22
Analysis of Present Analysis of Present Status and Status and Future Supply /Demand Prospects for Future Supply /Demand Prospects for the DPRK Power System the DPRK Power System 2006. 6. 2006. 6. 25. 25. Power System Group, KERI Power System Group, KERI (J. Y. YOON (J. Y. YOON [email protected] ) )

Analysis of Present Status and Future Supply /Demand Prospects for the DPRK Power System

  • Upload
    maleah

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

Analysis of Present Status and Future Supply /Demand Prospects for the DPRK Power System. 2006. 6. 25. Power System Group, KERI (J. Y. YOON [email protected] ). . Introduction Electricity policies in the DPRK Present status of the DPRK Power System - PowerPoint PPT Presentation

Citation preview

Page 1: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

Analysis of Present Analysis of Present Status and Future Supply Status and Future Supply

/Demand Prospects for the DPRK Power System/Demand Prospects for the DPRK Power System

2006. 6.2006. 6. 25. 25.

Power System Group, KERIPower System Group, KERI

(J. Y. YOON (J. Y. YOON [email protected] ) )

Page 2: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

22

<CONTENTS><CONTENTS>

IntroductionIntroduction

Electricity policies in the DPRK Electricity policies in the DPRK

Present status of the DPRK Power Present status of the DPRK Power

SystemSystem

Future prospects in the DPRK Electricity Future prospects in the DPRK Electricity

SectorSector

ConclusionConclusion

Page 3: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

33

<Introduction><Introduction>

DPRK suffers from Electricity shortage ….DPRK suffers from Electricity shortage …. Main reason of DPRK Economy crisisMain reason of DPRK Economy crisis DPRK devise proper internal & external measures …DPRK devise proper internal & external measures …

Construction of generation plants (big or medium hydro plants)Construction of generation plants (big or medium hydro plants)

Remodeling of power facilities (plants, T/L, D/L. Network …)Remodeling of power facilities (plants, T/L, D/L. Network …)

Reduce Transmission/Distribution loss Reduce Transmission/Distribution loss

Strong Demand side managementsStrong Demand side managements

Co-operational policy with the ROK, RF, ChinaCo-operational policy with the ROK, RF, China No exact data & statistics on the DPRK Electricity Sector

Nobody knows the exact data on power plants, power system …Nobody knows the exact data on power plants, power system … Only estimated data had been published Only estimated data had been published

Page 4: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

44

<Overview of Present Status><Overview of Present Status>

Factors ROK (Jan. 2005) DPRK (Jan. 2005)DPRK/ROK

Supply potentialCapacity (MW)

Hydro

59,960

3880

597

3930

10.0Thermal

39,360 2040

Nuclear

16,720 -

Capacity Factor(%) 65.2% Estimates 30% 2.1

GenrationAmount(TWh)

Hydro

342.2

5.9

16.3

2.8(37%)*8.1(30%)*

21.0Thermal

205.6 5.4(30%)*

Nuclear

130.7 -

Frequency(Hz) 60 60 -

Trans. Voltage (kV)

765/345/154 220/110/66 -

Dist. Voltage(kV) 22.9/0.22/0.11 3.3/6.6/11/22  -

Demand Char. Summer daytime peak Winter night peak -

Supply Char. No. Shortage Shortage -

Operation Island System Island System -

*) Capacity factor*) Capacity factor

Page 5: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

55

<Overview of Present Status><Overview of Present Status>

<DPRK Capacity 2005><DPRK Capacity 2005>

ThermalThermal

43.6%43.6%

Hydro 1Hydro 1

12.1%12.1%

Hydro 2Hydro 2

44.3%44.3%

<DPRK Generation 2005><DPRK Generation 2005>

ThermalThermal

33.1%33.1%

Hydro 1Hydro 1

17.2%17.2%

Hydro 2Hydro 2

49.7%49.7%

*) Hydro-1 : collaboration company with CHINA*) Hydro-2 : DPRK plants

Page 6: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

66

<Present Status, Generation><Present Status, Generation>

DPRK authority transfer their formal Data to KERI (Jan. DPRK authority transfer their formal Data to KERI (Jan.

