Accelerator Operation Summary Calendar Week # 49 NuMI Weekly Integrated Intensity 7.75 E18 protons Beam Hours To NuMI hours BNB Weekly Integrated Intensity 4.34 E13 protons Beam Hours To BNB 0.7 hours NMuon Weekly Integrated Intensity 3.51 E16 protons Beam Hours To NMuon hours MTest Weekly Integrated Intensity 3.46 E14 protons Beam Hours To MTest 62.5 hours From : December 01, 2014 (0000 hours) To: December 08, 2014 (0000 hours)
Citation preview
All Experimenters’ Meeting
December 8, 2014
Photo by Greg Vogel
Accelerator Operation Summary
Calendar Week # 49
NuMI Weekly Integrated Intensity 7.75 E18 protons Beam Hours To NuMI 131.4 hours BNB Weekly Integrated Intensity 4.34 E13 protonsBeam Hours To BNB 0.7 hours NMuon Weekly Integrated Intensity 3.51 E16 protonsBeam Hours To NMuon 134.4 hours
MTest Weekly Integrated Intensity 3.46 E14 protonsBeam Hours To MTest 62.5 hours
From : December 01, 2014 (0000 hours)To: December 08, 2014 (0000 hours)
Complex Status– Accelerators
• Monitoring systems during Kautz Road SubStation test
• Investigating issues, understanding, planning• No plans to switch back to Master SubStation
– Maybe in January 2015
– NuMI• Making use of available beam
– Switchyard• Beam to experiments
– SeaQuest• Increased intensity and tuning
– Meson Test• Beam and tuning
– Meson Center• Safety System Tests• MC6D polarity check• Startup for checkout
– BNB• Performed more tests and analyzing data
Schedules and Links:• Schedule can be accessed from the
Operations Home Page– - Schedules -> Operations Schedule
• Direct link to schedule– - http://www-ad.fnal.gov/ops/schedule.html