56
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental -Ancillary Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06) Ancillary Equipment Interior SamplinglMonitoring: rculationltransfer If Monitoring wlFID: Page 1 of 2 1" M" 3 3 3 2" 1" %" Ball Ball Gate Ball Check Swing Check Ball Check Ball Check Ball Check Processflransfer line Reagent Injection Line Block valve at tanks Processltransfer line Pump discharge Processflransfer line Processflransfer line Reagent injection line Record Readings: Ancillary Equipment Release: Date: Off-site Facility Name: ManifesffBill of Lading: Shipping Date:

Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Embed Size (px)

Citation preview

Page 1: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks

D/K Environmental -Ancillary Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06)

Ancillary Equipment Interior SamplinglMonitoring:

rculationltransfer

If Monitoring wlFID:

Page 1 of 2

1"

M"

3

3

3

2"

1"

%"

Ball

Ball

Gate

Ball Check

Swing Check

Ball Check

Ball Check

Ball Check

Processflransfer line Reagent Injection Line Block valve at tanks

Processltransfer line Pump discharge

Processflransfer line Processflransfer line Reagent injection line

Record Readings:

Ancillary Equipment Release:

Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

Page 2: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Storage & Treatment Tanks

Ancillary Equipment Interior SamplinglMonitoring:

If Monitoring w/FID:

Record Readings:

ff-site Facility Name: nifestlBill of Lading:

DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06) Page 2 of 2

Page 3: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

ABRS

Page 4: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

(0 INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (pr~nt name) (s~gnature) (date)

DKE Form TVC-1

Employee: (pr~nt name) (s~gnature) (date)

Employee: (print name) (signature) (date)

Employee: I (print name) (s~gnature) (date)

TankNessel DataIService: TanWessel #: M-3

Diameter (feet): 10

Height (feet): 16

Initial Capacity (gal): 8,808

Primary Service: Acids

Other Service:

Tank Bottom Design:

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TankNessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

* **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 5: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TAN WESSEL CLOSURE PROCEDURE

Supervisor: (print name) (s~gnature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanMVessel DataIService: TanWessel #: M-4

Diameter (feet): 10

Height (feet): 16

Initial Capacity (gal): 8,808

Primary Service: Acids

Other Service:

Tank Bottom Design:

Closure: Rinsate Volume: Transfer/Disposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume:

Liquid Gallons: Chain of Custody:

Vessel:

Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBiii of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 6: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

) INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TankJVessel DataIService: TankIVessel #: M-5

Diameter (feet): 8

Height (feet): 15

Initial Capacity (gal): 5,261

Primary Service: Acids

Other Service:

Tank Bottom Design:

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wIFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

B **Attach Photos

DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 7: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (s~gnature) (date)

TanWessel DataIService: TanWessel #: M-6

Diameter (feet): 9

Height (feet): 6

Initial Capacity (gal): 3,876

Primary Service: Acids

Other Service:

Tank Bottom Design: Cone / Flat / (circle one)

Closure: Rinsate Volume: TransferlDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring w1FID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

a **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 8: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental
Page 9: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Acid Bulk Receiving & Storage Unit

Ancillary Equipment Interior SamplingIMonitoring:

If Monitoring w/FID:

Record Readings:

ff-site Facility Name: anifesUBill of Lading:

DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)

Page 2 of 2

Page 10: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

CSUW

Page 11: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Silpervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService:

TanklVessel #: Container Storage Unit West

Diameter (feet): nla

Height (feet): nla

Initial Capacity (gal): nla

Primary Service: nla

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferlDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release:

Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

**Attach Photos

D/K Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 12: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Container Storage Unit West

Page 1 of 2

Ancillary Equipment Interior SamplinglMonitoring:

If Monitoring w1FID:

Ancillary Equipment Release:

DIK Environmental - Ancillaiy Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06)

Check discharge

----

Off-site Facility Name: ManifestlBill of Lading: Shipping Date:

Page 13: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Container Storage Unit West

Ancillary Equipment Interior Sampling/Monitoring:

If Monitoring wlFID:

I I I I I I I I I I

DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06) Page 2 of 2

Page 14: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

CSSU

Page 15: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

I TANKNESSEL CLOSURE PROCEDURE DKE Form TVC-1

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (pr~nt name) (signature) (date)

