Upload
lykhue
View
215
Download
0
Embed Size (px)
Citation preview
ANNUAL ACTION PLAN OF 2012-2013 IN RESPECT OF ONGOING SPECIAL SCHEMES [ NEED BASED ]
TOTAL
#
Name of the Scheme
/ Activity DRJ
(H)
KPG
SLG
JLP
CBR
UDP
DDP
MLD
MSD
NAD 24
PGS
MIDN
PRL
BANK
BRDN
BIRBH GRAND
ONGOING SCHEMES T T T T T T T T T T T T T T T T T
1
Quality linked price
support system for
adopted Muga Grainures towards
production of max.
quantity of quality Dfls
0
0
0
2
10
0
0
0
0
0
0
0
0
0
0
0
12
2
Assistance to farmers
for adopting Shelf Rearing for better productivity
10
6
12
0
6
0
3
25
0
10
0
5
0
5
0
0
82
3
Support to mulberry
rearers for Remodeling
of their existing
Rearing Houses (Nos)
10
8
7
25
20
2
18
0
100
50
0
0
0
5
0
150
395
4
Supply of Knapsack
Sprayer (10 ltr.
Capacity) (Nos.)
10
5
0
0
0
10
0
40
50
40
6
28
0
6
0
50
245
5
Assistance to CB/MV
Seed Rearers for
supply of Bed Disinfectants(Nos)
0
0
25
100
70
20
25
2800
1000
360
30
100
10
15
2
1200
5757
6
Support to farmers for
Mulberry Tree
plantation (6' X 6')
(Acres)
10
0
0
0
10
0
0
0
0
0
0
0
10
0
0
0
30
7
(a) Establishment of new Bivoltine CRC
0
1
0
1
0
0
0
10
10
0
0
0
0
0
0
0
22
(b)Maintenance
charges of existing
CRCs
0
11
1
2
0
0
0
15
23
8
2
12
0
1
0
2
77
Special Scheme: The Directorate has been implementing a host of Special Schemes for the last few years under ODS with a specific purpose. These Schemes are need based and
beneficiary specific in nature and are generally formulated to fill up the gaps felt during implementation of the existing routine schemes. Prompted with the success of
Special Scheme, a substantial amount is kept every year under Plan Budget for implementation of these Schemes which have been found to be adequately instrumental for
sustainability of Sericulture in the State.
TOTAL
#
Name of the Scheme
/ Activity DRJ
(H)
KPG
SLG
JLP
CBR
UDP
DDP
MLD
MSD
NAD 24
PGS
MIDN
PRL
BANK
BRDN
BIRBH GRAND
ONGOING SCHEMES T T T T T T T T T T T T T T T T T
8
Marketing support to
Mulberry seed Rearers
[Rs.]
0
406700
676000
360500
18000
90200
11000
991000
1081000
45000
0
360500
9100
54000
0
1397000
5500000
9
Support to LSPs for
construction of
Grainage Building
0
0
0
0
0
0
0
8
7
0
0
0
0
0
0
0
15
10
Mass disinfection
through SHGs / Quality
Clubs .
(a) Cost of Peddle Van,
Power Sprayer &
accessories
0
0
1
1
1
1
0
8
5
2
0
2
0
1
0
2
24
(b) Cost of Senitech @
1.0 lit./farmer/Crop
[Ltr.]
0
0
800
800
800
800
0
6400
4000
1600
0
1600
0
800
0
1600
19200
(C) Cost of Lime @ 200 gm/Ltr [Qtl]
0
0
1.6
1.6
1.6
1.6
0
12.8
8
3.2
0
3.2
0
1.6
0
3.2
38.4
(d) Repairing and
maintenance
0
0
1
1
1
1
0
8
5
2
0
2
0
1
0
2
24
11
Popularisation of 2
Basin Ghosh Reeling
Unit
0
0
0
0
0
0
0
35
5
0
0
0
0
0
0
0
40
12 Supply of Exhaust Fan
to Rearers
0
0
0
0
0
0
8
175
150
42
20
30
0
0
0
175
600
13
Modernisation of
Kaliachak Cocoon Market
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
14
Support to Muga
rearers for construction of Mounting shed (Nos)
0
5
0
0
30
0
0
0
0
0
0
0
0
0
0
0
35
15 Input support to BV
Mulberry Seed Growers
100
160
50
40
40
20
10
35
50
45
30
45
10
15
0
60
710
16 Input support to Tasar
Seed Rearers (Nos)
0
0
0
0
0
0
0
0
0
0
0
0
100
200
10
50
360
17 Induction training for women reelers
0
0
0
0
0
0
0
30
0
0
0
0
0
0
0
0
30
TOTAL
#
Name of the Scheme
/ Activity DRJ
(H)
KPG
SLG
JLP
CBR
UDP
DDP
MLD
MSD
NAD 24
PGS
MIDN
PRL
BANK
BRDN
BIRBH GRAND
ONGOING SCHEMES T T T T T T T T T T T T T T T T T
18
Strengthening of Govt.
Farm through
procurement of modern scientific equipments
0
3
0
2
0
1
0
2
2
0
0
1
1
0
0
1
13
19
Popularisation of N X
BV and BV Comm.dfls.
during unfavourable
and favourable seasons
a) Supply of NxBV
DFLs. at reduced rate /
100 DFLs Unit
0
0
0
0
0
15
5
600
1050
300
0
0
0
0
0
200
2170
b) Supply of BV DFLs.
at reduced rate / 100
DFLs Unit
0
0
0
0
0
0
0
400
550
40
0
0
0
0
0
30
1020
c) Supply of Bed
disinfectants to both category of rearers @
3Kgs. / 100 DFLS Unit
0
0
0
0
0
15
5
1000
1600
340
0
0
0
0
0
230
3190
20
Installation of Solar
energy System at
Govt.Units
2
5
1
3
2
1
0
0
1
2
0
3
2
3
0
5
30
A N N E X U R E
Abstract Showing the Total Requirement of fund including O&M under Ongoing Special Scheme During 12-13
Rs. In Lakh
Sl No Name of the Scheme
Scheme Share
O&M @2%
Ben Share
Total
1 Quality linked price support system for adopted Muga Grainures
towards production of max. quantity of quality Dfls (Nos.)
1.20000
0.02400
1.20000
2.42400
2 Assistance to farmers for adopting Shelf Rearing for better
productivity
3.69000
0.07380
1.23000
4.99380
3 Support to mulberry rearers for Remodelling of their existing
Rearing Houses (Nos)
59.25000
1.18500
19.75000
80.18500
4 Supply of Knapsack Sprayer (10 ltr. Capacity) (Nos.) 1.83750 0.03675 1.83750 3.71175
5 Assistance to Crossbred / MV Seed Rearers for supply of Bed
Disinfectants
23.02800
0.46056
5.75700
29.24556
6 Support to farmers for Mulberry Tree plantation (6' X 6') (Acres) 2.10000 0.04200 1.38600 3.52800
7
(a) Establishment of new Bivoltine CRC
3.30000
0.06600
0.00000
3.36600
(b) Maintenance charges of existing CRCs
8.08500
0.161700
0.00000
8.24670
8
Improvement of communication system for surveillance down to
the grass root level including maintenance charges of old ones
5.61182
0.112236
0.00000
5.724056
9 Support to LSPs for construction of Grainage Building 15.00000 0.30000 15.00000 30.30000
10 Mass disinfection through SHGs / Quality Clubs etc. 39.45600 0.78912 0.00000 40.24512
11 Popularisation of 2 Basin Ghosh Reeling Unit 18.00000 0.36000 6.00000 24.36000
12 Supply of Exhaust Fan to Rearers 4.50000 0.09000 1.50000 6.09000
13 Modernisation of Kaliachak Cocoon Market
4.98600
0.09972
0.00000
5.08572
14
Support to Muga rearers for construction of Mounting shed (Nos)
5.25000
0.10500
1.75000
7.10500
15 Input support to BV Mulberry Seed Growers 24.85000 0.49700 0.00000 25.34700
16 Input support to Tasar Seed Rearers (Nos) 10.80000 0.21600 0.00000 11.01600
17 Induction training for women reelers 2.30000 0.04600 0.00000 2.34600
18 Strengthening of Govt. Farm through procurement of Equipments
and Appliances
13.00000
0.26000
0.00000
13.26000
19 Popularisation of N X BV and BV Comm.dfls. during unfavourable
and favourable seasons
11.40800
0.22816
3.11400
14.75016
20
Installation of Solar Energy System at Govt. Units
6.00000
0.12000
0.00000
6.12000
Grand Total [ 20 Schemes] :
263.65232
5.27305
58.52450
327.44987
<< TOTAL STATE SHARE >>
268.92537
Director of Textiles (Sericulture)
W EST BENGAL
Name of the scheme
: Quality Linked Price Support System for Adopted Muga Graineurs towards Production of Maximum Quantity of Quality DFLs
Ongoing/New Ongoing
Project objective : Under Non Mulberry (Muga) sector, about 90% of DFLs are being produced at
private level in the state. The basic objective of the scheme is to assist the
adopted Muga Graineurs financially for maximum utilization of their available
infrastructure towards production of quality DFLs to cater the optimum need of
commercial rearers in the state.