2005)2005)

These data delivered by DPRK officers through These data delivered by DPRK officers through

PANMUNSEOMPANMUNSEOM

Existing capacity 9500MW(Hydro 5170, Thermal Existing capacity 9500MW(Hydro 5170, Thermal

4330MW)4330MW)

Almost plants are decrepit, couldn’t supplyAlmost plants are decrepit, couldn’t supply

Supply potential capacity 5970MW(Hydro 3930, Supply potential capacity 5970MW(Hydro 3930,

Thermal 2040)Thermal 2040)

Existing Capacity

9500 MWHydro 5170 MW

Thermal 4330 MW

PotentialSupply

Capacity5970 MW

Hydro 3930 MW

Thermal 2040 MW

Page 7: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

77

<Present Status, Generation><Present Status, Generation>

Generation amountGeneration amount Min 14TWh (KERI, 1998) , 645kWh/person, same level of 2977(ROMin 14TWh (KERI, 1998) , 645kWh/person, same level of 2977(RO

K), Capacity Factor : Hydro 30-37%, Thermal 16%K), Capacity Factor : Hydro 30-37%, Thermal 16% Min 16.3 (KERI) -20.6(Gov) TWh in 2004Min 16.3 (KERI) -20.6(Gov) TWh in 2004

Average capacity factor 31%, same level of 1980 (ROK)Average capacity factor 31%, same level of 1980 (ROK) Max 38 TWh if free supply/demand is guaranteed …Max 38 TWh if free supply/demand is guaranteed …

same level of 1987 (ROK)same level of 1987 (ROK) Real Electricity Consumption

Estimates power loss 20% caused by weak system characteristicsEstimates power loss 20% caused by weak system characteristics

same level of 1960’s (ROK, 4.3% 2005)same level of 1960’s (ROK, 4.3% 2005)

Page 8: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

88

<Present Status, Transmission><Present Status, Transmission><표 > 2004년 북한 전력산업 현황 추정자료<표 > 남북한 전력계통 비교 (2004년 12월 기준 )

Transmission System Transmission System Composed of 220, 110, 66kV systemComposed of 220, 110, 66kV system Frequency 60Hz, same as The ROK // Russia, China 60HzFrequency 60Hz, same as The ROK // Russia, China 60Hz Divided into East, West, South & Central SystemDivided into East, West, South & Central System Weak power systemWeak power system Plan to construct 500kV Line to connect east/west Plan to construct 500kV Line to connect east/west

systemsystem Power transmission west Power transmission west east in rainy season east in rainy season

east east west in dry season west in dry season Eastern system DUMAN-river Hydro & SEONBON Eastern system DUMAN-river Hydro & SEONBON

Thermal plantsThermal plants Western system AMROK-river hydro & Thermal plants Western system AMROK-river hydro & Thermal plants

nearby PYEONGYANGnearby PYEONGYANG

Page 9: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

99

<Present Status, Distribution><Present Status, Distribution>

Distribution System Distribution System Primary Voltage Primary Voltage 3.3, 6.6, 11, 22kV 3.3, 6.6, 11, 22kV Secondary Voltage Secondary Voltage 110V, 220V 110V, 220V Standardization to 11kV Primary VoltageStandardization to 11kV Primary Voltage

KEPCO 22.9kV is more reasonableKEPCO 22.9kV is more reasonable 22.9kV system was already applied to supply 22.9kV system was already applied to supply

“GAESUNG Industrial complex”, 30km, 15MW x 2 “GAESUNG Industrial complex”, 30km, 15MW x 2 circuits circuits

Page 10: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1010

<Present Status, Power Quality><Present Status, Power Quality>

Very weak system and bad qualityVery weak system and bad quality Several measured data was reportedSeveral measured data was reported

Voltage below 0.7-0.9[pu] (ex 110kV Voltage below 0.7-0.9[pu] (ex 110kV 80-90kV level) 80-90kV level)

Frequency 60Hz Frequency 60Hz 43-48Hz 43-48Hz

Obstacle to practical business cooperationObstacle to practical business cooperation

(ex: KORES develops the DPRK coal mine, but couldn’t (ex: KORES develops the DPRK coal mine, but couldn’t

operation because of bad power quality, seek to operation because of bad power quality, seek to

alternatives to solve ….)alternatives to solve ….)

Necessity for reinforcements on overall DPRK power systemNecessity for reinforcements on overall DPRK power system

Reduce power loss above 20% Reduce power loss above 20% below 5%, ROK level below 5%, ROK level

Improve the industrial productivityImprove the industrial productivity

Page 11: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1111

<DPRK Electricity Policy><DPRK Electricity Policy>

Electricity Policy for DPRK Power Supply/DemandElectricity Policy for DPRK Power Supply/Demand

Divided into 5-step electricity policiesDivided into 5-step electricity policies 1945 - 1970 : 1945 - 1970 :

Mainly dependent on hydro plants (90%), No Mainly dependent on hydro plants (90%), No shortageshortage

1970’s – 1980’s : Policy change hydro by coal 1970’s – 1980’s : Policy change hydro by coal (thermal)(thermal)

Construction of thermal plant supported by RussiaConstruction of thermal plant supported by Russia 1980’s – : Policy change coal by nuclear plan1980’s – : Policy change coal by nuclear plan Construction Plan for Nuclear plants, ex) KEDO Construction Plan for Nuclear plants, ex) KEDO

projectproject 1990’s - : Construction of medium/small hydro plants1990’s - : Construction of medium/small hydro plants 2000’s - : Conduct both internal, external policies in 2000’s - : Conduct both internal, external policies in

parallelparallel

Page 12: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1212

<DPRK Electricity Policy><DPRK Electricity Policy>

Internal policy :Internal policy :

