AFRICAN DEVELOPMENT BANK SUDAN RELOCATION AND OUTFITTING PROJECT

VOLUME 1 FINAL DESIGN DRAWING

FEB 2018

Page 2: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-GN-02

DRAWING LIST

DRAWING LIST

NO. SHEET NO. SHEET TITLE SIZE

1 9.51-AFDB-DD-GN-01 COVER SHEET NTS-A32 9.51-AFDB-DD-GN-02 DRAWING LIST NTS-A33 9.51-AFDB-DD-GN-03 SYMBOLS & ABBREVIATIONS NTS-A34 9.51-AFDB-DD-A-01 DEMOLITION PLAN 1:150-A35 9.51-AFDB-DD-A-02 ARCHITECTURAL FLOOR PLAN 1:150-A36 9.51-AFDB-DD-A-03 FURNITURE FLOOR PLAN 1:150-A37 9.51-AFDB-DD-A-04 WALL TYPES FLOOR PLAN 1:150-A38 9.51-AFDB-DD-A-05 FINISHING FLOOR PLAN 1:150-A39 9.51-AFDB-DD-A-06 REFLECTED CEILING PLAN 1:150-A310 9.51-AFDB-DD-A-07 DOOR FLOOR PLAN 1:150-A311 9.51-AFDB-DD-A-08 FINISHES & DOOR SCHEDULES NTS-A312 9.51-AFDB-DD-A-09 INTERNAL FINISHES DETAILS VAR-A3

Page 3: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

9.51-AFDB-DD-A-1 00

FLOOR NUMBER

ROOM NUMBER

General Notes

1- ALL DIMENSIONS ARE IN MILLIMETERS U.N.O.2- DIMENSIONS ARE ALWAYS TO BE CALCULATED AND NOT SCALED FROM THE DRAWINGS.3- ARCHITECTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT STRUCTURAL, MECHANICAL, ELECTRICAL AND OTHER DISCIPLINES DRAWINGS.4- ANY DISCREPANCIES (IF ANY) ARE TO BE BROUGHT TO THE ENGINEER'S ATTENTION FOR CLARIFICATION BEFORE STARTING THE WORK.5- UNLESS NOTED OTHERWISE ALL PLAN DIMENSIONS ARE TO UNFINISHED CONCRETE BLOCK OR CONCRETE WALLS.6- SIZES OF ELECTRO- MECHANICAL OPENINGS AND SHAFTS TO BE COORDINATED WITH STRUCTURAL AND ELECTRO- MECHANICAL DRAWINGS AGAINST ARCHITECTURAL DRAWINGS.7- ALL PARTITIONS EXTEND TO THE UNDERSIDE OF SLAB ABOVE U.N.O.

8- ALL WALLS NOT DIMENSIONED ARE ALIGNED WITH THE ADJACENT FACE OF COLUMN OR CONCRETE WALLS U.N.O. ON PLANS.

SYMBOLS REFERENCE

ROOM TAG

DEPARTMENT NAME

ROOM NAME

PHASE

TD TENDER DRAWINGDD DETAIL DESIGN

DISCIPLINE

A ARCHITECTURE

DRAWING NUMBERING SYSTEM

SEQUENCE NUMBERDRAWING GROUPDISCIPLINEPHASEPROJECT NAMEPROJECT NUMBER

DRAWING NUMBER

SD SHOP DRAWING

SC SCHEMATIC DESIGN

D01.A DOOR TAG

DOOR TAG

E ELECTRICALG MEDICAL GASESI INTERIOR DESIGNM MECHANICALMD MEDICAL PLANNINGS STRUCTURE

C CONSTRUCTION DRAWINGS

DISCIPLINES & PHASES SYMBOLS

OPHTHALMOLOGYL00.OPD.15

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-GN-03

SYMBOLS & ABBREVIATIONS

Page 4: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UP

IHGFEDCBA

1

2

3

4

5

6

7

-

---

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

BALCONY

BALCONY

VOID

BALC.

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

3.21

0.90

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-01

DEMOLITION PLAN

1 : 150DEMOLITION PLAN1

DEMOLITION SCHEDULE

DEMOLISH WALLS

UNINSTALL EXISTINGDOORS

D1

D2

Page 5: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UP

IHGFEDCBA

1

2

3

4

5

6

7

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

BALCONY

BALCONY

VOID

BALC.

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

4.34

5.02

2.20

3.00

2.99 5.01

2.02

3.46

5.323.

224.

003.

286.42 1.74 3.40

5.95

1.15 1.84 7.02

5.99

2.43

CONFERENCEROOM(10USERS)

L02.ADM.07

COUNTRYECONOMISTL02.ADM.06

COUNTRYPROGRAMOFFICER

L02.ADM.08SECRETARYL02.ADM.05

COUNTRYMANAGERL02.ADM.04

PUBLICINFORMATION

CENTERL02.ADM.10

ECONOMISTL02.ADM.11

SERVER ROOML02.ADM.13a

IT STOREL02.ADM.13b

IT OFFICEL02.ADM.13

SHAFT11

FINANCEOFFICE

L02.ADM.17

MISSIONSROOM

L02.ADM.18DINING ROOM

L02.ADM.19

G.STOREL02.ADM.26

OFFICEL02.ADM.25

ARCHIVESROOM

L02.ADM.20

JANITORROOM.

L02.ADM.23

DRIVERSOFFICE

L02.ADM.27

CONFERENCEROOM(40USERS)

L02.ADM.29

CORRIDORL02.ADM.32

PANTRYL02.ADM.33

TEL.RM.L02.ADM.34

3 m²

PANTRYL02.ADM.21

TOIL.L02.ADM.15A

ELEC

.RM

L02.

ADM

.03

WCL02.ADM.30

LOBBY 3L02.ADM.14

WAITING AREAL02.ADM.02a

CORRIDORL02.ADM.09

CORRIDOR AL02.ADM.28

LOBB

Y 1

L02.

ADM

.01

LOBB

Y 2

L02.

ADM

.12

W37

L TOILETL02.ADM.30a

WCL02.ADM.31

CO

RR

IDO

R B

L02.

ADM

.28A

WCL02.ADM.24

4 m²2 m²

WCL02.ADM.15

SHAFT50

SHAFT51

G. TOILETL02.ADM.29a

G. TOILETL02.ADM.29b

WCL02.ADM.22

4 m² 2 m²

6.52

6.44

6.46

3.97

5.30

10.2

7

9.01

3.80 3.80 1.54

7.99

7.99

6.01

3.21

10.00 13.00

5.00

6.00

1.90 2.50

5.00

-

---

6.27

6.41 4.76 4.78 6.28 6.30

5.105.20

3.23

0.90 3.97

5.10

5.67

4.58

1.81 1.07

1.082.28

4.46

4.18

6.27

3.37

4.965.00

3.237.04

1.61

RECEPTIONL02.ADM.02

WCL02.ADM.24A

WCL02.ADM.24b

WCL02.ADM.22A

WCL02.ADM.22b

WCL02.ADM.03a

SL1C

OR

RID

OR

CL0

2.AD

M.2

8B

LOBB

Y 4

L02.

ADM

.09A

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-02

ARCHITECTURAL FLOOR PLAN

1 : 150ARCHITECTURAL FLOOR PLAN1

Page 6: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UP

IHGFEDCBA

1

2

3

4

5

6

7

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

SHAFT

TEL.RM.

ELEC.RM

DU

CT

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1SHAFT

SHAFT

-

---

-

---

1.77

2.43

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-03

FURNITURE FLOOR PLAN

1 : 150FURNITURE FLOOR PLAN1

Page 7: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UP

IHGFEDCBA

1

2

3

4

5

6

7

-

---

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

BALCONY

BALCONY

VOID

BALC.

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

4.34

5.02

2.20

3.00

2.99 5.01

4.01

3.46

5.32

3.22

4.00

3.28

6.42 1.74 3.40

5.95

2.00

1.15 1.84 7.02

5.99

2.43

CONFERENCEROOM(10USERS)

L02.ADM.07

COUNTRYECONOMISTL02.ADM.06

COUNTRYPROGRAMOFFICER

L02.ADM.08SECRETARYL02.ADM.05

COUNTRYMANAGERL02.ADM.04

PUBLICINFORMATION

CENTERL02.ADM.10

ECONOMISTL02.ADM.11

SERVER ROOML02.ADM.13a

IT STOREL02.ADM.13b

IT OFFICEL02.ADM.13

SHAFT11

FINANCEOFFICE

L02.ADM.17

MISSIONSROOM

L02.ADM.18DINING ROOM

L02.ADM.19

G.STOREL02.ADM.26

OFFICEL02.ADM.25

ARCHIVESROOM

L02.ADM.20

JANITORROOM.

L02.ADM.23

DRIVERSOFFICE

L02.ADM.27

CONFERENCEROOM(40USERS)

L02.ADM.29

CORRIDORL02.ADM.32

PANTRYL02.ADM.33

TEL.RM.L02.ADM.34

3 m²

PANTRYL02.ADM.21

TOIL.L02.ADM.15A

ELEC

.RM

L02.

ADM

.03

WCL02.ADM.30

LOBBY 3L02.ADM.14

WAITING AREAL02.ADM.02a

CORRIDORL02.ADM.09

CORRIDOR AL02.ADM.28

LOBBY 1L02.ADM.01

LOBB

Y 2

L02.

ADM

.12

W37

3 m²

WCL02.ADM.31

CO

RR

IDO

R B

L02.

ADM

.28A

WCL02.ADM.24

4 m²2 m²

WCL02.ADM.15

SHAFT50

SHAFT51

2 m² 2 m²

WCL02.ADM.22

4 m² 2 m²

6.52

6.44

6.46

3.97

5.30

10.2

7

9.01

3.80 3.80 1.54

7.99

7.99

6.01

3.21

10.00 13.00

5.00

6.00

1.90 2.50

5.00

6.27

6.41 4.76 4.78 6.28 6.30

5.105.20

3.23

0.90 3.97

5.10

5.67

4.58

1.81 1.07

1.082.28

4.46

4.18

6.27

3.37

4.965.00

3.237.04

1.61

RECEPTIONL02.ADM.02

WCL02.ADM.24A

WCL02.ADM.24b

WCL02.ADM.22A

WCL02.ADM.22b

WCL02.ADM.03a

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-04

WALL TYPES FLOOR PLAN

1 : 150WALL TYPES FLOOR PLAN1

WALL FINISHES SCHEDULEACCOUSTICAL STUDWALL 10 CM

GLASS PARTITION

EXISTING WALL

W1

W4

W3

ACCOUSTICAL STUDWALL 20 CMW2

Page 8: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UP

IHGFEDCBA

1

2

3

4

5

6

7

-

---

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

BALCONY

BALCONY

VOID

BALC.

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

4.34

5.02

2.20

3.00

2.99 5.01

3.46

5.323.

224.

003.

286.42 1.74 3.40

5.95

4.00

1.15 1.84 7.02

5.99

2.43

3 m²

3 m²

4 m²2 m²

2 m² 2 m²

4 m² 2 m²

6.52

6.44

6.46

3.97

5.30

10.2

7

9.01

3.80 3.80 1.54

7.99

7.99

6.01

3.21

10.00 13.00

5.00

6.00

1.90 2.50

5.00

6.27

6.41 4.76 4.78 6.28 6.30

5.105.20

3.23

0.90 3.97

5.10

5.67

4.58

1.81 1.07

1.082.28

4.46

4.18

6.27

3.37

4.965.00

3.237.04

1.61

CONFERENCEROOM(10USERS)

L02.ADM.07

COUNTRYECONOMISTL02.ADM.06

COUNTRYPROGRAMOFFICER

L02.ADM.08SECRETARYL02.ADM.05

COUNTRYMANAGERL02.ADM.04

PUBLICINFORMATION

CENTERL02.ADM.10

ECONOMISTL02.ADM.11

SERVER ROOML02.ADM.13a

IT STOREL02.ADM.13b

IT OFFICEL02.ADM.13

SHAFT11

FINANCEOFFICE

L02.ADM.17

MISSIONSROOM

L02.ADM.18DINING ROOM

L02.ADM.19

G.STOREL02.ADM.26

OFFICEL02.ADM.25

ARCHIVESROOM

L02.ADM.20

JANITORROOM.

L02.ADM.23

DRIVERSOFFICE

L02.ADM.27

CONFERENCEROOM(40USERS)

L02.ADM.29

CORRIDORL02.ADM.32

PANTRYL02.ADM.33

TEL.RM.L02.ADM.34

PANTRYL02.ADM.21

TOIL.L02.ADM.15A

ELEC

.RM

L02.

