Ma Memorandum . . a . . . . . . . . . . . DATE: 12 September, 2014 TO: Darrell Ouimet Environmental Approvals Conservation and Water Stewardship 160-123 Main Street, Winnipeg Air Quality-Environmental Programs & Strategies Conservation and Water Stewardship 1007 Century Street, Winnipeg Air Quality Section has reviewed the above proposal and provides the following comments: The proposal is not expected to have a significant impact on air quality provided that the cited measures regarding potential dust and particulate emissions during construction work are implemented. FROM: Muntaseer Ibn Azkar SUBJECT: MB Floodway and East Side Road Authority All Season Road Connecting Paulngassi First Nation and and Little Grand Rapids First Nation to The Little Grand Rapids Airports (File: 5733.00) Air Quality Section suggests that the FA Clause regarüing noise nuisance be included.

Air Quality-Environmental Programs Environmental · PDF fileFROM: Muntaseer Ibn Azkar SUBJECT:

  • Upload
    doanbao

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Ma Memorandum• . . • a . . . . . . . • . . . .

DATE: 12 September, 2014

TO: Darrell OuimetEnvironmental ApprovalsConservation and WaterStewardship160-123 Main Street, Winnipeg

Air Quality-Environmental Programs& StrategiesConservation and Water Stewardship1007 Century Street, Winnipeg

Air Quality Section has reviewed the above proposal and provides the following comments:

The proposal is not expected to have a significant impact on air quality provided that thecited measures regarding potential dust and particulate emissions during construction workare implemented.

FROM: Muntaseer Ibn Azkar

SUBJECT: MB Floodway and East Side Road Authority — All Season RoadConnecting Paulngassi First Nation and and Little Grand Rapids FirstNation to The Little Grand Rapids Airports (File: 5733.00)

Air Quality Section suggests that the FA Clause regarüing noise nuisance be included.

ManttvbaInfratsctw. and Wan.pc.btlonHlghwqPbnifl .rdonlgnerancbEnvfrormfl SeMen Sedanlag —2150ny8LM,r*eIpm RC3fl7(204) S1I43 P(204) S454e3

September 22, 2014

Tracey Brawn, fbi. Sc.Director, Environmental Approvals BrananManitoba Conservation and Water Stewardehlp123 Main St., Sufte 160WinnIpeg, MB R3C 1A5

RE: East Side Road and Floodway Authaitty - Paufrigassi RoadCMeni File No. 5733.00

Dew P& &ain

MiT has reviewud the proposal under the Enviro.wnen* Ad noted above ni we do not have any

Thank you v.ry much for providhig us the oppoitaifty to review the proposal.

Sflcerety,

w ,-, z_

Ryan Coulter, NI. Sc., P. Eng.Manager of EnvIronmental SeMces

Oulinet, Darrell (CWS)

From: Matthews, Rob (CWS)Sent: September-10-14 4:27 PMTa: Quimet, Darrell (CWS)Subject: RE: EAP Review and comments Floodway Auth. - Pauingassi Road - File: 5733.00

No concerns.

Rob Matthews, WULS, CWS.

From: Steele, Tania (CWS)Sent: September-10-14 11:07 AMTo: Wilson, Brian (MAFRD); Kaita, Adara (CWS); Labosslere, Don (CWS); Molod, Rornmel (CWS); Streich, Laurie (CWS);Kelly, Jason (CWS); Keenan, Phil (CWS); Missyabit, Ron (CWS); Hay, David (CWS); Phipps, Graham (CWS); Janusz,Laureen R (CWS); Stlbbard, James (CWS); Matthews, Rob (CWS); Reimer, Geoff P (CWS); +WPGS74 - HRB (TCHSCP);Cunningham, Neil (CWS); Crone, Jim (MMG); Roberecki, Susan (HHLS); Roberts, Tracy (HHLS); +WPG969 - MITEnvironmental Services Section (MU); Firlotte, NIcole (CWS); Boissonneault, CarolIne (CWS); Allum, Brad (MIT); Lowdon,Keith (MMR); Beaumont-Smith, Chris (MMR); ‘Slgurdson,Shauna [CEAA]’; Prosser, Cheryl (CWS); Walker, Mitch (CWS);±BEA2OB - Beausejour CRP (MMG)Cc: Ouimet, Darrell (CWS)Subject: EAP Review and comments Floodway Auth. - Pauingassl Road - File: 5733.00

Your review and comments would be appreciated for the attached Proposal submitted pursuant to TheEnvironment Act:

<<File: Project 7A MC Project Desc Comb Flnal.pdf>> <<File; Project 7A MC Scoping Dac.pdf>> <<File: advert.pdf>><<File: ack.pdf>>

The contact person assigned to co-ordinate review and assessment of the Proposal is:

Darrell Ouimet @ 204-803-1389. Email replies are programmed to automatically deliver todarrell.ouimetcfrgov.rnb.ca

Please indicate to the contact person if you are unable to review the proposal. A non-reply will be consideredas indicating your department has reviewed the proposal and has no concerns.