Target group : Private Muga graineurs (created under UNDP/CDP/CADP during IX, X & XI Plan
Period) of 2 (two) Muga Culture practicing Districts of West Bengal namely
Coochbehar & Jalpaiguri who belong to Minority community and weaker section
of the society. Preference will be given to the Graineurs producing DFLs for
both the Commercial Crops in a year.
Socio-economic status
&
Agro-climatic
condition
: i) Industrially backward.
ii) Average land holding capacity is low.
iii) Seasonal job for farmers.
iv) The farmers mostly hail from SC/ST/OBC/Minority community with poor
economic condition.
v) The agro-climatic condition is congenial for Muga Culture.
Justification : In order to develop a habit for cash purchase of quality seed cocoons to ensure
maximum Grainage output by the bonafide Muga graineurs, such kind of financial
assistance is need of the hour. Examination of mother moth will be obligatory
one under the scheme. Besides, it would ensure use of certain consumables and
disinfectants which are essentially required during Grainage operation. Thus, the
present scheme will help the Private Muga Graineurs to be more sincere for
maximum production of quality DFLs at their Grainages.
FILENAMSEpl-Sch-Wrtup-Muga grainure-12-13-O.1.5.doc
Project details:
Price Support will be provided to 12 Nos. of Adopted Muga Graineurs in the form of 50% assistance
towards the cost of 4000 DFLs being produced at their Grainages. Preference will be given to those
Graineurs who have a good track record of performance viz. production of 2000 DFLs per Grainage
and shown due technical skill.
Subsidy will be provided by DOT(S) to the tune of 50% and the rest 50% of the cost will be borne by
the beneficiary.
They will be imparted training on Grainage Management of minimum of 10 days duration at the
nearest Govt. SSPC / Farm for upgrading their knowledge and skill level to further improve the
quality of Muga Silkworm Seed stock.
Project input:
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from time
to time at district & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-Muga grainure-12-13-O.1.5.doc
Component
No. of
Grainage /
year
DFLs to
be
produced
per annum
(in Nos.)
Rate per
DFL (in
Rs.)
Total price of
DFLs
(in Rs.)
Scheme
Share
(in Rs.)
(50%)
Ben.
Share (in
Rs.)
(50%)
Conduct of Muga
Commercial Grainage at
private level by adopted
graineurs
2
4000
5.00
20000.00
10000.00
10000.00
Scheme share required for 12 Nos. of Muga Graineurs: 12x Rs. 10000.00= Rs. 120000.00 (Rupees One
lakh twenty thousand) only
Overhead & Monitoring Cost @ 2%= Rs. 2400.00
Total State Share : (Rs.120000+Rs.2400) i.e. Rs122400.00
Name scheme
of the : Assistance to farmers for adopting Shelf Rearing for better productivity
Ongoing/New : Ongoing
Project objective : i) To increase productivity as well as product quality of the cocoons produced by
the rearers.
ii) To minimize chances of disease outbreak as the rearing will continue in open
space.
iii) To save the labour cost towards rearing to a great extent.
Rearers mostly belonging to SC/ST/OBC/Minority community of all over the
State will be covered under the scheme. Preference will be given to the rearers
conducting BV/CB rearing, at least, in 3-4 crops in a year.
Target group :
Socio-economic status
&
Agro-climatic
condition
: i) ii)
iii)
iv)
Industrially backward. Average land holding capacity is low.
Seasonal job for farmers.
The farmers mostly hail from SC/ST/OBC/Minority community with poor
economic condition.
The agro-climatic condition is congenial for sericulture. v)
Justification : By adopting shelf rearing technique, mainly for late stage worms, the farmers
would be benefited through an improvement of their product quality and
productivity. At the same time, a considerable savings can be made towards
production cost of rearing by curtailment of labour cost.
Project inputs:-
Assistance will be provided to 82 Nos. of beneficiaries. The material cost of Rs. 6,000 per unit would be borne jointly by DOT(S) and Beneficiary @ 75% & 25%
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from
time to time at district & DOT(S), HQs levels. |Spl-Sch-Wrtup-Shelf-Rear-12-13-O.02
Component
Qty
(Nos.)
Unit cost
( Rs.)
Total Outlay
( Rs. in lakh )
State
Share
Ben.
Share
Total State
Share
Ben.
Share
Total
Shelf Rearing in
Rearing room /
under temporary
shade in open
space
82
4,500
1,500
6,000
3.69
1.23
4.92
Overhead and Monitoring Cost @ 2%=0.0738 Lakh
Total State Share: (Rs.3.69 Lakh+ 0.0738 Lakh)= Rs. 3.7638 Lakh
Name of the scheme : Support to Mulberry Rearers for Remodelling of their existing Rearing Houses.
: Ongoing Ongoing/New
Project objective : Sometimes mulberry rearers cannot afford their share for construction of new
rearing houses under the ongoing schemes. The present scheme envisages
introducing B.V. / C.B. rearing in large scale by improving rearing conditions
through remodelling of their existing rearing houses which will ultimately lead to
the improvement in productivity as well as product quality.
Target group : Rearers mostly belonging to SC/ST/OBC/Minority community of all over the
State will be covered under the scheme. Preference will be given to the rearers
conducting BV/CB rearing, at least, in 2-3 crops in a year.
: Socio-economic status
&
Agro-climatic
condition
i) ii)
iii)
iv)
Industrially backward. Average land holding capacity is low.
Seasonal job for farmers.
The farmers mostly hail from SC/ST/OBC/Minority community with poor
economic condition.
The agro-climatic condition is congenial for sericulture. v)
Justification : By remodelling of the existing rearing houses the overall rearing condition of the
silkworm rearing houses will be improved which will help the progressive minded
rearers to rear BV/CB DFLs successfully leading to the improvement in cocoon
productivity and product quality.
Project details: Assistance will be provided to 395 Nos. of mulberry beneficiaries for remodelling of their existing rearing houses.
Subsidy will be provided by DOS to the tune of 75% and the rest 25% of the cost
will be borne by the beneficiary.
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet. A team of DOT(S) officials will evaluate the progress of the scheme from time
to time at district & DOT(S), HQs levels.
Monitoring & Evaluation :
Spl-Sch-Wrtup-Remodelling-12-13-O.3.7.doc-3
Component
Qty
(Nos.)
Unit cost
(Rs.)
Total Outlay
( Rs. in Lakh )
State
Share
Ben.
Share
Total State
Share
Ben.
Share
Total
Remodelling of Mulberry
Rearing House
395
15,000
5,000
20,000
59.25
19.75
79.00
Overhead & Monitoring Cost @ 2%= Rs. 1.185 Lakh
Total State Share: (Rs. 59.25 Lakh+ 1.185 Lakh)= Rs. 60.435 Lakh
Name of the Scheme Ongoing/New
: :
Supply of Knapsack Sprayer Ongoing
Project objective
: i)To carry out effective disinfection measure ii) To support the poor silkworm rearers who cannot afford to bear the cost
of Sprayer
iii) To prevent the mulberry garden of the rearers from severe damage due to
pest attack as well as to prevent Silk worm diseases.
Target group : Farmers mostly belonging to SC/Minority community of Sericulture practicing districts of the state. Preference would be given to those farmers who are
progressive minded and rear CB DFLs, at least, in 2-3 crops.
Socio-Economic Status &
Agro Climatic
Condition
: i) ii)
iii)
iv)
Seasonal job for farmers. Industrially backward.
Mostly belong to poor & weaker section of the society.
Agro-climatic condition is congenial for mulberry cultivation.
Justification : i) Effective Disinfection measure would minimize the degree of infestation of Silk worm diseases.
ii) Prevention from damage to mulberry foliage would ensure remunerative
price of the cocoons produced by the rearers.
Project input:
245 Sericulturists will be covered under the scheme. Subsidy will be provided by DOT(S) to the tune of 50% and the rest 50% of the cost will be borne by the
beneficiary.
Spraying will be done by the concerned beneficiary.
Operating details: Implementation Agency : DOT(S), WB through its extension network.
Beneficiary selection : TSC officials will select the beneficiaries Panchayet.
in consultation with
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from time to time at district & DOT(S), HQs levels.
Spl-Sch-Wrtup-Knapsack-12-13-O.4.8.doc-4
Sl.
No.
Item
Quantity
(Nos.)
Unit Cost (Rs.) Amount Required
(Rs. in lakh)
State
Share
Ben.
Share
Total State
Share
Ben.
Share
Total
1. Knapsack Sprayer
(10 Ltr . Capacity)
245
750
750
1500
1.8375
1.8375
3.675
Overhead and Monitoring Cost @ 2%=0.03675 Lakh
Total State Share: (Rs. 1.8375 Lakh+ 0.03675 Lakh)= Rs. 1.87425 Lakh
Name of the Scheme : Assistance to Cross breed/MV Seed Rearers for supply of
Bed Disinfectants
Ongoing/New : Ongoing
Project objective : i) To popularize and to create awareness among the
Sericulturists regarding use of bed disinfectants.
ii) To disseminate latest technology regarding use of
Bed Disinfectants among the CB/MV Seed
farmers with the object of improving
productivity and product quality.
Target group : Rearers of the State mostly belonging to
SC/ST/OBC/Minority Community will be the target group in
the scheme.