ADM

.03

WCL02.ADM.30

LOBBY 3L02.ADM.14

WAITING AREAL02.ADM.02a

CORRIDORL02.ADM.09

CORRIDOR AL02.ADM.28

LOBB

Y 1

L02.

ADM

.01

LOBB

Y 2

L02.

ADM

.12

W37

L TOILETL02.ADM.30a

WCL02.ADM.31

CO

NFE

REN

CE

RO

OM

(40U

SER

S)L0

2.AD

M.2

9

WCL02.ADM.24

WCL02.ADM.15

SHAFT50

SHAFT51

G. TOILETL02.ADM.29a

G. TOILETL02.ADM.29b

WCL02.ADM.22

RECEPTIONL02.ADM.02

WCL02.ADM.24A

WCL02.ADM.24b

WCL02.ADM.22A

WCL02.ADM.22b

WCL02.ADM.03a

CO

RR

IDO

R C

L02.

ADM

.28B

LOBB

Y 4

L02.

ADM

.09A

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-05

FINISHING FLOOR PLAN

1 : 150FINISHING FLOOR PLANS1

FLOOR FINISHES SCHEDULELAMINATE FLOOR TILESOVER CERAMIC TILES

30x30cm WHITE CERAMICFLOOR TILES ATDEMOLISHED WALLLS

EXISTING FLOORING

F1

F3

F2

60X60cm RUBBER TILESON RAISED FLOORMETAL SUPPORTS

F4

Page 9: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

IHGFEDCBA

1

2

3

4

5

6

7

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-06

REFLECTED CEILING PLAN

1 : 150REFLECTED CEILING PLAN1

CEILING FINISHES SCHEDULEEXISTING 60X120 CEILINGTILESEXISTING 60X60cmCEILING TILESEXISTING GYPSUMBOARD CEILING

C1

C3

C2

NEW GYPSUM BOARDCEILING

C4

Page 10: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UP

IHGFEDCBA

1

2

3

4

5

6

7

-

---

5.00 5.00 5.00 6.50 5.00 5.00 5.00 5.00

41.50

5.00

6.00

4.00

4.00

6.00

5.00

30.0

0

BALCONY

BALCONY

VOID

BALC.

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

4.34

5.02

2.20

3.00

2.99 5.01

2.02

3.46

5.32

3.22

4.00

3.28

6.42 1.74 3.40

5.95

1.15 1.84 7.02

5.99

2.43

CONFERENCEROOM(10USERS)

L02.ADM.07

COUNTRYECONOMISTL02.ADM.06

COUNTRYPROGRAMOFFICER

L02.ADM.08

SECRETARYL02.ADM.05

COUNTRYMANAGERL02.ADM.04

PUBLICINFORMATION

CENTERL02.ADM.10

ECONOMISTL02.ADM.11

SERVER ROOML02.ADM.13a

IT STOREL02.ADM.13b

IT OFFICEL02.ADM.13

SHAFT11

FINANCEOFFICE

L02.ADM.17

MISSIONSROOM

L02.ADM.18

DINING ROOML02.ADM.19

G.STOREL02.ADM.26

OFFICEL02.ADM.25

ARCHIVESROOM

L02.ADM.20

JANITORROOM.

L02.ADM.23

DRIVERSOFFICE

L02.ADM.27

CONFERENCEROOM(40USERS)

L02.ADM.29

CORRIDORL02.ADM.32

PANTRYL02.ADM.33

TEL.RM.L02.ADM.34

3 m²

PANTRYL02.ADM.21

TOIL.L02.ADM.15A

ELEC

.RM

L02.

ADM

.03

WCL02.ADM.30

LOBBY 3L02.ADM.14

WAITING AREAL02.ADM.02a

CORRIDORL02.ADM.09

CORRIDOR AL02.ADM.28

LOBB

Y 1

L02.

ADM

.01

LOBB

Y 2

L02.

ADM

.12

W37

L TOILETL02.ADM.30a

WCL02.ADM.31

CO

RR

IDO

R B

L02.

ADM

.28A

WCL02.ADM.24

4 m²2 m²

WCL02.ADM.15

SHAFT50

SHAFT51

G. TOILETL02.ADM.29a

G. TOILETL02.ADM.29b

WCL02.ADM.22

4 m² 2 m²

6.52

6.44

6.46

3.97

5.30

10.2

7

9.01

3.80 3.80 1.54

7.99

7.99

6.01

3.21

10.00 13.00

5.00

6.00

1.90 2.50

5.00

6.27

6.41 4.76 4.78 6.28 6.30

5.105.20

3.23

0.90 3.97

5.10

5.67

4.58

1.81 1.07

1.082.28

4.46

4.18

6.27

3.37

4.965.00

3.237.04

1.61

RECEPTIONL02.ADM.02

N2A

N2A

N2A

N2C

X

43

43

N2D

N2A

N2A

N2E

N1B

N1B

N1B

N1A

WCL02.ADM.24A

WCL02.ADM.24b

WCL02.ADM.22A

WCL02.ADM.22b

WCL02.ADM.03a

N2A

N2B

N2A

N2E

SL1

SL1

SL1

SL1

SL1

SL2

SL3

SL4

SL1

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-07

DOOR FLOOR PLAN

1 : 150DOOR FLOOR PLAN1

Page 11: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

FLOOR FINISHESLAMINATE FLOOR TILES OVER CERAMIC TILESF130x30 cm WHITE CERAMIC FLOOR TILES AT DEMOLISHEDWALLS TO MATCH EXISTING TILES

F2

EXISTING FLOOR FINISHF3

CEILING FINISHESEXISTING 60X120 CEILING TILESC1EXISTING 60X60cm CEILING TILESC2EXISTING GYPSUM BOARD CEILINGC3NEW GYPSUM BOARD CEILINGC4

WALL FINISHESACCOUSTICAL STUD WALL 10 CMW1ACCOUSTICAL STUD WALL 20 CMW2GLASS PARTITIONW3EXISTING WALLW4

60X60cm RUBBER TILES ON RAISED FLOOR METAL SUPPORTSF4

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-08

FINISHES & DOOR SCHEDULES

Door Schedule

DOORTYPE WIDTH HEIGHT MATERIALFRAME

MATERIALFRAME

THICKNESS COUNT DESCRIPTION

N1A 0.90 2.00 GLASS - - 1 SINGLE LEAF GLASS DOORN1B 0.80 GLASS - - 3 SINGLE LEAF GLASS DOORN2A 0.90 2.20 WOOD WOOD 12.54cm 7 SINGLE LEAF HINGED WOODEN DOORN2B 0.90 2.20 WOOD WOOD 22.54cm 1 SINGLE LEAF HINGED WOODEN DOORN2C 0.80 2.20 WOOD WOOD 12..54cm 1 SINGLE LEAF HINGED WOODEN DOORN2D 0.90 2.16 WOOD WOOD 12.54cm 1 SINGLE LEAF HINGED WOODEN DOORN2E 0.90 2.17 WOOD WOOD 12.54cm 2 SINGLE LEAF HINGED WOODEN DOORSL1 1.80 2.20 GLASS - - 5 SINGLE LEAF SLIDING GLASS DOORSL2 1.50 2.20 GLASS - - 1 SINGLE LEAF SLIDING GLASS DOORSL3 1.20 2.20 GLASS - - 1 SINGLE LEAF SLIDING GLASS DOORSL4 0.90 2.20 GLASS - - 1 SINGLE LEAF SLIDING GLASS DOORGrand total: 24

Room Schedule 2

Number Name Floor Finish Ceiling Finish NORTH-WALL SOUTH-WALL EAST-WALL WEST-WALL

L02.ADM.01 LOBBY 1L02.ADM.02 RECEPTION F1 C4/C3/C1 W4 W4/W2 W3 W4/W1L02.ADM.02a WAITING AREA F1 C1/C3 W4 - W4 W3/W1L02.ADM.03 ELEC.RML02.ADM.03a WCL02.ADM.04 COUNTRY MANAGER F3 C3/C1 W4/W1 W4 W4/W1 W4L02.ADM.05 SECRETARY F3 C4/C3/C1 W4 W4/W1 W3/W1 W4L02.ADM.06 COUNTRY ECONOMISTL02.ADM.07 CONFERENCE ROOM(10USERS)L02.ADM.08 COUNTRY PROGRAM OFFICERL02.ADM.09 CORRIDOR F3 C2 W4 W4/W3 W4 W4L02.ADM.09A LOBBY 4 F3 C4/C3/C1 W4 W4 W4 W3L02.ADM.10 PUBLIC INFORMATION CENTER F2/F3 C4/C3/C1 W3 W4 W3 W3L02.ADM.11 ECONOMIST F2/F3 C4/C3/C1 W4 W4 W3 W3L02.ADM.12 LOBBY 2L02.ADM.13 IT OFFICE F3 C3/C1 W1 W4 W4 W4/W1L02.ADM.13a SERVER ROOM F4 C3/C1 W4 W1 W4 W4L02.ADM.13b IT STORE F3 C3/C1 W1 W1 W4 W1L02.ADM.14 LOBBY 3 F2/F3 C4/C3/C1 W4 W3 W3/W4 W1L02.ADM.15 WCL02.ADM.15A TOIL.L02.ADM.17 FINANCE OFFICE F3 C3/C1 W4 W3 W4 W3L02.ADM.18 MISSIONS ROOM F3 C3/C1 W3 W4 W4 W3L02.ADM.19 DINING ROOM F3 C3/C1 W3 W4 W3 W4/W2L02.ADM.20 ARCHIVES ROOM F2/F3 C4/C3 W4 W4 W1 W1L02.ADM.21 PANTRYL02.ADM.22 WCL02.ADM.22A WCL02.ADM.22b WCL02.ADM.23 JANITOR ROOM.L02.ADM.24 WCL02.ADM.24A WCL02.ADM.24b WCL02.ADM.25 OFFICE F3 C3/C1 W4 W1 W2 W1L02.ADM.26 G.STORE F3 C3/C1 W1 W1 W4/W2 W1L02.ADM.27 DRIVERS OFFICE F3 C3/C1 W1 W4 W4 W1L02.ADM.28 CORRIDOR A F3 C3 W4 W4 W4 W4L02.ADM.28A CORRIDOR B F2/F3 C3 W4 W1 W1 W1L02.ADM.28B CORRIDOR C F2/F3 C4/C3 - W4 W1 W2L02.ADM.29 CONFERENCE ROOM(40USERS) F3 C3/C1 W4 W4 W1 W4L02.ADM.29a G. TOILETL02.ADM.29b G. TOILETL02.ADM.30 WCL02.ADM.30a L TOILETL02.ADM.31 WCL02.ADM.32 CORRIDORL02.ADM.33 PANTRYL02.ADM.34 TEL.RM.

Page 12: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

MULTIPLE HDS JAMB STUDS1 CLIPS @ BASE OF HDS STUD/JAMB2

10cm GAUGE24 METALSTUD

CRIPPLESTUDSABOVEOPENING

︵1 ︶ #10-16SCREWS @ 30cmO.C.

#10-16 SCREWSEA. SIDE @ 60cmO.C.

CAP W/TRACK @OPENINGAS REQ'D.BY DESIGN

DIETRICH CBCONNECTOR OREQUIVALENT︵2 ︶

#10-16SCREWS@ 50cmO.C.

TYPICALTRACK

10cmGauge24 Metalstud

︵1 ︶

#10-16SCREW @EACHFLANGE

OPENING

︵2 ︶ DIETRICHA-SERIES CLIPSWITH SCREWSTO STUD/JAMB

︵OREQUIVILANT ︶

FASTENERS TOCONCRETE

WALL TYPE- P1 OUTLETS TYPICALDEMISING WALLS

HEAD

PLAN

BASE

1/2" GYP. BD.BOTH SIDES

REFER TO ELECT DWGS FOR QUANTITY &LOCATION OF OUTLET BOXES

FIRESTOP PUTTY PADS AT METALOUTLET AND SWITCH BOXES WITHSEPARATION LESS THAN 24" - SEE PTNSCHED FOR REQ'D RATING

DEMISING WALL-REFER TOPARTITION SCHEDULE

1/4" MIN ROUND BEAD OFACOUSTICAL SEALANT AROUNDPENETRATION, TYPICAL

LOCATE METAL STUD BETWEEN OUTLETBOXES FOR ADJACENT ROOMS-VERIFYOUTLET LOCATIONS WITH ELECT PLANS

OUTLET BOX

10cm STEEL STUDMIN 24 GA

10cm STEEL STUDMIN 24 GA

15cm SOUND BATT INSULATION

10cm STEEL STUDMIN 24 GA

10MM SECURITYGLASS PARTITION

F MOUNT BASEPROFILE 2MM THK

RUBBER INSERT ANCHOR BOLT

FLOOR FINISHPORCELAIN FINISH

80MM SAND BED & MORTAR

10MM SECURITYGLASS PARTITION

F MOUNT BASEPROFILE 2MM THK

RUBBER INSERT

ACOUSTICAL TILES30MM THK

CEILING FIXATION

TOP

ADHESIVE

NEWTECHCONSULTING GROUP

BUILDING No.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel: +(249) 183-521771-75

Fax: +(249) 183-22552

www.newtech-consulting.com

OWNER

REV. DESCRIPTION APP.DATE

NOTES

ARCHITECTURAL CONSULTANT

DRAWING TITLE

PROJECT

DESIGNED BY

ENGINEERING DIRECTOR

REVIEWED BY

MANAGING DIRECTOR

DATE PROJECT CODE

SCALE DEPARTMENT

DRAWING NO.REV.

