2010.
Fujin 20 6.4 153.9 28.9 CASS BOT
Operation Dec. 2009 July 2009 Nov. 2010
Existing, started to run
formally in December 2010.
Harbin Xingyi
Wastewater
Treatment Plant
50 / / / CASS
BOT
Under
construction
Nov. 2008 June 2009 June 2010 Existing, phase is under
construction by municipal
government
Upgrade of Harbin
Wenchang and
Taiping
600 / / /
A/0+
biofilters for
denitrification
+ mechanical
filtration +
UV
disinfection
BOT
Operation Sept.2011 June 2010 June 2011
Existing, at trial operation
currently, environmental
acceptance in progress
Wastewater treatment plants under construction or proposed wastewater treatment plants
Mudanjiang Phase
II 100 / / / NA
BOT
Initialization NA NA NA Proposed
Heihe Phase II 25 / / / CASS
BOT
Under
construction
/ Oct. 2010 Sept. 2011 Expansion
Acheng Phase II 50 / / / BOT
construction / Sept.2012 Aug.2014 Expansion
Wastewater Treatment Plants in operation
Mudanjiang
Longjiang
Environmental
360 / TOT
Operation April 2010 NA NA Existing
Environment Social Performance Report (2012) LJEP Group Co. Ltd
40
Water Supply
Company
Jixi Water Plant 100 /
Operation
under
assignment
June 2009 NA NA Existing
Jiamusi Water
Plant 2000 / Franchise NA NA NA Existing
Sludge treatment plant under construction
Harbin Sludge
Treatment Plant 1 / / /
Thermorphilic
aerobic
composting
BOT
Under
construction
Sept.2012 Aug. 2010 Dec. 2011 Under construction
Environment Social Performance Report (2012) LJEP Group Co. Ltd
41
Annex 2
Environment Quality Management System Certificate of Conformity and Environment
Management System Certificate of Conformity for Longjiang: ISO9001:2008 and ISO14001:2004
Environment Social Performance Report (2012) LJEP Group Co. Ltd
42
Environment Social Performance Report (2012) LJEP Group Co. Ltd
43
Annex 3
Name of
subprojects Status of land transaction Land No.
Owner of
land use
right
Location Land type
(application)
Type of
use right
Area of
use right
Issuance
date Remarks
Wastewater Treatment Plant in Operation
Harbin
Wenchang
Has acquired land certificate,
renaming
Heilongjiang
State-owned Land
Use (1997)
Document No.075
Harbin
Drainage
Co., Ltd.
Tuanjie
Township,
Taiping
District
Harbin
Land for
municipal
facilities
Allocation
of
state-owne
d land use
right
585169.0
m2
July
25,2007
Since both Wenchang,
and Taiping jointly
handled the land
certificate initially, the
area of tenure for
Wenchang Wastewater
Plant include
the usable area of
Taiping Wastewater
Plant.
Harbin Taiping Acquired, belonging to the
Group
Harbin
State-owned Land
Use (2009)
Document No.
040011557
Tongfang
(Harbin)
Water Co.,
Ltd.
Tuanjie
Township,
Taiping
District
Harbin
Municipal
public
facilities
Allocation 152141.8
m2
December
18,2009
Harbin
Pingfang
Wastewater
Treatment Plant
Acquired, belonging to joint
project, the partner holds the
certificate of land allocation
/ / / / / / /
Harbin Xingyi
Wastewater
Treatment Plant
Acquired, belonging to joint
project, the partner holds the
certificate of land allocation
/ / / / / / /
Harbin Acheng
WWTP
Acquired, belonging to joint
project
A
State-owned Land
Harbin
Acheng /
Public
facilities Allocation
74924.0
m2 June 9,2012
Environment Social Performance Report (2012) LJEP Group Co. Ltd
44
Use (2011)
Document No.
00548
Tengfei
Wastewater
Treatment
Co., Ltd.
Mudanjiang
Phase Acquired
Mudianjiang
Property Right
Certificate
Yangming District
Document No.
4084828
Mudian-
jiang
Longjiang
Environ-
mental
Protection
and Water
Co., Ltd.
450-515-3/
1-27-DZ
Yangming
District
450-515-3/
1-27-DZ
Industrial Allocation 101026.0
m2
January
2,2010
Jiamusi East Acquired
Jiamusi State-owned
Land Use(09)
Document No.
0900800
Jiamusi
Longjiang
Environmen
tal
Protection
and Water
Co., Ltd.
North of
Eastern
part of
Chang’an
Road
Dongfeng
District
Public
infrastruc-
ture
Allocation 70807.00
m2
June 9,2009
Heihe Phase I Acquired
Heihe
State-owned Land
Use (2011)
Preliminary
Document No. 262
Heihe
Longjiang
Environ-
mental
Protection
and Water
Co., Ltd.
