Welcome The Florida Department of Transportation (FDOT) would like to welcome you to the Alternatives Public Workshop for the Brooks Bridge Replacement Project Development and Environment (PD&E) Study. The purpose of tonight’s meeting is to provide you with an opportunity to learn more about the alternatives currently under consideration, ask questions, and express your comments and concerns. Information about the conceptual design and potential impacts of the various alternatives are on display. Project Team representatives will be available to answer questions and listen to your ideas. We look forward to your input. About the Project After more than 50 years in operation, the Brooks Bridge is approaching the end of its useful life. The existing bridge does not meet current design standards, Americans with Disabilities Act (ADA) requirements, or navigational clearance requirements for this portion of the Gulf Intracoastal Waterway. The bridge is currently structurally deficient, which does not pose an immediate threat to the traveling public, but does require FDOT to plan for a replacement bridge. To address the need for replacement, FDOT is conducting the Brooks Bridge Replacement PD&E Study. The intent is to identify replacement alternatives and evaluate the potential environmental, engineering and social impacts. The study will also assess potential improvements at the bridge approaches including the U.S. 98/ Santa Rosa Boulevard intersection on Okaloosa Island and the U.S. 98/Perry Avenue intersection in Fort Walton Beach. The results of the study will provide FDOT the information necessary to make a decision on the conceptual design of the replacement bridge. We Need Your Input At this Alternatives Public Workshop, we are seeking input on various options to replace the Brooks Bridge at the current location: Typical Section of the bridge (number and configuration of vehicle lanes and bicycle / pedestrian lanes) Whether the replacement bridge should be shifted to the left (north) or right (south) of the current location Intersection options at Perry Avenue in Fort Walton Beach, and in the vicinity of Santa Rosa Boulevard on Okaloosa Island Alternatives Public Workshop FM No. 415474-2-22-01 For more information, please visit our website at: www.nwflroads.com Santa Rosa Sound Gulf of Mexic o c C h o t a w h a t c h e e B a y BROOKS BRIDGE 189 98 85 98 Per y Ave SE r Santa R o s a B lv d Pier Rd BEGIN PROJECT END PROJECT Tuesday, May 17, 2016, 5:30 – 6:30 p.m. Emerald Coast Convention Center

Alternatives Public Workshop...2016/05/17  · Contact Information Project Manager April Williams, P.E. FDOT District 3 1074 Highway 90 Chipley, FL 32428 (888) 638-0250, ext. 1625

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Alternatives Public Workshop...2016/05/17  · Contact Information Project Manager April Williams, P.E. FDOT District 3 1074 Highway 90 Chipley, FL 32428 (888) 638-0250, ext. 1625

WelcomeThe Florida Department of Transportation (FDOT) would like to welcome you to the Alternatives Public Workshop for the Brooks Bridge Replacement Project Development and Environment (PD&E) Study. The purpose of tonight’s meeting is to provide you with an opportunity to learn more about the alternatives currently under consideration, ask questions, and express your comments and concerns. Information about the conceptual design and potential impacts of the various alternatives are on display. Project Team representatives will be available to answer questions and listen to your ideas. We look forward to your input.

About the Project After more than 50 years in operation, the Brooks Bridge is approaching the end of its useful life. The existing bridge does not meet current design standards, Americans with Disabilities Act (ADA) requirements, or navigational clearance requirements for this portion of the Gulf Intracoastal Waterway. The bridge is currently structurally deficient, which does not pose an immediate threat to the traveling public, but does require FDOT to plan for a replacement bridge. To address the need for replacement, FDOT is conducting the Brooks Bridge Replacement PD&E Study. The intent is to identify replacement alternatives and evaluate the potential environmental, engineering and social impacts. The study will also assess potential improvements at the bridge approaches including the U.S. 98/ Santa Rosa Boulevard intersection on Okaloosa Island and the U.S. 98/Perry Avenue intersection in Fort Walton Beach. The results of the study will provide FDOT the information necessary to make a decision on the conceptual design of the replacement bridge.

We Need Your Input At this Alternatives Public Workshop, we are seeking input on various options to replace the Brooks Bridge at the current location: Typical Section of the bridge (number and configuration of vehicle lanes and bicycle / pedestrian lanes) Whether the replacement bridge should be shifted to the left (north) or right (south) of the current

locationIntersection options at Perry Avenue in Fort Walton Beach, and in the vicinity of Santa Rosa Boulevard on

Okaloosa Island

Alternatives Public Workshop FM No. 415474-2-22-01

For more information, please visit our website at: www.nwflroads.com

S a n t a R o s a S o u n d

G u l f o f M e x i c o

cC h o t a w h a t c h e e B a y

BROOKS BRIDGE

189

98

85

98

Per

y A

veS

Er

Santa Rosa Blvd

Pier Rd

BEGIN PROJECT

END PROJECT

Tuesday, May 17, 2016, 5:30 – 6:30 p.m.Emerald Coast Convention Center

Page 2: Alternatives Public Workshop...2016/05/17  · Contact Information Project Manager April Williams, P.E. FDOT District 3 1074 Highway 90 Chipley, FL 32428 (888) 638-0250, ext. 1625

Contact Information

Project ManagerApril Williams, P.E.FDOT District 31074 Highway 90Chipley, FL 32428(888) 638-0250, ext. [email protected]

Public Information OfficerIan SatterFDOT District 31074 Highway 90Chipley, FL 32428(888) 638-0250, ext. [email protected]

Consultant Project ManagerSteve Schnell, AICPHDR 200 W Forsyth St. Suite 800Jacksonville, FL 32202-4321(904) [email protected]

Need More Info? Frequently Asked Questions and additional project information are available from the FDOT at www.nwflroads.com.

Email Us: [email protected]

Stay Involved: www.facebook.com/brooksbridgereplacementstudy and www.nwflroads.com

Online MeetingAvailable between May 17 - May 31, 2016. For more information, scan the QR Code with your smart phone or visit brooksbridgereplacement.com

Process and ScheduleThe Brooks Bridge Replacement Study is in the second of four years. It is scheduled to be complete by the end of 2018. A construction start date has not been established and construction funding has not yet been identified in the FDOT Five Year

Plan, or in the Okaloosa-Walton Transportation Planning Organization Long Range Transportation Plan Cost Feasible Plan.