PROJECT MANAGER

Lumumbastraße 2104155 LeipzigDeutschland / GermanyFax:      +49 (0) 341 2689609

SITE

AFRICAN DEVELOPMENT BANK

SUDAN

Website: www.vitalkonzept‐leipzig.comE‐mail:[email protected]

/A2

GENERAL CONSULTANT

31/12/2017 9.51

ARCHITECTURAL

00 FINAL DESIGN H. ELSHERIF26.2.2018

MAGDY AMIN HUSSEIN GALAL

MOHAMED HASSAN

MOHAMED HUSSEIN

02

MANAR SHETEWY

SUDAN RELOCATION AND OUTFITTING PROJECT

9.51-AFDB-DD-A-09

INTERNAL FINISHES DETAILS

1 : 20STUD WALL CONNECTION DETAIL1

1 : 20ACCOUSTICAL STUD WALL SECTION2 1 : 20

GLASS PARTITION FIXATION DETAILS3

Page 13: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

LIST OF ELECTRICAL DRAWINGS

AFDB-ELECTRICAL-1000-LIGHTING

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

LIST OF ELECTRICAL DRAWINGS

Sheet Number Sheet Name Sheet IssueDate

CurrentRevision

AFDB-ELECTRICAL-1000-LIGHTING LIST OF ELECTRICAL DRAWINGS 24/02/2018 0AFDB-ELECTRICAL-1001-LIGHTING ELECTRICAL GENERAL NOTES 28/12/2017 0AFDB-ELECTRICAL-1002-LIGHTING THIRD FLOOR LIGHTING LAYOUT 24/02/2018 0AFDB-ELECTRICAL-1003-LIGHTING EXISTING LIGHTING ARRANGEMENT 24/02/2018 0AFDB-ELECTRICAL-1004-LIGHTING EXISTING LIGHTING CIRCUITING 24/02/2018 0AFDB-ELECTRICAL-2001-POWER THIRD FLOOR RAW POWER LAYUOT 24/02/2018 0AFDB-ELECTRICAL-2002-POWER THIRD FLOOR UPS POWER LAYUOT 24/02/2018 0AFDB-ELECTRICAL-2003-POWER THIRD FLOOR VAC POWER LAYUOT 24/02/2018 0AFDB-ELECTRICAL-2004-POWER (SMDB-4) 24/02/2018 0AFDB-ELECTRICAL-2005-POWER (DB-1) 24/02/2018 0AFDB-ELECTRICAL-2006-POWER DB-L&P(DB-3) 24/02/2018 0AFDB-ELECTRICAL-2007-POWER (SDB-F3) 24/02/2018 0AFDB-ELECTRICAL-2008-POWER DB-VAC-2(DB-2) 24/02/2018 0AFDB-ELECTRICAL-2009-POWER DB-UPS-1(DB-4) 24/02/2018 0AFDB-ELECTRICAL-2010-POWER DB-UPS-2 24/02/2018 0AFDB-ELECTRICAL-2011-POWER EXISTING POWER CIRCUITING 24/02/2018 0AFDB-ELECTRICAL-3000-FIRE ALARM FIRE ALARM GENERAL NOTES 28/12/2017 0AFDB-ELECTRICAL-3001-FIRE ALARM THIRD FLOOR FIRE ALARM LAYOUT 24/02/2018 0AFDB-ELECTRICAL-3002-FIRE ALARM THIRD FLOOR FIRE ALARM LAYOUT ( FM 200 ) 28/12/2017 0

Page 14: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

g. The color code for a 5-wire circuit shall be: red (phase 1), yellow (phase 2), blue (phase 3), black (neutral) and earthing shall be green with yellow strips.

3. Power & Fixtures :

1. COMMON ELECTRICAL NOTES:a. All power and electrical works are all-inclusive of all materials, transportation, storage, handling, workmanship, inspection, testing (periodic), final testing commissioning and all other items to enable “fitness for purpose” criteria to be

2. Cable Management & Wiring:

b. These drawings shall be used for the power and electrical discipline purposes only.

c. All material used for electrical works shall conform to relevant IEC specification and wiring shall be carried out as per latest edition of IEE wiring regulation.

d. The power and electrical system selection, installations and testing etc shall be as per latest BS and/or IEC codes.

e. All dimensions are in meters (m) unless otherwise specified.

f. All levels are related to the Project Datum which must determined and verified onsite by the Contractor and approved by the supervising Engineer.

g. In-door fixture levels are measured from concrete floor (slab) level. Note that the finish tile level is approx +/-100mm above concrete floor (slab) level.

h. Do not scale from the General Plan drawings. Use the scaled Part Plans instead. The designed distances and measurements could change onsite as per the specific site conditions.

i. All power and electrical drawings shall be read in conjunction with general notes, specifications and miscellaneous details.

j. These drawings shall be read in conjunction with all relevant drawings of the different trades / disciplines for co-ordination purposes.

k. All equipment layout are provisional .Final layout shall be determined by the Contractor from the workshop drawing and after coordination with other trades.

l. The Contractor shall submit for approval set of shop drawings showing openings and sleeves in concrete and walls before construction can begin.

n. All pipe-work vertically penetrating reinforced or non-reinforced concrete structures and or going horizontally through walls to be approved by the Structural Engineer. If approved, these pipes shall pass through heavy duty/gauge uPVC sleeve

encapsulated with fire-stopping material. The size and location of the sleeve is to be coordinated with the number, size and pressure of the passing piping systems.

o. Where power and electrical elements are running though false ceilings, care must be taken to avoid clashing / conflict with other mechanical and instrumentation installations and The Contractor shall prepare sets of shop drawings

p. All power and electrical equipment should be approved prior to placing the Purchase Order, shipment and site installation.

q. All pipes, conduits and fittings to be properly secured in walls and ceilings through clamps, hangers and supports.

r. The contractor shall provide all fixing accessories required for complete installation of lighting fixtures, cable trays, bus-bars, switchgears, etc.

s. Underground pipe lines with top of pipe less than 600mm deep from Finished Floor Level (FFL) shall be surrounded with 150mm thick C25 plain concrete. Warning tape demarcation is advised.

t. The location of lighting fixtures in ceiling or in walls must be coordinated with all other disciplines (architectural, VAC and low current elements) to ensure that the ceilings and walls arrangements have aesthetic appeal. If in doubt, the Engineer advice should be thought.

u. Where required, provide minimum 60x60 cm maintenance access panels (unless otherwise specified) in ceilings to all power and electrical elements (e.g. ceiling boxes, etc) , The location of maintenance access panels to suit

v. The Contractor shall engage the services of competent power and electrical vendor for the supply, installation, testing, etc services.

w. All necessary testing and commissioning to be carried out to the requirement of the BS and IEC codes and to the satisfaction of the Engineer.

x. Any discrepancies between the Contract Documents (Design, Specs and BOQs) are to be brought to the attention of the Engineer and resolved before commencement of any work.

a. The size of conduits, boxes, trays, trunking are not shown in drawings. The size of all shall be selected by the Contractor in accordance with the latest edition of IEE wiring regulations and shall be a function of the number and size of the respective conductors.

b. All conduits embedded in concrete slab or inside walls shall be heavy gauge uPVC conduits and fittings.

c. All conduits in exposed & wet areas shall be heavy gauge hot dip galvanized steel conduits fittings.

d. Maximum of 40% of the conduit section shall be used for wires running inside to avoid over-loading the conduit.

e. The minimum conduit size (external diameter) has to be 20mm *1.8mm.

f. The Contractor is to install a pull box every 15m of conduit run and/or two 90° bends, without extra cost.

h. For every circuit separate neutral and earth wire shall be drawn along with phase wire.

i. All electrical equipment to be grounded.

j. Earth continuity conductors shall be run with all circuit and feeders in accordance with specifications, regulations and standards.

k. Ground result anywhere in the system shall not exceed 5 ohms.

e. Power sockets shall be mounted at 500mm above finished floor level unless otherwise indicated.

f. Outdoor electrical fitting shall weather-proof.

g. Disconnect switches for outdoor VAC units will be installed beside the unit.

a. All MCCB´s are fixed type with rated maximum short circuit breaker capacity of 25 KA at 240 VAC and 10 KA at 415 VAC.

b. If applicable, MCC provided for VAC chillers to accommodate duty/standby control system.

c. The Contractor has to verify that voltage drop on electrical devices is less that 5% for lighting and 5% for power.

d. The connection between two or more conductors has to be carried out by connectors. The connectors are of the pressure type for size 6 mm2 or less and bolted type for size 10 mm2 and more.

m. Light switch shall be mounted on the wall 1400 mm above finished floor level and coordinated with interior design (level consistent with the room FCU thermostats).

achieved and to enable safe use and operation of the facility.

for approval showing the power and electrical systems exactly in place.

the selected equipment and to be coordinated with the ceiling plans.

*ALL OLD EQUIPMENT SHOULD BE UTILIZED FOR THE NEW MODIFICATION & FOR THE NEW DESIGN , MAINTAIN UNCHANGED LOCATIONAS IT IS

A3

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1 : 250

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM28/12/2017

D.D

ELECTRICAL GENERAL NOTES

AFDB-ELECTRICAL-1001-LIGHTING

28/12/2017 28/12/2017

SEM

D.D

AMM

SEMSIAAMM

Page 15: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

3

UPS

32

2

4 2

2

2

333

3

3

2

2

2

2

2

3

3 3

3

4

4

2

2

3

3

33 3

3

2

3

3

3

2

3

4

2

22

E

E

E

E

234

E

SECRETARY

CO

UN

TRY

MAN

AG

ER

TEL.

RM

.

PANTRY

CORRIDOR

WC

PUBLIC INFORMATION CENTER

ECONOMIST

CO

NFE

REN

CE

RO

OM

(10U

SER

S)

CO

UN

TRY

PR

OG

RAM

OFF

ICER

CO

UN

TRY

EC

ON

OM

IST

SHAFT

IT O

FFIC

E

IT STORE

SERVER ROOM

TOIL.

FINANCE OFFICE

MIS

SIO

NS

RO

OM

DIN

ING

RO

OM

ARC

HIV

ES R

OO

M

PANTRYJANITOR ROOM.

G.STORE

OFF

ICE

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

DRIVERS OFFICE

ELE

C.R

M

WC

WAITING AREA

DU

CT

LOBB

Y 1

CORRIDOR A

LOBB

Y 4

LOBB

Y 2

SHAFT

WC

SHAFT

W

WC

WCWC WC WC

(DB-1)

CO

RR

IDO

R B

WC

LOBB

Y 3

RECEPTION

2(DB-1)

3(DB-1)

4(DB-1)

6(DB-1)

5(DB-1)

CORRIDOR

(SMDB-4)

RELOCATION

NEW

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

7DB-L&P(DB-3)

1DB-L&P(DB-3)

DB-

L&P

(DB-

3)

1(DB-1)

DB-UPS-1(DB-4)

2(SDB-F3)

9(DB-1)

8(DB-1)

10(DB-1)

(SDB-F3)

DB-

UPS

-2DB-

VAC

-2(D

B-2)

7(DB-1)

1(SDB-F3)

3,6(SDB-F3)

4DB-L&P(DB-3)

3DB-L&P(DB-3)

6DB-L&P(DB-3)

2DB-L&P(DB-3)

5DB-L&P(DB-3)

SURFACE SCONE LIGHT 60 W

SYMBOL DESCRIPTIONLEGEND

RECESSED SCONE LIGHT 30 W

RECESSED DOWNLIGHT CAN 30 W IP 42

RECESSED DOWNLIGHT CAN EMERGENCY 30 W IP 42

RECESSED PLAIN 60X60 LIGHTING EMERGENCY 4 X 18 W

RECESSED PLAIN 60X60 LIGHTING 4 X 18 W

SURFACE PLAIN 120X30 LIGHTING 2 X 40 W

DISTRIBUTION BOARD FOR UPS

DISTRIBUTION BOARD

SUB MAIN DISTRIBUTION BOARD

ONE GANG ONE WAY SWITCH

TWO WAY SWITCH

INTERMEDIATE SWITCH

SURFACE SCONE LIGHT EMERGENCY 60 W

RECESSED SCONE LIGHT EMERGENCY 30 W

EXIT SIGN LIGHTING , NORMAL OFF WITH BATTERY BUILT IN& INDICATOR LED

TWO GANG TWO WAY SWITCH

THREE GANG ONE THREE SWITCH

FOUR GANG FOUR WAY SWITCH

SURFACE PLAIN 120X30 LIGHTING EMERGENCY 2 X 40 W

CEILING MOUNTED MOTION (OCCUPANCY) DETECTOR 6-8 METERCOVERAGE IP 42 - WITH LOW POWER CONSUMPTION

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

As indicated

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

THIRD FLOOR LIGHTING LAYOUT

AFDB-ELECTRICAL-1002-LIGHTING

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 150THIRD FLOOR LIGHTING LAYOUT

1

Page 16: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

35 35

60

65

15

25

S

S

S

S

S

S

S

SS

S

SS

S S

S

S

S

S

S

S

S

S

S S

S

S

S

S S

S S

S S

S S

SS

S

S

R

R

R

R

R

RR

R

R

R

R

R

R

R

R

R R

R

R R

R

R

R

R

R

R

R

R

R

R

RR

R

R

R

R

R

RRR

R R

S SS RRR

S S

R R

S

S S

E E EE

ES

E

S

R

E F

R

EF

E

EF

E

F

F FFF

F E F S

F

FF

F

Acess

F F

FF

F

F F F F F

FFF

F

F

H

H

H

HHHH

H

H

H

Acess

Acess

Acess

Acess

Acess

S F

60BALCONY

OFFICE

BALCONY

RECEP.