Employee: I (print name) (signature) (date)

Employee: ate

TanldVesael DataIService: TankIVessel #: DCU-601

Diameter (feet): nla(est.3')

Height (feet): nla(est.9')

initial Capacity (gal): 2,550 GPH

Primary Service: Drum Crusher

Other Service:

Tank Bottom Design: Gone 1 Flat 1 Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wIFID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

a **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 16: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (s~gnature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (signature) (date)

TanWessel DataJService: TankIVessel #: MX-601

Diameter (feet): n/a

Height (feet): n/a

Initial Capacity (gal): 2 cu. Yd.

Primary Service: Solids Mixer

Other Service:

Tank Bottom Design: Cone / Flat / Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankNessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 17: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

) INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (pr~nt name) (s~gnature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Tanmessel DataIService: TanWessel #: S-600

Diameter (feet): 9

Height (feet): 20

Initial Capacity (gal): 9,512

Primary Service: Reagent Powder

Other Service:

Tank Bottom Design: Gone 1 Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

Tanmessel Interior SamplingIMonitoring: If Monitoring wIFID: -

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

Tanmessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanldVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 18: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Consolidation of Solids & Sludges Unitt

ncillary Equipment Interior SamplinglMonitoring:

Off-site Facility Name: ManifesffBill of Lading:

Page 1 of 1

DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)

Page 19: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

BSSU

Page 20: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

I TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1

@ INSTRUCTIONS: Complete all sections, print name, sign, and date - submit t o Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (print name) (Signature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (S~gnature) (date)

TanldVessel DataIService: TankNessel #: Gondola (Railcar)

Diameter (feet): nla

Height (feet): nla

Initial Capacity (gal): 100 yd3

Primary Service: Container

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TanldVessel Interior SamplinglMonitoring: If Monitoring w1FID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 21: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DatalService: TanWessel #: Portable Hopper

Diameter (feet): nla

Height (feet): n/a

Initial Capacity (gal): 2 yd3

Primary Service: Container

Other Service:

Tank Bottom Design: Cone I Flat 1 Dish (circle one)

Closure: Rinsate Volume: 1 Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: k Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 22: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

@ INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TAN WESSEL CLOSURE PROCEDURE

Supervisor: (print name) (s~gnature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (signature) (date)

TanWessel DatalService:

TankIVessel #: Portable Hopper

Diameter (feet): nla

Height (feet): nla

Initial Capacity (gal): 1.5 yd3

Primary Service: Container

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankJVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 23: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (prfnt name) (signature) (date)

DKE Form TVC-1

Employee: I (prfnt name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: I I (print name) (signature) (date)

TanWessel DataJService: TankIVessel #: Roll-off Bin

Diameter (feet): nla

Height (feet): nla

Initial Capacity (gal): 20 yd3

Primary Service: Container

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release:

Date:

Off-site Facility Name:

ManifesUBill of Lading:

Shipping Date:

e **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 24: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: I (print name) (signature) (date)

Employee: (print name) (signature) (date)

TankNessel DataIService: TanWessel #: Roll-off Bin

Diameter (feet): nla

Height (feet): nla

Initial Capacity (gal): 30 yd3

Primary Service: Container

Other Service:

Tank Bottom Design: Cone I Flat I Dish (clrcie one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TankJVessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

a **Attach Photos

DIK Environmental - TankiVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 25: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: 1 (pnnt name) (signature) (date)

DKE Form TVC-1

Employee: (pr~nt name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TankNessel DatalService: TanWVessel #: Roll-off Bin

Diameter (feet): nla

Height (feet): n/a

Initial Capacity (gal): 40 yd3

Primary Service: Container

Other Service:

Tank Bottom Design: Cone 1 Flat 1 Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 26: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Bulk Solids & Sludges Unitt

Ancillary Equipment Interior SamplingNonitoring:

Page 1 of 1

DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)

Page 27: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

RLUU

Page 28: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (pr~nt name) [s~gnature) (date)

DKE Form TVC-1

Employee: (print name) (s~gnature) (date)

Employee: \ (print name) (s~gnature) (date)