Two
kilometers
south from
Changfa
village
Public
facilities Allocation
54000.00
m2
September
30,2011
Jixi Acquired, renaming
Zhaodong
Phase Acquired
Zhaodong
State-owned Land
Use (issued in
2010 ) Document
No. 12
Zhaodong
Longjiang
Environ-
mental
Protection
and Water
Co., Ltd.
West side
of Nanhan
River, the
Ninth
Middle
School of
Tiedong
Industrial Allocation 44100.00
m2
October
17,2010
Environment Social Performance Report (2012) LJEP Group Co. Ltd
45
District
Zhaodong
Phase II Acquired
Zhaodong
State-owned Land
Use (issued in
2010 ) Document
No. 12
Zhaodong
Longjiang
Environ-
mental
Protection
and Water
Co., Ltd.
West side
of Nanhan
River, the
Ninth
Middle
School of
Tiedong
District
Industrial Allocation 44100.00
m2
October
17,2010
Ning’an Not acquired / / / / / / /
An’da Acquired, but in government
name / / / / / / /
Fujin Acquired
Heilongjiang Fujin
State-owned Land
Use (2011 )
Document No. 0102
Fujin
Longjiang
Environ-
mental
Protection
and Water
Co., Ltd.
North side
of
industrial
park
Land for
environmen
tal
sanitation
facilities
Allocation 18800m2
April
25,2011
Jiamusi West
Wastewater
Treatment Plant
Acquired
Jiamusi State-owned
Land Use(2011)
Document No.
201101738
Jiamusi
Longjiang
Environ-
mental
Protection
and Water
Co., Ltd.
No. 100
Committee,
Yonghong
District
Municipal
facilities Allocation 99866m
2
November
25,2011
Upgrade of
Harbin
Wenchang and
Taiping
Included in the landholding of
Wenchang
Heilongjiang
State-owned Land
Use (1997)
Document No.075
Harbin
Drainage
Co., Ltd.
Tuanjie
Township,
Taiping
District
Harbin
Land for
municipal
facilities
Allocation
of
state-owne
d land use
right
585169.0
m2
July
25,2007
Since both Wenchang,
and Taiping jointly
handled the land
certificate initially, the
area of tenure for
Wenchang Wastewater
Environment Social Performance Report (2012) LJEP Group Co. Ltd
46
Plant include
the usable area of
Taiping Wastewater
Plant.
Wastewater treatment plants under construction or proposed wastewater treatment plants
Mudanjiang
Phase II
In the process of land
acquisition / / / / / / /
Heihe Phase II Acquired,
Heilongjiang
State-owned
Land Use
(2011)
Preliminary
Document
No.262
Heilongjian
g
Longjiang
Environ-
mental
Protection
and Water
Control
Co., Ltd.
Two
kilometers
south from
Changfa
village
Public facilities Allocation 54000.00
m2
September
30,2011
Acheng Phase
II
Acquired, belonging to joint
project
A
State-owned
Land Use
(2011)
Document
No. 00548
Harbin
Acheng
Tengfei
Wastewater
Treatment
Co., Ltd.
/ Public facilities Allocation 74924.0m2
June 9,2012
Water supply company in operation
Mudanjiang
Longjiang
Environmental
Water Supply
Company
Acquired,
Ningan
State-owned
Land
Resource(Bra
nch)
Document
No.0072
Mudian-
jiang Water
Supply
Company
Outside
Dongdaem
un
4900.00m2
Jiamusi Water Acquired, HeiJiamusi Jiamusi Xiangyang Public facilities Allocation 1248.23m2
October
Environment Social Performance Report (2012) LJEP Group Co. Ltd
47
Supply
Company
State-owned
Land
Resource
Public
Document
No.00773
Water
Supply
Company
district
No.57
15,2002
Jixi Water Plant Operation under assignment,
not belonging to the Group / / / / / / /
Sludge treatment plant under construction
Harbin Sludge
Treatment Plant
Included in the landholding
of Wenchang
Heilongjiang
State-owned
Land Use
(1997)
Document
No.075
Harbin
Drainage
Co., Ltd.
Tuanjie
Township,
Taiping
District
Harbin
Land for municipal
facilities
Allocation
of
state-owne
d land use
right
585169.0
m2
July
25,2007
Area of tenure for
Wenchang Wastewater
Plant includes
Environment Social Performance Report (2012) LJEP Group Co. Ltd
48
Annex 4
Mudanjiang Bureau of Land and Resources
Announcement about Compensation and Allocation Scheme for Collecting Collective Land
of Yangming Village and Yumin Village in Xinxing Street Office
According to the Notice about Examination and Approval of Implementation Plan for the Phase
VIII Mudanjiang Urban Construction Farmland Transference and Land Collection in 2009
which was approved by the People’s Government of Heilongjiang in Heilongjiang Government
Land [2011] Document No.169 in October 18, 2011 and re-checking of land collection
compensation registration of villages whose land is collected, Mudanjiang Bureau of Land and
Resources protocolled Compensation and Allocation Scheme for Collecting Land. In accordance
with the Article 48 of Land Management Law of the People’s Republic of China and the Article 25
of Implementing Regulations for Land Management Law of the People’s Republic of China, the
contents and relevant matters of Compensation and Allocation Scheme for Collecting Land are as
follows:
I. Villages with lands to be collected and the areas: in this phase, 11,4165 hectares of collective
land are transferred to urban construction farmland and collected to be owned by the state
(including 4.5310 hectares of collective farmland of Yangming Village and 6.8855 hectares of
collective farmland of Yumin Village; 6.0461 hectares of collective construction land is collected
to be owned by the state (including 5.6027 hectares of residential land and 0.4434 hectares of
Environment Social Performance Report (2012) LJEP Group Co. Ltd
49
industrial and mineral warehouse land of Yangming Village); at the same time, 2.3586 hectares of
state-owned farmland in the Jiangxi Farm is transferred to construction land. The above 19.8212
hectare land altogether is the urban construction land in this phase.
