AICTE Approval Process 2007-08

Embed Size (px)

Citation preview

  • 8/13/2019 AICTE Approval Process 2007-08

    1/20

    i,I

    I

    :

    /li

    i

    i

    i

    I

    i,iI

    iI

    i

    i

    I

    i

    i

    APPROVALPBOCESSi

    FOR

    DIPLOMA INSTTTUTIONSi

    I

    2007-2008 I

  • 8/13/2019 AICTE Approval Process 2007-08

    2/20

    I

    PROGRAMMES REQUIRING AICTE APPROVAL

    1.1 DIPLOMA LEVEL COURSES

    t.

    2.

    aJ.

    4.

    5.

    6.

    Diploma in Engineering & TechnologzDiploma in Pharmacy

    Diploma in Architectural Assistantship

    Diploma in Hotel Management & Catering TechnoloryDiploma courses in the field ofApplied Arts & CraftsPost-Diploma/Advanced Diploma Courses related to Technical Education

    l'2 Increased enrollment initiatives for optimal utilization of infrastructure: TheCouncil will considerproposals for starting second shift of enroltment for a selectprogramme, of well reputed Diploma Level Institutions in order to increaseenrollment

    for Diploma Level courses and also to reduce the education cost byoptimal utilization of infrastructure facilities. The institutions will be requrired toprovide teaching fu""lry and the PrincipaV Head of the Institute separately for thesecond shift. This provision will be considered for new institutions as well as toexisting institutions beginning y en 2007 -200g.

  • 8/13/2019 AICTE Approval Process 2007-08

    3/20

    2

    PROCEDURE FORPROCESSING OF PROPOSALS FORESTABLISHMENT OF NEW TECHNICAI TNSTTTUTIONS (DIPLOMA)FOR THE ACADEMIC YEAR 2007-2008

    2.1 REQUIREMENT OF GRANT OF AppRovALNo new technical institution of Government, Government Aided or private(self financing) institution shall be started and no new courses or programsin Technical Education shall be introduced and no increase/ variation ofintake shall be effected without obtaining prior approval of the Council.

    2.2 THE APPLICATION FORM CAN BE SUBMITTED BYRegistered Societies and Trusts /Self financing Private Institutions

    b) Central/State Government Institutions/Government AidedInstitutions

    The stages involved in the processing of applications are described below:

    2.3 STAGE -1

    SUBMISSION OF APPLICATION

    Applications duly filled in along with requisite processing Fee may be

    submitted any time of the year to the Director Technical Education of theconcerned State Gofi.AJT in original and a copy sent to the C-orrcemedRegional Office of AICTE

  • 8/13/2019 AICTE Approval Process 2007-08

    4/20

    CHECK LIST TO BE FOLLOWED AT THE TIME OFUBMISSIoN oF, Appt,tcarioN

    ' copy of Registration of society/Trust arong with details ofconstitution, memorandum of association of the sociefy/Trust.

    ' copy of letter from competent Authority as designated by the concemedstate Govemment for classification of land, with respect to its location i.e.Metropolitan Citylstate Capital /Others.

    t copy of registered land documents in the name of applicant rrust/Society.

    ' copy of building plan prepared by an Architect and approved by thecompetentAuflrority as designated by concemed state Govt.AJT.

    t copy of resolution of the society/Trust /Applicant earmarking land for theproposed institution(s)

    t copy of land use certificate from competent Authority as designated byconcemed State Govt.AJT

    Details of latest fund position along with photocopy of FDRs, sB A/c,current A/c etc. available with the applicant for this proposal

    Detailed Project Report (DpR/.

    2.4 STAGE - II

    VERIFICATION OF DOCUMENTS.

    The application alongwith following documents received at the Directorate ofTechnical Education of the concerned State Gort.AJT may be scrutinized by

  • 8/13/2019 AICTE Approval Process 2007-08

    5/20

    t.

    a committee comprising experts, including Regional officer of AICTE asmembers and Director, Technicar Education or his nominee as convenorconstituted by the Secretary dealing with technical education

    of theconcerned state Govt.ruT.

    Registration document of the Trusv society indicating members ofSociety/ Trust and its Objectives.

    Land documen(s) in original showing or,vnership in the name ofTrust/society in the form of Registered sale Deed / Irrevocable Gift Deed

    (Registered)/ Irrevocable Govemment Lease (for minimqr.n 30 years) byconcerned authority of Government.