Employee: I (print name) (s~gnature) (date)

TanWessel DataIService: TanWessel #: Railcar Loading & Unloading Unit

Diameter (feet): n/a

Height (feet): nla

Initial Capacity (gal): nla

Primary Service: nla Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

a Date Emptied: Gallons: Date: Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Faceity: To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 29: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Railcar Loading & Unloading Unit

Ancillary Equipment Interior SamplinglMonitoring:

Record Readlngs

ff-s~te Faclllty Name: an~festIB~II of Ladlng

Page 1 of I

D/K Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)

Page 30: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

VAPOR RECOVERY

Page 31: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (s~gnature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService: TankIVessel #: C-710

Diameter (feet): 2.3

Height (feet): 8.7

Initial Capacity (gal): 47

Primary Service: Inorganic Scrubber

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Vol~me: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanWessel Interior SamplingIMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestJBill of Lading:

Shipping Date:

a **Attach Photos

D/K Environmental - TankiVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 32: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKIVESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (s~gnature) (date)

TanWVessel DataIService: TanWessel#: 0-706

Diameter (feet): 3

Height (feet): 4

Initial Capacity (gal): 150

Primary Service: Caustic RecirculationIBleed Drum

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TanWVessel Interior SamplinglMonitoring: If Monitoring w/FID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWVessel Release: Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

**Attach Photos

Page 2 of 2

D/K Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04)

Page 33: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (print name) (s~gnature) (date)

DKE Form TVC-1

Employee: 1 (print name) (signature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (signature) (date)

TanMVessel DataIService:

TanWessel #: D-708

Diameter (feet): 3

Height (feet): 4

Initial Capacity (gal): 200

Primary Service: Caustic for C-710

Other Service:

Tank Bottom Design: Cone 1 Flat I Dish (circle One)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings.

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

0 **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 34: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService: TanWessel #: TOX-700

Diameter (feet): nla

Height (feet): nla

Initial Capacity (gal): 1.0 mmbtulhr.

Primary Service: Thermal Oxidizer

Other Service:

Tank Bottom Design: Cone 1 Flat 1 Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

Tanmessel Interior SamplinglMonitoring: If Monitoring wlFID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2 i

Page 35: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKIVESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TankNessel DataJService: TanldVessel #: C-711

Diameter (feet): 2.3

Height (feet): 8.7

Initial Capacity (gal): 47

Primary Service: Caustic scrubber - Organic System

Other Service:

Tank Bottom Design: Cone I Flat / Dish (circle one)

Closure: Rinsate Volume: TransferIDisgosal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifesUBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 36: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (s~gnature) (date)

DKE Form TVC-1

Employee: (print name) (s~gnature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (signature) (date)

TankNessel DataIService:

TanWessel #: D-707

Diameter (feet):

Height (feet):

Initial Capacity (gal): 55

Primary Service: Caustic recirculation/Bleed Drum

Other Service:

Tank Bottom Design: Cone / Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TankNessel Interior SamplinglMonitoring: If Monitoring w/FID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date:

**Attach Photos

D/K Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 37: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

I TANKNESSEL CLOSURE PROCEDURE DKE Form TVC-1

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (print name) (s~gnature) (date)

Employee: (print name) (signature) (date)

Tank Bottom Design: Cone I Flat / Dish (circle one)

Employee:

Closure: Rinsate Volume: TransferIDisposal Destination:

I

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

(print name) (signature) (date)

TanWessel DataIService: TankNessel #: D-709

Diameter (feet):

Height (feet):

Initial Capacity (gal): 3.5

Primary Service: Caustic Make-up (Reagent) to C-711

Other Service:

To:

TanWessel Interior SamplingIMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanVVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 38: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Vapor Recover System (TOX-700, C-711, 0-707, D-709)

Ancillary Equipment Interior SamplinglMonitoring:

If Monitoring wlFID:

DiK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-lA Rev. (2-06)

Page 2 of 2

Page 39: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Vapor Recovery System (C-710, D-706, D-708)

ncillary Equipment Interior SamplingIMonitoring:

Page 1 of 2

DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)

Page 40: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

BULK REAGENT

Page 41: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: I (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService: TankNessel #: T-726

