Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai
664
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary Control Point and Associated Works Environmental Impact Assessment Report Volume 1 - Main Text December 2010 Civil Engineering and Development Department
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai
Boundary
Control Point and Associated Works
Environmental Impact Assessment Report
Volume 1 - Main Text
P:\Hong Kong\BRI\255228 Liantang_HeungYuenWai
BCP\Environmental\Deliverables\EIA Report\4th\Vol 1 of
5_cover.doc
20 August 2010
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
Environmental Impact Assessment Report
Volume 1 - Main Text
Civil Engineering and Development Department
Mott MacDonald, 20/F Two Landmark East, 100 How Ming Street, Kwun
Tong, Kowloon, Hong Kong T +852 2828 5757 F +852
2827 1823 W www.mottmac.com
Civil Engineering Office Boundary Control Point Division 3/F, Civil
Engineering and Development Building 101 Princess Margaret Road
Homantin Kowloon
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Chapter Title Page
4. Noise Impact Assessment 4-1 4.1 Introduction
_______________________________________________________________________4-1
4.2 Environmental Legislation, Standards and Guidelines
______________________________________4-1 4.3 Assessment Area,
Noise Sensitive Receivers and Background Noise Climate
___________________4-5 4.4 Construction Phase
Impact___________________________________________________________4-8
4.5 Operation Phase Impact
____________________________________________________________4-22
4.6 Environmental Monitoring and Audit
___________________________________________________4-35 4.7
Conclusion
______________________________________________________________________4-35
5. Water Quality Impact 5-1 5.1 Introduction
_______________________________________________________________________5-1
5.2 Environmental Legislation, Standards and Guidelines
______________________________________5-1 5.3 Assessment Area,
Water Sensitive Receivers and Description of the Environment
________________5-4 5.4 Assessment
Methodology____________________________________________________________5-9
Content
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
5.5 Identification, Prediction and Evaluation of Environmental
Impact ____________________________5-10 5.6 Mitigation of Adverse
Environmental
Impact_____________________________________________5-14 5.7
Evaluation of Residual
Impact________________________________________________________5-19
5.8 Environmental Monitoring and Audit
___________________________________________________5-19 5.9
Conclusion
______________________________________________________________________5-19
6. Sewerage and Sewage Treatment Impact 6-1 6.1 Introduction
_______________________________________________________________________6-1
6.2 Assessment Approach and Methodology
________________________________________________6-1 6.3 Design
Assumptions, Parameters and Criteria
____________________________________________6-2 6.4 Existing
Sewerage Conditions
________________________________________________________6-5 6.5
Estimated Pollutant Loads due to the Project
_____________________________________________6-7 6.6 Proposed
Mitigation Measures
________________________________________________________6-9 6.7
Short Term Measures during Construction Phase
________________________________________6-13 6.8 Environmental
Monitoring and Audit
___________________________________________________6-13 6.9
Conclusion
______________________________________________________________________6-13
7. Waste Management Implications 7-1 7.1 Introduction
_______________________________________________________________________7-1
7.2 Environmental Legislation, Standards and Guidelines
______________________________________7-1 7.3 Assessment
Methodology____________________________________________________________7-2
7.4 Identification, Prediction and Evaluation of Environmental
Impact _____________________________7-4 7.5 Opportunities for
Reducing Waste Generation and Maximise Re-Use
__________________________7-7 7.6 Mitigation of Adverse
Environmental Impacts
_____________________________________________7-9 7.7 Impacts Caused
by Handling, Collection and Disposal of C&D
Materials_______________________7-11 7.8 Waste Handling Procedures
and Routes _______________________________________________7-11 7.9
Evaluation of Residual
Impacts_______________________________________________________7-14
7.10 Environmental Monitoring and Audit
___________________________________________________7-14 7.11
Conclusion
______________________________________________________________________7-14
8. Land Contamination 8-1 8.1 Introduction
_______________________________________________________________________8-1
8.2 Environmental Legislation, Standards and Guidelines
______________________________________8-1 8.3 Description of the
Environment/ Baseline Conditions
_______________________________________8-1 8.4 Assessment
Methodology____________________________________________________________8-4
8.5 Identification of Environmental Impact
__________________________________________________8-4 8.6
Prediction and Evaluation of Environmental Impact
________________________________________8-6 8.7 Mitigation of
Adverse Environmental
Impact______________________________________________8-8 8.8
Evaluation of Residual
Impact_________________________________________________________8-9
8.9 Environmental Monitoring and Audit
____________________________________________________8-9 8.10
Conclusion
_______________________________________________________________________8-9
9. Ecological Impact 9.1 9.1 Introduction
_______________________________________________________________________9-1
9.2
Background_______________________________________________________________________9-1
9.3 Environmental Legislation, Standards and Guidelines
______________________________________9-7 9.4 Assessment Area and
Ecological Survey Methodology
_____________________________________9-8 9.5 Ecological Baseline
Condition________________________________________________________9-12
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
9.6 Habitat and Species Evaluation
_____________________________________________________9-104 9.7
Identification / Evaluation of Environmental Impact and
Recommendation of Mitigation Measures __9-134 9.8 Mitigation
Measures
______________________________________________________________9-172
9.9 Evaluation of Cumulative
Impact_____________________________________________________9-181
9.10 Evaluation of Residual
Impact_______________________________________________________9-186
9.11 Environmental Monitoring and Audit
__________________________________________________9-186 9.12
Conclusion
_____________________________________________________________________9-187
9.13 Reference
______________________________________________________________________9-189
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
13.3 Noise
Impact_____________________________________________________________________13-1
13.4 Water Quality Impact
______________________________________________________________13-1
13.5 Sewerage and Sewage Treatment Implications
__________________________________________13-2 13.6 Waste
Management Implications
_____________________________________________________13-2 13.7 Land
Contamination
_______________________________________________________________13-2
13.8 Ecological Impact
_________________________________________________________________13-2
13.9 Fisheries Impact
__________________________________________________________________13-3
13.10 Landscape, Visual and Glare Impact
__________________________________________________13-3 13.11 Impact
on Cultural Heritage
_________________________________________________________13-4
15. Implementation Schedule of Mitigation Measures 15-1 15.1
General
_________________________________________________________________________15-1
Tables
Table 2.1: Summary of Environmental Benefits and Dis-Benefits of
the BCP Location Options _______________2-8 Table 2.2: Final
Screened Options
____________________________________________________________2-15
Table 2.3: Summary of Environmental Benefits and Dis-Benefits of
the Alignment Options _________________2-17 Table 2.4: Summary of
Potential Concurrent Projects
______________________________________________2-38
Table 3.1: Hong Kong Air Quality
Objectives______________________________________________________3-1
Table 3.2: Tunnel Air Quality Guidelines
_________________________________________________________3-2 Table
3.3: Representative ASRs Identified for the
Assessment________________________________________3-4 Table 3.4:
Assumptions for Calculation of Dust Emission
Factors______________________________________3-6 Table 3.5: Vehicle
Classification in the EMFAC-HK Model
