ANALISIS HARGA SATUAN PEKERJAAN SALURAN DRAINASE MENGGUNAKAN BETON PRECAST U DITCH DAN BUIS BETON U TUGAS AKHIR Oleh I Gede Andre Suputra NIM: 1204105010 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS UDAYANA 2016

ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

  • Upload
    vudung

  • View
    288

  • Download
    2

Embed Size (px)

Citation preview

Page 1: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

ANALISIS HARGA SATUAN PEKERJAAN SALURAN

DRAINASE MENGGUNAKAN BETON PRECAST U

DITCH DAN BUIS BETON U

TUGAS AKHIR

Oleh

I Gede Andre Suputra

NIM: 1204105010

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS UDAYANA

2016

Page 2: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

iii

LEMBAR PERNYATAAN

Yang Bertanda tangan dibawah ini:

Nama : I Gede Andre Suputra

NIM. : 1204105010

Judul TA : Analisis Harga Satuan Pekerjaan Saluran Drainase Menggunakan

Beton Precast U ditch dan Buis Beton U

Dengan ini saya menyatakan bahwa Laporan Tugas Akhir/Skripsi saya ini

tidak terdapat karya yang pernah diajukan untuk memperoleh gelar kesarjanaan di

suatu perguruan tinggi, dari sepanjang pengetahuan saya juga tidak terdapat karya

atau pendapat yang pernah ditulis atau diterbitkan orang lain, kecuali secara

tertulis diacu dalam naskah dan disebut dalam daftar pustaka.

Gianyar, Mei 2016

I Gede Andre Suputra

NIM. 1204105010

Page 3: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

iv

ABSTRAK

Pada Proyek Peningkatan Kualitas Permukiman Kumuh Kawasan

Sukawati Kecamatan Sukawati, Kelurahan Ubud, dan Desa Mas Kecamatan Ubud

Kabupaten Gianyar dikerjakan oleh PT. Sinarbali Binakarya yang

mempergunakan beton precast u ditch dan Proyek Penataan Lingkungan

Permukiman di Kecamatan Denpasar Barat dikerjakan oleh CV. Akta Jaya yang

mempergunakan buis beton u. Pada kedua proyek ini dilakukan penelitian yang

bertujuan untuk menganalisis harga satuan tenaga kerja serta mencari waktu dan

biaya yang diperlukan pada pekerjaan saluran drainase menggunakan masing-

masing material tersebut.

Penelitian ini menggunakan metode pengamatan langsung dilapangan

dengan menggunakan data primer dan data sekunder. Data primer berupa luasan

pekerjaan yang terselesaikan dalam satu hari dengan pengamatan selama 8 jam

per hari selama 7 hari. Data sekunder berupa gambar proyek, data jumlah tenaga

kerja, dan data harga satuan upah dan bahan. Perhitungan analisis produktivitas

tenaga kerja dilakukan dengan cara membandingkan luas pekerjaan terealisasi

dengan waktu pekerjaan. Hasil analisis produktivitas ini digunakan untuk

mendapatkan koefisien pada masing–masing tenaga kerja, sehingga didapatkan

analisis harga satuan, biaya, dan waktu pada masing-masing material.

Berdasarkan dari analisis koefisien tenaga kerja pemasangan saluran

drainase menggunakan beton precast u ditch per m′ adalah untuk pekerja sebesar

0,0762, untuk tukang batu 0,0464, untuk kepala tukang batu 0,0464, dan untuk

mandor 0,0099. Sedangkan koefisien tenaga kerja pada pemasangan saluran

drainase menggunakan buis beton u per m′ adalah untuk pekerja 0,1047, untuk

tukang batu 0,0827, untuk kepala tukang batu 0,0523, dan untuk mandor 0,0160.

Jadi koefisien tenaga kerja pemasangan saluran drainase menggunakan beton

precast u ditch lebih kecil dari pemasangan buis beton u. Biaya pemasangan

(upah + material) saluran drainase menggunakan beton precast u ditch sebesar Rp.

262.891,23 per m′ dalam waktu pengerjaan 2 hari dengan mempergunakan 2

pekerja, 1 tukang batu, 1 kepala tukang batu, 1 mandor dan untuk biaya

pemasangan (upah + material) saluran drainase menggunakan buis beton u

sebesar Rp. 65.330,5 per m′ dalam waktu pengerjaan 3 hari dengan

mempergunakan 2 pekerja, 2 tukang batu, 1 kepala tukang batu dan 1 mandor.

