9
questions? we have the answers an in-depth look at Thornhill

an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

questions? we have the answers

an in-depth look at Thornhill

Page 2: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

the community and rapid transitResidents who live and work in the Thornhill area may be interested in the background and key questions about the next phase of the rapid transit system, including historical details related to the planning, location and timing.

In this booklet, we answer the most common questions and highlight how the vivaNext projects will benefit our living environment for generations to come while York Region—and Thornhill—continues to grow.

planning for expected growth started long agoIn 1994, York Region’s Official Plan outlined a system of urban growth centres and corridors, and a rapid transit network that will connect centres of population and employment growth.

Two of the key urban growth centres identified are the Vaughan Metropolitan Centre area, and the Richmond Hill/Langstaff Gateway. The Highway 7 West rapidway will connect these two urban centres, including high-demand stops on Centre Street and Bathurst Street along the way.

York Region’s rapidway projects went through an extensive Environmental Assessment [EA] process and, after 14 public consultation meetings that were attended by over 1,200 residents between 2003 and 2004, received approval from the Ministry of the Environment in 2006.

In 2005, the Province of Ontario mandated plans to manage growth, limit urban sprawl, protect green spaces and create complete communities, including housing, employment and transportation.

1

Page 3: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

provincial funding for the rapidways was announced in 2009In 2009, the Province of Ontario announced $8.6 billion in public transit funding with much media publicity—$7.2 billion for Transit City in Toronto and $1.4 billion for vivaNext rapidways in York Region.

Since the funding announcement, vivaNext has routinely issued public announcements to the media, attended community events, placed advertisements on radio and in newspapers, and engaged the public through social media channels.

2 3

the community needs rapid transitHigh density in the Bathurst and Centre Street area already exists, and the population and employment opportunities will continue to increase in the area, which is why improving transit now along this route is so important.

ridership demand exists nowViva has travelled down Bathurst and across Centre Street since 2005 when Viva was first launched, and serves thousands of people each workday—the vivaNext rapidway on Bathurst and Centre Street is not a detour or new route.

Thornhill Woods is a point of originThornhill Woods is predominately low-density detached and semi-detached homes, and YRT/Viva transit stops throughout the neighbourhood.

subway stations will be within easy reachThe rapidway will provide quick and convenient access to Toronto-York Spadina Subway Extension [scheduled to open by the end of 2017] and Yonge North Subway Extension [awaiting full funding], offering residents and commuters greater options for how to get around.

Page 4: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

Bathurst and Centre Street is a destinationThe Bathurst and Centre Street area hosts a significant number of retail shops, a theatre, professional services, transit terminal, health and education services, and a mix of low- and high-density residential accommodations.

rapidways connect destinationsRapidways connect urban centres and key destinations within York Region, unlike an express service that goes to just one stop in as little time as possible.

a rapidway on Highway 7, between Bathurst and Centre Streets, was evaluated and determined not practicalThree alignment alternatives were evaluated as part of the Environmental Assessment, including along Hwy. 7 between Centre and Bathurst Streets. The existing route provides the greatest amount of benefits and best addresses future demands.

The Highway 7 alternative would have been bound by hydro towers and Highway 407 to the south, low-rise commercial buildings to the west and detached homes to the north—restricting future growth opportunities, providing minimal benefits to ridership and impacting operational costs due to missed revenue.

vaughan 2020Thornhill Centre Street CorridorThe City of Vaughan is developing a plan for sustainable growth in the Centre Street Corridor. As part of the City’s Official Plan, a key objective will be to manage growth while maintaining a high quality of life for residents, today and in the future.

The Centre Street Corridor Urban Design Guidelines and Streetscape Master Plan Study outline a vision for Centre Street between Highway 7/ Highway 407 and Bathurst Street. The renewal of this area will focus on preserving local neighbourhoods, while creating a sense of place through improved retail and public spaces.

The Centre Street Corridor Study reflects Vaughan’s commitment to plan and manage the city’s growth and vitality as outlined in the Vaughan Vision 2020, strategic plan.

For more information, visit the Centre Street project website at vaughan.ca under Major Projects.

N

Station east ofCarl Tennen St

Toronto-York Spadina Subway Extension

SmartREITTerminal

TTC Bow

es R

oad

Ans

ley

Gro

ve R

oad

Cre

dits

tone

Roa

d

Jane

Str

eet

Edg

eley

Bou

leva

rd

Mil

lway

Ave

nue

Apple Mill Rd

Hig

hway

400

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

Hel

en S

tree

t

Kee

le S

tree

t

Duf

feri

n S

tree

t

Nor

th P

rom

enad

e

Yong

e S

tree

t

Highway 407

Highway 7

Highway 7Highway 7

Wig

wos

s D

rive

Commerce St

New

Wes

tminster Dr

Centre Street

Bat

hurs

t Str

eet

Highway 407

Steeles Ave

land usestudy area.