Socio-economic status &
Agro-climatic
condition
: i) Less paddy growing area
ii) Seasonal job for farmers
iii) Industrially backward
iv) Most of the farmers belong to poor & weaker section
of the society
v) Agro-climatic condition is congenial for Sericulture.
Justification : The success of Silk worm rearing largely depends on
effective disease management since Silk worm race is very
much susceptible to various diseases. Application of bed
disinfectants at proper dosage would help in
eliminating/minimizing disease occurrence to a large extent,
thus ensuring a good harvest.
FILENAMSEpl-Sch-Wrtup-bed disinfect-CB-MV-Seed11-12-O.5.9.doc
Project details:
i) The stake holders will have to bear 20% of the cost of disinfectants.
ii) Assistance will be provided to the stake holders conducting at least rearing of 200 DFLs at a
time. In case of consumption of less quantity of DFLs, assistance will be reduced
proportionately.
iii) Disinfectants worth Rs. 500 will be provided to each beneficiary.
iv) A total of 5757 Nos. of Rearers will be covered under the scheme.
Operating details:
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of beneficiary : The TSC officials will select the Beneficiaries in consultation
with Panchayat.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme
from time to time at district & DOS, HQs level.
FILENAMSEpl-Sch-Wrtup-bed disinfect-CB-MV-Seed11-12-O.5.9.doc
Component
No. of
Rearers
Rate of
Scheme
Share (Rs)
Rate of
Ben. Share
(Rs)
Financial Outlay (Rs. in lakh)
Scheme
Share
Ben.
Share
Total
CB/MV Seed
Rearers
5757
400
100
23.028
5.757
28.785
Overhead and Monitoring Cost @ 2%=0.46056 Lakh
Total State Share: (Rs. 23.028 Lakh+ 0.46056 Lakh)= Rs. 23.48856 Lakh
Sl.
No.
Components/Items
Qty.
Rate
(Rs.)
Unit Cost (Rs.)
Scheme
Share
Ben.
Share
Total
1. Vijeta 5 Kg 66 264 66 330
3. Labex Plus 5 Kg. 34 136 34 170
Total:
400
100
500
Project inputs per Beneficiary
: Support to Farmers for Mulberry Tree Plantation Name of the scheme
Ongoing/New Ongoing
Project objective : (i) To provide financial assistance to the Mulberry Farmers of Hilly
region of Darjeeling and Purulia (Ayodhya Hill) districts and
Coochbehar Districts of the State for raising of Tree Plantation
(ii) To ensure survival of Mulberry Plantation and Production of quality
leaves suitable for BV and CB Silkworm rearing
(iii) To ensure earning from the land engaged during gestation period of
Mulberry, Intercropping has been planned.
Target group : The Silkworm Rearers who mostly belong to SC/ST and other weaker section of
the society.
Socio-economic status
&
Agro-climatic
condition
: i) Industrially backward.
ii) Average land holding capacity is low.
iii) Seasonal job for farmers.
iv) The farmers mostly hail from SC/ST community with poor economic
condition.
v) The agro-climatic condition is congenial for raising Bivoltine crop.
Justification : The climatic condition in the State during P1 crop for Agrahayani commercial is
not favourable for raising of Bivoltine crop. It is mandatory to have quality
leaves for conducting BV rearing which is available from deep rooted Mulberry
trees. This necessitates the Plan for raising Tree plantation.
Suitable Mulberry leaves may be available after 3 years of Plantation. During the
gestation period the farmers normally do not get any earning from the land thus
engaged which may lead to frustration of the farmer resulting in uprooting. To
ensure some income from the land, it has been planned to give some assistance
for intercropping.
Project details:
FILENAMSEpl-Sch-Wrtup-Mulberrytree-12-13-O.6.A.doc
The Scheme will be implemented in the Districts of Darjeeling, Coochbehar, & Purulia with the following target:
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from
time to time at district & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-Mulberrytree-12-13-O.6.A.doc
Scheme Share for 30 Acres: Rs.7000x30=Rs. 2.1 Lakh
Overhead and Monitoring Cost @ 2%=0.042 Lakh
Total State Share: (Rs.2.1 Lakh+ 0.042 Lakh)= Rs. 2.142 Lakh
Item
Mandays
Required
(No)
Qty. required
Rate (Rs)
Financial Pattern (Rs)
DOT(S) Share
Ben. Share
Total
Digging of 1200 Pits @ 50
Pits/Manday
24
0
130
3120
0
3120
Filling of Pits @ 100
Pits/Manday
12
0
130
1560
0
1560
FYM/Organic Manure 0 100 C.ft 10 0 1000 1000
Application of
FYM/Organic Manure
10
0
130
0
1300
1300
Pesticides 0 20Kgs 10 100 100 200
Neem Cake 0 25 KGs 12 300 0 300
MOP 0 20KGs 5 100 0 100
Transplantation @ 200
Plants/Manday
6
0
130
0
780
780
Cultural Operation @ 200
Plants /Manday
6
0
130
780
0
780
Cost Of Saplings 0 1200 Pcs 0.15 0 180 180
Intercropping 0
a) Land Preparation 9 0 130 0 1170 1170
b) Cost of Peason Pea
Seed
0
9KGs
30
270
0
270
c)Urea 0 18KGs 5 90 0 90
d)MOP 0 14KGS 5 70 0 70
e) SSP 0 125KGs 4 500 0 500
Contingencies Lumpsum 110 90 200
Total 7000 4620 11620
Sl No Name of the District Acreage to be covered
1 Darjeeling (Hills) 10
2 Coochbehar 10
3 Purulia (Ayodhya Hill) 10
Total 30
Name of the scheme : Establishment of new Bivoltine Chawki Rearing Centre (CRC)
Ongoing/New : Ongoing
Project objective : The basic objective of the scheme is to promote and improve Bivoltine
Silkworm Rearing by reducing larval mortality at young stage throughout
the State and thus to maximize the production of BV commercial cocoons
as well as to prepare quality C.B. DFLs. with the BV Seed Cocoons
produced in the State.
Target group : Progressive BV Seed/Commercial Rearers of the State
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing.
Justification : The introduction of the concept of Chawki Rearing came into being from
the necessity of having quality foliage required for feeding of mulberry
silkworm which would ultimately reduce the mortality of worms and
improve the cocoon quality & productivity at a desired level. The existing
practice is to rear MV Silkworms partly mixed with some quantity of BV
Silkworms without maintaining optimum conditions required for the BV
Silkworm rearing which ultimately causes poor cocoon yield with huge pupal
mortality of BV Silkworms. Establishment of CRC in the villages itself
would minimize these hazards to a considerable extent which would
ultimately help the rearers to have a successful harvest of robust BV
commercial Cocoons and BV Seed cocoons for preparation of more quantity
of qualitative C.B. DFLs.
FILENAMSEpl-Sch-Wrtup-BV-CRC-12-13-O-07(a).B.doc
A. Non Recurring Expenses / CRC
# Item Rate (Rs) Quantity Amount Required (Rs)
1 Chawki Rearing Nets (Nos) 40 25 1,000
2 Max. - Min. Thermometer(No) 900 1 900
3 Hygrometer (Nos) 800 1 800
4 Room Heater(1.00KW) 1,000 1 1,000
4 Foam Pad (Pcs) 20 40 800
SUB TOTAL 4,500
B. Recurring Expenses / CRC / Crop
# Item Rate (Rs) Quantity Amount Required (Rs)
1 Sanitech (Room & Appliances 125 2 250
Disinfectant) 2 Vijeta(KG) 65 2 130
3 Lime(KG) 10 5 50
4 Paraffin Paper (Metres) 29 8 232
5 Cost of Mulberry leaf / Kg 2.5 300 750
6 Cost of labour 136 8 1,088
7 Rent for Chawki Room 500 1 500
8 Managerial charges (L.S.) 500
SUB TOTAL 3,500
Annual Recurring Chawki Expenses for 3 Crops: Rs. 3500 x 3 i.e. Rs. 10,500
GRAND TOTAL Rs. 15,000
Project details: (i)
Operating Details : * The Chawki owner will have to procure 500 BV DFLs for each
crop from Govt. source against payment as per the existing rate
fixed in the PFC.
3rd * The BV Silkworms would be reared upto completion of
Moult and distributed to the selected BV Seed /Commercial
Rearers after 1st feeding of 4th in star.
DOT(S), West Bengal through its extension network. Implementation agency :
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the
scheme from time to time at district & DOT(S), HQs levels. FILENAMSEpl-Sch-Wrtup-BV-CRC-12-13-O-07(a).B.doc
Scheme Share for 22 Nos of CRC: Rs.15000 x 22=Rs. 3.30 Lakh
Overhead and Monitoring Cost @ 2%=0.066 Lakh
Total Scheme Share: (Rs.3.30 Lakh+ 0.066Lakh)= Rs. 3.366 Lakh
Project Inputs
Name of the scheme : Maintenance Charges of Existing Chawki Rearing Centre (CRC)
Ongoing/New : Ongoing
Project objective : The basic objective of the scheme is to maintain the 77 Nos. of CRCs
which were established across the State during previous years to reduce
larval mortality at young stage and to improve the cocoon quality and
productivity substantially by following the latest package of practices in
Chawki Rearing Centres.
Target group : Progressive BV Rearers of the State
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing.