VOID

OFFICE

OFFICE

ROOF OF ELEC. SUBSTATION

SHAFT

MEETING SECRETARY OFFICE OFFICE

OFFICEOFFICEOFFICEOFFICE

OFFICE

ELEC. RM.

PANTRY

LOBBY LOBBY

SHAFT

SHAFT

TEL.RM.

ROOF GARDEN

B A-16

B A-16

30

35

35

35

15

20

65.15

20

20

35

30

*REFER FOR AS BUILTCOORDINATION

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 400

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

EXISTING LIGHTING ARRANGEMENT

AFDB-ELECTRICAL-1003-LIGHTING

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 400EXISTING LIGHTING ARRANGEMENT

1

Page 17: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

10 PERSONS.

BALCONY

OFFICE 301

BALCONY

RECEP.

VOID

CORRIDOR 3 (380 W)

OFFICE 303

OFFICE 302

SHAFT

BALC.TOIL.K

G. TOIL.L.TOIL.

TTT

CORRIDOR 2 (350 W)

MEETINGSECRETARY

OFFICE 309 OFFICE 306

OFFICE 305OFFICE 307OFFICE 308

OFFICE 311

OFFICE 304

PANTRY

CORRIDOR 1 (330 W) UP

DN

UP

DN

LOBBY 1

LOBBY 2

SHAFT

SHAFT

T W TEL.RM.

LIFT-5

LIFT-6LIFT-3

LIFT-2

LIFT-1 LIFT-4

ELEC.RMDUCT

OFFICE 310

A B C D E F G H J1

23

45

67

A0

500 500 650 500 500 500 5005000

400

3000

500

600

400

600

500

500850

DB-3

DB-4

DB-3DB-2

DB-1

3,b

3,a

3

3,c3,c

3,c 3,c

3,a 3,b

3,b

3,a3,b

3,a

a,b,c

4,a4,b4,a

4,c 4,c

4,c 4,c

4

4,b4,a

4,b

4,a

4,b

4,a a,b.c

2,a 2,a

2,b

2

2,b

a,b

2,a2,a

9,a

9,a

9 9,b

9,b

9,b

a,b a,b,c

10,a

10,b 10,b10,b

10,c10,c10,c

10,a 10

a,b,c

11

11,b

11,c 11,c 11,c

11,b11,b

11,a 11,a

11,a 1,a 1,a 1,a 1,a1,a

1

1,a

a

a

a6,a

6,a 6,a

67,a 7,a

7,b 7,b 7,b

7

a,b a,b,c

8,a 8,a

8,b 8,b 8,b c 8,c

8,c

2,b

2,b

2,c

2 2,b

2,b

2,c

2

a,b,c,d2,a2,a

2

2,d2,b

2,a

2

2,a

22,b

1,b

1,b

1,b

1,b 1,b

1

1,b

1,b2,a

2,a

2,a

2,a

2,a

2,a

2,a

2,a

2

2,a

1

1,a

aa,b

2,a 2,a 2,a 2,a 2,a

2,a 2 2,a 2,a 2,a

3,a 3,a 3,a 3,a 3,a

3,a

3,a 3,a 3,a 3,a

aa,b

1,a a11,aa

1,c 1,c

1,b

c

1,b11,b

b

c a

1,a

1

1,a2 2

2,c

b

a

3

3,b

a

b

bc

2,c

2,c

SMDB-4

UP TO F3/4

From F1

TO F1TO F3/4

UP TO F3/4

From F1

TO F1

TO F3/4

ToSMDB-4

ToSMDB-4

ToSMDB-4

ToSMDB-4

8

TO Y4 DB-1

SDB-F3

3,b 1,a 2,a

TO Y1 SDB-F3

2,b2,b2,b2,b2,b

TO SDB-F3

4,f 4,d

4,e

4,g

4,h

d,e

2,i

2,e2,f

2,j

2,k2,l

c,di,j

e,f g,hk,l

f,g,h

2,d

3,a

3,d 3,c

3,ea

c,d,e

1,c1,c

1,e1,f

1,d

1,g

c,d

11,d11,c 11,c

c,d

11,e11,f11,g

1,h

11,h

f,g,h f,g,he e

22,g2,h

TO B3DB-1

TO R4DB-1

TO Y3DB-1

TO R3DB-1

B1

R2

Y1

R1

B2

R1

Y1 B1

R1Y1

Y4

B1

R1Y1

*REFER FOR CIRUTINGONLY , & AS BUILT(DB)LOCATION

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 200

0

AFRICAN DEVELOPMENT BANK

ANN SIA SEM24/02/2018

D.D

EXISTING LIGHTING CIRCUITING

AFDB-ELECTRICAL-1004-LIGHTING

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAANN

1 : 200EXISTING LIGHTING CIRCUITING

1

Page 18: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UPS

2U

2

1U

IHGF

E

E

D

DCBA

1

2

3

4

5

6

7

PUBLICINFORMATION

CENTER

ECONOMIST

CONFERENCEROOM(10USERS)

COUNTRYPROGRAM OFFICER

CORRIDOR

SERVER ROOM

IT STORE

IT O

FFIC

E

WC TOIL.

FINANCE OFFICE

MISSIONS ROOM

DINING ROOM

WCW

C

WC

WC

WC

WC

JANITOR ROOM.

ARCHIVES ROOM

OFF

ICE

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

CO

RR

IDO

R B

WCWC

L TO

ILET

G. T

OIL

ET

G. T

OIL

ET

WC W

PANTRY TEL.

RM

.

ELE

C.R

M

DU

CT

COUNTRY MANAGER

SECRETARY

WAITING AREA

CO

UN

TRY

EC

ON

OM

IST

LOBBY 2

SHAFT

PANTRY

SHAFT

RECEPTION

DRIVERS OFFICE

CORRIDOR A

LOBB

Y 1

14(DB-1)

(DB-1)

DB-L&P(DB-3)

DB-

VAC

-2(D

B-2)

19(DB-1)

21(DB-1)

DB-

UPS

-2

10DB-L&P(DB-3)

17(DB-1)

25(DB-1)

G.STORE

8DB-L&P(DB-3)

16DB-L&P(DB-3)

18DB-L&P(DB-3)

13(DB-1)

(SMDB-4)

DB-

UPS

-1(D

B-4

)

(SD

B-F3

)

16(DB-1)

15(DB-1)

12(DB-1)

11(DB-1)

24(DB-1)

22 23(DB-1)

23

22(D

B-1)

20(DB-1)

18(DB-1)

RELOCATED

REMOVED

TYPE CHANGED

9DB-L&P(DB-3)

11DB-L&P(DB-3)

12DB-L&P(DB-3)

NEW

14DB-L&P(DB-3)

13DB-L&P(DB-3)

LOO

P

LOOP

LOO

P

LOO

P

LOOP

LOOP

LOOP

LOOP

LOOP

LOOP

17DB-L&P(DB-3)

LOOP

LOBBY 3

CORRIDOR A

15DB-L&P(DB-3)C

OR

RID

OR

C

SYMBOL DESCRIPTION

LEGEND

DISTRIBUTION BOARD FOR UPS SPN

DISTRIBUTION BOARD TPN

SUB MAIN DISTRIBUTION BOARD TPN

ISOLATOR

UNINTERRUPTIBLE POWER SUPPLY 12/24V (EXISTING 30 KVA)

TWIN SWITCH SOCKET ( UPS )

SINGLE SWITCH SOCKET 13 A

TWIN SWITCH SOCKET

SINGLE SWITCH SOCKET ( UPS )

SINGLE SWITCH SOCKET 16 A

SINGLE SWITCH SOCKET ( UPS ) FOR CEILING PROJECTOR

CABLE TRAY 200X100 mm

POWER FOR FAN COIL UNITS ABOVE CEILING

SINGLE MULTI PURPOSE SWITCH SOCKET 13 AP

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

THIRD FLOOR RAW POWER LAYUOT

AFDB-ELECTRICAL-2001-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 150THIRD FLOOR POWER LAYOUT

1

RELOCATED TO ELEC ROOMFOR UPS

Page 19: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UPS

2U

2

1U

IHGFEDCBA

1

2

3

4

5

6

7

(SDB-F3)

PUBLICINFORMATION

CENTER

ECONOMIST

CONFERENCEROOM(10USERS)

CO

UN

TRY

PR

OG

RAM

OFF

ICER

CORRIDOR

SERVER ROOM

IT STORE

IT OFFICE

WC TOIL.

FIN

AN

CE

OFF

ICE

MISSIONS ROOM

DIN

ING

RO

OM

WCW

C

WC

WC

WC

WC

JANITOR ROOM.

ARCHIVES ROOM

OFFICE

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

CO

RR

IDO

R B

WCWC

L TO

ILET

G. T

OIL

ET

G. T

OIL

ET

WC W PANTRY

TEL.

RM

.

ELE

C.R

M

DU

CT

CO

UN

TRY

MAN

AGER

SECRETARYWAITING AREA

COUNTRYECONOMIST

LOBB

Y 2

SHAFT

PANTRY

SHAFT

RECEPTION

DRIVERS OFFICE

CORRIDOR A

LOBBY 1

DB-L&P(DB-3)

DB-VAC-2(DB-2)

DB-UPS-2

(DB-1)

(SMDB-4)

DB-

UPS

-1(D

B-4

)

1DB-UPS-1(DB-4)

3DB-UPS-1(DB-4) 4

DB-UPS-1(DB-4) 5DB-UPS-1(DB-4)

6DB-UPS-1(DB-4)

2DB-UPS-1(DB-4)

3DB-UPS-2

4DB-UPS-2

5DB-UPS-2

6DB-UPS-2

7DB-UPS-2

8DB-UPS-2

9DB-UPS-2

10DB-UPS-2

30 KVA

7DB-UPS-1(DB-4)

15(DB-1)

8DB-UPS-1(DB-4)

4DB-UPS-2

11DB-UPS-2

LOBBY 3

CORRIDOR

1DB-UPS-2

2DB-UPS-2

G.STORE

SYMBOL DESCRIPTION

LEGEND

DISTRIBUTION BOARD FOR UPS SPN

DISTRIBUTION BOARD TPN

SUB MAIN DISTRIBUTION BOARD TPN

ISOLATOR

UNINTERRUPTIBLE POWER SUPPLY 12/24V (EXISTING 30 KVA)

TWIN SWITCH SOCKET ( UPS )

SINGLE SWITCH SOCKET 13 A

TWIN SWITCH SOCKET

SINGLE SWITCH SOCKET ( UPS )

SINGLE SWITCH SOCKET 16 A

SINGLE SWITCH SOCKET ( UPS ) FOR CEILING PROJECTOR

CABLE TRAY 200X100 mm

POWER FOR FAN COIL UNITS ABOVE CEILING

SINGLE MULTI PURPOSE SWITCH SOCKET 13 AP

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

THIRD FLOOR UPS POWER LAYUOT

AFDB-ELECTRICAL-2002-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 150THIRD FLOOR UPS POWER LAYOUT

1

Page 20: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

UPS

2U

2

1U

IHGF

E

E

D

DCBA

1

2

3

4

5

6

7

(SDB-F3)

DB-VAC-2(DB-2)

COUNTRY MANAGER

SECRETARY

WAITING AREA

ELE

C.R

M

DU

CT

PANTRY

WWCTEL.RM.