__________________________________________3-10 Table 3.6: Worst
Case Emission Factors as Predicted by EMFAC-HK
Model____________________________3-13 Table 3.7: Forecast of Idling
Vehicles in Kiosks, L&UL and PTI in Peak
Hour____________________________3-16 Table 3.8: Idling Emissions
from Kiosks, L&UL areas and PTI
_______________________________________3-17 Table 3.9: Predicted
Cumulative Hourly Average TSP Concentration in near the BCP, Lin Ma
Hang to Frontier
Closed Area and Ping Yeung to Wo Keng Shan (Tier 1 – Unmitigated)
________________________3-20 Table 3.10: Predicted Cumulative
Hourly Average TSP Concentration in Sha Tau Kok (Tier 1–
Unmitigated) ____3-21 Table 3.11: Predicted Cumulative Hourly
Average TSP Concentration in Po Kak Tsai (Tier 1–
Unmitigated)_____3-21 Table 3.12: Predicted Cumulative Hourly
Average TSP Concentration in Fanling (Tier 1 – Unmitigated)
________3-21 Table 3.13: Predicted Cumulative Hourly Average TSP
Concentration in near the BCP, Lin Ma Hang to Frontier
Closed Area and Ping Yeung to Wo Keng Shan (Tier 1 – Mitigated)
__________________________3-22 Table 3.14: Predicted Cumulative
Hourly Average TSP Concentration in Sha Tau Kok (Tier 1– Mitigated)
______3-22 Table 3.15: Predicted Cumulative Hourly Average TSP
Concentration in Po Kak Tsai (Tier 1– Mitigated) _______3-23 Table
3.16: Predicted Cumulative Hourly Average TSP Concentration in
Fanling (Tier 1 – Mitigated) __________3-23 Table 3.17: Predicted
Cumulative Hourly Average TSP Concentration at Selected ASRs (Tier
2 – Mitigated) ____3-23 Table 3.18: Predicted Cumulative Daily
Average TSP Concentration in near the BCP, Lin Ma Hang to Frontier
Closed
Area and Ping Yeung to Wo Keng Shan (Tier 1 – Unmitigated)
______________________________3-24 Table 3.19: Predicted Cumulative
Daily Average TSP Concentration in Sha Tau Kok (Tier 1 –
Unmitigated)_____3-25 Table 3.20: Predicted Cumulative Daily
Average TSP Concentration in Po Kak Tsai (Tier 1 – Unmitigated)
_____3-25 Table 3.21: Predicted Cumulative Daily Average TSP
Concentration in Fanling (Tier 1 – Unmitigated) _________3-25
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Table 3.22: Predicted Cumulative Daily Average TSP Concentration in
near the BCP, Lin Ma Hang to Frontier Closed
Area and Ping Yeung to Wo Keng Shan (Tier 1 – Mitigated)
________________________________3-25 Table 3.23: Predicted
Cumulative Daily Average TSP Concentration in Sha Tau Kok (Tier 1 –
Mitigated) _______3-26 Table 3.24: Predicted Cumulative Daily
Average TSP Concentration in Po Kak Tsai (Tier 1 – Mitigated)
_______3-26 Table 3.25: Predicted Cumulative Daily Average TSP
Concentration in Fanling (Tier 1 – Mitigated) ___________3-26 Table
3.26: Predicted Cumulative Daily Average TSP Concentration at
Selected ASRs (Tier 2 – Mitigated) _____3-27 Table 3.27: Predicted
Cumulative Annual Average TSP Concentration in near the BCP, Lin Ma
Hang to Frontier
Closed Area and Ping Yeung to Wo Keng Shan (Unmitigated)
______________________________3-27 Table 3.28: Predicted Cumulative
Annual Average TSP Concentration in Sha Tau Kok (Unmitigated)
_________3-28 Table 3.29: Predicted Cumulative Annual Average TSP
Concentration in Po Kak Tsai (Unmitigated) __________3-28 Table
3.30: Predicted Cumulative Annual Average TSP Concentration in
Fanling (Unmitigated) ______________3-28 Table 3.31: Predicted
Cumulative Annual Average TSP Concentration in near the BCP, Lin Ma
Hang to Frontier
Closed Area and Ping Yeung to Wo Keng Shan
(Mitigated)_________________________________3-29 Table 3.32:
Predicted Cumulative Annual Average TSP Concentration in Sha Tau
Kok (Mitigated)____________3-29 Table 3.33: Predicted Cumulative
Annual Average TSP Concentration in Po Kak Tsai (Mitigated)
____________3-30 Table 3.34: Predicted Cumulative Annual Average
TSP Concentration in Fanling (Mitigated) ________________3-30 Table
3.35: Predicted Cumulative Hourly and Daily NO2 and Daily RSP
concentrations for Stability Class D ____3-30 Table 3.36: Predicted
Cumulative Hourly and Daily NO2 and Daily RSP concentrations for
Stability Class F_____3-32 Table 3.37: Predicted Cumulative Annual
NO2 and RSP
concentrations_________________________________3-34
Table 4.1: Noise Standards for Daytime Construction Activities
_______________________________________4-2 Table 4.2: Ground-borne
Noise Criteria (Leq 30min,
dB(A))_____________________________________________4-3 Table 4.3:
Relevant Noise Standards for Planning Purposes
_________________________________________4-4 Table 4.4: Acceptable
Noise Level for Fixed Plant Noise
____________________________________________4-4 Table 4.5: Area
Sensitivity Rating
______________________________________________________________4-5
Table 4.6: Representative Noise Sensitive Receivers
_______________________________________________4-7 Table 4.7
Measured Noise Levels
_____________________________________________________________4-8
Table 4.8: Unmitigated Construction Airborne Noise Impact near BCP,
Leq (30mins) dB(A) ____________________4-9 Table 4.9 Unmitigated
Construction Airborne Noise Impact from Lin Ma Hang to Wo Keng
Shan, Leq (30mins) dB(A)
_______________________________________________________________________________4-10
Table 4.10 Unmitigated Construction Airborne Noise Impact at Wo
Keng Shan, Leq (30mins) dB(A)_____________4-10 Table 4.11
Unmitigated Construction Airborne Noise Impact near Sha Tau Kok
Road, Leq (30mins) dB(A) ________4-11 Table 4.12 Unmitigated
Construction Airborne Noise Impact near Po Kak Tsai, Leq (30mins)
dB(A) _____________4-11 Table 4.13 Unmitigated Construction
Airborne Noise Impact near Fanling, Leq (30mins) dB(A)
_________________4-11 Table 4.14 Quieter PME Recommended for
Adoption during Construction Phase_________________________4-12
Table 4.15 Noise Mitigation Measures for Certain PME during
Construction Phase _______________________4-13 Table 4.16:
Mitigated Construction Airborne Noise Impact near BCP, Leq (30mins)
dB(A)______________________4-14 Table 4.17 Mitigated Construction
Airborne Noise Impact from Lin Ma Hang to Wo Keng Shan, Leq
(30mins) dB(A)_4-14 Table 4.18 Mitigated Construction Airborne
Noise Impact at Wo Keng Shan, Leq (30mins) dB(A)
_______________4-15 Table 4.19 Mitigated Construction Airborne
Noise Impact near Sha Tau Kok Road, Leq (30mins) dB(A)
__________4-15 Table 4.20 Mitigated Construction Airborne Noise
Impact near Po Kak Tsai, Leq (30mins) dB(A)________________4-16
Table 4.21 Mitigated Construction Airborne Noise Impact near
Fanling, Leq (30mins) dB(A) ___________________4-16 Table 4.22:
Cumulative Mitigated Construction Airborne Noise Impact near BCP,
Leq (30mins) dB(A) ____________4-17 Table 4.23 Cumulative Mitigated
Construction Airborne Noise Impact at Lin Ma Hang to Frontier
Closed Area
Boundary, Leq (30mins) dB(A)
__________________________________________________________4-17
Table 4.24: Reference Vibration Level based on Measurements
______________________________________4-19 Table 4.25: Source
Vibration Velocity of Octave Band Frequency for Hydraulic Breaker
____________________4-19 Table 4.26: Wave Propagation Properties of
Soil __________________________________________________4-19 Table
4.27: Adjustment Factor for Building Coupling Loss (BCF)
______________________________________4-20 Table 4.28: Adjustment
Factor for Building Structure Attenuation
(BSA)_________________________________4-20
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Table 4.29: Building Structure Attenuation (BSA)
__________________________________________________4-20 Table 4.30:
Building Structure Resonance (BSR)
__________________________________________________4-21 Table 4.31:
Room Correction Factors
___________________________________________________________4-21
Table 4.32 Unmitigated Construction Ground-borne Noise
__________________________________________4-22
Table 4.33 Comparison between With and Without Project in Year 2018
from Lin Ma Hang to North Tunnel (Existing
Receivers)_______________________________________________________________________4-23
Table 4.34 Comparison between With and Without Project in Year 2018
from Lin Ma Hang to North Tunnel (Planned
Receivers)_______________________________________________________________________4-24
Table 4.35 Comparison between With and Without Project in Year 2018
near Sha Tau Kok Road Section (Existing
Receivers)_______________________________________________________________________4-25
Table 4.36 Comparison between With and Without Project in Year 2018
near Fanling Highway (Existing Receivers)
_______________________________________________________________________________4-25
Table 4.37 Unmitigated Road Traffic Noise Impact in Year 2033 near
Lin Ma Hang to Wo Keng Shan (Existing Uses)
_______________________________________________________________________________4-26
Table 4.38 Unmitigated Road Traffic Noise Impact in Year 2033 near
Lin Ma Hang to Wo Keng Shan (Planned Uses)
