8
Annexure-C Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents to be submitted along with technical bid Valid Class –I Electrical license of the bidder or their nominee. Valid Electrical supervisor license for executing electrical works as mentioned in the detailed specifications (Bidder or their nomine). Work completion Certificates from the previous customers with completion cost. Works executed during the previous five years. Financial profile of the company for the previous five years. Compliance to execute all the works as mentioned in the detailed RFP (request for proposal) , Drawings and Technical Annexures/specifications Annexure-1(A) to 9(A) and respective BOM’s and Table-I Technical compliance in the Annexure-B to be filled and submitted along with the technical bid.

Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents

  • Upload
    others

  • View
    28

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents

Annexure-C

Supply, Installation, Testing, Commissioning of

Electrical systems for SCES#10 and 11 at

MCF,Hassan  

I. Documents to be submitted along with technical bid

Valid Class –I Electrical license of the bidder or their nominee.

Valid Electrical supervisor license for executing electrical works as mentioned in the detailed specifications (Bidder or their nomine).

Work completion Certificates from the previous customers with completion cost.

Works executed during the previous five years.

Financial profile of the company for the previous five years.

Compliance to execute all the works as mentioned in the detailed RFP (request for proposal) , Drawings and Technical Annexures/specifications Annexure-1(A) to 9(A) and respective BOM’s and Table-I

Technical compliance in the Annexure-B to be filled and submitted along with the technical bid.

Page 2: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents
Page 3: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents
Page 4: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents
Page 5: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents
Page 6: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents
Page 7: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents
Page 8: Annexure-C Supply, Installation, Testing, Commissioning of ... · Supply, Installation, Testing, Commissioning of Electrical systems for SCES#10 and 11 at MCF,Hassan I. Documents