Accelerator Operation Summary Calendar Week # 35 NuMI Weekly Integrated Intensity 7.95 E18 protons Beam Hours To NuMI hours BNB Weekly Integrated Intensity 5.76 E18 protons Beam Hours To BNB hours NMuon Weekly Integrated Intensity 3.49 E16 protons Beam Hours To NMuon hours MTest Weekly Integrated Intensity 5.71 E14 protons Beam Hours To MTest hours From : August 25, 2014 (0000 hours) To: September 01, 2014 (0000 hours)

Citation preview

Page 1: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

All Experimenters’ Meeting

October 20, 2014Photo by Greg Vogel

Page 2: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

2014 Shutdown• Six full weeks into the shutdown

– Linac and Booster Operational– Main Injector/Recycler startup today

Page 3: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

2014 Shutdown• NuMI Work

– Beryllium vacuum window leak– Replace window– Horn Stripline maintenance– Work complete by Monday, October 27th

• Switchyard Work– F1-F3 Vacuum recovery

• Once 46B work is done• Impact MI for ~3 hours

– Feeder 43 maintenance• Scheduled for Saturday, October 25th

– G1 Stub Magnet Installation• Magnet installed • Leak check and final work

– Feeder 46B work• Prevents daytime operation of switchyard• Expected to be complete by end of week

• Various Safety System Tests• Meson Center Work

– MC6D-3

Page 4: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

Accelerator Startup Plan– Start up Linac, Booster, Main Injector and

Recycler• Linac and Booster running beam• Main Injector/Recycler startup on Monday

afternoon– Start up NuMI after the vacuum repairs

• Week of the October 27th – Establish beam and perform scans– Run at nominal intensity for several

days– Start up Switchyard

• Possibly the week of October 27th

Page 5: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

Wilson Hall Power Outages

• Saturday, October 18th – Sunday, October 19th

– Power outage to Wilson Hall– 0700 – 1600 Sunday– Wilson Hall closed except authorized personnel– Remote Operations Center West (ROC West) available

• Saturday, November 8st – Sunday, November 9th

– Rescheduled from Nov. 1st & 2nd – Power outage to Wilson Hall– 0700 – 1600 Sunday– Wilson Hall closed except authorized personnel– Remote Operations Center West (ROC West) unavailable

• Need to perform work impacting transfer switch on Saturday• Further scheduling and more details required

• Friday, November 28th – Saturday, November 29th – Rescheduled from Oct. 20th & 21st – Power outage to Wilson Hall– 0700 – 1600 Sunday– Wilson Hall closed except authorized personnel– Remote Operations Center West (ROC West) available

COMPLETED

Page 6: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

ICW & PM work

• Inspection & Cleaning of Casey’s Pond Intake Sump – Tuesday, October 14th

• Requires ICW flow between 4500 and 5000 GPM• Currently between 5500 and 6000 GPM• Will take a reading on Monday, October 13th

• ICW Valve repairs – Various areas affected – MINOS/LArTF/BNB/MTA(partial)

• ICW Flushing– Various locations over this week.

• Electrical PM’s– Feeder 43: Oct. 25th

• Transfer Gallery, Switchyard

COMPLETED

COMPLETED

Page 7: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

Upcoming Issues

• In July 2015 we will need to power the entire site (except the village) off of Kautz Road SubStation (KRSS) for a year while operating– A new Master SubStation (MSS) will be built

beside the old one– We have the capacity, but don’t know if we can

run a Physics Program• Possible noise on the lines• Expect some problems with the Proton

Source• Planned on starting up from the shutdown

with the site on KRSS to test• Gives us some time to address problems

– We don’t know what impact it may have on the rest of the Lab

• Will lights flicker?• Will processes be sensitive to the Main

Injector ramp?

Page 8: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

When do we test?

– Met with FESS and AD Departments to discuss possible test dates and impacts to schedules

– Set up a meeting for tomorrow with Division/Section power representatives to confirm test date

– Lock in a test starting date (proposed date is November 4th)

– The duration of the test will depend on the results

• If we can operate, stay on KRSS for some time to allow the Lab to cycle through its normal power usage. Look for an agreeable time to switch back.

• If we cannot operate, switch back to using both substations after a few days, apply fixes, regroup, retest

– Working with FESS HV to put together a likely schedule for the rolling power outages across the lab while the power feeds are being configured

Page 9: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

Switch to

KRSS

NuMI Start Up

NuMI Beam check

Target Scans Lower

Intensity

NuMI Higher Intensity

Stabilize & Run Beam

Schedule

Page 10: All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel

Schedules and Links:• Schedule can be accessed from the

Operations Home Page– - Schedules -> Operations Schedule

• Direct link to schedule– - http://www-ad.fnal.gov/ops/schedule.html