_______________________________________________________________________________4-27
Table 4.39 Unmitigated Road Traffic Noise Impact in Year 2033 near
Sha Tau Kok Road Section (Existing Uses)4-27
Table 4.40 Unmitigated Road Traffic Noise Impact in Year 2033 near
Fanling Highway (Existing Uses)________4-27
Table 4.41 Summary of Exceedance of Road Traffic Noise
Criteria____________________________________4-28
Table 4.42 Proposed Location of Noise Barrier for Existing Uses
_____________________________________4-29
Table 4.43: Mitigated Road Traffic Noise Levels of Existing
Uses______________________________________4-30
Table 4.44 Noise Criteria of Fixed Plant Noise
____________________________________________________4-31
Table 4.45: Summary of Fixed Plant Noise Sources
________________________________________________4-33
Table 4.46: Maximum SWLs of the Fixed
Plant____________________________________________________4-33
Table 5.1 Water Quality Objective for the Deep Bay WCZ
___________________________________________5-1 Table 5.2 Marine
Water Quality in Deep Bay Water Control Zone in
2008_______________________________5-5 Table 5.3: Summary of River
Water Quality Monitoring Data at Several Sections of Shenzhen River
(2006-2007) 5-6 Table 5.4: Summary of River Water Quality
Monitoring Data at River Ganges and River Indus (2008) _________5-7
Table 5.5: Summary of Results of Water Quality Sampling at River
Indus, River Ganges and Kong Yiu Channel _5-9
Table 6.1: Population of the proposed LT/HYW BCP on Hong Kong Side
_______________________________6-2 Table 6.2: Population of the
Proposed Resite of Chuk Yuen Village
____________________________________6-2 Table 6.3: Staffing of
proposed Administration
Building______________________________________________6-3 Table
6.4: Design Unit Load Factors
____________________________________________________________6-4
Table 6.5: Peaking Factor for Sewers
___________________________________________________________6-5
Table 6.6: Population and Estimated Sewage Flow from Existing Chuk
Yuen Village_______________________6-5 Table 6.7: Pollutant Loading
of Existing Chuk Yuen Villages
_________________________________________6-6 Table 6.8: Performance
of Septic Tank
__________________________________________________________6-6 Table
6.9: Pollutant Loading Performance of Septic
Tank____________________________________________6-6 Table 6.10:
Estimated Sewage Flow from Proposed Chuk Yuen Village Resite
____________________________6-7 Table 6.11: Estimated Sewage Flow
from the proposed LT/HYW BCP on Hong Kong
Side___________________6-7 Table 6.12: Estimated Sewage Flow from
the proposed LT/HYW BCP on Hong Kong Side (with 15% of
passengers
using toilet)
_______________________________________________________________________6-8
Table 6.13: Pollutant Loads arising from the Raw Sewage of the
Proposed Development ____________________6-8 Table 6.14: Comparison
of MBR Treatment Performance with Discharge Standards
_______________________6-10 Table 6.15: Pollutant Loadings in
Treated Effluent (with 10% of passengers using toilets)
___________________6-11 Table 6.16: Pollutant Loadings in Treated
Effluent (with 15% of passengers using
toilet)____________________6-11 Table 6.17: Comparison of Pollutant
Loadings ____________________________________________________6-11
Table 6.18: Comparison of Sewage Flow and Pollutant Loadings to be
Discharged after Effluent Reuse (with 10% of
Passengers Using Toilets)
__________________________________________________________6-12
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Table 6.19: Standards for Reuse of MBR Treated Effluent
___________________________________________6-12 Table 7.1: Summary
of Waste Handling Procedures and Routes during Construction
Phase________________7-12
Table 8.1 Historical land use in the area of Chuk Yuen Village
_______________________________________8-2 Table 8.2 Historical
land use along connecting road between Lin Ma Hang and Frontier
Closed Area and between
Ping Yeung and Wo Keng Shan
_______________________________________________________8-2 Table
8.3 Historical land use along connecting road in Sha Tau Kok Road
Section________________________8-3 Table 8.4 Historical land use of
the location of proposed ventilation building at Po Kai Tsai
_________________8-3 Table 8.5 Historical land use along the
proposed BCP connecting road in Fanling ________________________8-4
Table 8.6 Potential Contamination for each section of Study
Area_____________________________________8-6
Table 9.1: Schedule of Fauna Surveys
_________________________________________________________9-11 Table
9.2: Habitats Present in Assessment
Area__________________________________________________9-15 Table
9.3: Habitats Present in Works Area
______________________________________________________9-15 Table
9.4: Mammal Species recorded from BCP Area
_____________________________________________9-24 Table 9.5: Mammal
Species recorded from Lin Ma Hang Road to Frontier Closed Area
Boundary ___________9-25 Table 9.6: Mammal Species recorded from
Ping Yeung to Wo Keng Shan______________________________9-27 Table
9.7: Mammal Species recorded from the North Tunnel Aboveground
Area_________________________9-28 Table 9.8: Mammal Species
recorded from Sha Tau Kok Road (Shan Tong, Man Uk Pin and Loi Tung
Areas)__9-28 Table 9.9: Mammal Species recorded in Pat Sin Leng
Country Park from AFCD Survey
(1, 2, 3, 4) _____________9-29
Table 9.10: Mammal Species recorded from Fanling (Wo Hop Shek and
Yuen Leng Areas) _________________9-31 Table 9.11: Bird Species
recorded from BCP Area
_________________________________________________9-36 Table 9.12:
Bird Species recorded from Lin Ma Hang Road to Frontier Closed Area
Boundary _______________9-38 Table 9.13: Bird Species recorded from
Ping Yeung to Wo Keng Shan _________________________________9-42
Table 9.14: Bird Species recorded from the North Tunnel Aboveground
Area ____________________________9-46 Table 9.15: Bird Species
recorded from Sha Tau Kok Road (Shan Tong, Man Uk Pin and Loi Tung
Areas) _____9-47 Table 9.16: Bird Species recorded from Tan Chuk
Hang and Lau Shui Heung Area _______________________9-50 Table
9.17: Bird Species Recorded from Fanling (Wo Hop Shek and Yuen Leng
Areas) ____________________9-53 Table 9.18: Amphibian and Reptile
Species recorded from BCP Area
__________________________________9-57 Table 9.19: Amphibian and
Reptile Species recorded from Lin Ma Hang to Frontier Closed Area
Boundary _____9-58 Table 9.20: Amphibian and Reptile Species
recorded from Ping Yeung to Wo Keng Shan___________________9-59
Table 9.21: Amphibian and Reptile Species recorded from Sha Tau Kok
Raod (Shan Tong, Man Uk Pin and Loi Tung
Areas)
__________________________________________________________________________9-61
Table 9.22: Amphibian and Reptile Species recorded from Tan Chuk
Hang and Lau Shui Heung Area_________9-62 Table 9.23: Amphibian and
Reptile Species Recorded from Fanling (Wo Hop Shek and Yuen Leng
Areas) _____9-64 Table 9.24: Butterfly Species recorded from BCP
Area______________________________________________9-67 Table 9.25:
Butterfly Species recorded from Lin Ma Hang to Frontier Closed Area
Boundary ________________9-68 Table 9.26: Butterfly Species
recorded from Ping Yeung to Wo Keng Shan
______________________________9-71 Table 9.27: Butterfly Species
recorded from the North Tunnel Aboveground Area
_________________________9-75 Table 9.28: Butterfly Species
recorded from Sha Tau Kok Road (Shan Tong, Man Uk Pin and Loi Tung
Areas) __9-76 Table 9.29: Butterfly Species recorded from Tan Chuk
Hang and Lau Shui Heung Areas ___________________9-79 Table 9.30:
Butterfly Species recorded from Fanling (Wo Hop Shek and Yuen Leng
Areas) _________________9-82 Table 9.31: Dragonfly Species recorded
from BCP Area_____________________________________________9-85
Table 9.32: Dragonfly Species recorded from Lin Ma Hang Road to
Frontier Closed Area Boundary___________9-85 Table 9.33: Dragonfly
Species recorded from Ping Yeung to Wo Keng Shan
_____________________________9-87 Table 9.34: Dragonfly Species
recorded from the North Tunnel Aboveground Area
________________________9-89 Table 9.35: Dragonfly Species recorded
from Sha Tau Kok Road (Shan Tong, Man Uk Pin and Loi Tung
Areas)_9-89 Table 9.36: Dragonfly Species recorded from Tan Shan
River and Lau Shui Heung Reservoir Area ___________9-92 Table 9.37:
Dragonfly Species recorded from Fanling (Wo Hop Shek and Yuen Leng
Areas) ________________9-94 Table 9.38: Freshwater Fish and
Crustacean Species recorded from BCP Area
__________________________9-97 Table 9.39: Freshwater Fish and
Crustacean Species recorded from the channels at Frontier Closed
Area _____9-98
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Table 9.40: Freshwater Fish and Crustacean Species recorded from
branches of River Ganges at Wo Keng Shan
Area
___________________________________________________________________________9-99
Table 9.41: Freshwater Fish and Crustacean Species recorded from
