5
www.durr.com AIRCRAFT PAINTING FROM STRUCTURAL PARTS TO COMPLETE AIRCRAFTS © Airbus – photo by S. Ramadier

AIRCRAFT PAINTING - Dürr · 2018. 8. 21. · Our Portfolio for aircraft painting: » CFD simulation & planning » Dipping systems » Paint booth & robot application » Oven » Conveyor

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AIRCRAFT PAINTING - Dürr · 2018. 8. 21. · Our Portfolio for aircraft painting: » CFD simulation & planning » Dipping systems » Paint booth & robot application » Oven » Conveyor

www.durr.com

AIRCRAFT PAINTINGFROM STRUCTURAL PARTS TO COMPLETE AIRCRAFTS

© A

irbu

s –

phot

o by

S. R

amad

ier

Page 2: AIRCRAFT PAINTING - Dürr · 2018. 8. 21. · Our Portfolio for aircraft painting: » CFD simulation & planning » Dipping systems » Paint booth & robot application » Oven » Conveyor

32

Virtual reality designed by Dürr stands for transparency in the planning process together with a realistic and improved understanding of the process for all parties involved. All dynamic activities such as material flow, air flow behavior, robot simulation, uptime reliability and shift model, as well as operation modes and controls can be checked and optimized.

Our Portfolio for aircraft painting:

» CFD simulation & planning» Dipping systems» Paint booth & robot application» Oven» Conveyor systems» Exhaust air purification» Service

The Dürr Group is one of the world’s leading mechanical and plant engineering companies with outstanding painting expertise. Products, systems and services offered by Dürr enable highly efficient manufacturing processes in different industries.

Besides our experience of countless projects in the automotive industry, Dürr has been an acknowledged partner of the international aerospace industry for more than 100 years. Dürr is your expert in painting for every dimension and takes over the responsibility for simulation, planning, execution and service – all from one single source.

YOUR EXPERT FOR EVERY DIMENSIONFOR EVERY DIMENSION

Your benefits:

» Trendsetting technologies» All from one single source» Strong in-house expertise» Experienced project management» Worldwide service locations» Quality management for aerospace standards» Ready for IIOT

PLANNING & SIMULATION PLANNING & SIMULATION

The basis for optimized production processes

Air flow simulation

» Paint hangar or booth» Optimization of air distribution and exhaust » Reduction of turbulences » Determination of temperature profiles» Concentration of harmful substances

Ventilation analysis

» Worker environment during painting (health and safety)» Energy efficiency (air velocity, humidity, temperature) » Harmful substances (in booth and in aircraft modules)

» Computional fluid dynamics (CFD) modelling wing

© A

irbu

s –

phot

o by

C. B

rink

man

n

Page 3: AIRCRAFT PAINTING - Dürr · 2018. 8. 21. · Our Portfolio for aircraft painting: » CFD simulation & planning » Dipping systems » Paint booth & robot application » Oven » Conveyor

AIR PURIFICATION

CFD SIMULATION AND PLANNING

DIPPIN

G SYSTEMS AND

CONVEYOR SYSTEMS

ROBOTIC PAINT APPLICATION

PAINT BOOTHS AND OVENS

4 6

DÜRR PROCESSES FOR AIRCRAFT PAINTINGFOR AIRCRAFT PAINTING

Aircraft paint finishing is a delicate process where structural, pre assembly and sub assembly parts must be treated in different processes before the final coating is applied.

The main processes for the surface treatment are:

» Wet cleaning » PFD (penetrant fluid detection) » Anodizing» Sealant application » Primer and top coat application » Waxing

Between the process steps, there are also a few intermediate processes as sanding and grinding, activation, dry cleaning and curing required.

Dürr offers customized solutions for your individual requirements.

YOUR EXPERT

FOR EVERY DIMENSION

AIRCRAFT PAINTING:

» Preparation (Grinding, cleaning, activation)

» Primer, Top coat» Drying/Curing

STRUCTURAL PARTS

PRE-ASSEMBLY PARTS

SUB-ASSEMBLY

PARTS

Page 4: AIRCRAFT PAINTING - Dürr · 2018. 8. 21. · Our Portfolio for aircraft painting: » CFD simulation & planning » Dipping systems » Paint booth & robot application » Oven » Conveyor

987

Dipping systems

The first steps of the surface treatment are cleaning and degreasing of the parts, followed by pickling or etching and as a last step the deoxidizing – usually these process steps are treated in tanks. After the wet cleaning process the main stressed structural parts are proofed with a non-destruction testing procedure (NDT) such as: Penetrant fluid detection (PFD) or liquid penetrant inspection (LPI).Before starting with the anodizing process, the parts have to be wet cleaned again to remove the PFD and to keep the surface clean.