Justification : The introduction of the concept of Chawki rearing came into being from
the necessity of having quality foliage required for feeding of young stage
mulberry silkworm which would ultimately improve the cocoon quality &
productivity at a desired level. Maintenance of the existing CRCs in the
villages itself would minimize unwanted hazards of silkworm transportation
to a considerable extent which would ultimately help the rearers to have a
good harvest.
FILENAMSEpl-Sch-Wrtup-BV-CRC-maint-12-13-O-07(b).C.doc
(i)
Operating Details : * The Chawki owner will have to procure 500 BV DFLs for each
crop from Govt. source against payment as per the existing rate
fixed in the PFC
3rd * The BV Silkworms would be reared upto completion of
Moult and distributed to the selected BV Seed /Commercial
Rearers after 1st feeding of 4th in star.
DOT(S), West Bengal through its extension network. Implementation agency :
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
A team of DOT(S) officials will evaluate the progress of the scheme Monitoring & Evaluation :
from time to time at district & DOT(S), HQs levels
FILENAMSEpl-Sch-Wrtup-BV-CRC-maint-12-13-O-07(b).C.doc
Scheme Share for maintenance of 77 Nos. of existing CRCs: Rs.10500x77=Rs. 8.085 Lakh
Overhead and Monitoring Cost @ 2%=0.16170 Lakh
Total Scheme Share: Rs.8.085 Lakh+ 0.16170 Lakh = Rs. 8.2467 Lakh
B. Operational Cost towards maintenance of Existing CRC / Crop
#
Item
Rate (Rs)
Quantity
Amount
Required
(Rs) 1 Sanitech (Room & Appliances Disinfectant)(Litre) 125 2 250
2 Vijeta(KG) 65 2 130 3 Lime(KG) 10 5 50 4 Paraffin Paper (Metres) 29 8 232 5 Cost of Mulberry leaf / Kg 2.50 300 750 6 Cost of labour 136 8 1088
7 Rent for Chawki Room 500 1 500
8 Managerial charges (L.S.) 500
SUB TOTAL 3,500
Annual Recurring Chawki Expenses for 3 Crops: Rs. 3500 x 3 i.e. Rs. 10,500
Project Inputs
Name of the scheme : Support to Licensed Seed Preparers (LSPs) for construction of Grainage Building
Ongoing Ongoing/New :
Project objective : Under mulberry sectors, about 80% of DFLs are prepared at private level
in the state. The basic objective of the scheme is to assist the Licensed
Seed Preparers (LSPs) for construction of ideal Grainage Building required
for production of quality DFLs at private level to meet up the demand of
commercial DFLs in the State.
Target group : Licensed Seed Preparers (LSPs) of two major traditional districts of the
State viz. Malda & Murshidabad who mostly belong to minority community
and weaker section of the society. Preference will be given to the LSPs
producing CB DFLs, at least in two crops in a year.
Socio-economic status &
Agro-climatic condition
: i)
ii)
Less Paddy growing area.
Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of
the society.
v) Agro-climatic condition is congenial for silkworm rearing.
Justification : Majority of the Private Graineurs of the State do not have ideal Grainage
Building as it calls for considerable amount of investment. An ideal
Grainage House is a prerequisite for production of quality DFLs. Hence the
present scheme envisages supporting the LSPs for construction of ideal
Grainage Building for production of quality DFLs to meet up the increasing
demand of commercial DFLs in the State.
Spl-Sch-Wrtup-Gr-Bldg-12-13-O.9.D.doc-9
i) Project inputs:
The benefit will be extended to 15 nos. of LSPs of the Districts of Malda & Murshidabad .
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the
scheme from time to time at district & DOT(S), HQs levels.
Spl-Sch-Wrtup-Gr-Bldg-12-13-O.9.D.doc-9
#
Item
Quantity
(Nos.)
Unit Cost (Rs.) Amount Required
(Rs. in lakh)
State
Share
Ben.
Share
Total
State
Share
Ben.
Share
Total
1.
Construction of
Grainage Building
15
100,000
100,000
2,00000
15.00
15.00
30.00
Overhead and Monitoring Cost @ 2%=0.30 Lakh
Total State Share: (Rs.15.00 Lakh+ 0.30 Lakh)= Rs. 15.30 Lakh
Name of the scheme : Mass Disinfection through SHGs/Quality Clubs
Ongoing/New : Ongoing
Project objective : i) To popularize and to create awareness among the
Sericulturists regarding use of disinfectants.
To disseminate latest technology among the farmers with the ii)
object of improving productivity and product quality.
Target group : The Silkworm rearers of the three major traditional districts of the state
viz. Malda, Murshidabad & Birbhum and of some other nontraditional
districts like Coochbehar,Uttar Dinajpur, Nadia, Midnapore & Bankura and
the Eri rearers of Jalpaiguri District who mostly belong to minority
community and weaker section of the society.
Socio-economic status &
Agro-climatic condition
: i)
ii)
Less Paddy growing area.
Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing.
Justification : The success of Silk worm rearing largely depends on effective disease
management since Silk worm race is very much susceptible to various
diseases. Due to increase in cost of disinfecting materials, the farmers
usually have a tendency not to apply the same at all or at a lower dose than
the recommended one which often results in outbreak of diseases and
subsequent crop loss. Thorough and proper disinfection of their Rearing
House and Rearing Equipments by an external Agency at a nominal cost
would help in eliminating/minimizing disease occurrence to a large extent,
thus ensuring a good harvest.
Spl-Sch-Wrtup-Disiftn-SHG-12-13-O.10.E.doc-10
i) Project Details:
(i) Interested SHGs /Sericulture Quality Clubs/Diploma holders of Sericulture having knowledge in
Sericulture will be identified and will be provided with a Paddle Van fitted with Power Sprayer &
other accessories, Disinfectants, etc at free of cost to offer disinfection service of Rearing House
and Rearing Appliances at the doorsteps of the farmers against realization of a nominal amount as
service charge from the concerned farmer.
(ii) Each such Unit will cater Disinfection service to at least 200 beneficiaries per crop.
(iii) The interested SHG/SQC/Individual has to sign an agreement with DOT(S) to the effect that
they/he would return the entire Unit i.e. the Paddle Van and the Power Sprayer along with other
accessories to the concerned District Officer of DOT(S) when the same is not in use.
(iv) The concerned TSC officials would keep necessary records/account of the farmers being benefited
under the scheme and certify that the concerned SHG/SQC/Individual has satisfactorily provided
the disinfection service.
Operating Details Implementation agency
: : DOT(S), West Bengal through its extension network.
Monitoring & Evaluation : A team of DOS officials will evaluate the progress of the scheme
from time to time at district & DOS, HQs levels.
Spl-Sch-Wrtup-Disiftn-SHG-12-13-O.10.E.doc-10
Overhead and Monitoring Cost @ 2%=0.78912 Lakh
Total State Share: (39.456 Lakh + 0.78912 Lakh)= 40.24512 Lakh
Sl.
No
Item
Qty
Unit Cost
(Rs)
Amount Required
(`in lakh)
State
Share
Ben.
Share
Total
1.
Cost of Paddle Van along
with Power Sprayer and
other accessories
24 Nos
60,000
14.40
-
14.40
2.
Cost of Sanitech @1.0
lit/farmer/ crop i.e. 4.0
lit/farmer in 4 crops
19200
Ltrs
125/lit
24.0
-
24.00
3.
Cost of Lime @ 200
Gms/Lit of Sanitech
38.4
Qntl
1500/Qntl
0.576
-
0.576
4.
Repairing and Maintenance
of Machineries
24
2000
0.48
-
0.48
Total
39.456
-
39.456
Name of the scheme : Popularization of 2 Basin Ghosh Reeling Machine
Ongoing/New : Ongoing
Project objective : The basic objective of the scheme is to support the existing Reeling
entrepreneurs towards production of finer quality warp silk in the state.
Target group : Existing traditional Reelers of the District of Malda & Murshidabad will
be the target group of this scheme.
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing.
Justification : Silk reeling activities in the District of Malda & Murshidabad are
performed by poor people mostly belonging to minority community or
backward classes. With the implementation of the scheme the existing
Reelers in the District will be benefited to create infrastructure for
production of finer quality warp yarn which has got a good market demand.
Promotion of such scheme in the field would definitely help to augment the
income of the beneficiaries. Marginal and small Reelers will find silk
reeling activity profitable due to its early disposal at a remunerative rate.
The primary silk weavers engaged in handloom sectors in the state would
be benefited with the steady supply of silk yarn required by them.
FILENAMSEpl-Sch-Wrtup-2 basin-12-13-O.11.F.doc
i) Project inputs:
The benefit will be extended to 40 nos. of Reelers of Malda & Murshidabad District.
Subsidy will be provided by DOT(S) to the tune of 75% and the rest 25% of the cost will be
borne by the beneficiary.
(Rs.)
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the
scheme from time to time at district & DOS, HQs levels.
FILENAMSEpl-Sch-Wrtup-2 basin-12-13-O.11.F.doc
Overhead and Monitoring Cost @ 2%=0.36 Lakh
Total State Share: (Rs.18.00 Lakh+ 0.36 Lakh)= Rs.18.36 Lakh
#
Item
Quan
tity
(Nos)
Unit Cost (Rs.) Amount Required
State
Share
Ben.
Share
Total
State
Share
Ben.
Share
Total
1.