Kata kunci : koefisien analisa harga satuan, beton precast u ditch, buis beton u

Page 4: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

v

UCAPAN TERIMA KASIH

Puji syukur penulis panjatkan kehadapan Tuhan Yang Maha Esa, karena

atas karunia-Nya saya dapat menyelesaikan Tugas Akhir yang berjudul “Analisis

Harga Satuan Pekerjaan Saluran Drainase Menggunakan Beton Precast U-

Ditch Dan Buis Beton U”

Penulis menyadari bahwa Tugas Akhir ini tidak akan berhasil tanpa

bimbingan dan pengarahan dari berbagai pihak yang telah turut membantu secara

langsung maupun tidak langsung dalam proses penelitian maupun saat penulisan

penelitian. Penulis mengucapkan terima kasih kepada Bapak Ir. Anak Agung

Wiranata, MT. selaku dosen pembimbing I, Bapak Ir. I Wayan Yansen, MT.

selaku dosen pembimbing II, bintang, orang tua, keluarga, dan teman-teman sipil

angkatan 2012, serta semua pihak yang telah membantu dalam menyelasaikan

Tugas Akhir yang tidak bisa disebutkan satu persatu.

Untuk kesempurnaan penelitian ini, kami mohon kritik dan sarannya.

Semoga penelitian ini dapat bermanfaat bagi semua pihak. Akhir kata penulis

mengucapkan terima kasih.

Bukit Jimbaran, April 2016

Penulis

Page 5: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

vi

DAFTAR ISI

HALAMAN JUDUL .......................................................................................... i

LEMBAR PENGESAHAN .............................................................................. ii

LEMBAR PERNYATAAN .............................................................................. iii

ABSTRAK ........................................................................................................ iv

UCAPAN TERIMA KASIH ..............................................................................v

DAFTAR ISI ..................................................................................................... vi

DAFTAR TABEL ............................................................................................ viii

DAFTAR GAMBAR ........................................................................................ ix

BAB I

PENDAHULUAN

1.1 Latar Belakang .......................................................................................1

1.2 Rumusan Masalah ..................................................................................2

1.3 Tujuan Penelitian ...................................................................................2

1.4 Manfaat Penelitian .................................................................................2

1.4 Batasan Masalah .....................................................................................3

BAB II

TINJAUAN PUSTAKA

2.1 Drainase ..................................................................................................4

2.2 Beton U-Ditch .........................................................................................5

2.3 Buis Beton U ..........................................................................................14

2.4 Produktivitas .........................................................................................21

2.5 Faktor yang Mempengaruhi Biaya Produktivitas .................................22

2.6 Waktu ....................................................................................................22

2.7 Rencana Anggaran Biaya ......................................................................23

2.8 Koefisien Analisa Harga Satuan Pekerjaan dan

Koefisien Tenaga Kerja..........................................................................24

2.9 Waktu Pengerjaan ..................................................................................26

BAB III

METODE PENELITIAN

3.1 Kerangka Kegiatan ................................................................................27

3.2 Studi Pustaka .........................................................................................29

3.3 Penentuan Obyek Penelitian .................................................................29

3.4 Pengumpulan Data ................................................................................30

3.5 Pengolahan Data ....................................................................................31

3.6 Analisis Data .........................................................................................33

BAB IV

HASIL DAN PEMBAHASAN

4.1 Umum ....................................................................................................35

4.2 Data Sekunder ........................................................................................36

Page 6: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

vii

4.3 Data Primer ............................................................................................40

4.4 Pengolahan Data ....................................................................................41

4.5 Analisis ...................................................................................................48

BAB V

PENUTUP

5.1 Simpulan ...............................................................................................53

5.2 Saran ......................................................................................................53

DAFTAR PUSTAKA

LAMPIRAN A ..................................................................................................56

LAMPIRAN B ..................................................................................................59

LAMPIRAN C ..................................................................................................71

LAMPIRAN D ..................................................................................................73

Page 7: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

viii

DAFTAR TABEL

Tabel 2.1 Tabel Analisa Harga Satuan Pekerjaan .............................................25

Tabel 4.1 Spesifikasi teknis Proyek Peningkatan Kualitas Permukiman Kumuh

Kawasan Sukawati Kecamatan Sukawati, Kelurahan Ubud, dan Desa

Mas Kecamatan Ubud Kabupaten Gianyar ......................................36

Tabel 4.2 Spesifikasi teknis Proyek Peningkatan Kualitas Permukiman di

Kecamatan Denpasar Barat yang berlokasi di Jalan Gunung Guntur, Kelurahan Padangsambian ....................................................... 38