Devise various countermeasures to overcome electricity Devise various countermeasures to overcome electricity shortageshortage

Construction of Large hydro plants (11 units 1180MW)Construction of Large hydro plants (11 units 1180MW) Remodeling of overall power system Remodeling of overall power system Generation plants, Transmission, Distribution systemGeneration plants, Transmission, Distribution system Co-operational policy with neighboring countriesCo-operational policy with neighboring countries Russia, The ROKRussia, The ROK

Energy saving policy Energy saving policy

Discriminatory power supply, replace by lighting Discriminatory power supply, replace by lighting lamp forlamp for

energy savingenergy saving Using the Electronic metering ticketUsing the Electronic metering ticket

Page 13: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1313

<DPRK Electricity Policy><DPRK Electricity Policy>

Internal policy (continue) :Internal policy (continue) :

Energy 3-year’s plan (03-05)Energy 3-year’s plan (03-05)

① ① Restructuring power plantsRestructuring power plants

② ② Coal production increaseCoal production increase

③ ③ Expansion for coal production machineryExpansion for coal production machinery

Science & Technology 5-year’s plan (03-07)Science & Technology 5-year’s plan (03-07)

① ① Efficiency improve of water turbine (90%)Efficiency improve of water turbine (90%)

② ② Saving the heavy oil & Modernize the coal production Saving the heavy oil & Modernize the coal production tech.tech.

③ ③ Reduce the power loss (21%→16%)Reduce the power loss (21%→16%)

④ ④ Transmission systemize for NEARESTTransmission systemize for NEAREST

⑤ ⑤ Develop the renewable energyDevelop the renewable energy

Page 14: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1414

<Energy Policies : Practical cases><Energy Policies : Practical cases>

Construction of large hydro plants Construction of large hydro plants

11 units, 1180MW 11 units, 1180MW

Restructuring of aging thermal plantsRestructuring of aging thermal plants

BUKCHANG(1600MW), PYONGYANG(500MW) BUKCHANG(1600MW), PYONGYANG(500MW)

Thermal PlantsThermal Plants

Change Boiler, Turbine ….Change Boiler, Turbine ….

SUPUNG(800MW)․GYANGKYE(246MW) SUPUNG(800MW)․GYANGKYE(246MW)

Water Turbine change & DAM ReconstructionWater Turbine change & DAM Reconstruction

Reinforcement of T&D Lines nearby PYONGYANGReinforcement of T&D Lines nearby PYONGYANG

Page 15: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1515

<Energy Policies : Small/Medium Hydro><Energy Policies : Small/Medium Hydro>

Construction of Medium Hydro plants from 1999Construction of Medium Hydro plants from 1999 Effect of small hydro was not high ….Effect of small hydro was not high …. Constructed 48 units(86MW) in 2005Constructed 48 units(86MW) in 2005

Under construction 18Under construction 18 개개 No. of units decreased (300/y →66/y),No. of units decreased (300/y →66/y),

Increased capacity (7-200kW/unit → 1,800kW/unit)Increased capacity (7-200kW/unit → 1,800kW/unit)

(unit : (unit :

kW)kW) -’00 2001 2002 2003 2004 2005 계Planning 6,840 370 250 ? 100 43  

Constructed

6,615 98 40 30 10 48(18)6,841(18

)

Capacity292,00

024,500

30,000

30,000

20,000 86,400 470,900

kW/unit 31 250 750 1,000 800 1,800  

Page 16: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1616

<DPRK Electricity Policy><DPRK Electricity Policy>

External policy :External policy :

DPRK requests to Electricity AidDPRK requests to Electricity Aid

To ROK, Short-term 500MW , Long-term 2,000MWTo ROK, Short-term 500MW , Long-term 2,000MW

To Russia, 300-500MWTo Russia, 300-500MW

Wants to build Nuclear plant through Political Wants to build Nuclear plant through Political negotiation negotiation

Facility maintenance support from neighboring Facility maintenance support from neighboring countriescountries

ROK offers 2000MW aid if DPRK gives up atomic plan ROK offers 2000MW aid if DPRK gives up atomic plan ……

Electricity Aid under mutual political, economic trust Electricity Aid under mutual political, economic trust should be guaranteedshould be guaranteed

Page 17: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1717

<Energy Policies : Cooperation cases><Energy Policies : Cooperation cases>

External cooperation External cooperation  Import used plant facilities with natural resources Import used plant facilities with natural resources

securitysecurity

from RUSSIA(BUCKCHANG), CHINA (large hydro), from RUSSIA(BUCKCHANG), CHINA (large hydro),