Any comments you have on the Proposal should be emailed by October 4, 2014.

**No hard copies will be provided**

Thank you.

Sent on behalfoft

Darrell Ouimct3nvirorunent OfficerFsvironmental Approvals BranchManitoba Conservation and \Vater StcwardsiupTel. 204-803-1389

1

ManflobaiDDate: September 11,2014 MemorandumTo: Darrell Quimet From: KevinjacobsM.Sc.

Environment Officer Water Quality Management SectionEnvironmental Approvals Branch Manitoba Conservation and Water123 Main Street, Suite 160 StewardshipWinnipeg MB R3C lAS 123 Main Street, Suite 160

Winnipeg MB RJC lASEmail: Kevin.iacobs(2ov.mb.caPhone: 9454304Fax: 948-2357

Subject: Pauingassi Road — Your File: 5733.00:

The above noted proposal has been reviewed by the Water Quality Management Section ofManitoba Conservation and Water Stewardship.

The mitigation measures discussed in the proposal will help ensure a certain degree ofenvironmental protection. As the project proponent is the Government of Manitoba there is anopportunity to use the best available practices for prevention and mitigation of environmentaleffects from this project.

Blast rock will be required for construction of this road. The proponent should ensure that anyrock utilized for the proposed road is of a quality such that it is not acid generating. It may beprudent for the proponent to have to cenduct acid base accounting on blasted rock used for roadmaterial. The proponent Will also have to ensure that if ammonium based explosives area used,residual ammonia from blasting operations does not leach into surface water.

The proposed road requires two stream crossings including crossing the channel separatingFishing and Family Lakes. Maximum buffem along watercourses and water bodies for waterquality protection and protection of fish resources established by Manitoba Conservation andWater Stewaxdship Forest Management Guidelines for Riparian Management Areas should beutilized. Buffer sizes should be increased above these maximums for areas known or thought tobe more sensitive such as steep slopes. Any reductions of buffer sizes from recommended widthsin forest practices guidelines need to be carefUlly considered and rationales documented.

Specific Comments:

• The proponent should be reminded that pursuant to the Nutrient Management Regulation(MR 62/ 2008) under the Water Protection Act, the mechanical application of substancescontaining nitrogen or phosphorus is prohibited in Nutrient Management Zone N4(Canada Land Inventory Agricultural Capability Class 6, Class 7, or unimproved organicsails) and in the Nutrient Buffer Zone.

• The proponent should implement effective long-term sediment and erosion control toprevent soil laden sediment, rimof and/or silt from entering any watertourse, duringconstruction and until vegetation is established. Biodegradable erosion control materialshould be used.

• The proponent should routinely inspect all erosion and sediment control measures andimmediately complete maintenance or repair.

• The use of chemical melting agents (for example road salts) for traction at water crossingshould be avoided for preference of alternatives such as clean crushed rock.

• Fuel and oil storage areas should be located a minimum of 100 metres from any waterbody.

• An incident! accidetit response plan should in place before construction starts. Theproponent should ensure appropriate spill response materials are on site at all times.

• The proponent will have to prevent oil, hydraulic fluids, coolant, paint, uncured concreteor concrete wash from entering any drainage course or waterbody

• Concerning the right of way management, it is not clear from the proposal if anyherbicides will be used during ongoing maintenance.

• All exposed areas should be re-vegetated with native species during road construction

• Measures should be in place to prevent the spread of non native invasive species

• Local drainage patterns shall not be altered

Considering work camps:

• Wastewater (sewage and grey water) from work camps and other infrastructure should becollected in holding tanks and disposed of at a licensed wastewater treatment facility.

Considering Monitoring:

• Water quality monitoring programs may be needed at locations along the proposed roadif issues are identified during construction, or the operation I maintenance phases of thisproject.

Thank you for the opportunity to comment on this proposal. If you have any questions, feel freeto contact me at your convenience.