Motorized Ghosh
Basin Reeling
Machine with Re-
reeling including
construction of
foundation and
installation cost.
Capacity-2 basins (4
ends/basin) & 1
window re-reeling
40
37500
12500
50000
1500000
500000
2000000
2.
Book Making
Machine
40
1875
625
2500
75000
25000
100000
3.
Two Pan Cooking
Unit
40
5625
1875
7500
225000
75000
300000
Total
45000
15000
60000
1800000
600000
2400000
Name of the scheme : Supply of Exhaust Fan to Rearers
Ongoing/New : Ongoing
Project objective : (i) The basic objective of the scheme is to assist the rearers of the
State with some device for controlling Temperature & Humidity inside the
Rearing House.
(ii) To make qualitative & quantitative improvement in the production
parameter.
(iii) Dissemination of latest Sericultural technologies to farmer’s level.
Target group : The Silkworm Rearers across the state who mostly belong to minority
community and weaker section of the society.
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing
Justification : The Sericulturists of the State in recent years have been motivated to
adopt High Yielding Variety of Mulberry with wider spacing, irrigation as
well as manuring for quality leaf yield suitable for CB silk worm rearing.
Majority of the rearers are in possession of a separate and Ideal rearing
House or have got their existing rearing house remodelled through
implementation of need based Schemes by DOT(S). The present scheme
aims at providing the Sericulturists with some device to control the
extreme climatic condition prevailing during unfavourable seasons with a
view to provide congenial rearing condition inside the Rearing House.
Spl-Sch-Wrtup-exstfan-12-13-O.12.10.doc-12
Project details:
Assistance will be provided to 600 Rearers for procurement of Exhaust Fan to improve rearing
condition inside their Rearing House.
Subsidy will be provided by DOT(S) to the tune of 75% and the rest 25% of the cost will be
borne by the beneficiary.
Preference will be given to Rearers who are conducting CB rearing of sizeable quantity at least
2-3 crops in a year.
Project inputs
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the
scheme from time to time at district & DOS, HQs levels.
Spl-Sch-Wrtup-exstfan-12-13-O.12.10.doc-12
Overhead and Monitoring Cost @ 2%=0.09 Lakh
Total State Share: (Rs.4.5 Lakh+ 0.09 Lakh)= Rs. 4.59 Lakh
Sl.
No.
Item
Quantit
y
(Nos.)
Unit Cost (Rs.) Amount Required
(Rs. in lakh)
State
Share
Ben.
Share
Total
State
Share
Ben.
Share
Total
1.
Supply of
Exhaust Fan
to Rearers
600
750
250
1000
4.5
1.5
6.0
Name of the scheme : Modernization of Kaliachak Cocoon Market
Ongoing/New : Ongoing
Project objective : (i) To provide continuous systematic marketing facilities to the
Silkworm Rearers and Silk Reelers in season and out of season.
(ii) To record data on actual transaction, market rate, quantity of
cocoons arriving at the market etc.
(iii) To ensure accuracy and transparency in the marketing process.
Target group : The Silkworm Rearers and Silk Reelers of the traditional districts of
the state viz. Malda, Murshidabad & Birbhum as well as other adjoining
Districts like Nadia and U.Dinajpur who mostly belong to minority
community and weaker section of the society.
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing.
Justification : The Kaliachak Cocoon Market located in the District of Malda accounts
for a heavy transaction of cocoon annually. The quantum of cocoons being
transacted in the said market revolves round 17000 MT annually involving
a financial transaction of Rs. 195-200 Crores taking together all the 5
crops. It is an ongoing Scheme and the market has now assumed an
organized structure through participation of rearers not only from the
nearby Districts of Malda, Murshidabad, Nadia but also from far flung
Districts of North Bengal like Coochbehar, Jalpaiguri etc. The overall
transparency in the marketing process has almost nullified the involvement
of the middlemen. The present scheme aims at providing sustained
facilities to the Sericulturists visiting the market and bringing more
transparency in the marketing process.
FILENAMSEpl-Sch-Wrtup-Cocoon-mkt-12-13-O.13.11.doc
i) Project inputs:
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from time to time at district & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-Cocoon-mkt-12-13-O.13.11.doc
Sl.
No.
Particulars
Amount Required
(Rs)
1.
2.
3.
Engagement of SHG to provide marketing assistance to Rearers in the form
of weighing in electronic balance, systematic marketing, general
management etc.
13 members of the Group having approximate 175 working days in a year
[covering 5 crop seasons ] @ Rs 204/- per Head
2(Two) Sets of liveries for the SHG members @ @Rs.750 /- per set
Miscellaneous Expenses (Repairing of weighing machine, Printing of Bidding
slip etc.)
464100
19500
15000
Total
498600
Overhead and Monitoring Cost @ 2%=0.09972
Total Scheme Share: (Rs.4.986 Lakh + Rs.0.09972 Lakh)= Rs. 5.08572 Lakh
Name of the scheme
Project objective
: Support to Muga Rearers for Construction of Mounting Shed
: There is dearth of mounting shed in Muga sector as it calls for lot of
expenditure hardly affordable by Muga silkworm rearers. As such, the present
scheme envisages setting up mounting sheds for Muga silkworm because although
silkworm rearing is conducted outdoor, process of cocooning is accomplished
indoor.
Target group : Rearers mostly belonging to SC/ST/OBC in the districts of Coochbehar &
Darjeeling (Kalimpong Sub-Division) will be covered under the scheme.
Socio-economic status
&
Agro-climatic
condition
: i) ii)
iii)
iv)
v)
Industrially backward. Average land holding capacity is low.
Seasonal job for farmers.
The farmers mostly hail from SC/ST/OBC with poor economic condition.
The agro-climatic condition is congenial for Muga culture.
Justification : Muga culture is mainly confined to Coochbehar district of the state with about
800 acres of land under host plantation at present. A good no of Rearers still do
not have the separate mounting shed because of their poor pecuniary condition.
Hence, construction of mounting shed will enable them to make an improvement
in the quality and quantitative parameters of their produce.
Project details: i) Project inputs:-
Assistance will be provided to 35 Nos. of Muga beneficiaries for construction of mounting shed.
Subsidy will be provided by DOT(S) to the tune of 50% and the rest 50% of the cost will be
borne by the beneficiary.
Operating Details
Implementation agency : DOS, West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOS officials will evaluate the progress of the Scheme from time to time at district & DOS, HQs levels.
FILENAMSEpl-Sch-Wrtup-Mugashed-12-13-O.14.12.doc
Component
Qty
(Nos.)
Unit cost ( Rs.) Total Outlay ( Rs. in lakh )
State
Share
Ben.
Share
Total State
Share
Ben.
Share
Total
Construction of Muga
Mounting Shed
35
15,000/-
5,000/-
20,000/-
5.25
1.75
7.00
Overhead and Monitoring Cost @ 2%=0.105 Lakh
Total State Share: (Rs.5.25 Lakh+ 0.105 Lakh)= Rs. 5.355 Lakh
Name of the scheme : Input support to BV Mulberry Seed Growers
Ongoing/New : Ongoing
Project objective : (i) To minimize deleterious effect of chemical fertilizer in mulberry garden of
the rearers and maximize leaf yield per unit area.
(ii) To popularize and to create awareness among the Sericulturists regarding
use of bed disinfectants.
(iii) To give fillip to BV Seed Rearing in the State as well as to make
qualitative & quantitative improvement in the production parameter.
Target group : The BV Silkworm Seed Rearers across the state who mostly belong to minority
community and weaker section of the society.
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area
ii) Seasonal job for farmers
iii) Industrially backward
iv)
v)
Most of the farmers belong to poor & weaker section of the society
Agro-climatic condition is congenial for silkworm rearing.
Justification : A positive trend has been observed in recent past that progressive farmers
have now become more aware of the harmful effects of various types of
chemical fertilizers. They have started showing inclination towards adoption
of alternative manuring schedule like bio-fertilizer, organic manure,
Vermicompost etc. Side by side, they have realized that the success of BV
Silk worm rearing largely depends on effective disease management. The
present scheme aims at providing the BV Seed growers with some Organic
Manure namely Neem Oil Cake/Benagro along with plant growth hormone with
a view to improving the leaf yield per unit area and bringing efficiency in soil
health management technique vis-à-vis bed disinfectants and ripening hormone
at proper dosage which would help in eliminating/minimizing disease
occurrence to a large extent and uniform maturing of silkworms, thus ensuring
a good harvest.
FILENAMSEpl-Sch-Wrtup-inputs.bv-12-13-O.15.13.doc
Project details:
i) The stake holders’ i.e. BV seed rearers will be supplied with the project inputs at free of cost.
ii) A total of 710 Nos. of BV Seed Rearers will be covered under the scheme.
iii) Assistance will be provided to those BV Seed rearers who possess minimum 0.50 Acre of
Mulberry host plantation and conducting at least 2 crops/year with rearing quantum of 100 DFLs
at a time. In case of consumption of less quantity of DFLs, assistance will be reduced
proportionately.
iv) Disinfectants worth Rs. 500 will be provided to each beneficiary.
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
: TSC officials will select the beneficiaries in consultation with Panchayet. Selection of Beneficiary
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from
time to time at district & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-inputs.bv-12-13-O.15.13.doc
Component
No. of
Rearers
Rate of
Scheme
Share (Rs)
Rate of
Ben. Share
(Rs)
Financial Outlay (Rs. in lakh)
Scheme
Share
Ben.