streams and channels at Man Uk Pin and Loi
Tung Area
______________________________________________________________________9-100
Table 9.42: Freshwater Fish and Crustacean Species recorded from
Tan Shan River, Kwan Tei River and Lau Shui
Heung
Reservoir_________________________________________________________________9-101
Table 9.43: Freshwater Fish and Crustacean Species recorded from
Fanling Area _______________________9-103 Table 9.44: Ecological
Evaluation of Woodland (1) – Fung Shui Wood
________________________________9-105 Table 9.45: Ecological
Evaluation of Woodland (2) – Secondary Woodland
_____________________________9-106 Table 9.46: Ecological
Evaluation of Woodland (3) – Secondary Woodland
_____________________________9-107 Table 9.47: Ecological
Evaluation of Woodland (4) – Secondary Woodland
_____________________________9-108 Table 9.48: Ecological
Evaluation of
Shrubland___________________________________________________9-109
Table 9.49: Ecological Evaluation of
Plantation___________________________________________________9-110
Table 9.50: Ecological Evaluation of Freshwater
Wetland___________________________________________9-111 Table 9.51:
Ecological Evaluation of Active Agricultural Land
________________________________________9-112 Table 9.52:
Ecological Evaluation of Abandoned Agricultural
Land____________________________________9-113 Table 9.53:
Ecological Evaluation of Hillside Grassland
____________________________________________9-114 Table 9.54:
Ecological Evaluation of
Pond_______________________________________________________9-114
Table 9.55: Ecological Evaluation of Drainage Channel
(1)__________________________________________9-115 Table 9.56:
Ecological Evaluation of Drainage Channel
(2)__________________________________________9-116 Table 9.57:
Ecological Evaluation of
Watercourse_________________________________________________9-117
Table 9.58: Ecological Evaluation of Open Field
__________________________________________________9-118 Table 9.59:
Ecological Evaluation of Developed Area
______________________________________________9-118 Table 9.60:
Ecological Evaluation of Floral Species of Conservation Interest
within Assessment Area ________9-119 Table 9.61: Mammal Species of
Conservation Interest identified within Assessment Area
__________________9-120 Table 9.62: Bird Species of Conservation
Interest identified within Assessment Area
_____________________9-122 Table 9.63: Amphibian and Reptile
Species of Conservation Interest identified within Assessment
Area_______9-126 Table 9.64: Butterfly Species of Conservation
Interest identified within Assessment Area __________________9-128
Table 9.65: Dragonfly Species of Conservation Interest identified
within Assessment Area _________________9-129 Table 9.66:
Freshwater Fauna Species of Conservation Interest identified within
Assessment Area ________9-132 Table 9.67: Habitat Loss in Works
Area_________________________________________________________9-135
Table 9.68: Potential Ecological Impact of Habitat Loss at Works
Area in Section 1 – BCP (1) ______________9-140 Table 9.69:
Potential Ecological Impact of Habitat Loss at Works Area in
Section 1 – BCP (2) ______________9-140 Table 9.70: Potential
Ecological Impact of Habitat Loss at Works Area in Sections 2 &
3 – Lin Ma Hang Road to
Frontier Closed Area Boundary and Ping Yeung to Wo Keng Shan (1)
_______________________9-141 Table 9.71: Potential Ecological
Impact of Habitat Loss at Works Area in Sections 2 & 3 – Lin Ma
Hang Road to
Frontier Closed Area Boundary and Ping Yeung to Wo Keng Shan (2)
_______________________9-142 Table 9.72: Potential Ecological
Impact of Habitat Loss at Works Area in Sections 2 & 3 – Lin Ma
Hang Road to
Frontier Closed Area Boundary and Ping Yeung to Wo Keng Shan (3)
_______________________9-142 Table 9.73: Potential Ecological
Impact of Habitat Loss at Works Area in Section 5 – Sha Tau Kok
Road (between
North and South Tunnel) (1)
________________________________________________________9-143 Table
9.74: Potential Ecological Impact of Habitat Loss at Works Area in
Section 5 – Sha Tau Kok Road (between
North and South Tunnel) (2)
________________________________________________________9-144 Table
9.75: Potential Ecological Impact of Habitat Loss at Works Area in
Section 6_______________________9-145 Table 9.76: Potential
Ecological Impact of Habitat Loss at Works Area in Section 7-
Fanling (1) _____________9-146 Table 9.77: Ecological Evaluation of
Works Area in Section 7- Fanling (2)
______________________________9-147 Table 9.78: Potential
Ecological Impact on Floral Species of Conservation interest
_______________________9-148 Table 9.79: Potential Ecological
Impact on Fauna Species of Conservation interest
______________________9-158 Table 9.80: Potential Ecological Impact
of Habitat
Fragmentation_____________________________________9-161
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Table 9.81: Potential Ecological Impact of Loss of Ecologically
Sensitive Wetland________________________9-164 Table 9.82:
Disturbance to Sites of Conservation
Interest___________________________________________9-167 Table
9.83: Potential Ecological Impact of Indirect Disturbance (Noise
and Visual) _______________________9-171 Table 9.84: Potential
Ecological Impact of Hydrological Disruption
____________________________________9-171 Table 9.85: Potential
Ecological Impact of Vibration
_______________________________________________9-172 Table 9.86:
Summary of Potential Ecological Impacts before and after adoption
of Mitigation Measures _______9-180
Table 11.1: Attributes of the BCP and the Associated Road Work
_____________________________________11-3 Table 11.2: Impact
Significance of Landscape or Visual Impact
_______________________________________11-7 Table 11.3: OZP No:
S/NE-TKL/14-Ping Che/Ta Kwu Ling
__________________________________________11-10 Table 11.4: OZP No:
S/NE-WKS/10-Wo Keng Shan
_______________________________________________11-11 Table 11.5:
OZP No: S/NE-MUP/11-Man Uk
Pin__________________________________________________11-11 Table
11.6: OZP No: S/NE-HT/5-Hok
Tau_______________________________________________________11-12
Table 11.7: OZP No: S/NE-LYT/14-Lung Yeuk Tau and Kwan Tei South
_______________________________11-12 Table 11.8: OZP No:
S/NE-KLH/11-Kau Lung Hang
_______________________________________________11-13 Table 11.9:
Draft DPA/NE-TKLN/1
____________________________________________________________11-14
Table 11.10: Factors Affecting Sensitivity of VSRs and Overall
Sensitivity Rating. _________________________11-50 Table 11.11:
Impact on Landscape Resources and Landscape Character Areas
affected by the Project in the Section
A, Zone 1
______________________________________________________________________11-55
Table 11.12: Impact on Landscape Resources and Landscape Character
Areas affected by the Project in the Section
A, Zone 2
______________________________________________________________________11-61
Table 11.13: Impact on Landscape Resources and Landscape Character
Areas affected by the Project in the Section
A, Zone 3
______________________________________________________________________11-66
Table 11.14: Impact on Landscape Resources and Landscape Character
Areas affected by the Project in the Section
B
_____________________________________________________________________________11-72
Table 11.15: Impact on Landscape Resources and Landscape Character
Areas affected by the Project in the Section
Proposed Treatment
______________________________________________________________11-79
Table 11.16: Proposed Construction and Operation Phase Mitigation
Measures (CM & OM) for Landscape and Visual
Impacts
________________________________________________________________________11-84
Table 11.17: Significance of Landscape Impacts in Construction and
Operation Phases in Section A, Zone 1 (All
impacts are adverse unless stated otherwise)
__________________________________________11-96 Table 11.20:
Significance of Landscape Impacts in Construction and Operation
Phases in Section B (All impacts are
adverse unless stated otherwise)
____________________________________________________11-98 Table
11.21: Significance of Landscape Impacts in Construction and
Operation Phases in Section C (All impacts are
adverse unless stated otherwise)
___________________________________________________11-101 Table
11.22: Factors Affecting and Overall Magnitude of Change
Experienced by Each VSR During Construction and
Operation Phases
_______________________________________________________________11-129
Table 11.23: Significance of Visual Impacts in Construction and
Operation Phases, both before and after Mitigation (All
impacts are adverse unless stated otherwise)
_________________________________________11-134 Table 11.24: A
subjective interpretation of the CIE’s Glare rating system.