    Iand use certificate/ Iand conversion certificate allowing the land to beused for educationar pu{pose, from the competent Authority arong withTopo-sketeh/ Village Map indicating land survey Nos. and a copy of cityroad map showing location ofproposed site ofthe institution.

    site Plarl Building plan prepared by a registered Architect and dulyapproved by the competent plan sanctioning Authority of the concemedStateAJT admn.

    Proof of adequate working capital (Funds) in the form of either FixedDeposits in the Bank / latest Bank statement of Account maintained bvthe Society / Trust/Applicant.

    Justification and viability ofthe pfoject as enunciated in the DpR

    The deficiencies if any, shall be communicated by the Director TechnicalEducation under intimation to the concemed Regional office of theAICTE concemed StateAJT to the applicant institution within 15 days fromthe date of receip ofthe Application.

    3.

    4.

    5.

    7.

  • 8/13/2019 AICTE Approval Process 2007-08

    6/20

    2.5 STAGE - Itr

    ISSUE OF'LETTER OF INTENT

    The recommendations of the scrutiny committee will be considered by thestate level committee, whose constitution is given below:

    1) secretary of Higher Education / Technical Education chairmanof the concerned state / ur / or his Nominee notbelow to level of professor/Director/VC of aUniversitv.

    2) Regional Officer of AICTE or aAICTE representative not below the rank ofDeputy Director/Reader or equivalent.

    3) Two (2) Subject Experts to be nominated by the Membersstate Govt./ ur Administration from within theState I AT or outside the State / UT

    4) Director of Technical Education / Member SecretaqyState Board of Technical Education .lof the Concerned State /UT

    Based on the recommendations of the above committee, the Regionaloffice of AICTE shall issue a letter of Intent to the Applicant TrusVSocietu.

    The Letter of Intent shall be valid for a maximum period of 3 years, duringwhich the Institution shall complete alr requirements as per the Norms &standards and conditions as decided by the council from time to time.

    In respect of cases, in which Letter of Intent is denied, the grounds forrejection shall be duly communicated to the concerned Applicant Institution.The Applicant may submit compriance Report along with documentary

    Member

  • 8/13/2019 AICTE Approval Process 2007-08

    7/20

    evidence to substantiate the claims to be considered forStateLevel Committee.

    reconsideration by the

    2.6 STAGE - IV

    ISSUE OF'LETTER OF APPROVALThe Applicant Trust/society to whom the Letter of Intent issued wouldbe required to comply with the following requirements and subnnit thedocuments to the Director of Technical Education of concerned stateGol.t./UT.

    1) A non-refundable processing fee of Rs. 25,000/- drawn in favour of"The Director Technical Education" of the Concerned State Govt./UT(Government and Govt. aided Institutions are exempted frompayment of processing fee).

    2) A Joint Fixed deposit of Rs. 15 lakhs created in the joint nannes ofthe Presidenvchairman of the Applicant society/Trust and theDirector Technical Education of the concerned state Govt./ur(Govemment and Govt. aided Institutions are exempted):

    The original Joint Fixed Deposit Receipt shall be kept under the custody ofthe proposed institution. A copy of the Joint Fixed Deposit Receipt shall besubmitted to the Director Technical Education of the concerned

    StateGom'AJT along with an affidavit on non judicial stamp paper of prescribedvalue stating that the Joint Fixed Deposit shall not be encashed or modifiedwithout prior consent of AICTE and DTE. the Director Technical Educationof the concerned State Govt.AlT shall instruct the concerned Bank not toallow any encashmenVmodification of fixed deposit and grant of loan againstthe FDR without prior consent of AICTE and the Director Technical

  • 8/13/2019 AICTE Approval Process 2007-08

    8/20

    Education of the concerned State Govt.AJT. The Appricant society/Trust/Institution may be permitted to encash the Joint Fixed Deposit on expiry ofthe term of the Fixed Deposit. However, the term of the fixed deposit

    couldbe extended for a further period as may be decided on case to case basisand/or forfeited incase of any vioration of norms, conditions, andrequirements and/or non-performance by the institution andzor compraintsagainst the institution.

    The processing fee and the Joint FDR amount for Minority institutions maybe reducedby 20%.

    2.7 STAGE.V

    E)(PERT COMMITTEE VISIT(a)As and when the applicant is ready for an inspection for verification of

    its preparedness for establishment of the proposed institution, it shallmake an application

    indicating compliance of the conditions stipulated atpara2.6 above for causing an inspection.

