AFDF Energy Management Program Mike Gaffney, C.E.M., C.E.A., C.P.Q. USCG Licensed Chief Engineer, Unlimited HP Exec VP Engineering, Alaris Companies October 14, 2013 Kodiak, Alaska

AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

AFDF  Energy  Management  

Program  Mike  Gaffney,  C.E.M.,  C.E.A.,  C.P.Q.  

USCG  Licensed  Chief  Engineer,  Unlimited  HP  Exec  VP  Engineering,  Alaris  Companies  

October  14,  2013  Kodiak,  Alaska  

Page 2: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Outline

 What is Energy Efficiency  Hull Power and Speed  Refrigeration System  Hydraulic System  Auxiliary Electrical Generation  Lighting

Page 3: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Ship  Energy  Efficiency:  The  Big  Picture  

& losses and waste (next page)

Page 4: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Electrical  Equipment  Efficiency  

Generator  

Torque Energy from Engine

Heat Losses 2 to 30%

Electricity  

Transmission Heat Losses 1 - 2%

Transformer  

Transformer Heat Loss 2 - 30%

Light  ballast  and  

bulb  

Motor  

Heat Losses: Up to 98%

Useful work, Light

Pump   Fan  

Heat Loss: 2 - 40%

Heat Loss: 5-20%

Heat Loss 5 -20%

Air Movement

Fluid Movement

Electrical Energy when converted from one form to another by electrical equipment has an associated efficiency (waste energy).

Page 5: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Engine  Efficiency  Curve  

200  

220  

240  

260  

280  

300  

320  

340  

BSFC  (g

/kWh)  

Power  (kW)  

C15  /  C18  /  3412  EFFICIENCY  COMPARISON  

C15  DITA  (STBY)  -­‐  500  kW  

3412  PCTA  (STBY)  -­‐  520  kW  

C18  DITA  (PRIME)  -­‐  500kW  

C18  DITA  (PRIME)  545  kW  

Load  Range  

Page 6: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$
Page 7: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$
Page 8: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Various Fishing Vessel Energy Performance Curves

Page 9: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0.0  

100.0  

200.0  

300.0  

400.0  

500.0  

600.0  

700.0  

800.0  

900.0  

0   20   40   60   80   100   120   140  

BSF

C  G

/kW

h  

Horsepower  

Woodstock  Cummins  NH  220  Fuel  Efficiency  

Page 10: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

20  

40  

60  

80  

100  

120  

140  

0   1   2   3   4   5   6   7   8   9   10  

Hor

sepo

wer

 

Speed  Knots  

Woodstock    39’    Power    vs  Speed  

Page 11: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Woodstock    

0.0  

10.0  

20.0  

30.0  

40.0  

50.0  

60.0  

70.0  

80.0  

90.0  

0   20   40   60   80   100   120   140  

Cen

ts/k

Wh  

Horsepower  

Cents/kWh  at  3.75/gal  

Page 12: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0.0  

0.1  

0.2  

0.3  

0.4  

0.5  

0.6  

0.7  

0.8  

0.9  

0   2   4   6   8   10  

Gallons

/Nau

tica

l  Mile  

Speed  overground,  Knots  

Woodstock,  Stabilizer  and  Fuel  Penalty  

Woodstock  no  stabilizers  

With  Stabilizer  

Fuel  Cost:    1,000  NM/yr  @  5kts  

With:  $11,652  Without:  $7,302  Difference:$4,344  

Page 13: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

250  

500  

750  

1,000  

1,250  

1,500  

1,750  

2,000  

2,250  

2,500  

3.5   4   4.5   5   5.5   6   6.5   7   7.5   8  

Fuel  Cos

t  ($)  

Speed  (kts)  

Woodstock  Fuel  Cost/1,000  miles  

Page 14: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

20  

40  

60  

80  

100  

120  

140  

160  

0   1   2   3   4   5   6   7   8   9   10  

Shaft  H

orse

power

 

Speed  (kts)  

Myriad  Shaft  HP  vs  Speed  

Page 15: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Myriad    

0.00  

0.20  

0.40  

0.60  

0.80  

1.00  

1.20  

2   3   4   5   6   7   8   9   10  

Gallons

/NM  

Speed  Kts  

Gallon/NM  

Page 16: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

20  

40  

60  

80  

100  

120  

140  

0   2   4   6   8   10  

Hor

sepo

wer

 