54

Page 5: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

vivastations provide comfort and convenience

arrival/departure screens provide real-time scheduling info

raised platform provides near level boarding of viva vehicles, reducing the need to climb steps or lift objects

temperature and motion activated heaters in wind

enclosure provide warmth while accessible entry doors

minimize heat loss

extended platform length can accommodate multiple viva vehicles, enhancing embarking/disembarking efficiency

roof extends up and over viva vehicles to keep snow and rain off while embarking/disembarking roof and side panels

made of tinted glass for greater visibility and comfort

security surveillance and intercom for emergency assistance on platform

tactile pavers along rapidway edge provide greater safety

way finding signage provides riders with easy and quick direction

energy-efficient lighting throughout for greater safety and comfort

ample seating inside and out provides greater personal space and comfort

flexible cash, pass andPresto fare machines

76

Page 6: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

the project has an attractive, welcoming design that benefits the neighbourhoodWe are designing the road, rapidways and sidewalks to reflect the overall character and appearance of each community.

Streetscape improvements may include the addition of trees, plants, wider sidewalks, and street lighting.

Bicycle lanes planned for this corridor will provide an important alternative for travelling in a pedestrian-friendly environment.

the rapidway project is different from the St. Clair project in TorontoThe vivaNext rapidway project has a completely different design, different project management and a focus on communications with the public and area businesses.

Looking at the Highway 7 rapidway segment from Bayview Avenue to Hwy. 404 that opened in 2015, it is clear that the vivaNext project management and design elements speak for the quality of this project.

existing traffic lanes will remain, with added safetyBathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has the potential of replacing over 70 cars.

The elimination of mid-block left turns will help in avoiding common side-impact accidents during heavy traffic.

Dedicated left-turn lanes and signals at intersections, with the ability to make u-turns, provides safer turning movements for drivers.

8 9

each transit vehicle has the potential of

replacing over 70 cars.

Page 7: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

property uplift occurs with investment in transitThe Canada Line project in British Columbia caused significantly higher property values [as high as 300% in some areas] and sparked revitalization of old communities with more employment opportunities.

In the Viva Benefits Case [Nov. 2008] issued by Metrolinx, it states, “Based on the average for North America and benchmarks from the Government of Canada, a rapid bus systemwould have a modest positive impact [of] 2–4% premium on residential and office space and 1–2% on retail on property values within a 400-meter radius of the stations. However, based on York Region’s integrated planning, the land uplift will likely be higher. The impact of VIVA on property values would be strongest in areas where high employment and population growth is expected...”

how construction will unfoldConstruction will be carefully scheduled and access to businesses, driveways and sidewalks will be maintained as much as possible, similar to the rapidway construction on Highway 7 in Markham and Richmond Hill.

10

* Subject to change * Subject to change Map not to scale Rev. 03 / 2016

Hig

hway

50

Highway 407

Finch Avenue

Sheppard AvenueSheppard Avenue

Lesl

ie S

tree

t

Steeles AvenueSteeles Avenue

Bat

hurs

t Str

eet

Yong

e St

reet

Yong

e St

reet

Hig

hway

27

Hig

hway

400

Jane

Str

eet

Highway 9

Finch Avenue

Sheppard Avenue

Steeles Avenue

Hig

hway

404

Hig

hway

404

Bay

view

Ave

nue

Ken

nedy

Roa

d

York

Dur

ham

Lin

e

Highway 407

Wellington St. E. Aurora Rd.

Davis Drive

Green Lane

Bloomington Rd.

Stouffville Rd.