    (b) A visit of Expert committee will be arranged by Director TechnicalEducation of the concemed state Govt.AIT for verification of the facilitiescreated for estabrishment ofthe proposed Instifution.

    (c) The Expert visiting committee shall comprise of the foilowingmembers:

    ' lhree Expert members not below the level of AssociateProfessor/Reader

    ' Regional ollice of the AIcrE or a AICTE representative notbelow the rank of Reader or equivalent

  • 8/13/2019 AICTE Approval Process 2007-08

    9/20

    . Director Technicalor his nominee notConvener.

    Education of thebelow the rank

    Concerned State Govt./UTof JT/Dy. Director level as

    (d) The Expert visiting committee shall examine the preparedness of theinstifution to impart qualrty education as per the norms & standards andconditions prescribed by the council from time to time.

    2.8 STAGE.VI

    CONSIDERATION ANDAPPROVAL/REJECTION ISSUANCE OF LETTER OF

    1' The Report of the Expert committee shall be placed before the stateLevel Committee for consideration.

    2' Based on the recommendations of the state level committee theRegional officer of AICTE shall issue letter of approvar.

    3. The Letter of Approval shall be valid for a maximum period of 2 years.It shall be the responsibility of the Applicant institutions to obtainnecessary permission/affiliation for admission of students fronn theconcerned Admission Authority/state Govt.AJTiBoard during thevalidity

    of the period of approval. Incase the institution fails to start theapproved programmes during the validity period of approval, theapplicant institution make a fresh application for consideration of letterof intent.

    In respect of cases, fornorns & standards and

    which approval is denied for non-fulfillment ofconditions as may be stipulated by the Council,

  • 8/13/2019 AICTE Approval Process 2007-08

    10/20

    grounds of denial shall beAppl icant/S ociety/Trust/Institution.

    communicated to the concerned

    2,9 STAGE -VII

    APPEAL TOR RECONSIDERATION OF TTIE PROFOSAL

    In case approval for establishment of new institution is not granted, theapplicant can make an appeal with documentary evidence to substantiate theclaims made and the appeal shall be heard by the foilowing committee:

    The chairman of the AIcrE Regionar committee as chairrmanTlvo members not berow the rank of professor to be nominated bythe Chairman AICTE

    a

    a

    members

    ' Director of rechnicar Education of the state Govt./[JT_ mernber. Regional Oflice of AICTE convener

    Based on the RecommendationsofApprovallRejection shall be issued bv

    behalf ofthe Council.

    the Appellate Committee Letter ofthe Regional Officer of AICTE on

    Incase the proposal isAppellate Committee.

    proposal.

    rejected based on the recommendations of thethe Applicant Society/Trust shall make a fresh

    l0

  • 8/13/2019 AICTE Approval Process 2007-08

    11/20

    3

    Extension of Approval to Existing Technical rnstitutions (Diploma levelechnical Institutions)

    3. Requirement of Grant of ApprovalNo existing technical institution of Government, Govemment Aided orPrivate (self financing) shall conduct any technical course/programmewithout obtaining prior approval of the Council.

    3.I APPROVAL PROCESS FOR PROCESSING PROPOSALS FORXTENSION OF APPROVAL TO EXISTINGTECHNICALINSTITUTIONS:

    (a) AICrn approved technical Institutions shall submit a ComplianceReport in the prescribed format along with mandatory disclosureinformation to the concerned Director of Technical Education of theconcerned state Govt.AJT and a copy to the concerned Regional officeof the Council by 3lst August every year.

    (b) The institution shall also submit an undertaking in the prescribed formatstating that the information provided in the compliance Report is factualand conect and that the Council can take appropriate action, includingwithdrawal of approval, if it is found that the information provided in theCompliance Report is false.

    3'2 (a) The compliance reports shall be placed before the State LevelCommittee comprising:

    1) secretary of Higher Education / Technical Education Chairrnanof the concerned state rar lor his Nominee notbelow to level of professor/I)irector/VC of aUniversity.

    2) Regional Oflicer of AICTE or any MemberAICTE representative not belowlhe rank of

    ll

  • 8/13/2019 AICTE Approval Process 2007-08

    12/20

    Deputy Director/Reader or equivalent.