Speed  

Salty:  Gillnetter    

Page 17: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Radio  GM  3-­‐71    

0  

20  

40  

60  

80  

100  

120  

0   10   20   30   40   50   60   70   80  

Cen

ts/k

Wh  

Horspower  

Cents/kWh  at  3.75/gal  

Page 18: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Radio  GM  3-­‐71    

0  

0.1  

0.2  

0.3  

0.4  

0.5  

0.6  

0   2   4   6   8   10  

Gallons

/NM  

Speed  

Gal/NM  

Page 19: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

100  

200  

300  

400  

500  

600  

700  

800  

900  

1000  

0   2   4   6   8   10   12  

Shaft  H

orse

power

 

Speed  KTS  

Topaz:  Shaft  HP  vs  Speed  

Page 20: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

0.1  

0.2  

0.3  

0.4  

0.5  

0.6  

0.7  

0.8  

0.9  

1  

0   10   20   30   40   50   60   70   80   90   100   110   120  

$/kW

-­‐hr  

Generator  kW  

Savage  Generator  kW-­‐hour  cost  based  on  engine  load  

3304B  Turbo  

3304B  NA  High  load  

3304B  Turbo  High  load  

Power(3304B  Turbo)  

Poly.(3304B  NA  High  load)  

Poly.(3304B  Turbo  High  load)  

Page 21: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

25 kW

45 kW

5kW

Page 22: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

10 kW

Heaters (4 kW)

Base load, (1.5 kW)

Oven and Stove (5 kW)

Deck Lights (8 kW)

Topaz Shore Power Load Test

Page 23: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Refrigeration System

Page 24: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

15  

20  

25  

30  

35  

10:22   10:24   10:27   10:30   10:33   10:36   10:39   10:42   10:45  

Pow

er  (k

W)  

Topaz  RSW  Compressor:  Power    and  Compressor    Discharge  Pressure  

180  PSI:  $18,000  Fuel  /2,000  hrs  of  operacon  

160  PSI  

140  PSI:      $13,800  Fuel/2,000  hrs  of  operacon  

Page 25: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

MOTORS  CONTROL  Motor Variable

Frequency Drives (VFD) Steering Gear, Fans,

Pumps, Winches

VFD for Aux S.W. Cooling Pump

Page 26: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$
Page 27: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Motor  Efficiency  

http://ngelmuelektro.wordpress.com/2011/06/24/motor-efficiency

Page 28: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0.00  

0.50  

1.00  

1.50  

2.00  

2.50  

Pow

e  (k

W)  

Date  and  Time  

Savage  Steering  Gear  #1  and  #2  

Page 29: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

0  

0.1  

0.2  

0.3  

0.4  

0.5  

0.6  

0.7  

0.8  

0.9  

1  

14:24   14:52   15:21   15:50   16:19   16:48   17:16  

Pow

er  (k

W)  

Topaz  Steering  Gear  

Page 30: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

VFD on Hydraulic Steering 70% reduction in Energy Usage 0  

1  

2  

3  

4  

5  

POW

ER  (K

W)    

TRADITIONAL  HYDRAULIC  STEERING  GEAR  

0.0  

0.5  

1.0  

1.5  

POW

ER  (K

W)  

VFD  CONTROLLED  STEERING  GEAR  

$4,500 in Fuel / 5,000 hrs

$1,125 in Fuel / 5,000 hrs

Page 31: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Improper Rudder Control

Additional annual fuel cost if not repaired: $300,000

Page 32: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

HIGH  EFFICIENCY  LIGHTING  

• Fluorescent Bulbs and Ballast • T12 Bulbs and Ballast phased out • Match Ballast to Bulbs • Specs for Bulbs and Ballast

• LED • New Technology • Life and Lumen output improved • Cost decreasing • Ensure quality LED used • Thermal Management of LED

Page 33: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

ENERGY  STAR  LABEL  ENERGY  STAR  LABEL  REQUIREMENTS  

 Must  be  a  good  investment   Non  –proprietary   Must  deliver  same  features    and  performance     Energy  savings  and    performance    tested  and    verified  

Page 34: AFDF$ Energy$Management Program$ - Alaska Sea Grant · AFDF$ Energy$Management Program$ Mike$Gaffney,$C.E.M.,$C.E.A.,$C.P.Q.$ USCG$Licensed$Chief$Engineer,$Unlimited$HP$ Exec$VP$Engineering,$Alaris$Companies$

Thank  You!