Share
Total
BV Rearers 710 3500 0 24.85 0.00 24.85
Overhead and Monitoring Cost @ 2%=0.497 Lakh
Total State Share: (Rs.24.85 Lakh+ 0.497 Lakh)= Rs. 25.347 Lakh
Sl.
No.
Components/Items
Qty.
Rate
(Rs.)
Unit Cost (Rs.)
State
Share
Ben.
Share
Total
1.
Neem Oil
Cake/Benagro
LS
2450
0
2450
2
Sanitech
LS
400
0
400
2. Vijeta/Rakshak L.S 370 0 370
3 Morizyme -B 400 ml 40/100ml 160 0 160
4 Sampoorna 4 ampls 30/ampl 120 0 120
Total:
3500
0
3500
Project inputs per Beneficiary
Name of the scheme : Input Support to Tasar Seed rearers
Ongoing/New : Ongoing
Project objective : i) Maintenance of Tasar systematic plantation on scientific lines which
would boost up quality leaf yield.
ii) To increase the productivity and product quality both in terms of leaf
and cocoon production
iii) To create additional employment and to uplift the economic condition of
the people belonging mostly to ST community.
Target group : Tasar Seed Rearers mostly belonging to Tribal communities residing in Tasar
practicing districts of the State. Preference will be given to women groups,
rearer groups, FPCs, SHGs etc. conducting Tasar rearing in the forest fringe
areas on systematic host plantations raised under different schemes.
Socio-economic status
&
Agro-climatic
condition
: i) Industrially backward and the farmers are mostly dependant on forest
for their livelihood.
ii) Seasonal job for farmers.
iii) The farmers mostly hail from ST community with poor economic
condition.
iv) The soil is nutritionally poor, mostly lateritic or hilly rock in nature
v) The agro-climatic condition is congenial for Tasar Rearing.
Justification : The success of Tasar Rearing largely depends upon the feeding of quality leaves
to Tasar Silkworm larvae. Application of manure & Fertilizer in proper dosage is
necessary to boost up the production of quality foliage. But the Tasar Rearers
who are mostly tribal cannot afford to purchase the plantation inputs of any kind
which is of utmost importance for management of Tasar host plantation. This
apart, the maintenance of plantation also entails deployment of huge labour
because of the very nature of the soil which is either lateritic or hilly rock in
nature. The present Scheme aims at providing support to these poor Tasar Seed
Rearers through supply of some essential farm inputs which would not only make
an improvement in the nutritional value of the foliage but also would enable them
to harvest a remunerative crop.
FILENAMSEpl-Sch-Wrtup-Tasar-input-12-13-O.16.14.doc
Project details:
The assistance would be provided to 360 Tasar seed Rearers in the Tasar practicing Districts of the State
Each Rearer would be provided with manure and Fertilizer worth Rs. 3000 at free of cost
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme from
time to time at district & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-Tasar-input-12-13-O.16.14.doc
Scheme Share for 360 Rearers = Rs. 10.80 lakh
Overhead and Monitoring Cost @ 2%=0.216 Lakh
Total State Share: (Rs.10.80 Lakh+ 0.216 Lakh)= Rs. 11.016 Lakh
Sl.
No.
Item
Quantity
Amount Required / Beneficiary
(Amount in Rs.)
State
Share
Ben. Share
Total
1
Organic Manure
(Neem Oil Cake)
100 KG
1300
0
1300
2 N.P.K 10:26:26 90 KG 750 0 750
3
Urea
25 KG
150
0 150
4
Cleaning, Mulching & Input
application
10 MD
800
0
800
Total 3000
Name of the scheme : Induction training for women Reelers
Ongoing/New : Ongoing
Project objective : (i) To provide self employment to the poverty stricken women
members of the traditional reelers’ family of Malda District
who are mainly engaged as workers in Bidi industry through
induction training in Mulberry reeling activities
(ii) Skill development among the potential women reelers
(iii) To reduce health hazards of women Bidi workers caused due to
continuous exposure to tobacco.
Target group : The women Bidi workers of traditional reelers’ family who hail from the
District of Malda and mostly belong to minority community and other
weaker section of the society.
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing
Justification : The reeling activity in the District of Malda has an age-old tradition which
is mainly carried out by the male members of the traditional reelers’
family. However, a trend has been observed among the present generation
to migrate to Western States of the Country like Maharashtra, Gujarat
etc. in search of some alternative jobs of more remunerative nature. It
results in serious manpower constraints in the Reeling sector of Malda
district at present. The present scheme envisages filling up of this void by
attracting women members of the traditional reelers’ family (presently
engaged in Bidi industry) to this age old avocation through some well
structured package based Induction training in Mulberry Reeling at Peddie
Silk Reeling Institute (PSRI), Malda which would not only ensure them to
find some alternative better source of earning but also curb the potential
health hazards that they are facing due to continuous exposure to
tobacco.
FILENAMSEpl-Sch-Wrtup-Indc Trg.women reelers-12-13-O.17.15.doc
i) Project inputs:
30 Nos. of women Bidi workers of traditional reelers’ family will be imparted structured
training in Mulberry reeling activity at PSRI, Malda.
The training will be of 2(two) months duration and to be conducted in 3(three) batches of
10(ten) members each.
The entire expenditure of the training including ancillary charges would be borne by the State
Government.
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
: Monitoring & Evaluation A team of DOT(S) officials will evaluate the progress of the
scheme from time to time at district & DOT(S), HQs levels
The Deputy Director of Textiles (Seri.), Malda is specifically
advised to conduct an impact study of the training programme
and furnish the same to the DOT(S), Hqrs, Kolkata.
FILENAMSEpl-Sch-Wrtup-Indc Trg.women reelers-12-13-O.17.15.doc
SL. No
ITEM
Cost per Trainee for
2 months (Rs.)
Amount required (Rs.)
1.
Up and Down fare to the training venue
from rural residence including
refreshment
1600
48000
2. Stipend 2000 60000
3. Cost of raw materials LS 62500
4. Fuel charges LS 41500
5.
Contingent expenditure for
maintenance of Reeling machine etc.
LS
18000
TOTAL >> 230000
Overhead and Monitoring Cost @ 2%=0.046 Lakh
Total State Share: (Rs.2.30 Lakh + 0.046 Lakh)= Rs. 2.346 Lakh
Name of the scheme : Strengthening of Government Farms through Procurement of Equipments and Appliances
Ongoing/New : Ongoing
Project objective : The basic objective of the scheme is to bring about technological
absorption, productivity improvement and quality up gradation of various
Government Units located across the State through procurement and
installation of modern scientific /rearing equipments.
Target Area : Ill equipped 13 nos of Govt. Units of the State
Justification : Technological achievements are always witnessed in different Sectors of
Sericulture, particularly in Seed and other on farm sector through
continuous Research and Developments. At present, some of the Govt.
Nurseries/Grainages in the State does not have the equipments
/appliances in required quantities which stand in the way of enhancement
in the productivity parameters of these Units. The present Scheme aims
at supply of latest equipment developed in these sectors for increase in
productivity and product quality of the Govt. Units.
Project details:
(i)
The total Schematic allocation per Govt. Farm / Grainage to be restricted to the tune of Rs. 1 Lakh
The ratio of expenditure for On Farm Machinery : Rearing Equipments has to be 60 : 40 out of the allocation per Govt. Farm / Grainage
The itemwise rate/s shown below is/are indicative and as such the quantity to be procured may vary depending upon the actual tendered / quoted rates.
There should not be any repetition with regard to procurement of equipment/appliances already purchased under CDP.
FILENAMSEpl-Sch-Wrtup-Govt-Farm-12-13-O-18.16.doc
Project Inputs
EXHAUSTIVE LIST FOR STRENGTHENING OF GOVT. FARM / GRAINAGE [UNIT COST DETAILS]
Operating Details :
Implementation agency : DOT(S), West Bengal.
Selection of Govt. Units : All State level, Zonal level and District level Officers and Officer
in charges of selected Nurseries and Grainages will look after the
successful implementation of the scheme.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the
scheme from time to time at district & DOT(S), HQs levels. FILENAMSEpl-Sch-Wrtup-Govt-Farm-12-13-O-18.16.doc
Scheme Share for 13 Nos of Govt. Units : Rs.100000x13=Rs. 13.00 Lakh
Overhead and Monitoring Cost @ 2%=0.26 Lakh
Total Scheme Share: (Rs.13.00 Lakh+ 0.26 Lakh)= Rs. 13.26 Lakh
#
Particulars
Qty.
Rate
(in Rs.)
Estimated
Total Cost
(in Rs.)