Major Mackenzie DriveMajor Mackenzie Drive

Highway 7Highway 7

Highway 7

Don

Mill

s R

oad

Lesl

ie S

tree

t

HeritageArea

N E W M A R K E T

W H I T C H U R C H -S T O U F F V I L L E

A U R O R A

V A U G H A N

M A R K H A M

R I C H M O N D H I L L

M A R K H A M

T O R O N T OT O R O N T O

Don Mills Station

Unionville GO Station

Sheppard West

FinchStation

East GwillimburyGO Station

NewmarketGO Station

Cornell

Richmond HillCentre

VaughanMetropolitan

Centre

Lincolnville

to Barrie

to Kitchener

Kipling

Islingto

n

Islingto

n

Helen

Helen

Pine Valley

Ansley G

rove

Westo

n

Keele

York U

nivers

ity

York U

nivers

ity

Finch W

est

Finch W

est

Downsview Park

Downsview Park

Pioneer Vill

age

Pioneer Vill

age

Hwy 407

Hwy 407

Dufferin

Dufferin

Centre

CentreBathurst

Bathurst

Atkinson

Bayview

Bayview

16th-C

arrvill

e

16th-C

arrvill

e

Bantry-Sco

tt

Steele

s

Steele

s

Cumm

er/Dre

wry

Cumm

er/Dre

wryClark

Leith H

ill

Leith H

ill

Langstaff

/ Longbrid

ge

Langstaff

/ Longbrid

ge

Weld

rick

Major Mack

enzie

Major Mack

enzie

CrosbyElgin M

ills

19th-G

ambleJeffe

rson

Jeffers

on

King

Bloom

ington

Bloom

ington

Regatta

Regatta

HendersonGolf L

inksWelli

ngtonOrc

hard H

eights

Orchard

Heights

Mulock

Eagle

Longford

Green Lane

Green Lane

Bristo

l

Bristo

l

Main

Southla

ke

Huron H

eights

Huron H

eights

Leslie

LeslieHwy 4

04

Hwy 404

Savage

Bernard

Chalmers

Chalmers

East Beave

r Cre

ek

East Beave

r Cre

ek

Montgom

ery

Montgom

ery

Allsta

te Park

way

Woodbine

Town Centre B

lvd.

Cedarland

Kennedy

Kennedy

Bullock

Bullock

Woote

n Way

Woote

n Way

Markham Sto

uffvill

e Hospita

l

Markham Sto

uffvill

e Hospita

l

McCowan

Main St. Mark

ham

Galsworth

y

Bur Oak

Ward

en

Enterp

rise

Enterp

rise

Market

MarketMarti

n Gro

ve

Martin G

rove

Highway 27

Highway 27

Highway 427

Highway 427

Highway 50

Highway 50

Comm

erce

Comm

erce

Credits

tone

Credits

tone

Pennsylvania

PennsylvaniaLangsta

ff

LangstaffVaughan M

ills M

all

Vaughan Mill

s Mall

Springside

SpringsideNorwood

Norwood

Promenade

Harding

Harding

Jane / Major M

ackenzie

Jane / Major M

ackenzie

McNaughto

n

McNaughto

n

KeeleKeele

Maple

Maple

Peter R

upert

Peter R

upert

Dufferin

Dufferin

Bathurs

t

Bathurs

t

Yonge

Yonge

Newkirk

Newkirk

Bayview

Bayview

Leslie / M

ajor Mack

enzie

Leslie / M

ajor Mack

enzie

Greenhill

/Sta

ples

Greenhill

/Sta

ples

Headford

/Orla

ndo

Headford

/Orla

ndo

16th Ave

nue

16th Ave

nue

East Beave

r Cre

ek

East Beave

r Cre

ek

Valleymede

Valleymede

Leslie

Leslie

Comm

erce

Valley

Comm

erce

Valley

Green Lane

Green Lane

JohnJohn

Steele

s

Steele

s

McNico

ll

McNico

ll

FinchFinch

West B

eaver C

reek

West B

eaver C

reek

Wilm

ot

Wilm

ot

DavisDavis

New

Westm

inster

Bathurs

tHild

a

Ward

en

Village Park

way

Sciberr

as

Main St. Unionvill

e

project map

Open Rapidway

Rapidway Construction (2012-2016)*

Rapidway Construction (2014-2018)*

Rapidway Construction (2016-2019)*

Rapidway Construction (tbd-2021)*

Future Rapid Transit

Proposed Future Viva Service

Spadina Subway Extension (2011-2017)*

Viva Curbside Station Construction [2015-2020]*

Proposed Yonge Subway Extension

Terminals [current and future]

GO Transit Rail Lines

Page 8: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has

more informationWe will continue to use newsletters, media announcements, social media, public speaking opportunities and so forth during construction to stay engaged with the community and those who work in the area.

Vaughan’s drop-in Project Information Office is also available for the community to ask questions about the project and see project maps:

location 7800 Jane Street [northwest corner of Highway 7 and Jane]

hoursMondays: 9am to noon Wednesdays: 1pm to 5pm

Sign up for updates and find project details at vivanext.com, and follow us on Twitter and Facebook.

