22
Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019 NJ DEP Division of Water Quality 1 Permit Overview And Compliance Assistance MS4 James Murphy NJDEP Division of Water Quality SWMDR Training 1 Day 2 October 31, 2019 Introduction MS4 Permit Renewal o Tier A (R9) & Tier B (R10) o Public Complex (R11) Permit Overview NJDEP Assistance/Guidance MS4 Audit Program TOPICS 2

And Compliance Assistance

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

1

Permit OverviewAnd Compliance Assistance

MS4

James MurphyNJDEP Division of Water Quality

SWMDR Training 1Day 2 October 31, 2019

Introduction

• MS4 Permit Renewalo Tier A (R9) & Tier B (R10)o Public Complex (R11)

• Permit Overview• NJDEP Assistance/Guidance• MS4 Audit Program

TOPICS

2

Page 2: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

2

Issuance ofDraft & Final Permits

• Tier A and Tier Bo Drafts issued 2/15/17o Final issued 11/9/17o Effective 1/1/18

• Public Complex Permito Draft issued 9/5/18o Final issued 11/27/18o Effective 1/1/19

3

MS4 Permit Universe – Tier A & BPermittees• Tier A Municipalities (462)

o urbanized or along or nearthe coast

• Tier B Municipalities (104)o rural and non-coastal

• Permit Historyo 2004 Initial Issuanceo 2009 Renewalo 2018 Renewal

4

Page 3: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

3

MS4 Permit Universe – Public ComplexPublic Complex Permittees• Sixty-Nine Permittees (69)

o Collegeso Universitieso Hospitalso Prisons

• R11 Permit Historyo 2004 Initial Issuanceo 2009 Renewalo 2019 Renewal

5

Source: https://www.epa.gov/sites/production/files/2017-01/documents/final_compendium_intro_document_508.pdf

National Map of Regulated MS4s

6

Page 4: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

4

Public Education and OutreachInvolve Public in Reducing Pollutants in Stormwater

7

• Implement Public Education Program• Increased annual points from 10 to 12• Maintain Documents• Certify Annually

Assistance:• Updated activities (social media, web pages, etc.)• More Opportunities Available to Align with Current

Municipal ActivitiesTimeframe in Renewal Permit:• EDPA

Post Construction Runoff ControlReview of Stormwater Management Designs for Major Development

8

• Local Review to Ensure consistency with NJ Stormwater Rules- Quantity, Quality, GW Recharge

• Utilize Attachment D Checklist to ensure compliance with Designand Performance requirements under the Stormwater Rules

• Maintain Records and Certify AnnuallyAssistance:• Updated BMP Manual for easier comprehension

and understanding of design requirements• Updated Training videos on Stormwater BMPs• FREE DEP training for local review of stormwater

designs (“Engineers training”)Timeframe in Renewal Permit:• EDPA

Page 5: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

5

9

Project Information

Site Information & Other BMPs Used

Basin only Information

Storm Event Info

POLLUTION PREVENTION/GOOD HOUSEKEEPINGCommunity Wide Ordinances and Measures

10

• Retains Six Existing Ordinance Requirements• Catch Basin Inspection and Cleaning

o At least every Five Yearso Focus on Problematic Areas Certify Annually

• Street Sweepingo Miles swept & tons collected

• Maintain Records and Certify AnnuallyAssistance:• Less Prescriptive• Discretion to Municipality to PrioritizeTimeframe in Renewal Permit:• EDPA

Page 6: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

6

Municipal Maintenance Yards and Ancillary Operations

11

• Expanded List to Cover Common Activities at MMYo Aggregate Materials and Construction Debris Storageo Street Sweepings, Catch Basin Clean Out Materialo Yard Trimmings & Wood Waste Management

• Containment of Vehicle Wash watero Maintain Logs

- Annual Engineers Inspection & Certification- Storage Tank Use & Pump Out Log - Integrity Testing every 3 Years

o Attachment E of the Permit • Maintain Records and Certify Annually

Timeframe in Renewal Permit:• EDPA + 12 months for new BMPs

POLLUTION PREVENTION/GOOD HOUSEKEEPING

PP/GH-Training RequirementsEmployee Training

12

• Specific to the Employee’s Job Title and Duties• Within Three (3) Months of Commencement of Duties• Every Two (2) Years Thereafter• Maintain Records and Certify Annually

Assistance:• More Specific/Targeted• Schedule to Implement (12 months)• DEP Training Materials Posted Online Timeframe in Renewal Permit:• EDPA + 12 months

Page 7: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

7

PP/GH-Training RequirementsStormwater Management Design Review

13

• Required Training for Stormwater Management Design Reviewers

- (e.g. Municipal Engineers)• Training Required Every Five Years• Register/DEP Maintains Records

Assistance:• Schedule to Implement (12 months)• FREE NJDEP Training

- generally twice per yearTimeframe in Renewal Permit:• EDPA + 12 months

PP/GH-Training RequirementsBoard & Council Member Training (Tier A & B)