CORRIDOR

WCWC

L TOILET G. TOILET G. TOILET

LOBBY 1

CORRIDOR A

PUBLICINFORMATION

CENTER

ECONOMIST

?

SERVER ROOM

IT STORE

IT OFFICE

SHAFT

TOIL.

WC

FINANCE OFFICE

?

ARCHIVES ROOM

PANTRYJANITOR ROOM.

WCWC

WCWC

WCWC

DRIVERS OFFICE

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

MISSIONS ROOM

CONFERENCEROOM(10USERS)

COUNTRYECONOMIST

COUNTRYPROGRAM OFFICER

CO

RR

IDO

R B

G.STORE

29(DB-1)

28(DB-1)

27(DB-1)

32(DB-1)

34(DB-1)

33(DB-1)

26(DB-1)

4(SDB-F3)

5(SDB-F3)

1DB-VAC-2(DB-2)

10DB-VAC-2(DB-2) 11

DB-VAC-2(DB-2) 2DB-VAC-2(DB-2)

DINING ROOM

3DB-VAC-2(DB-2)

12DB-VAC-2(DB-2)

4DB-VAC-2(DB-2)

5DB-VAC-2(DB-2)

6DB-VAC-2(DB-2)

7DB-VAC-2(DB-2)

6(SDB-F3)

8(SDB-F3)

OFFICE

(SMDB-4)DB-UPS-1(DB-4)

(DB-1)

31(DB-1)

30(DB-1)

7(SDB-F3)

LOBBY 3

SHAFT

8DB-VAC-2(DB-2)

DB-L&P(DB-3)

9DB-VAC-2(DB-2)

DB-UPS-2

SYMBOL DESCRIPTION

LEGEND

DISTRIBUTION BOARD FOR UPS SPN

DISTRIBUTION BOARD TPN

SUB MAIN DISTRIBUTION BOARD TPN

ISOLATOR

UNINTERRUPTIBLE POWER SUPPLY 12/24V (EXISTING 30 KVA)

TWIN SWITCH SOCKET ( UPS )

SINGLE SWITCH SOCKET 13 A

TWIN SWITCH SOCKET

SINGLE SWITCH SOCKET ( UPS )

SINGLE SWITCH SOCKET 16 A

SINGLE SWITCH SOCKET ( UPS ) FOR CEILING PROJECTOR

CABLE TRAY 200X100 mm

POWER FOR FAN COIL UNITS ABOVE CEILING

SINGLE MULTI PURPOSE SWITCH SOCKET 13 AP

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

THIRD FLOOR VAC POWER LAYUOT

AFDB-ELECTRICAL-2003-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 150THIRD FLOOR VAC POWER LAYOUT

1

Page 21: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

(SMDB-4)

AFDB-ELECTRICAL-2004-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Lighting - Interior 848 VA 66.00% 560 VA Total Est. Demand Current: 100 ALighting 8452 VA 100.00% 8452 VA Total Conn. Current: 109 AOther 7752 VA 100.00% 7752 VA Total Est. Demand: 71524 VAHeating 11250 VA 100.00% 11250 VA Total Conn. Load: 78562 VACooling 15800 VA 57.28% 9050 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAmps: 113 A 121 A 94 A

26447 VA 28428 VA 22626 VA

15 -- -- -- -- 3060 VA14 -- -- -- -- 8604 VA13 UPS ( 30 KVA ) CU/XLPE/SWA/PVC 3-#16 mm, 1-#16 mm, 1-#10 mm 63 A 8148 VA12 -- -- -- -- 5575 VA11 -- -- -- -- 5575 VA10 DB-VAC-2(DB-2) CU/XLPE/SWA/PVC 3-#16 mm, 1-#16 mm, 1-#10 mm 63 A 3675 VA9 -- -- -- -- 2385 VA8 -- -- -- -- 2899 VA7 (SDB-F3) CU/XLPE/SWA/PVC 3-#16 mm, 1-#16 mm, 1-#10 mm 63 A 2868 VA6 -- -- -- -- 4078 VA5 -- -- -- -- 4278 VA4 DB-L&P(DB-3) CU/XLPE/SWA/PVC 3-#16 mm, 1-#16 mm, 1-#10 mm 63 A 5078 VA3 -- -- -- -- 7528 VA2 -- -- -- -- 7072 VA1 (DB-1) CU/XLPE/SWA/PVC 3-#16 mm, 1-#16 mm, 1-#10 mm 63 A 6678 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC PD Rating

R Y B

Enclosure: Type 1 MCB Rating: 125 A

Mounting Type: Recessed Mains Rating: 160 A

DB supplied from: No. of Phases: 3 Incoming cable size EXISTING CABLELocation of DB: ELECTRCAL ROOM Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: (SMDB-4)

Page 22: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

(DB-1)

AFDB-ELECTRICAL-2005-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Total Est. Demand Current: 29 A

Lighting - Interior 170 VA 66.00% 112 VA Total Conn. Current: 31 ALighting 3732 VA 100.00% 3732 VA Total Est. Demand: 20494 VAOther 0 VA 0.00% 0 VA Total Conn. Load: 22102 VACooling 5400 VA 71.30% 3850 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAmps: 29 A 31 A 33 A

6942 VA 7340 VA 7808 VA

363534 CCOLING FOR COUNTRY PROGRAM OFFICER CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA33 COOLING FOR ECONOMIST CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA32 COOLING FOR CONFERENCE ROOM (10 USERS) CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA31 COOLING FOR PULIC INFORMATION CENTER CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA30 COOLING FOR WAITING AREA CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA29 COOLING FOR SECRETARY CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA28 COOLING FOR WAITING AREA CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA27 COOLING FOR COUNTRY ECONOMIST CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA26 COOLING FOR COUNTRY MANAGER CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA25 SOCKETS FOR PUPLIC INFORMATION CENTER CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1600 VA24 SOCKETS FOR CORRIDOR 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA23 SOCKETS FOR CORRIDOR 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA22 SOCKETS FOR ECONOMEEIST 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA21 SOCKETS FOR COUNTRY PROGRAM OFFICER & ECONOMIST 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA20 SOCKETS FOR COUNTRY PROGRAM OFFICER & ECONOMIST CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1800 VA19 SOCKETS FOR CONFRENCE ROOM (10 USERS) 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA18 SOCKETS FOR CONFRENCE ROOM (10 USERS) & COUNTRY ECONOMEST CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1600 VA17 SOCKETS FOR COUNTRY ECONOMEST 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA16 SOCKETS FOR WAITING AREA 16 A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA15 SOCKETS FOR COUNTRY ECONOMIST & WAITING AREA & RECEPTION CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 2500 VA14 SOCKETS FOR SECRETARY 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA13 SOCKETS FOR SECRETARY CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1000 VA12 SOCKETS FOR COUNTRY MANGER 16 A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA11 SOCKETS FOR COUNTRY MANGER CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1600 VA10 LIGHTING FOR RECEPTION CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 224 VA9 LIGHTING FOR PUBLIC INPORMATION CENTER CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 224 VA8 LIGHTING FOR ECONOMIST CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 344 VA7 LIGHTING FOR CORRIDOR CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 384 VA6 LIGHTING FOR COUNTRY PROGRAM OFFICE CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 448 VA5 LIGHTING FOR CONFERENCE ROOM (10USERS) CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 448 VA4 LIGHTING FOR COUNTRY ECONOMIST CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 336 VA3 LIGHTING FOR WAITING AREA CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 336 VA2 LIGHTING FOR SECRETARY CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 448 VA1 LIGHTING FOR COUNTRY MANEGER & WC& W CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 698 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC PD Rating

R Y B

Enclosure: Type 2 MCB Rating: 63 A

Mounting Type: Recessed Mains Rating: 80 A

DB supplied from: (SMDB-4) No. of Phases: 3 Incoming cable size 3-#16 mm, 1-#16 mm,1-#10 mmLocation of DB: RECEPTION Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: (DB-1)

Page 23: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

DB-L&P(DB-3)

AFDB-ELECTRICAL-2006-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Total Est. Demand Current: 19 ATotal Conn. Current: 19 A

Lighting - Interior 250 VA 66.00% 165 VA Total Est. Demand: 13529 VALighting 3764 VA 100.00% 3764 VA Total Conn. Load: 13614 VAOther 0 VA 0.00% 0 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAmps: 22 A 18 A 17 A

5148 VA 4320 VA 4127 VA

24232221201918 SOCKETS FOR IT OFFICE & CORRIDOR CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA17 SOCKETS FOR IT STORE & SERVER ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1600 VA16 SOCKETS FOR FINANCE OFFICE CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1400 VA15 SOCKETS FOR ARCHIVE ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 2000 VA14 SOCKETS FOR CONFERENCE ROOM (40 USERS) & OFFICE & CORRIDOR B CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1000 VA13 SOCKETS FOR CONFERENCE ROOM (40 USERS) & JANITOR ROOM &... CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1800 VA12 SOCKETS FOR CORRIDOR 16A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA11 SOCKETS FOR DINING ROOM 16 A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA10 SOCKETS FOR MISSION ROOM 16 A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA9 SOCKETS FOR DRIVERS OFFICE 16 A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA8 SOCKETS FOR CONFERENCE ROOM (40 USERS) 16 A CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 300 VA7 LIGHTING FOR CONFERNCE ROOM (40USERS) CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 672 VA6 LIGHTING FOR SERVER ROOM & IT ROOM & CORREIDOR CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 700 VA5 LIGHTING FOR MISSIONS ROOM & DINING ROOM CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 672 VA4 LIGHTING FOR TOILET & WC & JANITOR ROOM CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 425 VA3 LIGHTING FOR TOILET & WC & PANTRY CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 527 VA2 LIGHTING FOR FINANCE OFFICE & CORRIDOR CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 448 VA1 LIGHTING FOR G STORE & OFFICE CORRIDOR &DRIVERS OFFICE CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 551 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC PD Rating

R Y B

Enclosure: Type 2 MCB Rating: 63 A

Mounting Type: Recessed Mains Rating: 80 A

DB supplied from: (SMDB-4) No. of Phases: 3 Incoming cable size 3-#16 mm, 1-#16 mm,1-#10 mmLocation of DB: CORRIDOR Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: DB-L&P(DB-3)

Page 24: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

(SDB-F3)

AFDB-ELECTRICAL-2007-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Lighting - Interior 428 VA 66.00% 283 VA Total Est. Demand Current: 11 ALighting 956 VA 100.00% 956 VA Total Conn. Current: 11 AOther 0 VA 0.00% 0 VA Total Est. Demand: 8064 VAHeating 5625 VA 100.00% 5625 VA Total Conn. Load: 8209 VACooling 1200 VA 100.00% 1200 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAmps: 12 A 12 A 10 A

2881 VA 2919 VA 2388 VA

18171615141312111098 HEATER FOR PANTRY CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1875 VA7 HEATER FOR W & ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1875 VA6 HEATER FOR L & G TOILTS CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1875 VA5 COOLING FOR CORRIDOR CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 600 VA4 COOLING FOR TEL. ROOM & ELECT ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 600 VA3 LIGHTING FOR LOBBY 1 & CORRIDOR CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 513 VA2 LIGHTING FOR TOILETS CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 444 VA1 LIGHTING FOR PANTRY & CORRIDOR & TEL. ROOM & ELECTRICAL ROOM CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 406 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC PD Rating

R Y B

Enclosure: Type 2 MCB Rating: 63 A

Mounting Type: Recessed Mains Rating: 100 A

DB supplied from: (SMDB-4) No. of Phases: 3 Incoming cable size 3-#16 mm, 1-#16 mm,1-#10 mmLocation of DB: ELECTRCAL ROOM Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: (SDB-F3)

Page 25: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

DB-VAC-2(DB-2)

AFDB-ELECTRICAL-2008-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Total Est. Demand Current: 16 ATotal Conn. Current: 21 ATotal Est. Demand: 11375 VA

Heating 5625 VA 100.00% 5625 VA Total Conn. Load: 14825 VACooling 9200 VA 62.50% 5750 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAm... 15 A 24 A 24 A

