24
PHONE : 6-03-8871 4000 TELEX : PENAWA MA 30128 FAX : 6-03-8881 0530 AFTN : WMKKYAYS COMM : AIRCIVIL KUALA LUMPUR AIP SUPPLEMENT MALAYSIA AERONAUTICAL INFORMATION SERVICES DEPARTMENT OF CIVIL AVIATION NO. 27, PERSIARAN PERDANA LEVEL 1-4, PODIUM BLOCK, PRECINCT 4, 62618 PUTRAJAYA MALAYSIA AIRAC 1 KUALA LUMPUR FLIGHT INFORMATION REGION UPGRADING OF KUALA TERENGGANU / SULTAN MAHMUD AIRPORT AIRSPACE INFRASTRUCTURE AND PROCEDURES EXTENSION OF CONTROL ZONE, INTRODUCTION OF SIDS, STARS, HOLDING AREAS AND NEW INSTRUMENT APPROACH PROCEDURES 1. INTRODUCTION 1.1 The Kuala Terengganu control zone is extended to accommodate the introduction of new air routes, airspace infrastructures and procedures. 1.2 The purpose of this AIP Supplement is to notify the aviation industry of the Standard arrival and Departure routes, holding areas and instrument approach procedures that are introduced to facilitate aircraft operations onto the new extended full length of the runway. 1.3 The information provided in this AIP Supplement is presented in similar ICAO format applicable for the Aeronautical Information Publication. 2. REVISION OF CONTROL ZONE, PROCEDURES AND CHARTS 2.1 NEW CONTROL ZONE 2.1.1 The existing control zone is extended to accommodate new holding areas and instrument approach procedures. Details of new control zone, coordinates, lateral and vertical limits are as tabulated in table AD 2.17 in Appendix A and Chart at Appendix B. 2.2 HOLDING AREAS 2.2.1 Details of Holding Areas are as shown in Appendix C. New VOR/DME holding areas are anchored on the VKR DVOR/DME. 12 / 2009 21 MAY

AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14

PHONE : 6-03-8871 4000TELEX : PENAWA MA 30128FAX : 6-03-8881 0530AFTN : WMKKYAYSCOMM : AIRCIVIL KUALA LUMPUR

AIP SUPPLEMENTMALAYSIA

AERONAUTICAL INFORMATION SERVICESDEPARTMENT OF CIVIL AVIATION

NO. 27, PERSIARAN PERDANA LEVEL 1-4, PODIUM BLOCK, PRECINCT 4,

62618 PUTRAJAYAMALAYSIA

AIRAC

1

KUALA LUMPUR FLIGHT INFORMATION REGION

UPGRADING OF KUALA TERENGGANU / SULTAN MAHMUD AIRPORTAIRSPACE INFRASTRUCTURE AND PROCEDURES

EXTENSION OF CONTROL ZONE, INTRODUCTION OF SIDS, STARS,HOLDING AREAS AND NEW INSTRUMENT APPROACH PROCEDURES

1. INTRODUCTION

1.1 The Kuala Terengganu control zone is extended to accommodate the introduction of new airroutes, airspace infrastructures and procedures.

1.2 The purpose of this AIP Supplement is to notify the aviation industry of the Standard arrivaland Departure routes, holding areas and instrument approach procedures that are introducedto facilitate aircraft operations onto the new extended full length of the runway.

1.3 The information provided in this AIP Supplement is presented in similar ICAO formatapplicable for the Aeronautical Information Publication.

2. REVISION OF CONTROL ZONE, PROCEDURES AND CHARTS

2.1 NEW CONTROL ZONE

2.1.1 The existing control zone is extended to accommodate new holding areas and instrumentapproach procedures. Details of new control zone, coordinates, lateral and vertical limits areas tabulated in table AD 2.17 in Appendix A and Chart at Appendix B.

2.2 HOLDING AREAS

2.2.1 Details of Holding Areas are as shown in Appendix C. New VOR/DME holding areas areanchored on the VKR DVOR/DME.

12 / 2009

21 MAY

Page 2: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14

2

2.3 STANDARD ARRIVAL AND DEPARTURE ROUTES

2.3.1 SIDS AND STARS are introduced to simplify and standardize arrivals and departuresin order to minimize conflict and maximize handling capacity.

2.3.2 STARs for Runway 04 and Runway 22 are illustrated in charts Appendix D -1 to D - 2and Appendix D -3 to D - 4 respectively.

2.3.3 SIDs for Runway 04 and Runway 22 are illustrated in charts Appendix D - 5 to D - 6and Appendix D -7 to D - 8 respectively.

2.4 INSTRUMENT APPROACH PROCEDURES

2.4.1 New Instrument Approach Charts for Runway 04 and Runway 22 following STARarrival for RNAV and VOR/DME are established and shown in Appendix E-1 to E-2and Appendix E-3 respectively. Instrument approach charts published under AIPSUPP 34/2008 are revised as shown in Appendix E-4 to E-9 to reflect lower OCA/Hvalues.

2.5 VFR ROUTES

2.5.1 VFR routes for the specific operations of light general aviation aircraft and helicopterswithin the Kuala Terengganu Control Zone are introduced and are shown in VisualChart at Appendix F.