HYDRO SWEDEN (small hydro plants)HYDRO SWEDEN (small hydro plants)

Collaboration with CHINA : Collaboration with CHINA :

Construction of Power line & cable factoryConstruction of Power line & cable factory

Change of T&D power line & lighting (Compact lamp Change of T&D power line & lighting (Compact lamp

to reduce power loss by 80%)to reduce power loss by 80%)

Supply card type electronic power meter Supply card type electronic power meter

Introduction of capitalism on power consumptionIntroduction of capitalism on power consumption

Page 18: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1818

<Future Prospects><Future Prospects>

Everybody wants to know theEverybody wants to know the

①① Future possible political scenariosFuture possible political scenarios

②② Prospects on DPRK power Industry & Prospects on DPRK power Industry &

system system

③③ Free volume of DPRK electricity market Free volume of DPRK electricity market

sizesize

ED = function ( economy (politics) )ED = function ( economy (politics) )

ED : Electricity Demand, DPRKED : Electricity Demand, DPRK

Page 19: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

1919

<Future Prospects : consumption <Future Prospects : consumption ratio>ratio>

Demand on free market at preset status …Demand on free market at preset status … Estimated by about 36TWh, 1,600kWh/person/yearEstimated by about 36TWh, 1,600kWh/person/year

Same level of 1985 in ROK ….Same level of 1985 in ROK ….

Consumption composition ratio (KERI)Consumption composition ratio (KERI)

Industry over 70% Industry over 70% Military 14%Military 14% House lower than 11%House lower than 11%

Industry

Military

HouseTransportat

ionSum

Consumption (TWh) 26 4.9 4.3 0.8 36

Ratio(%) 72.4 13.6 11.9 2.1 100

Page 20: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

2020

<Future Prospects : <Future Prospects : Interconnection Interconnection Scenario>Scenario>

Many scenarios for NEAREST has been publishedMany scenarios for NEAREST has been published

ESI, KERI, NI report/paper etc. ESI, KERI, NI report/paper etc. Has rough concept/contents and similarities with each Has rough concept/contents and similarities with each

other other

Among these scenarios, “(RU)-DPRK-ROK” is the key pointAmong these scenarios, “(RU)-DPRK-ROK” is the key point

Future interconnection potentials b/t ROK and DPRKFuture interconnection potentials b/t ROK and DPRK Possibility of power interconnection in futurePossibility of power interconnection in future

Power supply for GAESUNG industrial complex was Power supply for GAESUNG industrial complex was realizedrealized

ROK government offers 2000MW aid if DPRK gives up atomic ROK government offers 2000MW aid if DPRK gives up atomic planplan

DPRK wants to build light water reactor ….DPRK wants to build light water reactor …. Unified power system operation will be realizedUnified power system operation will be realized

Page 21: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

2121

Future potentials for “RF-DPRK” power interconnection

““RU Vladivostok – DPRK Cheongjin” 375km, DC LineRU Vladivostok – DPRK Cheongjin” 375km, DC Line Expect 220kV 50Hz AC Expect 220kV 50Hz AC 500kV 50Hz AC 500kV 50Hz AC

500kV or 500kV or 600kV DC Operation600kV DC Operation Future considerable points

Harmonization of Short and Long term Interconnection policyHarmonization of Short and Long term Interconnection policy GAESUNG & CheongjinGAESUNG & Cheongjin Parallel operation of interconnection systemParallel operation of interconnection system

How to operate 50Hz AC S/S in Cheongjin after DC operationHow to operate 50Hz AC S/S in Cheongjin after DC operation

begins ?begins ?

<Future Prospects : Interconnection <Future Prospects : Interconnection Scenario>Scenario>

Page 22: Analysis of Present  Status and Future Supply /Demand Prospects for the DPRK Power System

2222

RFE VladivostokRFE Vladivostok50Hz AC50Hz AC

BTBBTB

DPRK AC 60HzDPRK AC 60Hz

ROK AC 60HzROK AC 60Hz

Border of RF-DPRKBorder of RF-DPRK

Border of ROK-DPRKBorder of ROK-DPRK

RFERFEVladivostokVladivostok

CHEONGJINCHEONGJIN

GAESUNGGAESUNG

(50Hz 500kV AC)(50Hz 500kV AC)

RFE VladivostokRFE Vladivostok

ROK AC SYSTEMROK AC SYSTEM

(60Hz 345kV AC)(60Hz 345kV AC)

DPRK AC SYSTEMDPRK AC SYSTEM

PYONGYANG orPYONGYANG orBorder of ROK-DPRKBorder of ROK-DPRK

DPRK AC SYSTEMDPRK AC SYSTEM

BTBBTB

KEDO NPKEDO NP

<Future Prospects : <Future Prospects : Interconnection Interconnection Scenario>Scenario>