    3) lwo (2) t"li::lE.perts to be nominated by theState Govt./ UT Administration from within theState / IJT or outside the State /llT

    4) Director of Technical Education /State Board of Technical Educationof the Concerned State /UT

    Members

    Member Secretarv

    Appellate Committee letter ofRegional Officer of AICTE on

    J.J (a) Based on the recommendations of the sate level committee the Regionalofficer of AICTE shall issue letter of extension of approvaurejectionletter.

    (b) The approvals to all the existing technical institutions shall becommunicated by 30't June every year.

    (c) In those cases where extension of approval is denied for non-fulfillmentof norms, & standards and conditions as may be stipulated by theCouncil, grounds of denial shall be communicated to the institution.

    3'4 In case Extension of Approval is not granted, the Institution can make anappeal with documentary evidence to substantiate the claims made and theappeal shall be heard by the following Committee:

    The chairman of the AICTE Regionar committee as chairman

    Iy"*:11.: n^lt*lo* the rank of professor to be nominated bytheChairman AICTE __-_----_:_:;;;i,Director of rechnical Education of the state Govt./ur- member

    Regional Oflice of AICTE _convenerBased on the Recommendations of theextension/rejection shall be issued by thebehalf ofthe Council

    a

    a

    a

    a

    t2

  • 8/13/2019 AICTE Approval Process 2007-08

    13/20

  • 8/13/2019 AICTE Approval Process 2007-08

    14/20

    4

    Introductionof New courses or Programmes and/or for variation/Increase in thentake capacity.of the Existing co,i.ru, in n*isur,g ArcrE-Approved rechnicalnstitutions (diploma).

    4.1 Requirement of Grant of ApprovalNo technical institution of Government, Govemment Aided or private (selffinancing) shall conduct courses or programs in Technical Education and nonew courses or programs shall be introduced and no increase and/or variation ofintake in the existing courses/Progrunmes shall be effected at all levels in thefield of 'Technical Education'without obtaining prior approval of the council.

    4'2 The stages involved in the processing of Proposals are described below:4.3 Stage-I- Submission of proposals

    The AICTE approved technical Institutions may submit ,,any time,, round the year aproposal for grant of approval

    for introduction of new courses or prograrnmesand/or increase/ variation in the intake capacity, in the prescribed format along withthe following documents to the concerned Director of Technical Education of thestate Govt.AJT and a copy to the Regional office ofAICTE

    e { copy ofthe Compliance Report along with Mandatory Disclosures submitted.r Detailed Project Report along with relevant documents

    4.4 STAGE-II: Verification of the proposal:

    t4

  • 8/13/2019 AICTE Approval Process 2007-08

    15/20

    o The Proposal shall be scrutinized by a committee comprising Expertsincluding

    Regional officer of AICTE as members and Director ofTechnical Education or his nominee as convener.Deficiencies if any, shall be communicated by the Director, TechnicalEducation of the concerned StateAJT intimation under intimation to theRegional office of AICTE to the applicant Institution within l5 days fromthe date of receipt of the proposal.

    4.5 Stage-III- Evaluation of proposal(a) The proposal shall thereafter be considered by the State level Committee:

    1) Secretary of Higher Education / Technical Education Chairmanof the concerned state rur tor his Nominee notbelow to level of professor/Director/VC of aUniversity.

    2) Regional Officer of AICTE or any MemberAICTE representative not below the rank ofDeputy Director/Reader or equivalent.

    3) Two (2) subject Experts to be nominated by the MembersState Govt./ UT Administration from within the

    State / UT or outside the State / UT

    4) Director of rechnical Education / Member secretarvState Board of Technical Educationof the Concerned State AIT

    4.6 @) Based on the recornmendations of the State level Committeeo the RegionalOffrcer of AICTE shall issue a letter of approvaVrejection for introduction ofnew courses/programmes and/or increase/variation of intake capacrty.

    l5

  • 8/13/2019 AICTE Approval Process 2007-08

    16/20

    (b) The approval accorded by the AICTE shall be valid for two years from the date ofissue of letter of approval.

    It shall be the responsibility of the Applicantinstitutions to obtain necessary permission/affiliation for admission of studentsfrom the concerned Admission Authority/state Govt .NT/Board during thevalidity of the period of approval. Incase the institution fails to start theapproved programmes during the validity period of approval, the applicantinstitution make a fresh application.

    (c) In those cases where approval is denied for non-fulfillmentof norms, &standards and conditions as may be stipulated by the council, grounds of denial

    shall be communicated to the concerned institutions.