______________________________11-163 Table 11.25: Limiting GR value
for lighting
installations_____________________________________________11-163
Table 11.26: Sensitivity of VSRs for Glare Assessment
____________________________________________11-165 Table 11.27:
Assumptions used in Glare Rating
Prediction__________________________________________11-166 Table
11.28: Predicted Glare Rating for VSRs near the BCP and Associated
Above Ground Structure________11-167
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Table 12.1: Definition of grading of historic
buildings________________________________________________12-2 Table
12.2: Brief Descriptions of the Proposed
Works_______________________________________________12-3 Table
12.3: Site Code Adopted for the Built Heritage Features
________________________________________12-5 Table 12.4: Geology of
the CHIA Study Area
_____________________________________________________12-8 Table
12.5: Summary of the Test Pits and Auger Holes Distribution
____________________________________12-9 Table 12.6: Test Pits and
Auger Holes Completed for the Archaeological Survey
________________________12-10 Table 12.7: Grading System for Levels
of Archaeological Potential
___________________________________12-10 Table 12.8: Summary of
Findings for TP0202
____________________________________________________12-11 Table
12.9: Summary of Findings for TP0201
____________________________________________________12-12 Table
12.10: Summary of Findings for AH0101, AH0201 and AH0208
__________________________________12-12 Table 12.11: Summary of
General Findings for the Layer / Stratum with Grayish Colour in
TP0303, AH0305, AH0307,
AH0308, AH0309, AH0313, AH0314, AH0315 and AH0316
_______________________________12-14 Table 12.12: Summary of
stratification of
TP0505__________________________________________________12-15 Table
12.13: List of Finds Unearthed in TP0505
___________________________________________________12-16 Table
12.14: Built Heritage Identified within the BCP Section
_________________________________________12-20 Table 12.15: Built
Heritage Identified within the Section between Lin Ma Hang and
Frontier Closed Area Boundary
______________________________________________________________________________12-22
Table 12.16: Built Heritage Identified within the Section between
Ping Yeung and Wo Keng Shan ____________12-24 Table 12.17: Built
Heritage Identified within the Cheung Shan Tunnel Section (North
Tunnel) ________________12-27 Table 12.18: Built Heritage
Identified within the Sha Tau Kok Road
Section______________________________12-27 Table 12.19: Built
Heritage Identified within the Lau Shui Heung Tunnel Section (South
Tunnel)______________12-29 Table 12.20: Built Heritage Identified
within the Fanling Section
_______________________________________12-31 Table 12.21: Impact
Assessment within the BCP Section
____________________________________________12-34 Table 12.22:
Impact Assessment within the Section between Lin Ma Hang and
Frontier Closed Area Boundary__12-35 Table 12.23: Impact Assessment
within the Section between Ping Yeung and Wo Keng Shan
_______________12-37 Table 12.24: Impact Assessment within the
Cheung Shan Tunnel Section (North Tunnel)___________________12-39
Table 12.25: Impact Assessment within the Sha Tau Kok Road Section
(Between North and South Tunnel) ____12-39 Table 12.26: Impact
Assessment within the Lau Shui Heung Tunnel Section (South
Tunnel)_________________12-40 Table 12.27: Impact Assessment within
the Fanling
Section__________________________________________12-42
Table 12.29: Areas Required Further Archaeological Survey
_________________________________________12-45
Figures
Figure 1.1a Project Layout Plan (Sheet 1 of 11)
Figure 1.1b Project Layout Plan (Sheet 2 of 11)
Figure 1.1c Project Layout Plan (Sheet 3 of 11)
Figure 1.1d Project Layout Plan (Sheet 4 of 11)
Figure 1.1e Project Layout Plan (Sheet 5 of 11)
Figure 1.1f Project Layout Plan (Sheet 6 of 11)
Figure 1.1g Project Layout Plan (Sheet 7 of 11)
Figure 1.1h Project Layout Plan (Sheet 8 of 11)
Figure 1.1i Project Layout Plan (Sheet 9 of 11)
Figure 1.1j Project Layout Plan (Sheet 10 of 11)
Figure 1.1k Project Layout Plan (Sheet 11 of 11)
Figure 2.1 Project Layout (Main Sections)
Figure 2.1a Project Area – Description of Works (Sheet 1 of
11)
Figure 2.1b Project Area – Description of Works (Sheet 2 of
11)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 2.1c Project Area – Description of Works (Sheet 3 of
11)
Figure 2.1d Project Area – Description of Works (Sheet 4 of
11)
Figure 2.1e Project Area – Description of Works (Sheet 5 of
11)
Figure 2.1f Project Area – Description of Works (Sheet 6 of
11)
Figure 2.1g Project Area – Description of Works (Sheet 7 of
11)
Figure 2.1h Project Area – Description of Works (Sheet 8 of
11)
Figure 2.1i Project Area – Description of Works (Sheet 9 of
11)
Figure 2.1j Project Area – Description of Works (Sheet 10 of
11)
Figure 2.1k Project Area – Description of Works (Sheet 11 of
11)
Figure 2.2 Finalised BCP Layout
Figure 2.3 Refined Alignment Options
Figure 2.4 Indicative Locations of Potential Concurrent
Projects
Figure 3.1.1 Location of Air Sensitive Receivers (Sheet 1 of
11)
Figure 3.1.2 Location of Air Sensitive Receivers (Sheet 2 of
11)
Figure 3.1.3 Location of Air Sensitive Receivers (Sheet 3 of
11)
Figure 3.1.4 Location of Air Sensitive Receivers (Sheet 4 of
11)
Figure 3.1.5 Location of Air Sensitive Receivers (Sheet 5 of
11)
Figure 3.1.6 Location of Air Sensitive Receivers (Sheet 6 of
11)
Figure 3.1.7 Location of Air Sensitive Receivers (Sheet 7 of
11)
Figure 3.1.8 Location of Air Sensitive Receivers (Sheet 8 of
11)
Figure 3.1.9 Location of Air Sensitive Receivers (Sheet 9 of
11)
Figure 3.1.10 Location of Air Sensitive Receivers (Sheet 10 of
11)
Figure 3.1.11 Location of Air Sensitive Receivers (Sheet 11 of
11)
Figure 3.2.1 Location of Potential Dust Emission Source (Sheet 1 of
11)
Figure 3.2.2 Location of Potential Dust Emission Source (Sheet 2 of
11)
Figure 3.2.3 Location of Potential Dust Emission Source (Sheet 3 of
11)
Figure 3.2.4 Location of Potential Dust Emission Source (Sheet 4 of
11)
Figure 3.2.5 Location of Potential Dust Emission Source (Sheet 5 of
11)
Figure 3.2.6 Location of Potential Dust Emission Source (Sheet 6 of
11)
Figure 3.2.7 Location of Potential Dust Emission Source (Sheet 7 of
11)
Figure 3.2.8 Location of Potential Dust Emission Source (Sheet 8 of
11)
Figure 3.2.9 Location of Potential Dust Emission Source (Sheet 9 of
11)
Figure 3.2.10 Location of Potential Dust Emission Source (Sheet 10
of 11)
Figure 3.2.11 Location of Potential Dust Emission Source (Sheet 11
of 11)
Figure 3.3.1 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For TYHP & TYH (Sheet 1 of 2)
Figure 3.3.2 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For TYHP & TYH (Sheet 2 of 2)
Figure 3.3.3 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For KL1, TKL1 & TKL2 (Sheet 1 of
2)
Figure 3.3.4 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For KL1, TKL1 & TKL2 (Sheet 2 of
2)
Figure 3.3.5 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For KTW4 & KTW2 (Sheet 1 of 2)
Figure 3.3.6 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For KTW4 & KTW2 (Sheet 2 of 2)
Figure 3.3.7 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For V1 and V2 (Sheet 1 of 2)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.3.8 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For V1 and V2 (Sheet 2 of 2)
Figure 3.3.9 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For WKS7
Figure 3.3.10 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For TTW1 & TTW3 (Sheet 1 of 2)
Figure 3.3.11 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For TTW1 & TTW3 (Sheet 2 of 2)
Figure 3.3.12 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For TH1 (Sheet 1 of 2)