Energy saving ovens

Painted parts have to be dried by convection, mostly in a separate dryer or curing oven.

The range of the curing temperature is from 40°C/ 104°F to 120°C/ 248°F.

Dürr offers temperature control and uniform air distribution to avoid damage of the part and to assure the required process parameters.

SERVICES & SOLUTIONSDürr’s Services & Solutions customer service offers support around the world.

With 65 service sites in 28 countries, Dürr is always on-site to help to reduce production costs, increase plant availability and guarantee rapid technical support. Whether you are dealing with an emergency or planning or implementing a revamp project – we are there for you.

SERVICES & SOLUTIONSOur service at your demand

» Global maintenance, service and spare parts (subsidiaries and antennas all over the world)

» Possibility of online maintenance » Ready for IIOT (Predictive Maintenance)

BOOTH AND TANK SIZES CUSTOMIZED FOR YOUR REQUIREMENTS!YOUR REQUIREMENTS!

» OHC with sheet metal cover and drip pan to prevent contamination on the site

Booth and robot paint application

The booths are for preparation, sanding and painting. Keeping the temperature and humidity inside the booth is important because with every change of temperature the paint viscosity changes and so does the finishing quality.Therefore it’s essential to control the temperature and humidity depending on the outside conditions. EcoSmart AC is the right solution for this task.

Automated painting application with paint robots and paint supply system is becoming essential in the aircraft manufac-turing processes. At Dürr, all the above processes are ready for IIoT.

» Top loading curing and drying oven for CREP parts

Conveyor systems

An overhead conveyor system (OHC) is used to convey the parts to the dedicated tanks.

A conveyor enclosure protects the environment from air contamination by hazardous fumes and a drip pan prevents the contamination of the surrounding areas.

Air pollution control systems – VOC-Concentrator

In some cases, governmental laws, local requirements, and VOC’s restrictions, require air treatment unit. Common practice is to use catalytic or thermal oxidation systems to treat the concentrated air stream. Ecopure® KPR adsorption system is a state of the art air treatment for this kind of process.

PARTS PART SIZE (UP TO)[LxWxH]

BOOTH/TANK SIZE (UP TO) [LxWxH]

WingsShellsStructural parts

34 x 0,5 x 5 m

111 x 2 x 16 ft

35 x 1,5 x 6 m

115 x 5x20 ft

Winglet/SharkletsFlap TracksStructural Parts

4 x 0,5 x 4 m

13 x 2 x 13 ft

8 x 5 x 5 m

26 x 16 x 16 ft

WingsShellsHTP/VTP’sSectionsKeel Beams

40 x 8 x 8 m

130 x 26 x 26 ft

55 x 20 x 10 m

180 x 65 x 33 ft

WingsShellsStructural PartsHTP/VTP’sSectionsWinglet/SharkletsFlap Tracks

20 x 8 x 8 m

65 x 7 x 26 ft

34 x 6 x 10 m

111 x 36 x 33 ft

WingsShellsStructuralHTP/VTP’sSectionsWinglet/SharkletsFlap Tracks

20 x 2 x 8 m

65 x 7 x 26 ft

34 x 11 x 10 m

111 x 36 x 33 ft

Aircrafts 75 x 80 x 25 m 246 x 262 x 82 ft

100 x 100 x 40 m 128 x 128 x 130 ft

Anodizing line

Small booth

Large booth

Combo booth

Oven

Hangar

Page 5: AIRCRAFT PAINTING - Dürr · 2018. 8. 21. · Our Portfolio for aircraft painting: » CFD simulation & planning » Dipping systems » Paint booth & robot application » Oven » Conveyor

www.durr.com

Subj

ect t

o ch

ange

. The

info

rmat

ion

in th

is b

roch

ure

cont

ains

onl

y gen

eral

des

crip

tions

or p

erfo

rman

ce c

hara

cter

istic

s w

hich

may

vary

in a

ctua

l cas

es.

The

requ

este

d pe

rfor

man

ce p

aram

eter

s sh

all b

e bi

ndin

g on

ly if

they

are

exp

licitl

y ag

reed

with

in th

e sa

les

cont

ract

. © D

ürr 2

018

Dürr – Leading in Production EfficiencyFive divisions, one goal: maximum production efficiency for our customers

» Paint and Final Assembly Systems: paint shops and final assembly systems for the automotive industry » Application Technology: robot technologies for the automatic application of paint as well as sealants and adhesives » Clean Technology Systems: exhaust-air purification systems and energy-efficiency technology » Measuring and Process Systems: balancing systems as well as assembly, testing and filling technology » Woodworking Machinery and Systems: machinery and systems for the woodworking industry