14

• Required Training by All Board and Council Members• Overview of Stormwater Permit Requirements • “Asking the Right Questions”• Maintain Records and Certify Annually

Assistance:• Schedule to Implement (6 months)• FREE On-line Class (45 minutes)Timeframe in Renewal Permit:• Current Members w/in EDPA + 6

months • New Members w/in 6 months• Once per Term Thereafter

Page 8: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

8

Mapping, Illicit Discharge and ScouringLocalized Stream Scouring

15

• Develop, Update, Implement a Program• Inspect Every Outfall Once Per 5 Years (Tier A &B)/Annually (R11)• Document Inspections

o Locationo IF Scouring

-Repairs Prioritized-Repairs Scheduled

Assistance:• Mapping App• Schedule to Implement

- Update SPPP & Map SubmissionTimeframe in Renewal Permit:• EDPA + 12 months

Mapping, Illicit Discharge and ScouringIllicit Discharge Detection and Elimination

16

• Develop, Update, Implement, and Enforce Ongoing Program• Inspect Every Outfall Once Per 5 Years (Annually for R11)• Document Inspections

o Locationo Illicit Connection Inspection Report Form

Assistance:• Mapping AppTimeframe in Renewal Permit:• EDPA

Page 9: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

9

Other Control Measures –MaintenanceMaintenance of Stormwater BMPs (e.g. basins, MTDs, GI, etc.)

17

• Maintain all publicly owned stormwater BMPs• Ensure maintenance of all privately owned BMPs built after 1984

o Locationo Illicit Connection Inspection Report Form

• Inspection and Maintain per maintenance Plan to Ensureproper function and operationo Maintain a Logo Location Informationo Dateo Findingso Maintenance Performed

• Prioritize Repairs

Other Control Measures –MaintenanceMaintenance of Stormwater BMPs (e.g. basins, MTDs, GI, etc.)

18

Assistance:• Mapping Application and License• Extensive new O & M checklist and

guidance posted on-line• Town-wide Land Use GP for basin

maintenance• Letter from Department to support

municipalitygaining information about andaccess to privatestormwater facilities

Timeframe in Renewal Permit:• EDPA

Page 10: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

10

TMDLIncorporation of TMDL information into SPPP

19

• Identify impaired waterways in municipality• Identify and develop strategies to address sources of pollutants • Update SPPP annually to include optional measures• Prioritize stormwater facility maintenance & repairs

Assistance:• TMDL Look-up Tool posted on-line• Summarized strategies already

posted• Schedule to implementTimeframe in Renewal Permit:• EDPA + 12 months

20

Page 11: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

11

21

NJDEP Mapping and Inventory Assistance

NJDEP Mapping and Inventory AssistanceMapping App

22

• All Drop Down Menus• Smart Phone/Tablet/GIS• Multiple Collection Methodologies• Guidance Pending• In Person Training and Assistance

Mapping App – Feature Classes• Outfall Pipe• Stormwater Management Basin• Subsurface Infiltration/Detention System• MTDs• Green Infrastructure• Storm Drain Inlet

Page 12: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

12

Mapping Under the Tier A PermitOutfall Pipe Mapping

23

• Outfall Location and Receiving Water Body• Include Map in the SPPP by 1/1/2019• Update by End of Each Calendar Year• Provide to the NJDEP by 1/1/2019• Submit Electronically by 12/21/2020

Stormwater Facilities• Locational Information

Assistance:• Schedule to Implement (12 months)• Mapping App and License FREE

TMDL Look-Up

ToolTMDL Look-Up Tool

24

Page 13: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

13

TMDL Look-Up

Tool

Posted at: www.nj.gov/dep/dwq/msrp_home.htm

25

Training Requirements in the Renewed Tier A MS4 Permit

26

MS4 Permit

Renewal

• Within 3 Months of Commencement of Duties

• Every Two Years Thereafter

• Complete Department Training Relative to NJAC 7:8 once every Five (5) Years

• Within 6 months of EDP or Within 6 months of commencement

• “Asking the Right Questions”• Once Per Term Thereafter

Tier A and R11 Employees

Review for 7:8 Compliance

Tier A-Municipal Board and

Governing Body Members

Page 14: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

14

Tier A and R11 MS4 Permit Training Requirements

27

MS4 Permit

Renewal

Design Engineer, Municipal Engineer, etc. • Review of Stormwater Development and Re-Development

Projects on behalf of the Municipality

Stormwater Management Design Review Course • Previously-Annual with coordination by/through Rutgers• Cost ~ $600

Complete Course within EDP +12 Months• NJDEP to Offer at least Twice Per Year• FREE!!

Complete Once Every Five Years

New/Updated BMP Chapters

28

BMP Manual

Standard Constructed WetlandsBioretention 

SystemsDry Wells

Extended Detention Basins

Pervious Paving Systems

Infiltration Basins

MTDs Blue Roofs

Page 15: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

15

New/Updated BMP Chapters (cont’d.)