Figure 3.3.13 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For TH1 (Sheet 2 of 2)
Figure 3.3.14 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For NWP1, NWP2 & NWP3 (Sheet 1 of
2)
Figure 3.3.15 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For NWP1, NWP2 & NWP3 (Sheet 2 of
2)
Figure 3.3.16 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For KT1, KT2, KT3 & KLH1 (Sheet 1 of
2)
Figure 3.3.17 Location of 30% Active Areas of Dust Sources Assumed
for Tier 2 Assessment – For KT1, KT2, KT3 & KLH1 (Sheet 2 of
2)
Figure 3.4.1a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
1 of 4)
Figure 3.4.1b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 1
of 4)
Figure 3.4.2a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
2 of 4)
Figure 3.4.2b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 2
of 4)
Figure 3.4.3a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
3 of 4)
Figure 3.4.3b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 3
of 4)
Figure 3.4.4a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
4 of 4)
Figure 3.4.4b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 4
of 4)
Figure 3.4.5a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Loi Tung (Sheet 1 of
2)
Figure 3.4.5b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Loi Tung (Sheet 1 of
2)
Figure 3.4.6a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Loi Tung (Sheet 2 of
2)
Figure 3.4.6b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Loi Tung (Sheet 2 of
2)
Figure 3.4.7a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Po Kak Tsai (Sheet 1 of
1)
Figure 3.4.7b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Po Kak Tsai (Sheet 1 of
1)
Figure 3.4.8a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Fanling (Sheet 1 of
2)
Figure 3.4.8a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Fanling (Sheet 1 of
2)
Figure 3.4.9a Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Fanling (Sheet 2 of
2)
Figure 3.4.9b Cumulative Result – Contour of Tier 1 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Fanling (Sheet 2 of
2)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.5.1 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TYHP & TYH (Sheet 1
of 2)
Figure 3.5.2 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TYHP & TYH (Sheet 2
of 2)
Figure 3.5.3 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KL1, TKL1 & TKL2
(Sheet 1 of 2)
Figure 3.5.4 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KL1, TKL1 & TKL2
(Sheet 2 of 2)
Figure 3.5.5 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KTW2 & KTW4 (Sheet 1
of 2)
Figure 3.5.6 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KTW2 & KTW4 (Sheet 2
of 2)
Figure 3.5.7 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for V1 and V2 (Sheet 1 of
2)
Figure 3.5.8 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for V1 and V2 (Sheet 2 of
2)
Figure 3.5.9 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for WKS7 (Sheet 1 of 1)
Figure 3.5.10 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TTW1 & TTW3 (Sheet 1
of 2)
Figure 3.5.11 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TTW1 & TTW3 (Sheet 2
of 2)
Figure 3.5.12 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TH1 (Sheet 1 of 2)
Figure 3.5.13 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TH1 (Sheet 2 of 2)
Figure 3.5.14 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for NWP1, NWP2 & NWP3
(Sheet 1 of 2)
Figure 3.5.15 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for NWP1, NWP2, NWP3 &
KT2 (Sheet 2 of 2)
Figure 3.5.16 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KT1, KT2, KT3 & KLH1
(Sheet 1 of 2)
Figure 3.5.17 Cumulative Result – Contour of Tier 2 Hourly TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KT1, KT2, KT3 & KLH1
(Sheet 2 of 2)
Figure 3.6.1a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
1 of 4)
Figure 3.6.1b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 1
of 4)
Figure 3.6.2a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
2 of 4)
Figure 3.6.2b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 2
of 4)
Figure 3.6.3a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
3 of 4)
Figure 3.6.3b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 3
of 4)
Figure 3.6.4a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Northern Section (Sheet
4 of 4)
Figure 3.6.4b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Northern Section (Sheet 4
of 4)
Figure 3.6.5a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Loi Tung (Sheet 1 of
2)
Figure 3.6.5b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Loi Tung (Sheet 1 of
2)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.6.6a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Loi Tung (Sheet 2 of
2)
Figure 3.6.6a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Loi Tung (Sheet 2 of
2)
Figure 3.6.7a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Po Kak Tsai (Sheet 1 of
1)
Figure 3.6.7b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Po Kak Tsai (Sheet 1 of
1)
Figure 3.6.8a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Fanling (Sheet 1 of
2)
Figure 3.6.8b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Fanling (Sheet 1 of
2)
Figure 3.6.9a Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Unmitigated) for Fanling (Sheet 2 of
2)
Figure 3.6.9b Cumulative Result – Contour of Tier 1 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for Fanling (Sheet 2 of
2)
Figure 3.7.1 Cumulative Result – Contour of Tier 2 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for V1 & V2 (Sheet 1 of
2)
Figure 3.7.2 Cumulative Result – Contour of Tier 2 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for V1 & V2 (Sheet 2 of
2)
Figure 3.7.3 Cumulative Result – Contour of Tier 2 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TH1 (Sheet 1 of 2)
Figure 3.7.4 Cumulative Result – Contour of Tier 2 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for TH1 (Sheet 2 of 2)
Figure 3.7.5 Cumulative Result – Contour of Tier 2 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KLH1 (Sheet 1 of 2)
Figure 3.7.6 Cumulative Result – Contour of Tier 2 Daily TSP
Concentration (µg/m 3 ) at 1.5m Above Ground
during Construction Phase (Mitigated) for KLH 1 (Sheet 2 of
2)
Figure 3.8.1a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Northern Section (Sheet 1 of
4)
Figure 3.8.1b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Northern Section (Sheet 1 of
4)
Figure 3.8.2a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Northern Section (Sheet 2 of
4)
Figure 3.8.2b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Northern Section (Sheet 2 of
4)
Figure 3.8.3a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Northern Section (Sheet 3 of
4)
Figure 3.8.3b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Northern Section (Sheet 3 of
4)
Figure 3.8.4a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Northern Section (Sheet 4 of
4)
Figure 3.8.4b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Northern Section (Sheet 4 of
4)
Figure 3.8.5a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Loi Tung (Sheet 1 of 2)
Figure 3.8.5b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Loi Tung (Sheet 1 of 2)
Figure 3.8.6a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Loi Tung (Sheet 2 of 2)
Figure 3.8.6b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Loi Tung (Sheet 2 of 2)
Figure 3.8.7a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Po Kak Tsai (Sheet 1 of
1)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.8.7b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Po Kak Tsai (Sheet 1 of 1)
Figure 3.8.8a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Fanling (Sheet 1 of 2)
Figure 3.8.8b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Fanling (Sheet 1 of 2)