    4'7 Incase approval for inhoduction of new courses/programmes and lorincrease/variation of intake capacity is not granted, the applicant institution canmake an appeal with documentary evidence to substantiate the claims made and theappeal shall be heard by the following

    Committee:

    o

    The chairman of the AICTE Regionar committee as chairmanTwo members not below the rank of professor to be nominated by theChairman AICTE _-_-_____membersDirector of rechnical Education of the state Govt./tJT- memberRegional Office of AICTE _convener

    Based on the Recommendations of the Appellate Committee the Regional officer ofAICTE shall issue letter of approval or rejection for introduction of new courses orprogranrmes and/or increase in intake and/or variation in the intake capacity.

    4'8 The decision on grant of approval or otherwise shall be communicated to theinstitutions throughout the year.

    a

    a

    l6

  • 8/13/2019 AICTE Approval Process 2007-08

    17/20

    4.9 Cases where approval is denied onCommittee grounds

    of denial shallApplicant Institution.

    Incase the proposal is rejectedAppellate Committee, the ApplicantProposal.

  • 8/13/2019 AICTE Approval Process 2007-08

    18/20

    2.

    AICTE NORMS F'OR DIPLOMA LEVELTECHNICAL INSTITUTIONS

    'Y^d No' of courses:- Diploma level technical institutions may be startedwlm ) courses with an intake of 300. The class size should be 60 in each discipline.Intake could be increased subject to providing additional infrastructure, faculty andother facilities as per the AICTE norns and accreditation of programmes.

    In order to put the available resources to optimum use, diploma level institutionsmay start courses in relevant clusters/groups such as:

    a. Mechanical Engineering Group,

    b. Information Technology and Electronics communication Engineering Group,c. Electrical Engineering Group,

    d. Civil Engineering and ArchitectureGroup,

    e' Hotel Management, Food Technology and Travel and Tourism Group,f. Applied Arts and Crafts Group,

    g. Pharmacy, Bio-Medical and Lab Technologies Group.

    select diploma level institutions with adequate infrastructure, faculty and otherfacilities may be allowed to conduct two shifts, provided

    that such arrangementsdoes not affect the quality of education. More specially, it should not leaal to anyreduction in Workshop, Laboratories and contact teaching hours. Adequate facultyand other resources have to be also provided to ensure quality diploma leveleducation.

    J.

    l8

  • 8/13/2019 AICTE Approval Process 2007-08

    19/20

    Table I Mega Cities Metro citiesincluding StateCapitals

    Others

    Diploma LevelTechnicalInstitutions

    1.5 Acres 2.5Acres 5 Acres

    4. Land:- Diploma level institutionsnonns as

    per the following table:

    may be permitted to be established with land

    Teacher Student Ratio: Diploma level institutions should be provided faculty inthe teacher student ratio of 1:20. The faculty should be appointed with approveddesignations, i.e Heads of Department, Senior Lecturers and Lecturers. Ratiobetween Senior Lecturer and LEcturer should be l:3.

    Built up area requirements: Diploma level technical institutions should beprovide built up area (instructional area) at the rate of 5 sqm per student. Sincethe built up area permitted be constucted vary from location to location,depending upon the local norms of construction, the institutions may be alllowed

    to consfruct building vertically to meet the built up area requirement in the light

    of reduction in land area.

    Besides the built-up area for instruction of 5 sqm per student, appropriate additional

    area may be provided as administative area plus circulation area etc. This includes

    area for Principal's Room, Store Room, Reception Offrce, maintenance etc. Theadditional built-up area could be 4 to 5 Sqm per student.

    5.

    6.

    l9

  • 8/13/2019 AICTE Approval Process 2007-08

    20/20

    7. ExperimentsThe experimental setups should be ananged as per the requirements of the affiliatingbody's curriculum, and normally not more than four students should work in a teamfor an experiment.

    8. Requirement of Computers

    As per the requirements of the affiliating Body's curriculum, and not more than 2students to work on one computer and not more than four students to work in anexperiment.

    9 Library/Boola and Journals

    l0 Funds:l. For new instifutions:

    a) Rs. 50 Lalfis (excludingland and buildings)b) JointFixedDeposit Rs. 15Lakhs

    2. For existing Institutions:a) Rs. 50 Lak*rs Operational funds

    Note: All other facilities shall be provided as per the requirement of curriculum ofthe concerned State Board of Technical Education/ Affiliating Body.

    2 referencebooks perstudent

    6 textbooks forstudent