3675 VA 5575 VA 5575 VA

18171615141312 HEATER FOR TOILTS CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1875 VA11 HEATER FOR TOILTS CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1875 VA10 HEATER FOR TOILTS CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1875 VA9 COOLING FOR SERVER ROOM (NEW SPLIT) CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 2500 VA8 COOLING FOR ARCHIVE ROOM (NEW SPLIT) CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 2500 VA7 COOLING FOR CORRIDOR CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA6 COOLING FOR CORRIDOR CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA5 COOLING FOR OFFICE CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA4 COOLING FOR IT OFFICE CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA3 COOLING FOR CORRIDOR CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA2 COOLING FOR DINDIG ROOM CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA1 COOLING FOR DRIVERS OFFICE CU/PVC 1-#2.5 mm, 1-#2.5 mm, 1-#2.5 mm 10 A 600 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC

PDRatin

gR Y B

Enclosure: Type 2 MCB Rating: 63 A

Mounting Type: Recessed Mains Rating: 100 A

DB supplied from: (SMDB-4) No. of Phases: 3 Incoming cable size 3-#16 mm, 1-#16 mm,1-#10 mmLocation of DB: CORRIDOR Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: DB-VAC-2(DB-2)

Page 26: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

DB-UPS-1(DB-4)

AFDB-ELECTRICAL-2009-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Total Est. Demand Current: 9 ATotal Conn. Current: 9 ATotal Est. Demand: 6480 VATotal Conn. Load: 6480 VA

Cooling 0 VA 0.00% 0 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAm... 11 A 11 A 6 A

2520 VA 2520 VA 1440 VA

12111098 SOCKETS FOR CORRIDOR CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 540 VA7 SOCKETS FOR PUPLIC INFORMATION CENTER CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 720 VA6 SOCKETS FOR ECONOMIST CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 540 VA5 SOCKETS FOR COUNTRY PROGRAM OFFICER & CONFERENCE ROOM (10 USERS) CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 900 VA4 SOCKETS FOR CONFERENCE ROOM (10 USERS) CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 900 VA3 SOCKETS FOR COUNTRY ECONOMEST CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 900 VA2 SOCKETS FOR WAITING AREA CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 1080 VA1 SOCKETS FOR COUNTRY MANAGER CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 900 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC

PDRatin

gR Y B

Enclosure: Type 2 MCB Rating: 32 A

Mounting Type: Recessed Mains Rating: 50 A

DB supplied from: UPS 30 KVA No. of Phases: 3 Incoming cable size 3-#6 mm, 1-#6 mm,1-#6 mmLocation of DB: ELECTRCAL ROOM Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: DB-UPS-1(DB-4)

Page 27: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

DB-UPS-2

AFDB-ELECTRICAL-2010-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

Notes:Total Est. Demand Current: 19 ATotal Conn. Current: 19 ATotal Est. Demand: 13332 VA

Other 7752 VA 100.00% 7752 VA Total Conn. Load: 13332 VACooling 0 VA 0.00% 0 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

TotalAm... 26 A 28 A 7 A

5628 VA 6084 VA 1620 VA

1211 SOCKETS FOR IT STORE & SREVER ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 720 VA10 SOCKETS FOR IT OFFICE & PRINTER CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 540 VA9 SOCKETS FOR FINANCE OFFICE CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 360 VA8 SOCKETS FOR MISSIONS ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 720 VA7 SOCKETS FOR DINING ROOM CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 540 VA6 SOCKETS FOR OFFICE CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 720 VA5 SOCKETS FOR DRIVERS OFFICE CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 540 VA4 SOCKETS FOR CONFERENCE ROOM (40 USERS) CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 900 VA3 SOCKETS FOR CONFERENCE ROOM (40 USERS) CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 540 VA2 IT RACK 2 CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 4104 VA1 IT RACK 1 CU/PVC 1-#4 mm, 1-#4 mm, 1-#4 mm 20 A 3648 VA

CircuitNumber Circuit Designation Type of Wiring

Circuit Conductors (csa) Live,Neutral, CPC

PDRatin

gR Y B

Enclosure: Type 2 MCB Rating: 32 A

Mounting Type: Recessed Mains Rating: 50 A

DB supplied from: UPS 30 KVA No. of Phases: 3 Incoming cable size 3-#6 mm, 1-#6 mm,1-#6 mmLocation of DB: CORRIDOR Voltage: 415/240 Wye Incoming cable type CU/XLPE/SWA/PVC

DB Schedule: DB-UPS-2

Page 28: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

PLOT LIMIT

PLOT LIMIT

PLOT LIMIT

PLOT LIMIT

PLOT LIMIT

PLOT LIMIT

PLOT LIMIT

PLOT LIMIT

A B C D E F G H J1

23

45

67

A0

500 500 650 500 500 500 5005000

400

3000

500

600

400

600

500

500850

EWH

EWH

EWH

EWH

EWHEWH

J

JJ

FDFD

FD FD

FD

FD

FD

FR

10 PERSONS.

BALCONY

OFFICE 301

BALCONY

RECEP.

VOID

CORRIDOR 3 (380 W)

OFFICE 303 OFFICE 302

SHAFT

BALC.TOIL.K

G. TOIL.L.TOIL.

TTT

CORRIDOR 2 (350 W)

MEETING SECRETARY OFFICE 309 OFFICE 306

OFFICE 305OFFICE 307

OFFICE 308OFFICE 311

OFFICE 304

PANTRY

CORRIDOR 1 (330 W) UP

DN

UP

DN

LOBBY 1

LOBBY 2

SHAFT

SHAFT

T W TEL.RM.

LIFT-5

LIFT-6LIFT-3

LIFT-2

LIFT-1 LIFT-4

ELEC.RMDUCT

OFFICE 310

FCU-11FCU-11

FCU-6

FCU-6

FCU-10 FCU-11

FCU-1 FCU-3

FCU-5

FCU-11

FCU-6

FCU-5

FCU-8

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

T

T T T T T

T

TTT

T T

T

T

T

T

T

DB-3DB-2

DB-4

DB-3DB-2

DB-4

DB-1To B7 DB-1

13

13

13

13

12 12

271920

3

14

14

14

12

12

26 25

17

17

36

To R3 DB-2 To R3 DB-3

4

4 4 4

4 4

4 4 4

4

12

12 5

5

5

12 5

5

242322

18

16

16

16 16

16

16

17

17

17

4

4

4

4

10

10

6 7 7 6

1

35

34

32

3837

12

109

9 8

30

6

5

4

SMDB-4

12

12

29

28

3

3

3

321

7

ToSMDB-4

ToSMDB-4

ToSMDB-4

ToSMDB-4

1718

18

1818

18

TO B10 DB-1

TO R2 SDB-F3

To B2 DB-2

To B3 DB-3

To B2 DB-311

SDB-F3

TO B2 SDB-F3

To R3 SDB-F3

To Y2 SDB-F2

To B13 DB-1

To B1 DB-3

3

39

5

To Y4 DB-2

11

6

TO B3 SDB-F2

9

3

16

16

16 16

16 1616

TO C 16IN SDB-F4

T

7

TO R9DB-1

TO Y9DB-1

TO R7DB-1

TO Y7DB-1

TO B9DB-1

TO B12DB-1

TO R13DB-1

TO Y13DB-1

TO R10DB-1

TO Y10DB-1

TO B8DB-1

TO Y12DB-1

TO R12DB-1

TO Y8DB-1

TO Y11DB-1

TO R8DB-1

B6

Y6

Y6

B6

R5 R5

B4

B4

R6

R6

B1 B1

R6

Y5 Y5

R4

TO R6SDB-F3

R2

R2

B2

R1 TO Y2DB-4

R2

R2

B3

TO R4DB-2

Y2

Y2

R2

R2

Y3

B4

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 200

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

EXISTING POWER CIRCUITING

AFDB-ELECTRICAL-2011-POWER

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 200EXISTING POWER CIRCUITING

1

Page 29: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

FIRE ALARM SYSTEM NOTES:a. Fire alarm system shall be analogue addressable type.

b. The fire alarm system shall be supplied and installed in accordance with the NFPA 72 and local authority requirements.

c. Minimum size conduit for fire alarm installations shall be 25mm2

d. All outdoor fire alarm devices shall be with minimum rating of IP-65.

e. Fire alarm device/cabling to be 2c x1.5mm2 fire resistance with red LSF sheath.

f. Exit stickers must be provided in fire escape doors even if exit luminaries are not installed above the door.

*ALL OLD EQUIPMENT SHOULD BE UTILIZED FOR THE NEW MODIFICATION FOR THE NEW DESIGN , AND MAINTAIN UNCHANGED LOCATIONAS IT IS

A3

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1 : 250

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM28/12/2017

D.D

FIRE ALARM GENERAL NOTES

AFDB-ELECTRICAL-3000-FIRE ALARM

28/12/2017 28/12/2017

SEM

D.D

AMM

SEMSIAAMM

Page 30: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

FACP

M

S

H

MR

FECP

IHGFEDCBA

1

2

3

4

5

6

7

SECRETARY

CO

UN

TRY

MAN

AGER

TEL.RM.PANTRY

CORRIDOR

WC

PUBLIC INFORMATION CENTERECONOMIST

CONFERENCE ROOM(10USERS)

COUNTRY PROGRAM OFFICER

CO

UN

TRY

EC

ON

OM

IST

SHAFTIT OFFICE

IT STORE

SERVER ROOM

TOIL.

FINANCE OFFICE

MISSIONS ROOM

DINING ROOM

AR

CH

IVES

RO

OM

PAN

TRY

JAN

ITO

R R

OO

M.

G.STORE

OFFICE

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

DRIVERS OFFICE

ELEC.RM

WC

WAI

TIN

G A

REA

DU

CT

LOBB

Y 1

CORRIDOR A

LOBB

Y 4

SHAFT

WC

SHAFT

W

WC

WC

WC

WC

WC

CO

RR

IDO

R B

WC

LOBB

Y 3

LOBBY 2

SECRETARY

FACP

RELOCATION

NEW

SERVER ROOM

WC

L TOILET G. TOILET G. TOILET

RECEPTION

SMOKE DETECTOR

SYMBOL DESCRIPTION

LEGEND

FIRE ALARM SOUNDER

FIRE ALARM CONTROL PANEL

FIRE ALARM MANUAL CALL STATION

HEAT DETECTOR

ALARM BELL

MANUAL RELEASE

FIRE EXTINGUISH CONTROL PANEL

INDICATOR LAMP

FIRE ALARM MANUAL CALL STATION (BREAK GLASS)LINKED WITH THE MAGNETIC LOCK

B-G

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM24/02/2018

D.D

THIRD FLOOR FIRE ALARM LAYOUT

AFDB-ELECTRICAL-3001-FIRE ALARM

24/02/2018 24/02/2018

SEM

D.D

AMM

SEMSIAAMM

1 : 150THIRD FLOOR FIRE ALARM LAYOUT

1

Page 31: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

FACP

M

S

H

MR

FECP

HG

3

SERVER ROOM

RAISED FLOOR

SMOKE AND HEATDETECTOR AT ROOF

4TH FLOOR ROOF

SMOKE AND HEAT DETECTORBELOW RAISED FLOOR

3RD FLOOR

HG

3

SERVER ROOM

SMOKE DETECTOR

SYMBOL DESCRIPTION

LEGEND

FIRE ALARM SOUNDER

FIRE ALARM CONTROL PANEL

FIRE ALARM MANUAL CALL STATION

HEAT DETECTOR

ALARM BELL

MANUAL RELEASE

FIRE EXTINGUISH CONTROL PANEL

INDICATOR LAMP

FIRE ALARM MANUAL CALL STATION (BREAK GLASS)LINKED WITH THE MAGNETIC LOCK

B-G

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

As indicated

0

AFRICAN DEVELOPMENT BANK

AMM SIA SEM28/12/2017

D.D

THIRD FLOOR FIRE ALARM LAYOUT ( FM200 )

AFDB-ELECTRICAL-3002-FIRE ALARM

28/12/2017 28/12/2017

SEM

D.D

AMM

SEMSIAAMM

1 : 50THIRD FLOOR FIRE ALARM ( FM 200 ) ABOVE RAISED FLOOR LAYOUT

1

THIRD FLOOR FIRE ALARM ( FM 200 ) 3D2 1 : 50

THIRD FLOOR FIRE ALARM ( FM 200 ) BELOW RAISED FLOOR LAYOUT3

Page 32: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

OME - SEM25/02/2018

D.D

LIST OF LOW CURRENT DRAWINGS

AFDB-ELECTRICAL-4000-LOW CURRENT

25/02/2018 25/02/2018

SEM

D.D

OME

SEM-OME

LIST OF LOW CURRENT DRAWINGS

Sheet Number Sheet Name Sheet IssueDate

CurrentRevision

AFDB-ELECTRICAL-4000-LOW CURRENT LIST OF LOW CURRENT DRAWINGS 25/02/2018 0AFDB-ELECTRICAL-4001-LOW CURRENT THIRD FLOOR LOW CURRENT LAYOUT 25/02/2018 0AFDB-ELECTRICAL-4002-LOW CURRENT MULTIMEDIA SYSTEM 25/02/2018 0

Page 33: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

CR

TV

s

A

IHGFEDCBA

1

2

3

4

5

6

7

CORRIDOR

WCWC

L TO

ILET

G. T

OIL

ET

G. T

OIL

ET

TOIL.WC

IT OFFICE

FIN

AN

CE

OFF

ICE

LOBBY 3

MISSIONS ROOM

DIN

ING

RO

OM

WCWC

JANITOR ROOM. PANTRY

WCWCWCWC

DRIVERS OFFICE

G.STORE

CO

NFE

REN

CE

RO

OM

(40U

SER

S)

CO

NFE

REN

CE

RO

OM

(40U

SER

S)LO

BBY

1

RECEPTION

COUNTRYECONOMIST

CONFERENCEROOM(10USERS)

CO

UN

TRY

PR

OG

RAM

OFF

ICER

LOBB

Y 4

CORRIDOR

ECONOMIST

COUNTRY MANAGER

ELEC.RM

DUCT

TEL.RM.PANTRYWWC

SECRETARY WAITING AREA

OFFICE

ARCHIVES ROOM

WC

LOBBY 3

SHAFT

SHAFT

SERVER ROOM

IT STORE

1- GANG WALL BOX DOUBLE SOCKET WITHBUILT IN LOCK AND PUSH TO OPEN LATCH.