Figure 3.8.9a Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Unmitigated) for Fanling (Sheet 2 of 2)
Figure 3.8.9b Cumulative Result – Contour of Annual TSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Construction Phase (Mitigated) for Fanling (Sheet 2 of 2)
Figure 3.9.1a Classification of Road Types (BCP Lower Level) (Sheet
1 of 12)
Figure 3.9.1b Classification of Road Types (BCP Upper Deck Level)
(Sheet 2 of 12)
Figure 3.9.2 Classification of Road Types (Sheet 3 of 12)
Figure 3.9.3 Classification of Road Types (Sheet 4 of 12)
Figure 3.9.4 Classification of Road Types (Sheet 5 of 12)
Figure 3.9.5 Classification of Road Types (Sheet 6 of 12)
Figure 3.9.6 Classification of Road Types (Sheet 7 of 12)
Figure 3.9.7 Classification of Road Types (Sheet 8 of 12)
Figure 3.9.8 Classification of Road Types (Sheet 9 of 12)
Figure 3.9.9 Classification of Road Types (Sheet 10 of 12)
Figure 3.9.10 Classification of Road Types (Sheet 11 of 12)
Figure 3.9.11 Classification of Road Types (Sheet 12 of 12)
Figure 3.10.1 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 1
of 4)
Figure 3.10.2 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 2
of 4)
Figure 3.10.3 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 3
of 4)
Figure 3.10.4 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 4
of 4)
Figure 3.10.5 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class D) (Sheet 1 of
2)
Figure 3.10.6 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class D) (Sheet 2 of
2)
Figure 3.10.7 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Stability Class D) (Sheet 1 of
1)
Figure 3.10.8 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class D) (Sheet 1 of
2)
Figure 3.10.9 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class D) (Sheet 2 of
2)
Figure 3.11.1 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 1
of 4)
Figure 3.11.2 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 2
of 4)
Figure 3.11.3 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 3
of 4)
Figure 3.11.4 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 4
of 4)
Figure 3.11.5 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class D) (Sheet 1 of
2)
Figure 3.11.6 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class D) (Sheet 2 of
2)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.11.7 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Stability Class D) (Sheet 1 of
1)
Figure 3.11.8 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class D) (Sheet 1 of
2)
Figure 3.11.9 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class D) (Sheet 2 of
2)
Figure 3.12.1 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 1
of 4)
Figure 3.12.2 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 2
of 4)
Figure 3.12.3 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 3
of 4)
Figure 3.12.4 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class D) (Sheet 4
of 4)
Figure 3.12.5 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class D) (Sheet 1 of
2)
Figure 3.12.6 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class D) (Sheet 2 of
2)
Figure 3.12.7 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Stability Class D) (Sheet 1 of
1)
Figure 3.12.8 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class D) (Sheet 1 of
2)
Figure 3.12.9 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class D) (Sheet 2 of
2)
Figure 3.13.1 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 1
of 4)
Figure 3.13.2 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 2
of 4)
Figure 3.13.3 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 3
of 4)
Figure 3.13.4 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 4
of 4)
Figure 3.13.5 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class F) (Sheet 1 of
2)
Figure 3.13.6 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class F) (Sheet 2 of
2)
Figure 3.13.7 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Stability Class F) (Sheet 1 of
1)
Figure 3.13.8 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class F) (Sheet 1 of
2)
Figure 3.13.9 Cumulative Result – Contour of Hourly NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class F) (Sheet 2 of
2)
Figure 3.14.1 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 1
of 4)
Figure 3.14.2 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 2
of 4)
Figure 3.14.3 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 3
of 4)
Figure 3.14.4 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 4
of 4)
Figure 3.14.5 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class F) (Sheet 1 of
2)
Figure 3.14.6 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class F) (Sheet 2 of
2)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.14.7 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Stability Class F) (Sheet 1 of
1)
Figure 3.14.8 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class F) (Sheet 1 of
2)
Figure 3.14.9 Cumulative Result – Contour of Daily NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class F) (Sheet 2 of
2)
Figure 3.15.1 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 1
of 4)
Figure 3.15.2 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 2
of 4)
Figure 3.15.3 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 3
of 4)
Figure 3.15.4 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Stability Class F) (Sheet 4
of 4)
Figure 3.15.5 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class F) (Sheet 1 of
2)
Figure 3.15.6 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Stability Class F) (Sheet 2 of
2)
Figure 3.15.7 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Stability Class F) (Sheet 1 of
1)
Figure 3.15.8 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class F) (Sheet 1 of
2)
Figure 3.15.9 Cumulative Result – Contour of Daily RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Stability Class F) (Sheet 2 of
2)
Figure 3.16.1 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 1 of 4)
Figure 3.16.2 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 2 of 4)
Figure 3.16.3 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 3 of 4)
Figure 3.16.4 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 4 of 4)
Figure 3.16.5 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Sheet 1 of 2)
Figure 3.16.6 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Sheet 2 of 2)
Figure 3.16.7 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Sheet 1 of 1)
Figure 3.16.8 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Sheet 1 of 2)
Figure 3.16.9 Cumulative Result – Contour of Annual NO2
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Sheet 2 of 2)
Figure 3.17.1 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 1 of 4)
Figure 3.17.2 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 2 of 4)
Figure 3.17.3 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 3 of 4)
Figure 3.17.4 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Northern Section (Sheet 4 of 4)
Figure 3.17.5 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Sheet 1 of 2)
Figure 3.17.6 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Loi Tung (Sheet 2 of 2)
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 3.17.7 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Po Kak Tsai (Sheet 1 of 1)
Figure 3.17.8 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Sheet 1 of 2)
Figure 3.17.9 Cumulative Result – Contour of Annual RSP
Concentration (µg/m 3 ) at 1.5m Above Ground during
Operational Phase for Fanling (Sheet 2 of 2)
Figure 4.1.1 Assessment Area and Outline Zoning Plan
Figure 4.1.2 Recommended Development Plan (Sheet 1 of 2)
Figure 4.1.3 Recommended Development Plan (Sheet 2 of 2)
Figure 4.2 Representative Noise Sensitive Receivers (Sheet 1 of
11)
Figure 4.3 Representative Noise Sensitive Receivers (Sheet 2 of
11)
Figure 4.4 Representative Noise Sensitive Receivers (Sheet 3 of
11)