Oulmet, Darrell (CWS)

From: Sigurdson,Shauna LCEAA] [Shauna.Slgurdson©ceaa-acee.gc.ca]Sent: September-10-14 12:34 PMTo: Cuimet, Darrell (CWS)Subject: RE: EAP Review and comments Floodway Auth. - Pauingassi Road - File: 5733.00

Hello Darrell

The proposed project is not a designated project under CEAA 2012. Therefore, the Agency will not be involved further inthe review.

Shauna Sigurdson

Regional Director, Prairie and Northern RegionCanadian Environmental Assessment Agency! Government of Canadashauna.siurdsonceaa-acee.gc.ca / Tel: 780-495-2236 / Canada Place, Suite 1145-9700 Jasper Avenue, EdmontonAlberta, TSJ 4C3

Directrice Regional, Region des Prairies et du NordAgence canadienne devaluation environnementale / Gouvernement du Canadashauna.siurdsonJceaa-acee.gc.ca / Tel: 780-495-2236/ Place du Canada, pièce 1145 9700 avenue Jasper, Edmonton(Alberta) T5J 40

From: Steele, Tania (CWS) [mailto:Tania.&[email protected]]Sent September 10, 2014 10:07 AMTo: Wilson, Brian (F’tRFRD); Kaita, Adara (CWS); Labosslere, Don (CWS); Molod, Rommel (CWS); Streich, Laurie (CWS);Kelly, Jason (CWS); Keenan, Phil (CWS); Missyabit, Ron (CWS); Hay, David (CWS); Phlpps, Graham (CWS); Janusz,Laureen R (CWS); Stibbarci, James (CWS); Matthews, Rob (CWS); Reimer, Geoff P (CWS); +WP6574 - HRB (TCHSCP);Cunningham, Nell (CWS); Crone, Jim (MMG); Roberecki, Susan (HHIS); Roberts, Tracy (HHLS); +WPG969 - MITEnvironmental Services Section (MU); Firlotte, Nicole (CWS); Boissonneault, Caroline (CWS); Allum, Brad (MU); Lowdon,Keith (MMR); Beaumont-Smith, Chris (MMR); Sigurdson,Shauna [CEAA]; Prcsser, Cheryl (CWS); Walker, Mitch (CWS);+8EA208 - Beausejour CRP (MMG)Cc Oulmet, Darrell (CWS)Subjed EAP RevIew and n’ments Floodway Auth. - Paulnqassi Road - File: 5733.00

Your review and comments would be appreciated for the attached Proposal submitted pursuant to TheEnvironment Act:

The contact person assigned to co-ordinate review and assessment of the Proposal is:

Darrell Ouiniet @204—803-1389. Email replies are programmed to automatically deliver todarrell. ouimetth) 2ov.mb ca

Please indicate to the contact person if you are unable to review the proposal. A non-reply will be consideredas indicating your department has reviewed the proposal and has no concerns.

1

Any comments you have on the Proposal should be emailed by October 4, 2014.

No hard copies will be provided**

Thank you.

Sent an behalfof

Darrell OnimecLnvirnn,nent OfficerEnvironmental A pprovIs 13 rind,.\I:nu?oba Consercadoit and \‘(aier Sievarddiipid. 204-803-1389J:. 204-945-5229

MALL.box 80, 160-123 Main StreetWinnipeg, NIB R3C t.\5

COU!JERRoom 2-13 (NW Sraircasc, 2nd floor, 123 Main Street

2

Oulmet, Darrell (CWS)

From: Wilson, Brian (MAFRD)Sent: September-26-14 10:38 AMTo: Cuimet, Darrell (CWS)Subject: RE: EAP Review and comments Floodway Auth. - Paulngassi Road - File: 5733.00

“No comment’ on this proposal on behalf of MAFRD.

Brian WilsonBrian.WlIson(ov.mb.caSoils Suitability SpecialistCrops BranchManitoba Agriculture, Food and Rural DevelopmentBox 1149 #65 - 3r Avenue NECarnian, Manitoba ROG OJO(204) 750-3180FAX (204) 745-5690

