AMI projectfor Israel Electricity Corporation

Beeper-Larotech

Ilan Friedland - CEO

Page 2: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Israel Electric Company - Background Information

• Yearly income - 6.3B $us• Total no’ of consumers - 2.5M

• Production capacity - 12,500 MW• Electricity supplied (sold) - 57,145,000 MWh

• Average Unavailabilityper consumer/year - 132 minutes(exceptionally low)

*IEC 2011 statistical reports

Page 3: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Rank Entity State Class of Ownership

Number of Customers Sales (MWh) Revenue

(1,000 $)Average

Retail Price (c/kWh)

1 Pacific Gas & Electric CA Investor Owned 5,212,602 84,045,146 11,633,791 13.84

2 Southern California Edison CA Investor

Owned 4,880,765 75,597,423 9,738,965 12.88

3 Florida Power & Light FL Investor Owned 4,515,032 105,003,376 9,835,774 9.37

4 Commonwealth Edison IL Investor

Owned 3,743,215 43,609,598 4,957,578 11.37

5 Consolidated Edison NY Investor Owned 2,677,350 24,141,995 5,546,422 22.97

6 Georgia Power GA Investor Owned 2,359,765 87,160,371 7,508,794 8.61

7 Dominion Resources VA Investor Owned 2,304,117 76,895,671 6,454,222 8.39

8 Detroit Edison MI Investor Owned 2,117,878 42,490,936 4,164,536 9.80

9 Public Service Enterprise Group NJ Investor

Owned 2,115,116 26,613,454 3,982,564 14.96

10 TXU Energy TX Power Marketer 2,080,686 52,921,258 6,094,807 11.52

USA - Largest Utilities

IEC

Page 4: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

IEC AMI - Project Background

• Israel Electric Corporation (IEC) decided to implement Smart Metering• Why smart metering?

Billing & Collection Customer service Improvement Demand Respond – peak shaving and production planning

• Deployment in few stages First stage : 8.5K Industrial customers

(the largest AMI project in Israel) Next stages: extend to 30K – 50K C&I

Page 5: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Israel Electric Company – Larotech AMI Project

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

53%8.4K meters

7% 50K meters

30%2,220K meters

10%200K meters

Heavy Industry Industrial/Businesses Home Others

Annual KWh Supply – Breakdown by Customer Type

AMIPhase I

AMIPhase II

60% of Annual Income

3.8B)$)

Page 6: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Israel Electric Company - AMI Project

ROI for AMI Project

•8,500 meters - 53% of total revenues

•Large customers billing - ~250K $US per month

•Project cost per year - 500 K $US

• 2 faulty meter reading per month = AMI project cost per year

• Customer service Improvement• Demand Respond – peak shaving and production planning

Page 7: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

• Objectives: Meter reading & management by either Web2MTM system users

or third party servers Monitoring and control of the communication infrastructure

• Main Larotec’s system components: Interface & Communication Units (ICU) interfaced to the meters Communication Server – management of meter reading, communication

and asset management

• The Web2MTM is integrated with additional system components: Metering server: Reads the meters via the ICU Radius Server: Responsible for the network IP assignment GIS Server: displaying end device (ICU + meter) location and

status on maps

AMI - Typical Architecture

Page 8: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

IEC AMI - Robust Architecture

Comm. Server

Radius Server

Metering Server

Larotec’s ICU Fixed IP

Industrial Meters

Private APN viaGPRS Network

reading success rate - 99.7%

Page 9: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Web2MTM – Consumption Reports

Page 10: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Web2MTM – Readings of Current value (1st phase)

Page 11: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Web2MTM – Readings of Power Factor value

Page 12: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Multiple operating modes

• Transparent mode: “Transparent Bridge” between 3rd party Metering Server and the system

• Listening mode: ICU waits for requests from the metering or communication

servers while still performing its regular procedures

• Command mode: FOTA (firmware over the air)Data on DemandConfiguration update

Page 13: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Additional features for IEC project

• Communication Management Monitoring:

Cell ID: tracking the active cell serving the ICU Rx level: tracking level of GPRS Radio Frequency signal reception

Commands: Get Data Now: enabling data acquisition at any required time Activation: remotely enable/disable meter reading services Communication parameters: Configure parameters on the fly

from remote location Remote s/w update

• Templates: pre-defined profile assigned to any hierarchical group via the communication server

Page 14: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Project Status - 2012

• 6,850 installations

• Deployment – Nation Wide since 2010

• Meter Reading success – 99.7%

• Data Collection Interval – 2 times per day

• Meter Reading Interval – 15 min

Page 15: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Why 2/3G for Smart Grid?

Page 16: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Why 2/3G for Smart Grid - Cellular Data Cost

2005 2008 2010 20120

2

4

6

8

10

12

14

16

Single (abroad)1MBBulk (Israel)2MBCo

st U

SD

Page 17: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Why 2/3G for Smart Grid – Cellular Capacity

Page 18: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Why 2/3G for Smart Grid – Total Cost Of Ownership

Page 19: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Why 2/3G for Smart Grid - Technology Selection Consideration

Page 20: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Why 2/3G Cellular for Smart Grid - Summery

Page 21: AMI project for Israel Electricity Corporation Beeper-Larotech Ilan Friedland - CEO

Thank You!