Tabel 4.3 Volume pemasangan saluran drainase dalam satu hari kerja pada Proyek Peningkatan Kualitas Permukiman Kumuh Desa Mas

Kecamatan Ubud Kabupaten Gianyar ..............................................41

Tabel 4.4 Volume pemasangan saluran drainase dalam satu hari kerja pada Proyek Peningkatan Kualitas Permukiman di Kecamatan

Denpasar Barat yang berlokasi di Jalan Gunung Guntur, Kelurahan Padangsambian ....................................................................... 41 Tabel 4.5 Perhitungan masing-masing koefisien analisa tenaga kerja ..............47

Tabel 4.6 Perhitungan masing-masing koefisien analisa tenaga kerja ..............47

Tabel 4.7 Hasil Perhitungan Koefisien Tenaga Kerja dari masing-masing

pekerjaan pemasangan saluran Drainase Menggunakan Beton

Precast U Ditch dan Buis Beton U ..................................................47

Tabel 4.8 Analisa harga satuan 1 m′ pekerjaan pemasangan saluran drainase

menggunakan beton precast u ditch..................................................49

Tabel 4.9 Analisa harga satuan 1 m′

pekerjaan pemasangan saluran drainase menggunakan buis beton u

..........................................................................................................50

Tabel 4.10 Hasil analisis harga satuan dan waktu pekerjaan pemasangan saluran

drainase .............................................................................................51

Tabel 4.11 Rekapitulasi total biaya dan waktu pada masing-masing pekerjaan

saluran drainase ...............................................................................52

Page 8: ANALISIS HARGA SATUAN PEKERJAAN SALURAN … Awal.pdf · analisis harga satuan pekerjaan saluran drainase menggunakan beton precast u ditch dan buis beton u tugas akhir oleh i gede

ix

DAFTAR GAMBAR

Gambar 2.1 Dimensi Standar Beton U Ditch .................................................. 6

Gambar 2.2 Detail Cover dan Penampang U ditch .........................................6

Gambar 2.3 Alat Pembengkok wiremesh Tulangan U ditch ...........................7

Gambar 2.4 Tulangan wire mesh U ditch yang sudah jadi ............................ 8

Gambar 2.5 Pengecoran U ditch menggunakan Ready Mixx Sinar Bali ........ 9

Gambar 2.6 Cetakan U ditch yang siap di cor .............................................. 10

Gambar 2.7 Proses pengecoran U ditch menggunakan concrete vibrator ....11

Gambar 2.8 Proses Pengecoran Cover U ditch .............................................12

Gambar 2.9 Beton U ditch yang baru dilepas dari cetakannya ..................... 13

Gambar 2.10 Buis Beton u .............................................................................14

Gambar 2.11 Spesifikasi Ukuran Cover Buis Beton U ..................................15

Gambar 2.12 Spesifikasi Ukuran Buis Beton U .............................................15

Gambar 2.13 Proses Pencampuran Agregat Buis Beton U ........................... 17

Gambar 2.14 Cetakan Buis Beton U ………………………………………..18

Gambar 2.15 Oli Bekas yang Digunakan Melumuri Cetakan ……………....19

Gambar 2.16 Proses Pengecoran Buis Beton U ............................................ 20

Gambar 3.1 Kerangka Penelitian ................................................................. 28

Gambar 3.2 Lokasi Penelitian Proyek Oleh PT. SinarBali Binakarya

(U ditch). ................................................................................... 29

Gambar 3.3 Lokasi Penelitian Proyek Oleh CV. Akta Jaya (Buis Beton U) .30

Gambar 4.1 Beton Precast U ditch yang digunakan pada Proyek Peningkatan

Kualitas Permukiman Kumuh Desa Mas Kecamatan Ubud

Kabupaten Gianyar ................................................................... 37

Gambar 4.2 Buis Beton U yang digunakan Proyek Peningkatan Kualitas

Permukiman di Kecamatan Denpasar Barat yang berlokasi di Jalan Gunung Guntur, Kelurahan Padangsambian ............................. 38

Gambar 4.3 Potongan Melintang dari pekerjaan saluran drainase menggunakan

buis beton u .............................................................................. 39

Gambar 4.4 Buis Beton U yang digunakan Proyek Peningkatan Kualitas