A < On farm Machinery > 1 Refrigerator 01 20,000 20,000
2 Diesel / Electrical Pump Set 01 25,000 25,000
3 Electronic / Digital Balance 01 12,000 12,000
4 Generator Set 01 40,000 40,000
5 Platform weighing balance 01 15,000 15,000
6 A.C Machine (1.5 Ton capacity) 01 20,000 20,000
7 Storage Tank and Delivery pipe L.S 4,000
B < Rearing / Grainage Equipments > 8 Rearing Rack 01 10,000 10,000
9 Bamboo made Dalla 160 100 16,000
10 Bamboo made Chandraki 100 180 18,000
11 Plastic Cellular Rearing Tray [10 nos= 1 set] with Rack 1 10,000 10,000
12 Mulberry rearing Net 200 20 4,000
13 Muga rearing Net 04 4,000 16,000
14 Egg Box / Egg Sheet L.S. 10,000
15 Earthen Pot [ to be used in Tasar Grainage] L.S. 5,000
16 Wheel Burrow 04 1,500 6,000
Name of the scheme : Popularization of NXBV and BV Commercial DFLs during unfavourable and favourable seasons
Ongoing Ongoing/New :
Project objective : (i) To encourage and motivate farmers towards adoption of NxBV
/ BV Commercial DFLs rearing following improved package of
practices during adverse climatic / congenial condition
(ii) To increase the productivity as well as product quality
(iii) To ensure the Sericulturists to get remunerative price of
their product.
Target group : The progressive and proactive Sericulturists of the 3(three) major
traditional districts of the State viz. Malda, Murshidabad & Birbhum as
well as U. Dinajpur, D. Dinajpur and the model district Nadia who mostly
belong to minority community and weaker section of the society.
Socio-economic status &
Agro-climatic condition
: i) Less Paddy growing area.
ii) Seasonal job for farmers.
iii) Industrially backward.
iv) Most of the farmers belong to poor & weaker section of the
society.
v) Agro-climatic condition is congenial for silkworm rearing
Justification : The Sericulturists of the State usually undertake NxBV rearing during
three favourable cropping seasons i.e. Agrahayani, Falguni and Baisakhi.
The rest two cropping seasons i.e. Ashari/Sravani and Bhaduri/Aswina are
characterized by unfavourable climate and hence the rearers go for
MVxMV rearing which result in comparatively lower outturn than NxB
rearing. On the other hand, the pure BV commercial rearing during
favourable seasons i.e. Agrahayani and Falguni seems to be lucrative one in
traditional districts considering the prevailing market demand of
produces. Thus, the present scheme aims at breaking this age old practice
of MV rearing by promoting rearing of commercial hybrid silkworms (MV x
BV) as well as to introduce profitable BV commercial rearing with the
objective to ensure higher return at primary grower’s end.
FILENAMSEpl-Sch-Wrtup-NxB-BVDfls-12-13-O.19.17.doc
i) Project inputs:
2170 Nos. of progressive minded Sericulturists [maximum] will be selected from 6 (six) Districts of the State for undertaking NxBV rearing in 2 crops during unfavourable season.
1020 Nos. of proactive Sericulturists [maximum] will be selected from 4(four) major traditional
Districts of the State for undertaking BV rearing in 2 crops during congenial season.
The selected Sericulturists will be supplied with DFLs at 50% cost and each of them will also be
supplied with Sampoorna @ 2 ampoules of 10 ml. each for 100 DFLs and Bed Disinfectant like Vijeta
etc @ 3 KGs per 100 DFLs at free of cost
The minimum quantum of DFLs to be reared exceeding 200 DFLs/crop under the Scheme.
by a single beneficiary is 100 DFLs/crop but not
Operating Details :
Implementation agency : DOT(S), West Bengal through its extension network.
Selection of Beneficiary : TSC officials will select the beneficiaries in consultation with
Panchayet.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme
from time to time at district & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-NxB-BVDfls-12-13-O.19.17.doc
#
Item
Quantity
(Nos.)
Unit Cost (Rs.) Amount Required
(Rs. in thousand)
State
Share
Ben.
Share
Total
State
Share
Ben.
Share
Total
1.
Supply of NxBV
DFLs at 50%
subsidy to 2170
Rearers in 2 Crops
217000
DFLs @ 100
DFLs
unit/Crop
/rearer
120
120
240
260400
260400
520800
2.
Supply of BV DFLs
at 50% subsidy to
1020 Rearers in 2
Crops
102000
DFLs @ 100
DFLs
unit/Crop/
rearer
50
50
100
51000
51000
102000
3.
Supply of
Sampoorna (ripening
hormone) to 3190
rearers
6380
Ampoules @
2 Ampoules
/100 DFLs
unit/rearer
60
00
60
191400
0
191400
4.
Supply of Vijeta
(Bed Disinfectant)
to 3190 rearers
9570 KGs @
3 KGs /100
DFLs
unit/rearer
200
00
200
638000
0
638000
Total :
1140800
311400
1452200
Overhead and Monitoring Cost @ 2%=0.22816 Lakh
Total State Share: (Rs.11.408 Lakh+ 0.22816 Lakh)= Rs. 11.63616 Lakh
Name of the scheme : Improvement of Communication System for surveillance down to Grass Root level through maintenance charges of old ones
Ongoing/New : Ongoing
Project objective : The basic objective of the scheme is to maintain easy communication
system from village level Govt. Farms and TSCs to the District
headquarters and also to the Zonal and State level Officials and
immediate advice from the higher authorities to cope up with the
unforeseen disease and other hazards of Silkworm crops and vice-versa.
Target group : Top to Grass Root level Officials including important Govt. Farms and
Grainages.
Justification : It is experienced that the Silkworms in every step of life cycle are
susceptible to various diseases and the degree of infestation vary with
the climatic conditions which fluctuates now and then. The message of
infestation of such diseases generally calls for immediate prophylactic
measures and delay of which might lead to mortality of Silkworms and
Moths which upset the entire crop programme resulting in financial loss to
the marginal farmers. As such, a good communication network was
developed among the Officials from Grass Root level to the State level
through procurement of mobile telephone sets with BSNL connections
with CUG (Closed User Group) facility. Such Mobile telephony network
service is required to be continued during the current financial year also
to have direct communication with the Field and District level Officials.
Project inputs:
As per BSNL norms the members of Closed User Group (CUG) would avail unlimited free calls among
themselves.
Annual Rental Facility will be renewed for 100 connections already covered in the first phase during
2009-10 and 50 connections covered in the second phase during 2010-11 in following manner :
Plan 325 for 20 members and Plan 99 for rest 130 members.
Annual charges for 1(one) GSM Modem under Plan 725.
FILENAMSEpl-Sch-Wrtup-comncn-12-13-O.20.18.doc
Project Details:
Operating Details :
Implementation agency : DOT(S), West Bengal.
Selection of Beneficiary : All State level, Zonal level and District level Officers and Officer in
charges of important Grainages, Nurseries and TSCs. Subsequently,
the facility would be extended to all village level units.
Monitoring & Evaluation : A team of DOT(S) officials will evaluate the progress of the scheme
from time to time at District & DOT(S), HQs levels.
FILENAMSEpl-Sch-Wrtup-comncn-12-13-O.20.18.doc
Overhead and Monitoring Cost @ 2%= ` 0.112236 Lakh
Total State Share: (`.5.61182 Lakh+ ` 0.112236 Lakh)= ̀ 5.724056 Lakh
#
Item
Quantity
(No.)
Unit
Cost
Period
(Months)
Fund
required
1
Fixed Rental plus Usage charges for 100 old
connections (20+80)
20 524 12 104,800
80 298 12 238,400
2
Fixed Rental plus Usage charges for 50 new
connections
50
298
12
149,000
3
Annual charges for 1(one) GSM Modem under Plan
725
1
725
12
7,250
TOTAL 499,450
Add Service Tax @ 12.36% 61,732
GRAND TOTAL 561,182
FILENAMSEpl-Sch-Wrtup-comncn-12-13-O.20.18.doc
DISTRIBUTION OF MOBILE CONNECTIVITY FOR THE YEAR 2009-10
#
NAME OF THE OFFICE
ENTITLEMENT
YEAR TOTAL 2009-10
1 O/o the Com. of Textiles Commissioner of Textiles 1 1
2
Directorate of Textiles (Seri.)
I . Director
II. Additional Director
III. JD(Seri-Audit)
IV. DDT(S)HQs
V. Executive Engineer
VI. DDT(Seri-Accts.)
VII.ADT(S), HQs
VIII. Asstt. Engineer
IX. DO, HQs
X. EOs, HQs
XI. SAEs
1
1
1
1
1
1
1
1
1
2
3
1
1
1
1
1
1
1
1
1
2
3
SUB TOTAL [ DOT(S), HQs ] 14 14
3
O/o the DDT(S), Darjeeling
I. DDT(Seri.)
II. DO/EO
III. EO ,Bijanbari
IV.EO , Kurseong
1
1
1
1
1
1
1
#REF!
SUB TOTAL [ DDT(S), Darjeeling ] 4 0 #REF!