Figure 4.5 Representative Noise Sensitive Receivers (Sheet 4 of
11)
Figure 4.6 Representative Noise Sensitive Receivers (Sheet 5 of
11)
Figure 4.7 Representative Noise Sensitive Receivers (Sheet 6 of
11)
Figure 4.8 Representative Noise Sensitive Receivers (Sheet 7 of
11)
Figure 4.9 Representative Noise Sensitive Receivers (Sheet 8 of
11)
Figure 4.10 Representative Noise Sensitive Receivers (Sheet 9 of
11)
Figure 4.11 Representative Noise Sensitive Receivers (Sheet 10 of
11)
Figure 4.12 Representative Noise Sensitive Receivers (Sheet 11 of
11)
Figure 4.13 Photos of Noise Sensitive Receivers (Sheet 1 of
5)
Figure 4.14 Photos of Noise Sensitive Receivers (Sheet 2 of
5)
Figure 4.15 Photos of Noise Sensitive Receivers (Sheet 3 of
5)
Figure 4.16 Photos of Noise Sensitive Receivers (Sheet 4 of
5)
Figure 4.17 Photos of Noise Sensitive Receivers (Sheet 5 of
5)
Figure 4.18 Schematic Diagram of Movable Noise Barrier
Figure 4.19 Schematic Diagram of Full Noise Enclosure for PME
Figure 4.20.1 Proposed Location of Noise Barriers
Figure 4.20.2 Proposed Location of Noise Barriers
Figure 4.20.3 Proposed Location of Noise Barriers
Figure 4.20.4 Proposed Location of Noise Barriers
Figure 4.20.5 Cross-section Plans of Proposed Barriers
Figure 4.21.1 Fixed Plant of Boundary Control Point
Figure 4.21.2 Fixed Plant of North Tunnel North Portal
Figure 4.21.3 Fixed Plant of North Tunnel South Portal
Figure 4.21.4 Fixed Plant of Administration Building
Figure 4.21.5 Fixed Plant of South Tunnel North Portal
Figure 4.21.6 Fixed Plant of Mid-Ventilation Building
Figure 4.21.7 Fixed Plant of South Tunnel South Portal
Figure 5.1 Location of Water Control Zone
Figure 5.2 Locations of Key Water Sensitive Receivers
Figure 5.3 Location Plan of the Interception between Proposed
Connecting Road Alignment and Existing
Stream
Figure 6.1 General Layout Plan for BCP
Figure 6.2 General Layout for Demonstration Scheme of the Proposed
Sewage Treatment Process
Figure 6.3 Proposed Landscape Plan at Lower Deck Level
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 6.4 Proposed Landscape Plan at Upper Deck Level
Figure 7.1 Potential Locations of Piers
Figure 7.2 Locations of Possible Temporary Stockpiling Areas
Figure 9.1a Ecological Assessment Area
Figure 9.1b Sections of Works Area
Figure 9.2a Habitat Map (Key Plan)
Figure 9.2b Record Locations of Mammal Species Yellow-bellied
Weasel and Crab-eating Mongoose around Assessment Area
Figure 9.3 Habitat Map (Sheet 1 of 12)
Figure 9.4 Habitat Map (Sheet 2 of 12)
Figure 9.5 Habitat Map (Sheet 3 of 12)
Figure 9.6 Habitat Map (Sheet 4 of 12)
Figure 9.7 Habitat Map (Sheet 5 of 12)
Figure 9.8 Habitat Map (Sheet 6 of 12)
Figure 9.9 Habitat Map (Sheet 7 of 12)
Figure 9.10 Habitat Map (Sheet 8 of 12)
Figure 9.11 Habitat Map (Sheet 9 of 12)
Figure 9.12 Habitat Map (Sheet 10 of 12)
Figure 9.13 Habitat Map (Sheet 11 of 12)
Figure 9.14 Habitat Map (Sheet 12 of 12)
Figure 9.15 Estimated Extent of Habitat to be Affected (Sheet 1 of
11)
Figure 9.16 Estimated Extent of Habitat to be Affected (Sheet 2 of
11)
Figure 9.17 Estimated Extent of Habitat to be Affected (Sheet 3 of
11)
Figure 9.18 Estimated Extent of Habitat to be Affected (Sheet 4 of
11)
Figure 9.19 Estimated Extent of Habitat to be Affected (Sheet 5 of
11)
Figure 9.20 Estimated Extent of Habitat to be Affected (Sheet 6 of
11)
Figure 9.21 Estimated Extent of Habitat to be Affected (Sheet 7 of
11)
Figure 9.22 Estimated Extent of Habitat to be Affected (Sheet 8 of
11)
Figure 9.23 Estimated Extent of Habitat to be Affected (Sheet 9 of
11)
Figure 9.24 Estimated Extent of Habitat to be Affected (Sheet 10 of
11)
Figure 9.25 Estimated Extent of Habitat to be Affected (Sheet 11 of
11)
Figure 9.26 Potential Woodland Compensation Area
Figure 9.27 Indicative Boundary of the Potential Wetland
Compensation Area
Figure 9.28 Conceptual Plan and Typical Cross-section Views of the
Proposed Wetland Compensation Area
Figure 11.1.0 Project Profile – Key Plan
Figure 11.1.1 Project Profile – Section A, Zone 1
Figure 11.1.2 Project Profile – Section A, Zones 1 & 2
Figure 11.1.3 Project Profile – Section A, Zones 2 & 3
Figure 11.1.4 Project Profile – Section A, Zones 2 & 3
Figure 11.1.5 Project Profile – Section B
Figure 11.1.6 Project Profile – Section C
Figure 11.2 Not Used
Figure 11.3.1 Proposed Landscape at Lower Deck Level Plan for
BCP
Figure 11.3.2 Proposed Layout Plan at Upper Deck Level for
BCP
Figure 11.3.3 BCP - Elevation
Figure 11.3.4 Ventilation Building Type A – G/F to 3/F Layout
Plans
255228/ENL/ENL/61/D December 2010 P:\Hong Kong\BRI\255228
Liantang_HeungYuenWai BCP\Environmental\Deliverables\EIA
Report\4th\Vol 1 of 5_cover.doc
Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works Environmental Impact Assessment
Report
Figure 11.3.5 Ventilation Building Type A – 4/F Layout Plans &
Section
Figure 11.3.6 Ventilation Building Type B – G/F to 3/F Layout
Plans
Figure 11.3.7 Ventilation Building Type B – Section
Figure 11.3.8 Ventilation Building Type C – G/F to 3/F Layout
Plans
Figure 11.3.9 Ventilation Building Type C – Section
Figure 11.3.10 Administration Building – Ground Floor Layout
Plan
Figure 11.3.11 Administration Building – Section A-A, B-B
Figure 11.3.12 Viaduct – Typical Section
Figure 11.4.0 Existing Zonings within 500m Study Area – Key
Plan
Figure 11.4.1 Existing Zonings within 500m Study Area Section A,
Zones 1 & 2
Figure 11.4.2 Existing Zonings within 500m Study Area Section A,
Zones 1 & 2
Figure 11.4.3 Existing Zonings within 500m Study Area Section A,
Zones 2 & 3
Figure 11.4.4 Existing Zonings within 500m Study Area Section A,
Zones 2 & 3
Figure 11.4.5 Existing Zonings within 500m Study Area Section
B
Figure 11.4.6 Existing Zonings within 500m Study Area Section
C
Figure 11.5.1 Landscape Resources – Key Plan
Figure 11.5.2 Landscape Resources Section A, Zones 1 & 2
Figure 11.5.3 Landscape Resources Section A, Zones 1 & 2
Figure 11.5.4 Landscape Resources Section A, Zones 2 & 3
Figure 11.5.5 Landscape Resources Section A, Zones 2 & 3
Figure 11.5.6 Landscape Resources Section B
Figure 11.5.7 Landscape Resources Section C
Figure 11.5.8 Landscape Character Areas – Key Plan
Figure 11.5.9 Landscape Character Areas Section A, Zones 1 &
2
Figure 11.5.10 Landscape Character Areas Section A, Zones 1 &
2
Figure 11.5.11 Landscape Character Areas Section A, Zones 2 &
3
Figure 11.5.12 Landscape Character Areas Section A, Zones 2 &
3
Figure 11.5.13 Landscape Character Areas Section B
Figure 11.5.14 Landscape Character Areas Section C
Figure 11.5.15 Photorecord of Existing Landscape Resources /
Section A, Zone 1
Figure 11.5.16 Photorecord of Existing Landscape Resources /
Section A, Zone 2
Figure 11.5.17 Photorecord of Existing Landscape Resources /
Section A, Zone 3
Figure 11.5.18 Photorecord of Existing Landscape Resources /
Section B
Figure 11.5.19 Photorecord of Existing Landscape Resources /
Section C
Figure 11.5.20 Visual Envelope
Figure 11.5.21 Location Plan of Visual Sensitive Receivers - Key
Plan
Figure 11.5.22 Location Plan of Visual Sensitive Receivers (Sheet 1
of 4)
Figure 11.5.23 Location Plan of Visual Sensitive Receivers (Sheet 2
of 4)
Figure 11.5.24 Location Plan of Visual Sensitive Receivers (Sheet 3
of 4)
Figure 11.5.25 Location Plan of Visual Sensitive Receivers (Sheet 4
of 4)
Figure 11.5.26 Photorecord of Visual Sensitive Receivers (Sheet 1
of 2)
Figure 11.5.27 Photorecord of Visual Sensitive Receivers (Sheet 2
of 2)
Figure 11.6.0 Impact on Landscape Resources – Key Plan
Figure 11.6.1 Impact on Landscape Resources Section A, Zones
1
Figure 11.6.2 Impact on Landscape Resources Section A, Zones 1
& 2
Figure 11.6.3 Impact on Landscape Resources Section A, Zone 2
Figure 11.6.4 Impact on Landscape Resources Section A, Zone 3
Figure 11.6.5 Impact on Landscape Resources Section B
Figure 11.6.6 Impact on Landscape Resources Section C
255228/ENL/ENL/61/D December 2010 P:\Hong Ko