MAGNETIC DOOR LOCK ,Internal lock, IP65

ACCESS CONTROL READER Ethernet and 232 interface, IP65 Both Sides (IN /OUT)

CEILING PROJECTOR WITH MOTORIZED SCREEN , USB,Ethernet, power outlet, IP65

IN DOOR CAMERAFish Eye view, Night view, 3MB, IP65.

DUAL FACE PLATE ( DATA + VOICE )U Access solid cover, IP65

SYMBOL DESCRIPTION

LEGEND

2- 3.75 INCH (95MM) DEEP FINISH SELECTEDBY ARCHITECT.

CEILING TV POINT, Smart TV function Ethernet, HDMI, Power outlet , IP65

WALL SPEAKER , 6 inch, 8ohm,20-30watt, 120dgree input range 90HZ-20KHZ, IP66

INTERNET ACCESS POINT

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 200

0

AFRICAN DEVELOPMENT BANK

OME - SEM25/02/2018

D.D

THIRD FLOOR LOW CURRENT LAYOUT

AFDB-ELECTRICAL-4001-LOW CURRENT

25/02/2018 25/02/2018

SEM

D.D

OME

SEM-OME

1 : 200THIRD FLOOR LOW CURRENT LAYOUT

1

Page 34: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

MEETING ROOMS MULTIMEDIA SYSTEM SINGLE LINE DIAGRAM

MULTI PURPOSE HALLS MULTIMEDIA SYSTEM SINGLE LINE DIAGRAM

60" LED TVWALL MOUNT

HDMIFACEPLATE

VGAFACEPLATE

CEILING

WA

LL

MOTORIZEDSCREENOR SMART BOARD

CEILING MOUNTPROJECTOR

HDMIFACEPLATE

VGAFACEPLATE

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

OME - SEM25/02/2018

D.D

MULTIMEDIA SYSTEM

AFDB-ELECTRICAL-4002-LOW CURRENT

25/02/2018 25/02/2018

SEM

D.D

OME

SEM-OME

1 : 150MULTIMEDIA SYSTEM

1

Page 35: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

0

AFRICAN DEVELOPMENT BANK

AuthorChecker Approver26/02/2018

D.D

LIST OF VAC DRAWINGS

AFDB-MECHANICAL-VAC-9000

26/02/2018 26/02/2018

Approver

D.D

Designer

ApproverCheckerAuthor

LIST OF VAC DRAWINGS

Sheet Number Sheet Name Sheet IssueDate

CurrentRevision

AFDB-MECHANICAL-VAC-9000 LIST OF VAC DRAWINGS 26/02/2018 0AFDB-MECHANICAL-VAC-9001 THIRD FLOOR VAC DUCTING 26/02/2018 0AFDB-MECHANICAL-VAC-9002 THIRD FLOOR VAC DRAIN LAYOUT 26/02/2018 0AFDB-MECHANICAL-VAC-9003 THIRD FLOOR VAC VENTILIATION DUCTING 26/02/2018 0

Page 36: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

BALCONY

BALCONY

VOID

BALC.

RECEPTION

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

IHGFEDCBA

1

2

3

4

5

6

7

FCU-11

FCU-6

FCU-6

FCU-10 FCU-11

FCU-11

FCU-1 FCU-3

FCU-5

FCU-5

FCU-11

FCU-8

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

UNIT TO BE INSTALLED AT BALCONYCOPPER TUBES & ELECTRICAL WIRES

OUT DOOR UNIT FOR EACH W,M INDOOR

TO BE EXTEND ABOVE CEILING

WE PROPOSE TO ADD CORRIDOR AREA TO IT OFFICE

4Nos.SCD15''X15''

488cfm Each

4Nos.RCD15''X15''

488cfm Each

2Nos.SCD15''X15''

490cfm Each

2Nos.RCD15''X15''

490cfm Each

2Nos.SCD15''X15''

490cfm Each

2Nos.RCD15''X15''

490cfm Each

3Nos.SCD15''X15''

383cfm Each

3Nos.RCD15''X15''

383cfm Each

3Nos.SCD15''X15''

383cfm Each

3Nos.RCD15''X15''

383cfm Each

2Nos.SCD18''X18''

617cfm Each

2Nos.RCD18''X18''

617cfm Each

2Nos.SCD18''X18''

617cfm Each

2Nos.RCD18''X18''

617cfm Each

1Nos.SCD15''X15''

430cfm Each

1Nos.RCD15''X15''

430cfm Each

1Nos.SCD15''X15''

490cfm Each

1Nos.RCD15''X15''

490cfm Each1Nos.SCD15''X15''

550cfm Each

1Nos.RCD15''X15''

550cfm Each

1Nos.SCD12''X12''

270cfm Each

1Nos.RCD12''X12''

270cfm Each

3Nos.SCD18''X18''

620cfm Each

3Nos.RCD18''X18''

620cfm Each

1Nos.SG36''X10''820cfm

1Nos.RCD36''X10''

820cfm Each

2Nos.SCD15''X15''550cfm

2Nos.RCD15''X15''550cfm

1Nos.SCD9''X9''

130cfm Each

1Nos.RCD9''X9''

130cfm Each

3Nos.SCD18''X18''

650cfm Each

3Nos.RCD18''X18''

650cfm Each

1Nos.SCD12''X12''400cfm

1Nos.RCD12''X12''400cfm

1Nos.SG15''X15''500cfm

1Nos.RG15''X15''500cfm

2Nos.SCD18''X18''

702cfm Each

2Nos.RCD18''X18''

702cfm Each

2Nos.SCD18''X18''

618cfm Each

2Nos.RCD18''X18''

618cfm Each

1Nos.SCD18''X18''

618cfm Each

1Nos.RCD18''X18''

618cfm Each

2Nos.SCD18''X18''

617cfm Each

2Nos.RCD18''X18''

617cfm Each

I.W.M-01

O.W.M-01

O.W.M-02

I.W.M-02

V.C.D

V.C.D

V.C.D

V.C.D

V.C.D

V.C.DV.C.D

1Nos.SCD15''X15''

450cfm Each

1Nos.RCD15''X15''

450cfm Each

V.C.D

1Nos.SCD6''X6''

100cfm Each

1Nos.SCD6''X6''

100cfm Each

1Nos.SCD6''X6''

100cfm Each

1Nos.SCD6''X6''

100cfm Each

1Nos.SG12''X12''280cfm

1Nos.SG9''X9''200cfm

1Nos.RCD12''X12''

280cfm Each

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

UP

SAD 22"X10"

BOD=40CM

SD

SD

SD

39 m²

CONFERENCEROOM(10USERS)

30 m²

COUNTRYECONOMIST

38 m²

COUNTRYPROGRAMOFFICER

39 m²SECRETARY

37 m²

COUNTRYMANAGER

22 m²

PUBLICINFORMATION

CENTER 21 m²ECONOMIST

13 m²SERVER ROOM

4 m²IT STORE

16 m²IT

OFFICE

5 m²SHAFT

23 m²

FINANCEOFFICE

34 m²

MISSIONSROOM

23 m²DINING ROOM

13 m²G.STORE

10 m²OFFICE

19 m²

ARCHIVESROOM

5 m²

JANITORROOM.

16 m²

DRIVERSOFFICE

63 m²

CONFERENCEROOM(40USERS)

10 m²CORRIDOR

6 m²PANTRY

4 m²TEL.RM.

3 m²

5 m²PANTRY

4 m²TOIL.

6 m²ELEC.RM

5 m²G. TOIL.

14 m²CORRIDOR

77 m²WAITING AREA

30 m²CORRIDOR

73 m²CORRIDOR

25 m²LOBBY 1

25 m²LOBBY 2

3 m²DUCT

3 m²W

3 m²

3 m²L.TOIL.

12 m²CORRIDOR

8 m²TOIL.

4 m²2 m²

4 m²Room

3 m²SHAFT

3 m²SHAFT

2 m² 2 m²

5 m²TOIL.

4 m² 2 m²

1.52

UP

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

MEP - SEM26/02/2018

D.D

THIRD FLOOR VAC DUCTING

AFDB-MECHANICAL-VAC-9001

26/02/2018 26/02/2018

SEM

D.D

MEP

SEM-MEP

1 : 150THIRD FLOOR VAC DUCTING

1

Page 37: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

16 m²IT OFFICE

14 m²CORRIDOR

BALCONY

BALCONY

VOID

BALC.

RECEPTION

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

IHGFEDCBA

1

2

3

4

5

6

7

FCU-11

FCU-6

FCU-6

FCU-10 FCU-11

FCU-11

FCU-1 FCU-3

FCU-5

FCU-5

FCU-11

FCU-8

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

WE PROPOSE TO ADD CORRIDOR AREA TO IT OFFICE

I.W.M-01

3Nos.SCD18''X18''

620cfm Each

3Nos.RCD18''X18''

620cfm Each

O.W.M-01

O.W.M-02

I.W.M-02

3"

3"

11/4"

21/2"

11/4"

11/4"

11/4"

2"

21/2"

2"

11/4"

11/4"

11/4"

3"

21/2"

11/4"

3"

11/4"1"

21/2"

11/2"

11/2"

2"

1"

3/4"

11/4"1" 11/2"

1"

3/4"

2"2" UP

1"

11/4"

11/4"

1"11/4"

1"

1"

39 m²

CONFERENCEROOM(10USERS)

30 m²

COUNTRYECONOMIST

38 m²

COUNTRYPROGRAMOFFICER

39 m²SECRETARY

37 m²

COUNTRYMANAGER

22 m²

PUBLICINFORMATION

CENTER 21 m²ECONOMIST

13 m²SERVER ROOM

4 m²IT STORE

5 m²SHAFT

23 m²DINING ROOM

13 m²G.STORE

10 m²OFFICE

19 m²

ARCHIVESROOM

5 m²

JANITORROOM.

16 m²

DRIVERSOFFICE

63 m²

CONFERENCEROOM(40USERS)

10 m²CORRIDOR

6 m²PANTRY

4 m²TEL.RM.

3 m²

5 m²PANTRY

4 m²TOIL.

6 m²ELEC.RM

5 m²G. TOIL.

77 m²WAITING AREA

30 m²CORRIDOR

73 m²CORRIDOR

25 m²LOBBY 1

25 m²LOBBY 2

3 m²DUCT

3 m²W

3 m²

3 m²L.TOIL.

12 m²CORRIDOR

8 m²TOIL.

4 m²2 m²

4 m²Room

3 m²SHAFT

3 m²SHAFT

2 m² 2 m²

5 m²TOIL.

4 m² 2 m²

UP

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

MEP - SEM26/02/2018

D.D

THIRD FLOOR VAC DRAIN LAYOUT

AFDB-MECHANICAL-VAC-9002

26/02/2018 26/02/2018

SEM

D.D

MEP

SEM-MEP

1 : 150THIRD FLOOR VAC DRAIN LAYOUT

1

Page 38: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

16 m²IT OFFICE

14 m²CORRIDOR

BALCONY

BALCONY

VOID

BALC.