Helen Street to Edgeley Boulevard (2015-2019)*

Edgeley Boulevard to Bowes Road (2012-2016)*

Bow

es R

oad

Ansl

ey G

rove

Roa

d C

redi

tsto

neR

oad

Jane

St

reet

Ed

gele

yB

oule

vard

Mill

way

Ave

nue

Hig

hway

400

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

H

elen

Stre

et

Kee

le S

tree

t

Duf

feri

n

Stee

t

B

athu

rst S

teet

Yong

e St

eet

NHighway 407 Highway 407

Highway 7

Highway 407

Highway 7

Highway 7

Centre Street

vivastation

TTC

Steeles Avenue

Finch Avenue

Sheppard AvenueTTC

Spadina

Subway

Richmond HillCentre

Bow

es R

oad

Ans

ley

Gro

ve R

oad

Cre

dits

tone

Roa

d

Jane

St

reet

Ed

gele

yB

oule

vard

Mill

way

Ave

nue

Hig

hway

400

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

H

elen

Stre

et

Kee

le S

tree

t

Duf

feri

n

Stee

t

B

athu

rst S

teet

Yong

e St

eet

NHighway 407 Highway 407

Highway 7

Highway 407

Highway 7

Highway 7

Centre Streetvivastation

TTC

Steeles Avenue

Finch Avenue

Sheppard AvenueTTC

Spadina

Subway

Richmond HillCentre

Bowes Road to Yonge Street

Bow

es R

oad

Ansl

ey G

rove

Roa

d C

redi

tsto

neR

oad

Ed

gele

yB

oule

vard

Mill

way

Ave

nue

Hig

hway

400

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

H

elen

Stre

et

Kee

le S

tree

t

Duf

feri

n

Stee

t

B

athu

rst S

teet

Yong

e St

eet

NHighway 407 Highway 407

Highway 7

Highway 407

Highway 7

Highway 7

Centre Street

TTC

Steeles Avenue

Finch Avenue

Sheppard AvenueTTC

Richmond HillCentre

*subject to change

05. 2

016

12

N

Station east ofCarl Tennen St

Toronto-York Spadina Subway Extension

SmartCentreTerminal

TTC Bow

es R

oad

Ans

ley

Gro

ve R

oad

Cre

dits

tone

Roa

d

Jane

Str

eet

Edg

eley

Bou

leva

rd

Mil

lway

Ave

nue

Apple Mill Rd

Hig

hway

400

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

Hel

en S

tree

t

Kee

le S

tree

t

Duf

feri

n S

tree

t

Nor

th P

rom

enad

e

Yong

e S

tree

t

Highway 407

Highway 7

Highway 7Highway 7

Wig

wos

s D

rive

Commerce St

Phase 1

Phase 2

Full dedicated rapidway

Partial rapidway

Transit in mixed traffic

Vivastation

Legend

New

Wes

tminster Dr

Centre Street

Bat

hurs

t Str

eet

Highway 407

Steeles Ave

N

Station east ofCarl Tennen St

Toronto-York Spadina Subway Extension

SmartCentreTerminal

TTC Bow

es R

oad

Ans

ley

Gro

ve R

oad

Cre

dits

tone

Roa

d

Jane

Str

eet

Edg

eley

Bou

leva

rd

Mil

lway

Ave

nue

Apple Mill RdH

ighw

ay 4

00

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

Hel

en S

tree

t

Kee

le S

tree

t

Duf

feri

n S

tree

t

Nor

th P

rom

enad

e

Yong

e S

tree

t

Highway 407

Highway 7

Highway 7Highway 7

Wig

wos

s D

rive

Commerce St

Phase 1

Phase 2

Full dedicated rapidway

Partial rapidway

Transit in mixed traffic

Vivastation

Legend

New

Wes

tminster Dr

Centre Street

Bat

hurs

t Str

eet

Highway 407

Steeles Ave

N

Station east ofCarl Tennen St

Toronto-York Spadina Subway Extension

SmartCentreTerminal

TTC Bow

es R

oad

Ans

ley

Gro

ve R

oad

Cre

dits

tone

Roa

d

Jane

Str

eet

Edg

eley

Bou

leva

rd

Mil

lway

Ave

nue

Apple Mill Rd

Hig

hway

400

Wes

ton

Roa

d

Pin

e Va

lley

Dri

ve

Hel

en S

tree

t

Kee

le S

tree

t

Duf

feri

n S

tree

t

Nor

th P

rom

enad

e

Yong

e S

tree

t

Highway 407

Highway 7

Highway 7Highway 7

Wig

wos

s D

rive

Commerce St

Phase 1

Phase 2

Full dedicated rapidway

Partial rapidway

Transit in mixed traffic

Vivastation

Legend

New

Wes

tminster Dr

Centre Street

Bat

hurs

t Str

eet

Highway 407

Steeles Ave

Helen Street to Edgeley Boulevard [2015–2019]*

Edgeley to Bowes Road [2012–2016/2017]*

*subject to change

Bowes Road to Yonge Street [2015–2019]*

Laura BlackCommunity Liaison Specialist

tel: 905.886.6767 ext 71181 | cell: [email protected]

Carrie SlatteryCommunity Liaison Specialist

tel: 905.886.6767 ext 71129 | cell: [email protected]

13

Page 9: an in-depth look at Thornhill · added safety Bathurst and Centre Street will have new rapid transit lanes without losing any existing traffic lanes, and each transit vehicle has