Diameter (feet): 7.5

Height (feet): 9.83

Initial Capacity (gal): 2,700

Primary Service: Reagent

Other Service:

Tank Bottom Design: Cone I I Dish (circ e one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankiVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 42: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

I TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1 1 INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (prtnt name) (signature) (date)

TanWessel DataIService: TankIVessel #: T-727

Diameter (feet): 7.5

Height (feet): 9.83

Initial Capacity (gal): 2,700

Primary Service: Reagent

Other Service:

Tank Bottom Design: Cone 1 9 I Dish (circ e one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release:

Date:

Off-site Facility Name:

ManifestlBill of Lading:

Shipping Date:

**Attach Photos

D/K Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 43: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

1 TANKNESSEL CLOSURE PROCEDURE DKE Form TVC-1

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (pr~nt name) (signature) (date)

TanWessel DataIService: TanWessel #: T-741

Diameter (feet): 7.5

Height (feet): 9.83

initial Capacity (gal): 2,700

Primary Service: Reagent

Other Service:

Tank Bottom Design: Cone I Flat 1 Dish P (circ e one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wIFID: ~ -

Date: Date:

Time: Time:

Lab Namc: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TankiVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 44: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit t o Operations Supervisor

TANWESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: 1 (print name) (s~gnature) (date)

Employee: 1 (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel#: T-791

Diameter (feet): 10

Height (feet): 10.33

Initial Capacity (gal): 5,000

Primary Service: Reagent

Other Service:

Tank Bottom Design:

Closure: Rinsate Volume: TransferlDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

Tanmessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanldVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 45: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANWVESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService: TankNessel #: T-792

Diameter (feet): 8.5

Height (feet): 10.33

Initial Capacity (gal): 3,750

Primary Service: Reagent

Other Service:

Tank Bottom Design: Cone 1 9 I Dish (circ e one)

Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifesUBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04)

Page 46: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: I (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (pr~nt name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService:

Tanmessel #: T-793

Diameter (feet): 7.5

Height (feet): 8.58

Initial Capacity (gal): 2,560

Primary Service: Reagent

Other Service:

Tank Bottom Design:

Closure: Rinsate Volume: TransferlDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility: To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

a **Attach Photos

DIK Environmental - TanWessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 47: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Bulk Reagent Tank System

Ancillary Equipment Interior SamplingIMonitoring:

If Monitoring w/FID:

Flanges

Pipeline

D/K Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06)

1"

%"

3

2"

1"

3

2

1 "

W

ball

ball

Chemical transfer Process

Process Process

Reagent transfer line block valves Reagent transfer pump sample spigot

Reagent fill line connection Reagent pumps suction line Reagent pumps discharge & transfer

Reagent fill line

Reagent pumps suction Reagent transfer Reagent injection

-----

Start Time:

Record Readings:

Ancillary Equipment Release:

Date:

Off-site Facility Name: ManifesffBill of Lading:

Shipping Date:

Page 1 of 1

Page 48: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

SUMPS

Page 49: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1 I INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TankNessel DataIService: TanWessel #: Sump 5

Diameter (feet): 38.17 x 6.75

Height (feet): n/a

Initial Capacity (gal): 6,579

Primary Service: Non-Haz Wastewater

Other Service:

Tank Bottom Design: Cone I Flat I Dish (circle one)

Closure: Rinsate Volume: TransferlDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TankNessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifestBill of Lading:

Shipping Date:

a **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 50: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: I (pr~nt name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (s~gnature) (date)

TankNessel DatalService: TanWessel #: Sump 10 (PP-010)

Diameter (feet): 6 x 6

Height (feet): n/a

Initial Capacity (gal): 1,885

Primary Service: Wastewater

Other Service:

Tank Bottom Design: Cone / Flat I Dish (circle one)

Closure: Rinsate Volume: TransferlDisposal Destination:

0 Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TankNessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifestBill of Lading:

Shipping Date:

t **Attach Photos

Page 2 of 2

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04)

Page 51: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

CONTAINMENT AREAS

Page 52: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (prtnt name) (signature) (date)

DKE Form TVC-1

Employee: (pr~nt name) (signature) (date)

Employee: (prlnt name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DatalService: TankIVessel #: Containment Area A