RECEPTION

LIFT-3

LIFT-2

LIFT-1

LIFT-3

LIFT-2

LIFT-1

IHGFEDCBA

1

2

3

4

5

6

7

DN

FCU-11

FCU-6

FCU-6

FCU-10 FCU-11

FCU-11

FCU-1 FCU-3

FCU-5

FCU-5

FCU-11

FCU-8

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

FCU-11

WE PROPOSE TO ADD CORRIDOR AREA TO IT OFFICE

3Nos.SCD18''X18''

620cfm Each

3Nos.RCD18''X18''

620cfm Each

I.W.M-01

O.W.M-01

O.W.M-02

I.W.M-02

VD

FD

10"x4"

FD

VD

FD

UP

SD

VD

DN

VD

SD

SD

SDVDVD

FD

FD

VD

SD

UPUP

SD

VD

VD

VD

SD

VD

FD

UP

VD

SD

FD

VD

SD

VD

SD

VDVD

VD

DN

VD

SD

VD

SD

VD

39 m²

CONFERENCEROOM(10USERS)

30 m²

COUNTRYECONOMIST

38 m²

COUNTRYPROGRAMOFFICER

39 m²SECRETARY

37 m²

COUNTRYMANAGER

22 m²

PUBLICINFORMATION

CENTER 21 m²ECONOMIST

13 m²SERVER ROOM

4 m²IT STORE

5 m²SHAFT

23 m²DINING ROOM

13 m²G.STORE

10 m²OFFICE

19 m²

ARCHIVESROOM

5 m²

JANITORROOM.

16 m²

DRIVERSOFFICE

63 m²

CONFERENCEROOM(40USERS)

10 m²CORRIDOR

6 m²PANTRY

4 m²TEL.RM.

3 m²

5 m²PANTRY

4 m²TOIL.

6 m²ELEC.RM

5 m²G. TOIL.

77 m²WAITING AREA

30 m²CORRIDOR

73 m²CORRIDOR

25 m²LOBBY 1

25 m²LOBBY 2

3 m²DUCT

3 m²W

3 m²

3 m²L.TOIL.

12 m²CORRIDOR

8 m²TOIL.

4 m²2 m²

4 m²Room

3 m²SHAFT

3 m²SHAFT

2 m² 2 m²

5 m²TOIL.

4 m² 2 m²

UP

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 150

0

AFRICAN DEVELOPMENT BANK

MEP - SEM26/02/2018

D.D

THIRD FLOOR VAC VENTILIATIONDUCTING

AFDB-MECHANICAL-VAC-9003

26/02/2018 26/02/2018

SEM

D.D

MEP

SEM-MEP

1 : 150THIRD FLOOR VAC VENTILIATION DUCTING

1

Page 39: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

A3

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

0

AFRICAN DEVELOPMENT BANK

MGA SEM26/12/2017

D.D

LIST OF FIRE FIGHTING DRAWINGS

AFDB-MECHANICAL-FIRE FIGHTING-7000

26/12/2017 26/12/2017

SEM

D.D

MGA

SEMMGA

LIST OF FIRE FIGHTING DRAWINGS

Sheet Number Sheet Name Sheet Issue Date Current Revision

AFDB-MECHANICAL-FIRE FIGHTING-7000 LIST OF FIRE FIGHTING DRAWINGS 26/12/2017 0AFDB-MECHANICAL-FIRE FIGHTING-7001-A FIRE FIGHTING GENERAL NOTES-A 26/12/2017 0AFDB-MECHANICAL-FIRE FIGHTING-7001-B FIRE FIGHTING GENERAL NOTES-B 26/12/2017 0

AFDB-MECHANICAL-FIRE FIGHTING-7002 THIRD FLOORGENERAL FIRE FIGHTING LAYOUT 24/02/2018 0

AFDB-MECHANICAL-FIRE FIGHTING-7003 3D-VIEW OF FM-200 26/12/2017 0

Page 40: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

1. COMMON FIRE-FIGHTING ( FF ) NOTES:a. All FF works are all-inclusive of all materials, transportation, storage, handling, workmanship, inspection, testing (periodic), final testing commissioning and all other items to enable “fitness for purpose” criteria to be

achieved and to enable safe use and operation of the facility.

b. These drawings shall be used for the mechanical FF discipline purposes only.

c. The fire-fighting system (cabinets, pipes, fittings, pumps, etc) selection, installations and testing etc shall be as per latest NFPA codes.

d. All dimensions in millimeters (mm) except piping length are in meters (m) unless otherwise specified..

e. All levels are related to the Project Datum which must determined and verified onsite by the Contractor and approved by the supervising Engineer.

f. In-door pipe levels are measured from concrete floor (slab) level. Note that the finish tile level is approx +/-100mm above concrete floor (slab) level.

g. Do not scale from the General Plan drawings. Use the scaled Part Plans instead. The designed distances and measurements could change onsite as per the specific site conditions.

h. All mechanical drawings shall be read in conjunction with general notes, specifications and miscellaneous details.

i. These drawings shall be read in conjunction with all relevant drawings of the different trades / disciplines for co-ordination purposes.

j. The Contractor shall submit for approval set of shop drawings showing openings and sleeves in concrete and walls before construction can begin.

k. All pipe-work vertically penetrating reinforced or non-reinforced concrete structures and or going horizontally through walls to be approved by the Structural Engineer. If approved, these pipes shall pass

l. Where FF elements are running though false ceilings, care must be taken to avoid clashing / conflict with other mechanical and/or electrical installations. The Contractor shall prepare sets of shop drawings for approval

m. All FF equipment should be approved prior to placing the Purchase Order, shipment and site installation.

n. All pipes and fittings to be properly secured in walls and ceilings through clamps, hangers and supports.

o. Underground pipe lines with top of pipe less than 600mm deep from Finished Floor Level (FFL) shall be surrounded with 150mm thick C25 plain concrete. Warning tape demarcation is advised.

p. If required, all FF drain lines must be with minimum inner dia of 50mm / 2” (unless otherwise specified). All drain installations to be inclusive of pipe work, fittings, supports, hangers and wall-brackets.

q. Each drain pipe or group of pipes are to connect to separate drain system or to dedicated storm / floor drain with slope of 1-2% max as provided on plumbing design.

r. Where required, provide minimum 60x60 cm maintenance access panels (unless otherwise specified) in ceilings to all FF elements (e.g. valves, etc). The location of maintenance access panels to suit the selected equipment

s. The Contractor shall engage the services of competent and licensed fire-fighting vendor for the supply, installation, testing, etc services. Non-licensed entities will not be allowed to execute work.

and to be coordinated with the ceiling plans.

t. All necessary testing and commissioning to be carried out to the requirement of the NFPA codes and to the satisfaction of the Engineer.

u. Any discrepancies between the Contract Documents (Design, Specs and BOQs) are to be brought to the attention of the Engineer and resolved before commencement of any work.

through heavy duty/gauge uPVC sleeve encapsulated with fire-stopping material. The size and location of the sleeve is to be coordinated with the number, size and pressure of the passing piping systems.

showing the FF systems exactly in place.

2. Fire Extinguishers:a. Fire extinguishers of designated types and capacities are to be provided and located as per drawings.

3. Fire-fighting FM200 Gas Suppression :a. FM200 Gas Suppression system is used in electric and IT server rooms where water suppression is not allowed. The following are indicative steps for FM200 system operation:

b. Automatic Activation:

Activation of any one of the detector in either circuit will cause:

ii. Alarm bell will ring

iii.Fire signal to main fire alarm panel.

Simultaneous activation of a second detector in the other circuit will cause

i. Alarm indication on FACP

i. pre-discharge indication on FACP

ii. Store horn will activate

iii. Starts countdown of set time delay

iv. Signal to main fire alarm panel.

A3

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1 : 100

0

AFRICAN DEVELOPMENT BANK

MGA SEM26/12/2017

D.D

FIRE FIGHTING GENERAL NOTES-A

AFDB-MECHANICAL-FIRE FIGHTING-7001-A

26/12/2017 26/12/2017

SEM

D.D

MGA

SEMMGA

Page 41: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

At the end of set time delay

i. Release indication on the panel.

ii. Signal to close the room entrance door.

iii. Activates impulse release module which in turn.

iv.Release the FM200 gas.

c. Manual Activation:

i. Activation of manual release switch will cause all operation above without any time delay.

Abort switch operation

i. If the Abort switch is activated in pre discharge period.

ii. Abort indication on panel.

iii.Release of gas is put on-hold the switch deactivated.

iv.FM200 gas is released when countdown is completed & abort is deactivated.

d. Whenever FM200 Gas Suppression system is specified, it is to be tested and commissioned as “real-time” fire scenario and all FM200 gas canisters refilled following each test.

A3

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1 : 100

0

AFRICAN DEVELOPMENT BANK

MGA SEM26/12/2017

D.D

FIRE FIGHTING GENERAL NOTES-B

AFDB-MECHANICAL-FIRE FIGHTING-7001-B

26/12/2017 26/12/2017

SEM

D.D

MGA

SEMMGA

Page 42: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

PW CO2

PWC

O2

PW CO2

PWC

O2

PW

PWC

O2

PW CO2

CO2

PW

IHGFEDCBA

1

2

3

4

5

6

7

LOBBY 1

RECEPTION

PUBLIC INFORMATION CENTER ECONOMIST

CONFERENCE ROOM(10USERS) COUNTRY PROGRAM OFFICERCOUNTRY ECONOMISTWAITING AREA

SECRETARY

COUNTRY MANAGERE

LEC

.RM

DU

CT

TEL.RM.PANTRYWWC

WCWC

L TO

ILET

G. T

OIL

ET

G. T

OIL

ET

SHAFT

CONFERENCE ROOM(40USERS)

OFFICE

LOBBY 3

ARCHIVES ROOM

G.STORE JANITOR ROOM. PANTRY

WCWC

DRIVERS OFFICE WC WC WC WC

DINING ROOMMISSIONS ROOM

FINANCE OFFICE

TOIL.WC

IT OFFICESHAFT

LOBBY 2

IT STORE

LOBBY 4

CORRIDOR

CORRIDOR A

40 mmø FM200C.L1759mm

32 mmø FM200C.L2939mm

Capacity cylinderfilled with 25 KgFM200

NozzleSERVER ROOM

CO

RR

IDO

R B

Exis

ting

Hos

e R

eel

Cab

inet

Exis

ting

Hos

e R

eel

Cab

inet

SYMBOL DESCRIPTION

LEGEND

FIRE PROTECTION DRY FM200

C.L - CEILING LEVEL

TWO POWDER CYLIDER 5Kg

TWO CO2 CYLIDER 5Kg

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

As indicated

0

AFRICAN DEVELOPMENT BANK

MGA SEM24/02/2018

D.D

THIRD FLOORGENERAL FIRE FIGHTING LAYOUT

AFDB-MECHANICAL-FIRE FIGHTING-7002

24/02/2018 24/02/2018

SEM

D.D

MGA

SEMMGA

1 : 150TIRD FLOOR - GENERAL FIRE FIGHTING LAYOUT

1

Page 43: African Development Bank - Building today, a better Africa tomorrow · 2019-06-29 · magdy amin hussein galal mohamed hassan mohamed hussein 02 manar shetewy sudan relocation and

CO2

PW

SYMBOL DESCRIPTION

LEGEND

FIRE PROTECTION DRY FM200

C.L - CEILING LEVEL

TWO POWDER CYLIDER 5Kg

TWO CO2 CYLIDER 5Kg

40 mmø FM200C.L1759mm

32 mmø FM200C.L2939mm

32 mmø FM200C.L464mm

Capacity cylinderfilled with 25 Kg

FM200

Nozzle ABOVE RASIED FLOOR

Nozzle BELOW RASIED FLOOR

A3

NOTES:

C

Date AuthRev Purpose of Issue

Chk'd AuthBy DateRev DESCRIPTION

C

010

5010

0Fi

le C

ad N

umb

erSt

atus

Rev

Client

BUILDING N0.13, BLOCK 21

RIYADH EXTENSION

POSTAL CODE 12214

KHARTOUM

SUDAN

Tel. +(249) 183-521771-75

Fax. +(249) 183-22552

www.newtech-consulting.com

Rev

Checked

Date Date

Authorised

Project

Title

Designed

Date

Status

Original Scale

Drawing Number

DA

TE:

FILE

:

PLO

TTED

BY:

Copyright. This drawing is the property of Newtech Consulting Group.Unauthorised reproduction infringes copyright and may lead to prosecution or civil proceedings. All Rights Reserved.

2,20180 FINAL DESIGN

Drawn

0 2,2018

1. REFER TO GENERAL NOTESSHEET.

1 : 200

0

AFRICAN DEVELOPMENT BANK

MGA SEM26/12/2017

D.D

3D-VIEW OF FM-200

AFDB-MECHANICAL-FIRE FIGHTING-7003

26/12/2017 26/12/2017

SEM

D.D

MGA

SEMMGA

3D-VIEW OF FM-2001