29

BMP Manual

Subsurface Gravel 

Wetlands

29

Sand Filters

Vegetative

Filter Strips

Wet Ponds

Grass Swales

Rain Garden Cistern Green Roofs

Newest…

30

BMP Manual

Page 16: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

16

Stormwater Maintenance Guidance and Website

31

Stormwater Maintenance

Guidance

31

Maintenance Website -Resources and

Templates and Field Manuals

31

Stormwater Training

32

Stormwater Training

www.njstormwater.org/training.htm

Live Training Courses

Videos & Interactive

Tools

Training for NJDOT

New Training Page at

DEP Website

Page 17: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

17

Manufactured Treatment Devices (MTD) Certification Process

33

MTD Certification

Process

Certified MTD

NJCAT

NJDEP

Audit Selection Process (Annual Reports/Supplemental Questionnaires; Enforcement Consulted; Construction Permits; Impaired Waterbodies)

Audit Process (Schedule Date of Audit; Request for Documents; Pre-Audit Preparation; On-Site Interview)

Conduct On-site Audit

Issue Audit Findings Report

MS4 Permit Audit Program

34

MS4 Permit Audit

Page 18: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

18

Goals of the MS4 Audit Program

35

MS4 Permit Audit

Effectiveness of the Permit

Compliance Assistance

Permit Compliance

Permit Modifications Rule Changes BMPs Guidance

Education Training Outreach

MS4 Audit Selection

36

MS4 Permit Audit

• Advance Notice and Coordinationo Minimum 30 days noticeo www.nj.gov/dep/dwq/tier_a_guidance_other.htm

• Solicitation of Project Plans• On-site Discussion and Review

o 1 or 2 Dayso Stormwater Coordinator/Twp. Engineer, etc.

• Areas of Focuso MS4 Permit Conditions - SBRs, Ordinances, etc.o Post Construction Requirements under NJAC 7:8

Page 19: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

19

MS4 Audit Report

37

MS4 Permit Audit

Audit Findings to Date

38

MS4 Permit Audit

SBRs

Post-Construction

Local Public Education

Employee Training

Illicit Connection Elimination

Other Permit Conditions

SPPP Not Updated

Outfall Pipe Mapping

Annual Reports

Page 20: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

20

Timelines Under Tier A & B Renewal Permit (not all inclusive)

39

EDPA (i.e. January 1, 2018)• Public Education and Outreach Program – 12 points• Use of Major Development Stormwater Summary Sheet,

Appendix D of the Permit

PAST DUE• April 1, 2018 - Postings to Web Page: SPPP, MSWMP and

Ordinances• July 1, 2018 - Board and Council Member On-line Training• January 1, 2019 – Training for Municipal Employees• January 1, 2019 – Training for Individuals that conduct Design and

Review • January 1, 2019 – Include Outfall Pipe Map in SPPP• January 1, 2019 – Submit Outfall Pipe Map to NJDEP• January 1, 2019 – Use TMDL Information to prioritize repairs or

Develop Strategies

Timelines Under Public Complex Renewal Permit (not all inclusive)

40

EDPA (i.e. January 1, 2019)• Public Education and Outreach Program – 12 points• Use of Major Development Stormwater Summary Sheet,

Appendix D of the Permit

PAST DUE/UPCOMING• April 1, 2019 - Postings to Web Page: SPPP and Regulatory

Mechanisms • January 1, 2019 – Training for R11 Employees• January 1, 2020 – Training for Individuals that conduct Design and

Review • January 1, 2020 – Complete Inventory of Stormwater Facilities• January 1, 2020 – Map of Stormwater Facilities to NJDEP• January 1, 2020 – Use TMDL Information to prioritize repairs or

Develop Strategies

Page 21: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

21

Moving Forward• Ongoing MS4 Stormwater Audits• Outreach Activitieso Permit Overviewo Mapping Appo Engineers Training

• Appendix A = Permit Summary Table• Tools Are the Keyo Trainingo Updated BMPso GI Guidance Documento Inspection/Field Manual Templateso Mapping

41

Important Links

• http://www.nj.gov/dep/dwq/fd.htmo BMP Manualo Stormwater Trainingo TMDL Look-up Toolo Maintenance Guidanceo MS4 Permit Documentso Mapping and Inventory o Educational Resources

• MTDso https://www.njstormwater.org/treatment.html

• Tools Are the Keyo http://www.nj.gov/dep/dwq/msrp_home.htm

42

NJDEP Stormwater Web Page

Page 22: And Compliance Assistance

Two‐Day Stormwater Management Design Review Course, October 29 & 31, 2019

NJ DEP Division of Water Quality

22

Any Questions?

Bureau of Nonpoint Pollution ControlDivision of Water Quality401 East State StreetPO Box 420, Mail Code 401-2BTrenton, NJ 08625-420Tel: 609-633-7021www.njstormwater.org

Jim [email protected] 43