Diameter (feet):

Height (feet):

Initial Capacity (gal):

Primary Service:

Other Service:

Tank Bottom Design: Cone 1 Flat I Dish (circle one)

Closure: Rinsate Volume: TransferlDisposal Destination:

Date Emptied Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TankNessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TankNessel Release: Date:

Off-site Facility Name:

ManifesffBill of Lading:

Shipping Date: -

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 53: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

Employee: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanldVessel DatalService: TanWessel #: Containment Area B

Diameter (feet):

Height (feet):

Initial Capacity (gal):

Primary Service:

Other Service:

Tank Bottom Design: Cone I Flat 1 Dish (circle one)

Closure: Rinsate Volume: TransferlDisposal Destination: Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

TanldVessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanldVessel Release: Date:

Off-site Facility Name:

ManifesUBill of Lading:

Shipping Date:

a **Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2

Page 54: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

I TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1

INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

Supervisor: (print name) (signature) (date)

Employee: (pdnt name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService: TankNessel #: Containment Area C

Diameter (feet):

Height (feet):

Initial Capacity (gal):

Primary Service:

Other Service:

Tank Bottom Design: Cone 1 Flat I Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

a Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:

Date: Date:

Time: Time:

Cab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

e **Attach Photos

DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 55: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

NSl-RUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor

TANKNESSEL CLOSURE PROCEDURE

Supervisor: (print name) (signature) (date)

DKE Form TVC-1

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

Employee: (print name) (signature) (date)

TanWessel DataIService:

TankNessel #: Containment Area D

Diameter (feet):

Height (feet):

Initial Capacity (gal):

Primary Service:

Other Service:

Tank Bottom Design: Cone 1 Flat 1 Dish (circle one)

Closure: Rinsate Volume: TransferIDisposal Destination:

Date Emptied: Gallons: Date:

Date: Tank #:

Waste Volume: Vessel:

Liquid Gallons: Chain of Custody: Facility:

To: Date:

Solids:

To:

TanWessel Interior SamplinglMonitoring: If Monitoring w1FID:

Date: Date:

Time: Time:

Lab Name: Record Readings:

Analytical Date:

TanWessel Release: Date:

Off-site Facility Name:

ManifestIBill of Lading:

Shipping Date:

**Attach Photos

DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2

Page 56: Ancillary Equipment Procedure DKE Form Storage Treatment Tanks · PDF fileAncillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks D/K Environmental

Bankof America -* BANK OF hMRR.TCA - CONFLWUN'I'IAL PAW: 1

I A I APRIL 27, 200'1

~MENDMENT TO IRREVOCAELO STANDBY' L ~ T E R OF cnGnrrp ~ m m : 3009169

ISSUING BANK WK os A ~ R L C A , N . A . 1000 W. TmPLE STREET

DLRECTOK, DEPARTMENT OF TOXIC SUBSTANCES CONTROL FINANCIAL RESPONSTRTT,ITY UNT'I' 8800 CAL CENTER DRXVE

7'rH FLOOR, CA~-505-07-05 LO$ ANGELES, CA 90012-1514

Tl.lTS AMEM)MEN'17 IS TO EE CONSIDEREIJ AN INTEGRAL PAW' OP THE AROVE CREDIT AN13 MUST BE AWACWED THERETO.

THE Ai3OVE WiiTSONED CREDIT IS AMRNDED AS FOLLOWS:

'1~1g AMOUNT OF TXIS CREDIT HAS BEEN XNCREASED BY USD 2 5 , 6 4 9 . ~ ~ THE AGC;lZEGArl'E AMOUNT OF THE CREIJTT IS WOW. USD 941,681.92

ALL OTFlFR TERMS AND CONDITIONS REMAIN WNCWGED.

IF YOU REQUIRE: ANY ASSISTANCE OR WAVE ANY QUESTIONS REGARUXNC THIS AMENDMFXT, PLEASE CRLL 213-481-'1843. *

- .. LL' ---------- AU TURE

THIS DOCUMENT CONSTSTS OE' 1. PAGE(S).

CHERVL JEFFERSON

ORIGINAL

uS.it.1186D 7 J O W

QPR 27 2007 16:13 2135808445 PRGE .02