Frcm: sttele, Tanla (CWS)Senb Sejtember-1O-14 11:07 AMTo: Wilson, Brian (MAFRD); Kalta, Adam (CWS); Labosslere, Don (CWS); Molod, Rommel (CWS); Stfficti, Laurie (CWS);Kelly, Jason (CWS); Keenan, Phil (CWS); Mlssyablt, Ron (CWS); Hay, David (CWS); Phlpps, Graham (CWS); Janusz,Laureen R (CWS); Sbbbard, James (CWS); Mathiews, Rob (CWS); Reth,er, Geoff P (CWS); +WPGS74 - HRB (TOISCP);Cunningham, NI (CWS); Crone, Jim (MMG); RObCItCkI, Susan (HHIS); Roberts, Tracy (HHLS); +WPG969 - MITEnvironmental Services SectIon (Mm; Firlotte, Nicole (CWS); Boissonneault, Caroline (CWS); Allum, Brad (Mm; Lowdon,Keith (MMR); BeaLnhlont-Smith, Girls (MMR); ‘Slgurdson,Shauna [CEAA]’; Prosser, Cheryl (CWS); Walker, Mitch (CWS);+0EA208 - Beausejour CRP (MMG)Cc Oulmet, Darrell (CWS)SUIIJeCb EAP Review and comments Floodway Auth. - Paulngassl Road - File: 5733.00

Your review and comments would be appreciated for the attached Proposal submitted pursuant to TheEnvironment Act:

<<File: Project 7A MC Project Desc Comb Final.pdf>> <<File: Project 7A MC Scoping Doc.pdf>> <<File: advert.pdf>’<<File; ack.pdf>>

The contact person assigned to co-ordinate review and assessment of the Proposal is:

Darrell Ouimet @ 204-803-1389. Email replies are programmed to automatically deliver todarrell .ouimetiagov.mb. ca

Please indicate to the contact person if you are unable to review the proposal. A non-reply will be consideredas indicating your department has reviewed the proposal and has no concerns.

Any comments you have on the Proposal should be emailed by October 4, 2014.

**No hard copies will be pmvided**

Thank you.

1

Sent on behalf of’

Darrell OnirnetRzivirc,nment OfficerEn-irniiiucnt;iI Approvals Branch

[amtol a Comervotion md Water StewardshipreL 21)4-803-1389

Fax. 204-945-5229fln/.’QsI(ii)pov rnh,\ LA IL.

Box 80, 11,0-113 fain Srrnet\‘Cinnipeg, MB R30 1A5

COURIER.Ron in 2—fl (NW S riircase) ,2nd F!nor, 113 .\ fain Street

2

Quimet, Darrell (CWS)

From: Kelly, Jason (CWS)Sent: September-22-14 8:55 AMTo: Oulmet, Darrell (CWS)Subject: RE: EAP Review and comments Floodway Auth. - Pauingassi Road - File: 5733.00

Parks and Protected Spaces Branch has reviewed the proposal submitted pursuant to the Environment Act for EAPReview and comments Floodway Auth. - Pauingassi Road - rile: 5733.00. The Branch has no comments or concerns tooffer as it does not affect any provincial parks, park reserves, ecological reserves, areas of special interest or proposedprotected areas.

Jason (elly, M.N.M,Ecological Reserves and Protected Areas SpecialistParks and Protected Spaces BranchConservation and Water Stewardship5ox 53, 200 Saulteaux CresWinnipeg, MB 113i 3W3

phone: 204-945-4148Cell:Fax: 104-945-0012

Email: [email protected]

From: Steele, Tania (CWS)Sent: September-10-14 11:07 AMTo: Wilson, Brian (MAFRD); Kaita, Adam (CWS); Labosslere, Don (CWS); Molod, Rommel (CWS); Streich, Laurie (CWS);Kelly, Jason (CWS); Keenan, Phil (CWS); Missyabit, Ron (CWS); Hay, David (CWS); Phlpps, Graham (CWS); Janusz,Laureen R (CWS); Stibbard, James (CWS); Matthews, Rob (CWS); Reimer, Geoff P (CWS); +WPG574 - HRB (1tHSCP);Cunningham, Neil (CWS); Crone, Jim (MMG); Roberecki, Susan (HHLS); Roberts, Tracy (HHI.5); +WPG9G9 - MITEnvironmental Services Secon (Mm; Srlotte, Nicole (CWS); Boissonneault, Caroline (CWS); Allum, Brad (Mm; Lowdon,Keith (MMR); Beaumont-Smith, Chris (MMR); ‘Slgurdson,Shauna [CEAAy; Prosser, Cheryl (CWS); Walker, Mitch (CWS);+BEA2OB - Beausejour CRP (MMG)Cc: Oulmet, Darrell (CWS)Subject: EAP Review and comments Floodway Auth. - Pauinqassl Road - File: 5733.00

Your review and comments would be appreciated for the attached Proposal submitted pursuant to TheEnvironment Act:

<<File: Project 7A MC Project Desc Comb Final.pdf’> <<File: Project 7A MC Scoping Doc.pdf>> <<File: advertpdf>><<File: ack.pdf>>

The contact person assigned to co-ordinate review and assessment of the Proposal is:

Darrell Oulmet @ 204-803-1389. Email replies are programmed to automatically deliver todarrell. Gui met(Z flov. mb . ca

1

Please indicate to the contact person if you are unable to review the proposal. A non-reply will be consideredas indicating your department has reviewed the proposal and has no concerns.