3. WAY POINTS

3.1 The following Way Points are published for area navigation for Kuala Terengganureferenced to VOR/DME “VKR”. Aircraft not equipped for RNAV should use the VOR/DME procedure :-

No Designator Radial / DME VKR WGS 84 Coordinates

1 PALNO R-268.42 / 26.43 N 05 20 53.93 E 102 38 24.83

2 LASOB R-247.99 / 24.77 N 05 12 18.56 E 102 41 53.01

3 LEKOR R-217.99 / 27.96 N 04 59 29.71 E 102 47 39.23

4 KALSO R-224.43 / 18.97 N 05 08 01.31 E 102 51 35.44

5 ASENI R-253.65 / 14.36 N 05 17 34.54 E 102 51 05.46

6 SASVU R-224.41 / 12.48 N 05 12 40.68 E 102 56 08.81

7 AVNOK R-224.46 / 7.67 N 05 16 08.34 E 102 59 31.00

8 OPASO R-268.55 / 10.06 N 05 21 22.95 E 102 54 48.99

9 REKEB R-015.36 / 14.39 N 05 35 34.79 E 103 08 43.45

10 VENEV R-044.47 / 12.57 N 05 30 39.07 E 103 13 43.95

11 LAGUB R-073.63 / 14.39 N 05 25 42.79 E 103 18 44.67

12 AKNIT R-189.22 / 15.00 N 05 06 45.71 E 103 02 29.73

13 GURBA R-356.81 / 12.17 N 05 33 51.06 E 103 04 13.43

Page 3: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14

3

4. IMPLEMENTATION

4.1 This AIP Supplement and relevant charts will be become effective on 2nd July 2009when the full runway and related facilities are opened and commissioned foroperations. A trigger NOTAM will be issued notifying the implementation of the newprocedures.

5. CANCELLATION

5.1 This AIP Supplement will remain current until the information is published in AIPMalaysia.

DATO’ AZHARUDDIN ABDUL RAHMAN Director General Department of Civil Aviation Malaysia

14 IPGAB R-044.48 / 10.11 N 05 28 30.38 E 103 12 22.62

15 PUMES R-092.49 / 12.11 N 05 21 06.51 E 103 17 02.02

16 BEVPI R-044.50 / 7.64 N 05 27 07.01 E 103 10 16.45

17 GIVAG R-224.28 / 6.74 N 05 16 47.34 E 103 00 11.05

18 VEREP R-277.44 / 11.25 N05 23 06.06 E102 53 43.37

19 LEGEM R-328.70 /9.72 N 05 29 59.18 E 102 59 50.37

20 PUDER R-224.28 / 15.01 N 05 10 50.38 E 102 54 23.96

21 XEKET R-254.32 / 19.80 N 05 16 15.46 E 102 45 47.51

22 IKUKO R-019.51 / 24.78 N 05 45 12.00 E 103 13 24.00

23 GUNBO R-206.89 / 32.88 N 04 52 10.21 E 102 50 00.47

Page 4: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14

DEPARTMENT OF CIVIL AVIATION MALAYSIA

APPENDIX A

WMKN AD 2.17 ATS AIRSPACE

WMKN AD 2.20 LOCAL TRAFFIC REGULATIONS

4. Procedures for VFR flights within the K. Terengganu CTR

a) A flight plan shall be filed for the flight.

b) ATC clearance shall be obtained from Terengganu TWR.

c) Any deviation from ATC clearance requires prior permission.

d) The flight shall be conducted with vertical visual reference to the ground.

e) Two – way communication shall be established with KualaTerengganu Approach on

123.6MHz or 235.32MHz prior to entering the Kuala Terengganu CTR.

f) All VFR flights shall follow the established VFR Routes for entering and exiting the CTR, as

shown in Visual Chart. Any deviation outside these routes requires prior ATC permission.

g) All arriving aircraft shall hold at the designated VFR Holding area at 1000 feet and await

onward ATC clearance for landing.

1 Designation and lateral limits Kuala Teregganu CTRCommencing from 045350N 1030804E,clockwise along an arc of a circle 28NM radiuscentered on VKR DVOR/DME 052138.4N1030454.2E, to 050708N 1024104E thence astraight line to 055737N 1030656E, thence alongthe arc of a circle 36NM radius centered on VKRDVOR/DME to 054331N 1033337E, thence astraight line to 045350N 1030804E.

2 Vertical limits Ground / Sea Level to 6500 FT

3 Airspace classification C

4 ATS unit callsignLanguage (s)

Terengganu TowerEnglish

5 Transition altitude 11000 FT

6 Remarks Nil

21 MAY 2009AIP SUPP 12/2009

Page 5: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 6: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 7: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 8: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 9: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 10: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 11: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 12: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 13: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 14: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 15: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 16: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 17: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 18: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 19: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 20: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 21: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 22: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 23: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14
Page 24: AIP SUPPLEMENT MALAYSIAaip.dca.gov.my/eaip/aip pdf new/AIP SUPP/AIPSUPP 200912.pdf · A trigger NOTAM will be issued notifying the implementation of the new procedures. 5. ... 14