4
O/o the ADT(S), Kalimpong
I. I/C ADT(S)
II. EO, Gorubathan
III. EO , HNK
IV. EO, FRSS
V. EO, KDF
VI. EO, Gitdabling
1
1
0
1
0
0
0
0
1
0
1
1
1
1
1
1
1
1
SUB TOTAL [ ADT(S), Kalimpong] 3 3 6
5
O/o the JDT(S), North Zone
I. JDT(S)
II. ADT(S)
III. EO, Zonal HQs
IV. EO , Matigara
V. EO, Phansidewa
VI. EO, Naxalbari
VII. SAE, Civil
VIII.SAE, Electrical
1
1
1
1
1
1
1
0
0
0
0
1
0
0
0
1
1
1
1
2
1
1
1
1
SUB TOTAL [ JDT(S), N Zone, SLG] 7 2 9
6
O/o the DDT(S), Jalpaiguri
I. DDT(S)
II. ADT(S), Alipurduar
III. DO, Dist. HQs
IV. EO , Birparajheel
V. EO, Ambari Falakata
VI. EO, Chalsa
VII.EO, Maynaguri
VIII.EO, Pukuria
IX. EO, Kumargram
1
1
1
1
1
0
0
0
0
0
0
0
0
0
1
1
1
1
1
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S),Jalpaiguri ] 5 4 9
7
O/o the DDT(S), CoochBehar
I. DDT(S)
II. EO, Dist. HQs
III.EO , Khagrabari
IV. EO, Dinhata
V. I/C, Baxiganj
VI. I/C, Ghughumari
1
0
1
1
0
0
0
1
0
0
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S),CoochBehar ] 3 3 6
8
O/o the ADT(S), Uttar Dinajpur
I. ADT(S)
II. EO, Dist. HQs
III.EO ,Domohana
IV. EO, Sohrai
V. EO, Hemtabad
VI. EO, Fulhara
1
0
1
1
1
0
0
1
0
0
0
1
1
1
1
1
1
1
SUB TOTAL [ ADT(S),U. Dinajpur ] 4 2 6
FILENAMSEpl-Sch-Wrtup-comncn-12-13-O.20.18.doc
DISTRIBUTION OF MOBILE CONNECTIVITY FOR THE YEAR 2009-10 AND 2010-11
#
NAME OF THE OFFICE
ENTITLEMENT YEAR
TOTAL 2009-10 2010-11
9
O/o the ADT(S), D'shin Dinajpur
I. ADT(S)
II. EO, Dist. HQs
III. EO ,Gangarampur
IV.EO, Kumarganj
V. EO, Balapur
1
1
1
0
0
0
0
0
1
1
1
1
1
1
1
SUB TOTAL [ ADT(S), D. Dinajpur ] 3 2 5
10
O/o the DDT(S), Malda
I. DDT(S)
II. ADT(S)
III. DO, HQs
IV. Dist. Inspector
V. EO, PCN & Piasbari Grainage
VI. EO, Krishnapur
VII. I/C, Sadullapur
VIII. EO, Jalalpur
IX. EO, Sujapur
X. EO, Kaliachak I
XI. EO, Kaliachak II
XII. EO, Mothabari
XIII. EO, Kaliachak Cocoon Market
XIV. EO, Gazole
XV. EO, Chanchol
XVI. EO, Amriti
XVII. Ramchandrapur Mul. Garden
XVIII. I/C, Harischandrapur
1
1
0
1
1
0
0
1
1
1
1
1
0
1
1
0
0
0
0
0
2
0
1
1
1
0
0
0
0
0
1
0
0
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S), Malda ] 11 9 20
11
O/o the DDT(S), Murshidabad
I. DDT(S)
II. ADT(S)
III. DO / EO, HQs
IV. Dist. Inspector
V. EO , Sagarpara
VI. EO, Raghunathganj
VII. EO, Nabagram
VIII. EO,Khargram
IX. EO, Raninagar
X. EO, Kiriteshwari
XI. EO, Hariharpara
XII. EO, Regional Grainage
XIII. EO, BCN
XIV. I/C, STI
XV. EO, Khosbag XVI. EO,
Akherighata XVII.SAE,
CIVIL, Dist Hqrs
1
1
1
1
1
0
1
1
0
0
0
1
1
1
0
1
0
0
0
0
0
1
1
0
0
1
1
1
0
0
0
1
0
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S), Murshidabad ] 11 7 18
12
O/o the JDT(S), Bolpur
I.JDT(S), West Zone
II. DO / EO, Zonal HQs
III. SAE, Zonal HQs
1
1
0
0
0
1
1
1
1 SUB TOTAL [ JDT(S), Bolpur ] 2 1 3
13
O/o the DDT(S), Birbhum
I. DDT(S)
II. ADT(S)
III. DO / EO, HQs
IV. EO , Nalhati
1
1
1
1
0
0
1
0
1
1
2
1
FILENAMSEpl-Sch-Wrtup-comncn-12-13-O.20.18.doc
DISTRIBUTION OF MOBILE CONNECTIVITY FOR THE YEAR 2009-10 AND 2010-11
#
NAME OF THE OFFICE
ENTITLEMENT YEAR
TOTAL 2009-10 2010-11
O/o the DDT(S), Birbhum
V. EO, Mayureshwar
VI. EO, Bhadrapur
VII. EO, Boswa
VIII. EOs, Kotasur
IX. EO, Sriniketan
X. EO, Dubrajpur
XI. EO, Mollarpur
XII. EO, Kalitha
XIII. EO, Muluk
0
1
1
1
1
0
1
1
0
1
0
0
1
0
1
0
0
1
1
1
1
2
1
1
1
1
1
SUB TOTAL [ DDT(S),Birbhum ] 10 5 15
14
O/o the DDT(S),Nadia
I. DDT(S)
II. ADT(S)
III. DO / EO, HQs
IV. EO , Bethuadahari
V. EO, Karimpur
VI. EO, Ranaghat
VII. EO, Shibnivas
VIII. EO , Dhubulia
1
1
1
1
1
0
1
0
0
0
0
0
0
1
0
1
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S), Nadia ] 6 2 8
15
O/o the DDT(S),Midnapore
I. DDT(S)
II. ADT(S)
III. DO / EO, HQs
IV. EO , Debra V.
EO, Golgram VI.
EO, Jhargram
VII. EO, Gopiballavpur
VIII. EO , Phulpahari
IX. EO , TSC II, Debra
1
0
0
1
1
1
0
0
1
0
1
1
0
0
0
1
1
0
1
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S), Midnapore ] 5 4 9
16
O/o the DDT(S),Bankura
I. DDT(S)
II. ADT(S)
III. DO / EO, HQs
IV. EO , Morar
V. EO, Ranibandh
VI. EO, Taldangra
VII. EO , Khatra
1
1
1
1
0
0
0
0
0
0
0
1
1
1
1
1
1
1
1
1
1
SUB TOTAL [ DDT(S), Bankura ] 4 3 7
17
O/o the ADT(S),Purulia
I. ADT(S)
II. DO / EO, HQs
III. EO , Ayodhya Hills
IV. EO, Balarampur
V. EO, Kapistha
VI. EO , Raghunathpur
1
1
1
0
0
1
0
0
0
1
1
0
1
1
1
1
1
1
SUB TOTAL [ ADT(S), Purulia ] 4 2 6
18
O/o the ADT(S),Burdwan
I. ADT(S)
II. EO, HQs
1
1
0
0
1
1
SUB TOTAL [ ADT(S), Burdwan ] 2 0 2
19
O/o the JDT(S),East Zone,
Lake Town
I. JDT(S)
II. ADT(S)
III. EO, Sonarpur
1
1
1
0
0
0
1
1
1
SUB TOTAL [ JDT(S), E Zone, Lake Town ] 3 0 3 GRAND TOTAL >> 100 50 150
Project details:
30 nos. of Government Units would be equipped with this Solar System to be procured
from West Bengal Renewable Energy Development Agency (WBREDA).
FILENAMSEpl-Sch-Wrtup-solar-12-13-O.21.19.doc
Name of the Scheme
:
Installation of Solar Energy System including maintenance at Govt. Units
Ongoing/New : Ongoing
Project objective
:
To carry out vital Sericulture activities like Silk worm Rearing and Silkworm
egg production even in the absence of electrical power.
Target group
:
Installation of Solar Energy System at Govt. Units followed by necessary
maintenance, if any will certainly facilitate rearing and Grainage operation
which in turn would accrue benefit to Lakhs of Sericulturists of the state.
Justification
:
There are several nos. of Sericulture Farms and Grainages under this
Directorate which spread over across the entire State. Vital Sericultural
activities like Silk worm Rearing, production of Silk worm eggs etc are
carried out at these Units. These Farms are distantly located and often do
not have the facility of Electrical power or suffer from serious power cut
problem that adversely affects the Rearing and Grainage Programme. The
Present scheme aims at sorting out this problem though Installation of Solar
Energy System at these Govt. Units which is a simple eco friendly system
and calls for little expenditure on its maintenance which may be provisioned
out of scheme fund.
The entire cost for installation of each set along with accessories and due maintenance
there of has been estimated to the tune of Rs. 20,000.
Project input:
Share
Operating details:
FILENAMSEpl-Sch-Wrtup-solar-12-13-O.21.19.doc
Implementation Agency
:
DOS, WB through its extension network.
Monitoring & Evaluation
:
A team of DOS officials will evaluate the progress of the scheme from
time to time at district & DOS, HQs levels.
Sl.
No.
Components
Qty.
(Nos)
Unit Cost
(Rs.)
Financial Outlay
(Rs. in Lakh)
Scheme
Share
WBREDA
Share
Total
Scheme
Share
WBREDA
Total
1.
Installation of Solar
Energy System
including maintenance
at Govt. Units
30
20,000
0.00
20,000
6.00
0.00
6.00
Overhead and Monitoring Cost @ 2%=0.12 Lakh
Total State Share: (Rs.6.0 Lakh+ 0.12 Lakh)= Rs. 6.12 Lakh