Any comments you have on the Proposal should be emailed by October 4,2014.

**No hard copies will be provided**

Thank you.

Sent on behalfof

I3antII OuimttEnvüonsneur ()ificezF,rnrnnrnenril \pprotals BnnchNtannc,ba Conwnadon nd Wirer StcwrdshipTcl. 2{48tl3.I.3691.ix. 2O4.9455229Dnm/LOdmtAços’.r.bea.\Lk IL

Box 80, 160-113 Main Street\tnnipeg, .\IB R3C 1A5

CO L1{IER.Rnrnn 2-B W Staircase), 2nd Flnnr, 123 Main Strect

I—

--

2

Oulmet, Darrell (CWS)

From: Kanya, Veronika (CWS)Sent: September-24-14 4:13 PMTo: Oulmel, Darrell (CWS)Cc: Kanya. Veronika (CWS)Subject: FW: EAP Review arid comments floodway Auth. - Pauingassl Road - FIle: 5733.00

Hi Darrell,

The Wildlife branch has the following comments:

This EIA provides no description of the existing environment, including habitat types and species of conservation. Thisinfotmation is necessary to allow for proper review.

Thanks,

Veronika

Wildlife Branch — Conservation and Water [email protected]

From: Steele, Tania (CWS)Sent September-10-14 11:Q7 AMTo: Wilson, Brian (MAFRD); Kalta, Adam (CWS); Labosslere, Don (CWS); Molod, Rommel (CWS); Streich, Laurie (CWS);Kelly, Jason (CWS); Keenan, Phil (CWS); tllssyabit, Ron (CWS); Hay, David (CWS); PhIpp5, Graham (CWS); )anusz,Laureen R (CWS); Stibbard, James (CWS); Matthews, Rob (CWS); Relmer, Geoff P (CWS); +WPG574 - HRB (TCHSCP);Cunningham, NeH (CWS); Crone, Jim (MMG); Roberecki, Susan (HHLS); Roberts, Tracy (HHLS); +WPG969 - MITEnvironmental Services SectIon (Mm; Firlotte, Nicole (CWS); Boissonneault, Caroline (CWS); Allun,, Brad (Mffl; Lowdon,Keith (MMR); Beaumont-Smith, Chris (MMR); ‘Slgurdson,Shauna CEAA1’; Prossec, Cheryt (CWS); Walker, Mitch (CWS);+BEA2O8 - Beausejour CRP (MMG)Cc: Oulmet, Darrell (CWS)Subject EAP Review and comments Floodway Auth. - Pauingassl Road - File: 5733.00

Your review and comments would be appreciated for the attached Proposal submitted pursuant to TheEnvironment Act:

<<File: Project 7A MC Project Desc Comb Final.pdf>> <<File: Project 7A MC Scoping Doc.pdf>’ <<File: advertpdf>><< File: ack.pdf’>

The contact person assigned to co-ordinate review and assessment of the Proposal is:

Darrell Oulmet 204-803-1389. Email replies are programmed to automatically deliver todarrell .ouimet(Th gov.mb ca

Please indicate to the contact person if you are unable to review the proposal. A non-reply will be consideredas indicating your department has reviewed the proposal and has no concerns.

1

Any comments you have on the Proposal should be emailed by October 4, 2014.

**No hard copies will be provided

Thank you.

Sent on behalfof

DantilOulinetEt.vütnmmu OtrEnvironinenni ‘.pprotb BranchNt,&rnha Conetrvtion and \t.IterSiev4rdshipTel. 204-S03-1589Fax. 2i)4—)45-5229Dczn’/LO,dmeKa r.r.mbca\ L IL

Box 80, 160-123 Main StreetWinnipeg, MB R3C I

COL’I{TER.Room 2-B W Snircase, 2nd Floor, 123 ‘bin Simet

2