    NEW 24 LEAN GAS PIPE LINE FROM BUHASA BAB

    THAMMAMA C

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    2/15

    HIGHLIGHTS1. HSE Statistics

    2. Near Miss Reporting

    Poor visibility to see Banks man while reversing.

    Waste materials keeping near to Excavation pit.

    3. In-house Trainings. (Al Asab)

    HIRA Communication

    Heat Stress

    4. Tool Box Talks (GASCO) Emergency Procedures

    Excavation safety

    4. HSE Appreciation Award

    JUNE-2014

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    3/15

    HSE STATISTICS (BUHASA)JUNE- 2014

    AL ASAB CONTRACTING EST.

    JUNE-2014

  • 8/12/2019 Al Asab Hse Presentation July-14

    4/15

    Description:

    On 17-June-2014 at 08.30 am, While the concrete mixer machine wasreversing near to the pit for concrete pouring , it just hit the hard

    barrication of the excavated pit due to the miss communicationbetween driver and banks man.

    Immediate Cause

    1. More than one person gave signal to the driver.

    2. Banks man didnt wore the visibility jacket to identify him3. Lack of supervision.

    NEAR MISS REPORTING - 1

    JUNE-2014

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    5/15

    Corrective Action

    1. Driver was instructed to stopthe vehicle immediately

    2. Special instruction given to theDrivers And Banks man

    Regarding the movement ofvehicles.

    3. Traffic management system wasexplained to work force throughTBT

    4. Supervisors are strictly

    instructed not to give signalsother than Signal man

    JUNE-2014

    AL ASAB CONTRACTING EST.

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    6/15

    NEAR MISS REPORTING - 2

    Description:

    On 23-june-2014 at around 04.00 pm, during road crossing excavation for the

    duct bank, small piece of asphalt got detached & fell into the excavated pit .A labor was narrowly escaped from being hit by it.

    Immediate Cause

    1. Some of the Asphalt debris were kept near to the Excavation

    2. Improper House keeping3. Poor supervision

    JUNE-2014

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    7/15

    Corrective Action

    1. Work was stopped at the sametime, and people were deployedfor removal of debris

    2. Supervisor and the workers werestrictly instructed to place all theexcavated material and debris 1meter away from Excavation

    3. Tool Box Talk given on this topic

    JUNE-2014

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    8/15

    HIRA/ARA COMMUNICATION(IN-HOUSETRAININGS)

    HIRA/ARA COMMUNICATION

    Topic Discussed

    HIRA of Hot Works

    Hazards Associated with hot work

    RISK Associated with particularactivities like Welding, Gas cutting,

    Powered tools, Pressurizedcylinders.

    Control measures to minimise theRisk

    AL ASAB CONTRACTING EST.

    JUNE-2014

    IN-HOUSE TRAININGS

  • 8/12/2019 Al Asab Hse Presentation July-14

    9/15AL ASAB CONTRACTING EST.

    JUNE-2014

    ARA COMMUNICATION PROGRAMME

  • 8/12/2019 Al Asab Hse Presentation July-14

    10/15AL ASAB CONTRACTING EST.

    HEAT STRESS AWARNESS (GASCO)

    JUNE-2014

    HEAT STRESS

    Heat Related Illnesses

    Importance of drinking morewater.

    Drink Water & Eat more fruits

    Symptoms of Heat Stroke

    What to do in case of HeatExhaustion or Heat Stroke

    Prevention and Control Measures

  • 8/12/2019 Al Asab Hse Presentation July-14

    11/15

    ATTENDANCE SHEET

    AL ASAB CONTRACTING EST.

    JUNE-2014

  • 8/12/2019 Al Asab Hse Presentation July-14

    12/15

    TOOL BOX TALK(Emergency Procedure, Excavation Safety)

    Toolbox was done by Mr. Leonard (GASCO BuHasa Training officer)

    Topic Discussed

    Precaution while working inside plant

    Emergency Evacuation Procedure

    Ensuring availability of PPEs

    How to use the escape mask in case of emergency,

    Dangers Excavation. Confined Space Entry.

    AL ASAB CONTRACTING EST.

    JUNE-2014

  • 8/12/2019 Al Asab Hse Presentation July-14

    13/15

    INCIDENT REPORTED ( By GASCO)

    1. Insufficient Sign board At the Connection Champer 4 Excavation.

    Action taken :

    a. Sufficient number of sign boards of excavation and confined spacehazards were placed around the Excavated pit.

    b. Supervisor is strictly instructed to ensure the availability of sign board

    in every excavated areasc. Importance of sign boards were clearly explained to Supervisors and

    workforce

    JUNE-2014

    AL ASAB CONTRACTING EST.

  • 8/12/2019 Al Asab Hse Presentation July-14

    14/15AL ASAB CONTRACTING EST.

    HSE APRECIATION AWARD

    JUNE-2014

  • 8/12/2019 Al Asab Hse Presentation July-14

    15/15AL ASAB CONTRACTING EST