II. Standards of compensation and allocation for collecting land: the land areas in this phase are
within the comprehensive land price blocks of collected land blocks in Mudanjiang and numbered
M-22 and M-24, whose comprehensive land prices are RMB 125/m2 and RMB 175/m
2
respectively.
III. Attachments and structures compensation:
For underground and over-ground attachments and structures compensation, compensation and
allocation will be given according to demolition method determined by municipal government.
IV. Farm workers allocation method
Allocation and compensation method will be formulated according to collective economic
organizations whose land is collected and practical situations of the villages in this project.
V. If owners of land ownership and land use right within the four boundaries of the collective land
have different opinions about this scheme, please send opinions in written form to Mudanjiang
Bureau of Land and Resources through Village Committees before January 26, 2012.
VI. After consultation, this scheme will be submitted to the People’s Government of Mudanjiang
for enforcement. According to the regulations in 25th
Article of Implementing Regulations for
Land Management Law of the People’s Republic of China, dispute on the approved Compensation
and Allocation Scheme for Collection Land will not influence enforcement.
Notice is hereby given.
Mudanjiang Bureau of Land and Resources
Mudanjiang Bureau of Land and Resources (sealed)
December 26, 2011
Environment Social Performance Report (2012) LJEP Group Co. Ltd
50
Mudanjiang Municipal People’s Government
Announcement about Collecting Collective Land of Yangming Village and Yumin Village in
Xinxing Street Office
The Notice about Notice about Examination and Approval of Implementation Plan for the Phase
VIII Mudanjiang Urban Construction Farmland Transference and Land Collection in 2009
(Heilongjiang Government Land [2011] No. 169), provided by Heilongjiang Provincial People’s
Government, approves the collection of collective land of Yangming Village and Yumin Village in
Xinxing Street Office in our city. In accordance with the Article 46 in “Land Management Law of
the People’s Republic of China” and Article 25 in “Implementing Regulations for Land
Management Law of the People’s Republic of China”, the issues which are relevant to the land
collection are announced as follows:
I. Title of the construction land project: Implementation Scheme of the Phase VIII Urban
Construction Farmland Transference and Land Collection in 2009 in Mudanjiang.
II. Location of the land to be collected: Yangming Village and Yumin Village in Xinxing Street
Office in Mudanjiang. The specific location refers to the block function chart approved by
Heilongjiang Government Land [2011] No. 169 Document.
III. Villages with lands to be collected and the areas: in this phase, 11,4165 hectares of collective
land are transferred to urban construction farmland and collected to be owned by the state
(including 4.5310 hectares of collective farmland of Yangming Village and 6.8855 hectares of
collective farmland of Yumin Village; 6.0461 hectares of collective construction land is collected
to be owned by the state (including 5.6027 hectares of residential land and 0.4434 hectares of
industrial and mineral warehouse land of Yangming Village); at the same time, 2.3586 hectares of
state-owned farmland in the Jiangxi Farm is transferred to construction land. The above 19.8212
hectare land altogether is the urban construction land in this phase.
IV. Standards of compensation and allocation for collecting land: carrying out the task in
accordance with the rules described in “Reply of Heilongjiang Provincial People’s Government on
Adjusting the Comprehensive Land Price of Collected Land Blocks” (Heilongjiang Government
Letter [2010] No. 140) and “Mudanjiang Municipal People’s Government Announcement about
Adjusting the Comprehensive Land Price of Collected Land Blocks in the Whole City”. The land
areas in this phase are within the comprehensive land price blocks of collected land blocks in
Mudanjiang and numbered M-22 and M-24, whose comprehensive land prices are RMB 125/m2
and RMB 175/m2 respectively.
V. From December 16, 2011 to March 16, 2012, owners of land ownership and land use right in
the areas of collected land shall hold the certificate of land ownership or other relevant certificate
materials and go to the village committee office of Yangming Village and Yumin Village in
Xinxing Street Office in Mudanjiang to deal with the land compensation register.
Notice is hereby given.